<?xml version="1.0"?><Regulation lims:pit-date="2009-12-31" hasPreviousVersion="true" lims:lastAmendedDate="2009-12-31" lims:current-date="2026-01-19" lims:inforce-start-date="2009-12-31" lims:fid="751036" lims:id="751036" gazette-part="II" regulation-type="SOR" xml:lang="en" in-force="yes" xmlns:lims="http://justice.gc.ca/lims"><Identification lims:inforce-start-date="2009-12-31" lims:fid="751037" lims:id="751037"><InstrumentNumber>SOR/2009-315</InstrumentNumber><RegistrationDate><Date><YYYY>2009</YYYY><MM>11</MM><DD>26</DD></Date></RegistrationDate><ConsolidationDate lims:inforce-start-date="2009-12-31"><Date><YYYY>2026</YYYY><MM>1</MM><DD>20</DD></Date></ConsolidationDate><EnablingAuthority lims:inforce-start-date="2009-12-31" lims:fid="751039" lims:id="751039"><XRefExternal reference-type="act" link="O-7">CANADA OIL AND GAS OPERATIONS ACT</XRefExternal></EnablingAuthority><LongTitle lims:inforce-start-date="2009-12-31" lims:fid="751040" lims:id="751040">Canada Oil and Gas Drilling and Production Regulations</LongTitle><RegulationMakerOrder><RegulationMaker>P.C.</RegulationMaker><OrderNumber>2009-1890</OrderNumber><Date><YYYY>2009</YYYY><MM>11</MM><DD>26</DD></Date></RegulationMakerOrder></Identification><Order lims:inforce-start-date="2009-12-31" lims:fid="751041" lims:id="751041"><Provision lims:inforce-start-date="2009-12-31" lims:fid="751042" lims:id="751042" format-ref="indent-0-0" language-align="yes" list-item="no"><Text>Whereas, pursuant to subsection 15(1) of the <XRefExternal reference-type="act" link="O-7">Canada Oil and Gas Operations Act</XRefExternal><FootnoteRef idref="fn_602187-E_hq_5493">a</FootnoteRef>, a copy of the proposed <XRefExternal link="SOR-2009-315" reference-type="regulation">Canada Oil and Gas Drilling and Production Regulations</XRefExternal>, substantially in the annexed form, was published in the <XRefExternal reference-type="other" link="gazette">Canada Gazette</XRefExternal>, Part I on April 18, 2009 and interested persons were given an opportunity to make representations to the Minister of Natural Resources and the Minister of Indian Affairs and Northern Development with respect to the proposed Regulations;</Text><Footnote id="fn_602187-E_hq_5493" placement="page" status="official"><Label>a</Label><Text>R.S., c. O-7; S.C. 1992, c. 35, s. 2</Text></Footnote></Provision><Provision lims:inforce-start-date="2009-12-31" lims:fid="751043" lims:id="751043" format-ref="indent-0-0" language-align="yes" list-item="no"><Text>Therefore, Her Excellency the Governor General in Council, on the recommendation of the Minister of Natural Resources and the Minister of Indian Affairs and Northern Development, pursuant to subsection 14(1)<FootnoteRef idref="fn_602187-E_hq_5494">b</FootnoteRef> of the <XRefExternal reference-type="act" link="O-7">Canada Oil and Gas Operations Act</XRefExternal><FootnoteRef idref="fn_602187-E_hq_5493">a</FootnoteRef>, hereby makes the annexed <XRefExternal link="SOR-2009-315" reference-type="regulation">Canada Oil and Gas Drilling and Production Regulations</XRefExternal>.</Text><Footnote id="fn_602187-E_hq_5494" placement="page" status="official"><Label>b</Label><Text>S.C. 1994, c. 10, s. 7</Text></Footnote></Provision></Order><Body lims:inforce-start-date="2009-12-31" lims:fid="751044" lims:id="751044"><Heading lims:inforce-start-date="2009-12-31" lims:fid="751045" lims:id="751045" level="1"><TitleText>Interpretation</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751046" lims:id="751046"><Label>1</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751047" lims:id="751047"><Label>(1)</Label><Text>The following definitions apply in these Regulations.</Text><Definition lims:inforce-start-date="2009-12-31" lims:fid="751048" lims:id="751048" generate-in-text="no"><Text><DefinedTermEn>abandoned</DefinedTermEn>, in relation to a well, means a well or part of a well that has been permanently plugged. (<DefinedTermFr>abandonné</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751049" lims:id="751049" generate-in-text="no"><Text><DefinedTermEn>Act</DefinedTermEn> means the <XRefExternal reference-type="act" link="O-7">Canada Oil and Gas Operations Act</XRefExternal>. (<DefinedTermFr>Loi</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751050" lims:id="751050" generate-in-text="no"><Text><DefinedTermEn>artificial island</DefinedTermEn> means a humanly constructed island to provide a site for the exploration and drilling, or the production, storage, transportation, distribution, measurement, processing or handling, of oil or gas. (<DefinedTermFr>île artificielle</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751051" lims:id="751051" generate-in-text="no"><Text><DefinedTermEn>authorization</DefinedTermEn> means an authorization issued by the Board under paragraph 5(1)(b) of the Act. (<DefinedTermFr>autorisation</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751052" lims:id="751052" generate-in-text="no"><Text><DefinedTermEn>barrier</DefinedTermEn> means any fluid, plug or seal that prevents gas or oil or any other fluid from flowing unintentionally from a well or from a formation into another formation. (<DefinedTermFr>barrière</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751053" lims:id="751053" generate-in-text="no"><Text><DefinedTermEn>Board</DefinedTermEn> means the National Energy Board established by section 3 of the <XRefExternal reference-type="act" link="N-7">National Energy Board Act</XRefExternal>. (<DefinedTermFr>Office</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751054" lims:id="751054" generate-in-text="no"><Text><DefinedTermEn>casing liner</DefinedTermEn> means a casing that is suspended from a string of casing previously installed in a well and does not extend to the wellhead. (<DefinedTermFr>tubage partiel</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751055" lims:id="751055" generate-in-text="no"><Text><DefinedTermEn>commingled production</DefinedTermEn> means production of oil and gas from more than one pool or zone through a common well-bore or flow line without separate measurement of the production from each pool or zone. (<DefinedTermFr>production mélangée</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751056" lims:id="751056" generate-in-text="no"><Text><DefinedTermEn>completed</DefinedTermEn>, in relation to a well, means a well that is prepared for production or injection operations. (<DefinedTermFr>complété</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751057" lims:id="751057" generate-in-text="no"><Text><DefinedTermEn>completion interval</DefinedTermEn> means a section within a well that is prepared to permit the</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751058" lims:id="751058"><Label>(a)</Label><Text>production of fluids from the well;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751059" lims:id="751059"><Label>(b)</Label><Text>observation of the performance of a reservoir; or</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751060" lims:id="751060"><Label>(c)</Label><Text>injection of fluids into the well. (<DefinedTermFr>intervalle de complétion</DefinedTermFr>)</Text></Paragraph></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751061" lims:id="751061" generate-in-text="no"><Text><DefinedTermEn>conductor casing</DefinedTermEn> means the casing that is installed in a well to facilitate drilling of the hole for the surface casing. (<DefinedTermFr>tubage initial</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751062" lims:id="751062" generate-in-text="no"><Text><DefinedTermEn>development plan</DefinedTermEn> means the development plan that is approved by the Board in accordance with section 5.1 of the Act. (<DefinedTermFr>plan de mise en valeur</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751063" lims:id="751063" generate-in-text="no"><Text><DefinedTermEn>drilling program</DefinedTermEn> means the program for the drilling of one or more wells within a specified area and time using one or more drilling installations and includes any work or activity related to the program. (<DefinedTermFr>programme de forage</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751064" lims:id="751064" generate-in-text="no"><Text><DefinedTermEn>environmental protection plan</DefinedTermEn> means the environmental protection plan submitted to the Board under section 6. (<DefinedTermFr>plan de protection de l’environnement</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751065" lims:id="751065" generate-in-text="no"><Text><DefinedTermEn>flow allocation procedure</DefinedTermEn> means the procedure to</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751066" lims:id="751066"><Label>(a)</Label><Text>allocate total measured quantities of oil, gas and water produced from or injected into a pool or zone back to individual wells in a pool or zone where individual well production or injection is not measured separately; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751067" lims:id="751067"><Label>(b)</Label><Text>allocate production to fields that are using a common storage or processing facility. (<DefinedTermFr>méthode de répartition du débit</DefinedTermFr>)</Text></Paragraph></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751068" lims:id="751068" generate-in-text="no"><Text><DefinedTermEn>flow calculation procedure</DefinedTermEn> means the procedure to be used to convert raw meter output to a measured quantity of oil, gas or water. (<DefinedTermFr>méthode de calcul du débit</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751069" lims:id="751069" generate-in-text="no"><Text><DefinedTermEn>flow system</DefinedTermEn> means the flow meters, auxiliary equipment attached to the flow meters, fluid sampling devices, production test equipment, the master meter and meter prover used to measure and record the rate and volumes at which fluids are</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751070" lims:id="751070"><Label>(a)</Label><Text>produced from or injected into a pool;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751071" lims:id="751071"><Label>(b)</Label><Text>used as a fuel;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751072" lims:id="751072"><Label>(c)</Label><Text>used for artificial lift; or</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751073" lims:id="751073"><Label>(d)</Label><Text>flared or transferred from a production installation. (<DefinedTermFr>système d’écoulement</DefinedTermFr>)</Text></Paragraph></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751074" lims:id="751074" generate-in-text="no"><Text><DefinedTermEn>fluid</DefinedTermEn> means gas, liquid or a combination of the two. (<DefinedTermFr>fluide</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751075" lims:id="751075" generate-in-text="no"><Text><DefinedTermEn>formation flow test</DefinedTermEn> means an operation</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751076" lims:id="751076"><Label>(a)</Label><Text>to induce the flow of formation fluids to the surface of a well to procure reservoir fluid samples and determine reservoir flow characteristics; or</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751077" lims:id="751077"><Label>(b)</Label><Text>to inject fluids into a formation to evaluate injectivity. (<DefinedTermFr>essai d’écoulement de formation</DefinedTermFr>)</Text></Paragraph></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751078" lims:id="751078" generate-in-text="no"><Text><DefinedTermEn>incident</DefinedTermEn> means</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751079" lims:id="751079"><Label>(a)</Label><Text>any event that causes</Text><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751080" lims:id="751080"><Label>(i)</Label><Text>a lost or restricted workday injury,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751081" lims:id="751081"><Label>(ii)</Label><Text>death,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751082" lims:id="751082"><Label>(iii)</Label><Text>fire or explosion,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751083" lims:id="751083"><Label>(iv)</Label><Text>a loss of containment of any fluid from a well,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751084" lims:id="751084"><Label>(v)</Label><Text>an imminent threat to the safety of a person, installation or support craft, or</Text></Subparagraph><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751085" lims:id="751085"><Label>(vi)</Label><Text>pollution;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751086" lims:id="751086"><Label>(b)</Label><Text>any event that results in a missing person; or</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751087" lims:id="751087"><Label>(c)</Label><Text>any event that causes</Text><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751088" lims:id="751088"><Label>(i)</Label><Text>the impairment of any structure, facility, equipment or system critical to the safety of persons, an installation or support craft, or</Text></Subparagraph><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751089" lims:id="751089"><Label>(ii)</Label><Text>the impairment of any structure, facility, equipment or system critical to environmental protection. (<DefinedTermFr>incident</DefinedTermFr>)</Text></Subparagraph></Paragraph></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751090" lims:id="751090" generate-in-text="no"><Text><DefinedTermEn>lost or restricted workday injury</DefinedTermEn> means an injury that prevents an employee from reporting for work or from effectively performing all the duties connected with the employee’s regular work on any day subsequent to the day on which the injury occurred whether or not that subsequent day is a working day for that employee. (<DefinedTermFr>blessure entraînant une perte de temps de travail</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751091" lims:id="751091" generate-in-text="no"><Text><DefinedTermEn>minor injury</DefinedTermEn> means an employment injury for which medical treatment or first aid is provided and excludes a lost or restricted workday injury. (<DefinedTermFr>blessure sans gravité</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751092" lims:id="751092" generate-in-text="no"><Text><DefinedTermEn>multi-pool well</DefinedTermEn> means a well that is completed in more than one pool. (<DefinedTermFr>puits à gisements multiples</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751093" lims:id="751093" generate-in-text="no"><Text><DefinedTermEn>natural environment</DefinedTermEn> means the physical and biological environment. (<DefinedTermFr>milieu naturel</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751094" lims:id="751094" generate-in-text="no"><Text><DefinedTermEn>near-miss</DefinedTermEn> means an event that would likely cause an event set out in paragraph (a) of the definition of <DefinedTermEn>incident</DefinedTermEn>, but does not due to particular circumstances. (<DefinedTermFr>quasi-incident</DefinedTermFr> )</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751095" lims:id="751095" generate-in-text="no"><Text><DefinedTermEn>operator</DefinedTermEn> means a person that holds an operating licence under paragraph 5(1)(a) of the Act and an authorization. (<DefinedTermFr>exploitant</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751096" lims:id="751096" generate-in-text="no"><Text><DefinedTermEn>permafrost</DefinedTermEn> means the thermal condition of the ground when its temperature remains at or below 0°C for more than one year. (<DefinedTermFr>pergélisol</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751097" lims:id="751097" generate-in-text="no"><Text><DefinedTermEn>physical environmental conditions</DefinedTermEn> means the meteorological, oceanographic and related physical conditions, including ice conditions, that might affect a work or activity that is subject to an authorization. (<DefinedTermFr>conditions environnementales</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751098" lims:id="751098" generate-in-text="no"><Text><DefinedTermEn>pollution</DefinedTermEn> means the introduction into the natural environment of any substance or form of energy outside the limits applicable to the activity that is subject to an authorization, including spills. (<DefinedTermFr>pollution</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751099" lims:id="751099" generate-in-text="no"><Text><DefinedTermEn>production control system</DefinedTermEn> means the system provided to control the operation of, and monitor the status of, equipment for the production of oil and gas, and includes the installation and workover control system. (<DefinedTermFr>système de contrôle de la production</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751100" lims:id="751100" generate-in-text="no"><Text><DefinedTermEn>production project</DefinedTermEn> means an undertaking for the purpose of developing a production site on, or producing oil or gas from, a pool or field, and includes any work or activity related to the undertaking. (<DefinedTermFr>projet de production</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751101" lims:id="751101" generate-in-text="no"><Text><DefinedTermEn>proration test</DefinedTermEn> means, in respect of a development well to which a development plan applies, a test conducted to measure the rates at which fluids are produced from the well for allocation purposes. (<DefinedTermFr>essai au prorata</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751102" lims:id="751102" generate-in-text="no"><Text><DefinedTermEn>recovery</DefinedTermEn> means the recovery of oil and gas under reasonably foreseeable economic and operational conditions. (<DefinedTermFr>récupération</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751103" lims:id="751103" generate-in-text="no"><Text><DefinedTermEn>relief well</DefinedTermEn> means a well drilled to assist in controlling a blow-out in an existing well. (<DefinedTermFr>puits de secours</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751104" lims:id="751104" generate-in-text="no"><Text><DefinedTermEn>rig release date</DefinedTermEn> means the date on which a rig last conducted well operations. (<DefinedTermFr>date de libération de l’appareil de forage</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751105" lims:id="751105" generate-in-text="no"><Text><DefinedTermEn>safety plan</DefinedTermEn> means the safety plan submitted to the Board under section 6. (<DefinedTermFr>plan de sécurité</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751106" lims:id="751106" generate-in-text="no"><Text><DefinedTermEn>seafloor</DefinedTermEn> means the surface of all that portion of land under the sea. (<DefinedTermFr>fond marin</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751107" lims:id="751107" generate-in-text="no"><Text><DefinedTermEn>slick line</DefinedTermEn> means a single steel cable used to run tools in a well. (<DefinedTermFr>câble lisse</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751108" lims:id="751108" generate-in-text="no"><Text><DefinedTermEn>support craft</DefinedTermEn> means a vessel, vehicle, aircraft, standby vessel or other craft used to provide transportation for or assistance to persons on the site where a work or activity is conducted. (<DefinedTermFr>véhicule de service</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751109" lims:id="751109" generate-in-text="no"><Text><DefinedTermEn>surface casing</DefinedTermEn> means the casing that is installed in a well to a sufficient depth, in a competent formation, to establish well control for the continuation of the drilling operations. (<DefinedTermFr>tubage de surface</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751110" lims:id="751110" generate-in-text="no"><Text><DefinedTermEn>suspended</DefinedTermEn>, in relation to a well or part of a well, means a well or part of a well in which drilling or production operations have temporarily ceased. (<DefinedTermFr>suspension de l’exploitation</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751111" lims:id="751111" generate-in-text="no"><Text><DefinedTermEn>termination</DefinedTermEn> means the abandonment, completion or suspension of a well’s operations. (<DefinedTermFr>cessation</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751112" lims:id="751112" generate-in-text="no"><Text><DefinedTermEn>waste material</DefinedTermEn> means any garbage, refuse, sewage or waste well fluids or any other useless material that is generated during drilling, well or production operations, including used or surplus drilling fluid and drill cuttings and produced water. (<DefinedTermFr>déchets</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751113" lims:id="751113" generate-in-text="no"><Text><DefinedTermEn>well approval</DefinedTermEn> means the approval granted by the Board under section 13. (<DefinedTermFr>approbation relative à un puits</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751114" lims:id="751114" generate-in-text="no"><Text><DefinedTermEn>well-bore</DefinedTermEn> means the hole drilled by a bit in order to make a well. (<DefinedTermFr>trou de sonde</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751115" lims:id="751115" generate-in-text="no"><Text><DefinedTermEn>well control</DefinedTermEn> means the control of the movement of fluids into or from a well. (<DefinedTermFr>contrôle d’un puits</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751116" lims:id="751116" generate-in-text="no"><Text><DefinedTermEn>well operation</DefinedTermEn> means the operation of drilling, completion, recompletion, intervention, re-entry, workover, suspension or abandonment of a well. (<DefinedTermFr>travaux relatifs à un puits</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751117" lims:id="751117" generate-in-text="no"><Text><DefinedTermEn>wire line</DefinedTermEn> means a line that contains a conductor wire and that is used to run survey instruments or other tools in a well. (<DefinedTermFr>câble</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751118" lims:id="751118" generate-in-text="no"><Text><DefinedTermEn>workover</DefinedTermEn> means an operation on a completed well that requires removal of the Christmas tree or the tubing. (<DefinedTermFr>reconditionnement</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751119" lims:id="751119" generate-in-text="no"><Text><DefinedTermEn>zone</DefinedTermEn> means any stratum or any sequence of strata and includes, for the purposes of the definition <DefinedTermEn>commingled production</DefinedTermEn>, section 7, subsection 61(2), sections 64 to 66 and 73, subsection 82(2) and section 85, a zone that has been designated as such by the Board under section 4. (<DefinedTermFr>couche</DefinedTermFr>)</Text></Definition></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751120" lims:id="751120"><Label>(2)</Label><Text>In these Regulations, <DefinedTermEn>delineation well</DefinedTermEn>, <DefinedTermEn>development well</DefinedTermEn> and <DefinedTermEn>exploratory well</DefinedTermEn> have the same meaning as in subsection 101(1) of the <XRefExternal reference-type="act" link="C-8.5">Canada Petroleum Resources Act</XRefExternal>.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751121" lims:id="751121"><Label>(3)</Label><Text>In these Regulations, <DefinedTermEn>drilling installation</DefinedTermEn>, <DefinedTermEn>drilling rig</DefinedTermEn>, <DefinedTermEn>drilling unit</DefinedTermEn>, <DefinedTermEn>drill site</DefinedTermEn>, <DefinedTermEn>installation</DefinedTermEn>, <DefinedTermEn>production installation</DefinedTermEn>, <DefinedTermEn>production operation</DefinedTermEn>, <DefinedTermEn>production site</DefinedTermEn> and <DefinedTermEn>subsea production system</DefinedTermEn> have the same meaning as in subsection 2(1) of the <XRefExternal reference-type="regulation" link="SOR-96-118">Canada Oil and Gas Installations Regulations</XRefExternal>.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751122" lims:id="751122"><Label>(4)</Label><Text>The following definitions apply for the purposes of paragraph 5(4)(c) of the Act:</Text><Definition lims:inforce-start-date="2009-12-31" lims:fid="751123" lims:id="751123" generate-in-text="no"><Text><DefinedTermEn>production facility</DefinedTermEn> means equipment for the production of oil or gas located at a production site, including separation, treating and processing facilities, equipment and facilities used in support of production operations, landing areas, heliports, storage areas or tanks and dependent personnel accommodations, but not including any associated platform, artificial island, subsea production system, drilling equipment or diving system. (<DefinedTermFr>matériel de production</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2009-12-31" lims:fid="751124" lims:id="751124" generate-in-text="no"><Text><DefinedTermEn>production platform</DefinedTermEn> means a production facility and any associated platform, artificial island, subsea production system, offshore loading system, drilling equipment, facilities related to marine activities and dependent diving system. (<DefinedTermFr>plate-forme de production</DefinedTermFr>)</Text></Definition></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751125" lims:id="751125"><Label>(5)</Label><Text>For the purpose of section 5.11 of the Act, <DefinedTermEn>installation</DefinedTermEn> means an onshore or offshore installation.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751126" lims:id="751126"><Label>(6)</Label><Text>For the purpose of section 58.2 of the Act, an onshore or offshore installation is prescribed as an installation.</Text></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751127" lims:id="751127" level="1"><Label>PART 1</Label><TitleText>Board’s Powers</TitleText></Heading><Heading lims:inforce-start-date="2009-12-31" lims:fid="751128" lims:id="751128" level="2"><TitleText>Spacing</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751129" lims:id="751129"><Label>2</Label><Text>The Board is authorized to make orders respecting the allocation of areas, including the determination of the size of spacing units and the well production rates for the purpose of drilling for or producing oil and gas and to exercise any powers and perform any duties that may be necessary for the management and control of oil or gas production.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751130" lims:id="751130" level="2"><TitleText>Names and Designations</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751131" lims:id="751131"><Label>3</Label><Text>The Board may give a name, classification or status to any well and may change that name, classification or status.</Text></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751132" lims:id="751132"><Label>4</Label><Text>The Board may also</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751133" lims:id="751133"><Label>(a)</Label><Text>designate a zone for the purposes of these Regulations;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751134" lims:id="751134"><Label>(b)</Label><Text>give a name to a pool or field; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751135" lims:id="751135"><Label>(c)</Label><Text>define the boundaries of a pool, zone or field for the purpose of identifying it.</Text></Paragraph></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751136" lims:id="751136" level="1"><Label>PART 2</Label><TitleText>Management System, Application for Authorization and Well Approvals</TitleText></Heading><Heading lims:inforce-start-date="2009-12-31" lims:fid="751137" lims:id="751137" level="2"><TitleText>Management System</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751138" lims:id="751138"><Label>5</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751139" lims:id="751139"><Label>(1)</Label><Text>The applicant for an authorization shall develop an effective management system that integrates operations and technical systems with the management of financial and human resources to ensure compliance with the Act and these Regulations.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751140" lims:id="751140"><Label>(2)</Label><Text>The management system shall include</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751141" lims:id="751141"><Label>(a)</Label><Text>the policies on which the system is based;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751142" lims:id="751142"><Label>(b)</Label><Text>the processes for setting goals for the improvement of safety, environmental protection and waste prevention;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751143" lims:id="751143"><Label>(c)</Label><Text>the processes for identifying hazards and for evaluating and managing the associated risks;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751144" lims:id="751144"><Label>(d)</Label><Text>the processes for ensuring that personnel are trained and competent to perform their duties;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751145" lims:id="751145"><Label>(e)</Label><Text>the processes for ensuring and maintaining the integrity of all facilities, structures, installations, support craft and equipment necessary to ensure safety, environmental protection and waste prevention;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751146" lims:id="751146"><Label>(f)</Label><Text>the processes for the internal reporting and analysis of hazards, minor injuries, incidents and near-misses and for taking corrective actions to prevent their recurrence;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751147" lims:id="751147"><Label>(g)</Label><Text>the documents describing all management system processes and the processes for making personnel aware of their roles and responsibilities with respect to them;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751148" lims:id="751148"><Label>(h)</Label><Text>the processes for ensuring that all documents associated with the system are current, valid and have been approved by the appropriate level of authority;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751149" lims:id="751149"><Label>(i)</Label><Text>the processes for conducting periodic reviews or audits of the system and for taking corrective actions if reviews or audits identify areas of non-conformance with the system and opportunities for improvement;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751150" lims:id="751150"><Label>(j)</Label><Text>the arrangements for coordinating the management and operations of the proposed work or activity among the owner of the installation, the contractors, the operator and others, as applicable; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751151" lims:id="751151"><Label>(k)</Label><Text>the name and position of the person accountable for the establishment and maintenance of the system and of the person responsible for implementing it.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751152" lims:id="751152"><Label>(3)</Label><Text>The management system documentation shall be controlled and set out in a logical and systematic fashion to allow for ease of understanding and efficient implementation.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751153" lims:id="751153"><Label>(4)</Label><Text>The management system shall correspond to the size, nature and complexity of the operations and activities, hazards and risks associated with the operations.</Text></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751154" lims:id="751154" level="2"><TitleText>Application for Authorization</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751155" lims:id="751155"><Label>6</Label><Text>The application for authorization shall be accompanied by</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751156" lims:id="751156"><Label>(a)</Label><Text>a description of the scope of the proposed activities;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751157" lims:id="751157"><Label>(b)</Label><Text>an execution plan and schedule for undertaking those activities;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751158" lims:id="751158"><Label>(c)</Label><Text>a safety plan that meets the requirements of section 8;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751159" lims:id="751159"><Label>(d)</Label><Text>an environmental protection plan that meets the requirements of section 9;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751160" lims:id="751160"><Label>(e)</Label><Text>information on any proposed flaring or venting of gas, including the rationale and the estimated rate, quantity and period of the flaring or venting;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751161" lims:id="751161"><Label>(f)</Label><Text>information on any proposed burning of oil, including the rationale and the estimated quantity of oil proposed to be burned;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751162" lims:id="751162"><Label>(g)</Label><Text>in the case of a drilling installation, a description of the drilling and well control equipment;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751163" lims:id="751163"><Label>(h)</Label><Text>in the case of a production installation, a description of the processing facilities and control system;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751164" lims:id="751164"><Label>(i)</Label><Text>in the case of a production project, a field data acquisition program that allows sufficient pool pressure measurements, fluid samples, cased hole logs and formation flow tests for a comprehensive assessment of the performance of development wells, pool depletion schemes and the field;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751165" lims:id="751165"><Label>(j)</Label><Text>contingency plans, including emergency response procedures, to mitigate the effects of any reasonably foreseeable event that might compromise safety or environmental protection, which shall</Text><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751166" lims:id="751166"><Label>(i)</Label><Text>provide for coordination measures with any relevant municipal, provincial, territorial or federal emergency response plan, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751167" lims:id="751167"><Label>(ii)</Label><Text>in an offshore area where oil is reasonably expected to be encountered, identify the scope and frequency of the field practice exercise of oil spill countermeasures; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751168" lims:id="751168"><Label>(k)</Label><Text>a description of the decommissioning and abandonment of the site, including methods for restoration of the site after its abandonment.</Text></Paragraph></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751169" lims:id="751169"><Label>7</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751170" lims:id="751170"><Label>(1)</Label><Text>If the application for authorization covers a production installation, the applicant shall also submit to the Board for its approval the flow system, the flow calculation procedure and the flow allocation procedure that will be used to conduct the measurements referred to in Part 7.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751171" lims:id="751171"><Label>(2)</Label><Text>The Board shall approve the flow system, the flow calculation procedure and the flow allocation procedure if the applicant demonstrates that the system and procedures facilitate reasonably accurate measurements and allocate, on a pool or zone basis, the production from and injection into individual wells.</Text></Subsection></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751172" lims:id="751172"><Label>8</Label><Text>The safety plan shall set out the procedures, practices, resources, sequence of key safety-related activities and monitoring measures necessary to ensure the safety of the proposed work or activity and shall include</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751173" lims:id="751173"><Label>(a)</Label><Text>a summary of and references to the management system that demonstrate how it will be applied to the proposed work or activity and how the duties set out in these Regulations with regard to safety will be fulfilled;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751174" lims:id="751174"><Label>(b)</Label><Text>a summary of the studies undertaken to identify hazards and to evaluate safety risks related to the proposed work or activity;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751175" lims:id="751175"><Label>(c)</Label><Text>a description of the hazards that were identified and the results of the risk evaluation;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751176" lims:id="751176"><Label>(d)</Label><Text>a summary of the measures to avoid, prevent, reduce and manage safety risks;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751177" lims:id="751177"><Label>(e)</Label><Text>a list of all structures, facilities, equipment and systems critical to safety and a summary of the system in place for their inspection, testing and maintenance;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751178" lims:id="751178"><Label>(f)</Label><Text>a description of the organizational structure for the proposed work or activity and the command structure on the installation, which clearly explains</Text><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751179" lims:id="751179"><Label>(i)</Label><Text>their relationship to each other, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751180" lims:id="751180"><Label>(ii)</Label><Text>the contact information and position of the person accountable for the safety plan and of the person responsible for implementing it;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751181" lims:id="751181"><Label>(g)</Label><Text>if the possibility of pack sea ice, drifting icebergs or land-fast sea ice exists at the drill or production site, the measures to address the protection of the installation, including systems for ice detection, surveillance, data collection, reporting, forecasting and, if appropriate, ice avoidance or deflection; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751182" lims:id="751182"><Label>(h)</Label><Text>a description of the arrangements for monitoring compliance with the plan and for measuring performance in relation to its objectives.</Text></Paragraph></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751183" lims:id="751183"><Label>9</Label><Text>The environmental protection plan shall set out the procedures, practices, resources and monitoring necessary to manage hazards to and protect the environment from the proposed work or activity and shall include</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751184" lims:id="751184"><Label>(a)</Label><Text>a summary of and references to the management system that demonstrate how it will be applied to the proposed work or activity and how the duties set out in these Regulations with regard to environmental protection will be fulfilled;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751185" lims:id="751185"><Label>(b)</Label><Text>a summary of the studies undertaken to identify environmental hazards and to evaluate environmental risks relating to the proposed work or activity;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751186" lims:id="751186"><Label>(c)</Label><Text>a description of the hazards that were identified and the results of the risk evaluation;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751187" lims:id="751187"><Label>(d)</Label><Text>a summary of the measures to avoid, prevent, reduce and manage environmental risks;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751188" lims:id="751188"><Label>(e)</Label><Text>a list of all structures, facilities, equipment and systems critical to environmental protection and a summary of the system in place for their inspection, testing and maintenance;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751189" lims:id="751189"><Label>(f)</Label><Text>a description of the organizational structure for the proposed work or activity and the command structure on the installation, which clearly explains</Text><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751190" lims:id="751190"><Label>(i)</Label><Text>their relationship to each other, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751191" lims:id="751191"><Label>(ii)</Label><Text>the contact information and position of the person accountable for the environmental protection plan and the person responsible for implementing it;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751192" lims:id="751192"><Label>(g)</Label><Text>the procedures for the selection, evaluation and use of chemical substances including process chemicals and drilling fluid ingredients;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751193" lims:id="751193"><Label>(h)</Label><Text>a description of equipment and procedures for the treatment, handling and disposal of waste material;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751194" lims:id="751194"><Label>(i)</Label><Text>a description of all discharge streams and limits for any discharge into the natural environment including any waste material;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751195" lims:id="751195"><Label>(j)</Label><Text>a description of the system for monitoring compliance with the discharge limits identified in paragraph (i), including the sampling and analytical program to determine if those discharges are within the specified limits; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751196" lims:id="751196"><Label>(k)</Label><Text>a description of the arrangements for monitoring compliance with the plan and for measuring performance in relation to its objectives.</Text></Paragraph></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751197" lims:id="751197" level="2"><TitleText>Well Approval</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751198" lims:id="751198"><Label>10</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751199" lims:id="751199"><Label>(1)</Label><Text>Subject to subsection (2), an operator who intends to drill, re-enter, work over, complete or recomplete a well or suspend or abandon a well or part of a well shall obtain a well approval.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751200" lims:id="751200"><Label>(2)</Label><Text>A well approval is not necessary to conduct a wire line, slick line or coiled tubing operation through a Christmas tree located above sea level if</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751201" lims:id="751201"><Label>(a)</Label><Text>the work does not alter the completion interval or is not expected to adversely affect recovery; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751202" lims:id="751202"><Label>(b)</Label><Text>the equipment, operating procedures and qualified persons exist to conduct the wire line, slick line or coiled tubing operations as set out in the authorization.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751203" lims:id="751203"><Label>11</Label><Text>If the well approval sought is to drill a well, the application shall contain</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751204" lims:id="751204"><Label>(a)</Label><Text>a comprehensive description of the drilling program; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751205" lims:id="751205"><Label>(b)</Label><Text>a well data acquisition program that allows for the collection of sufficient cutting and fluid samples, logs, conventional cores, sidewall cores, pressure measurements and formation flow tests, analyses and surveys to enable a comprehensive geological and reservoir evaluation to be made.</Text></Paragraph></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751206" lims:id="751206"><Label>12</Label><Text>The application shall contain</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751207" lims:id="751207"><Label>(a)</Label><Text>if the well approval sought is to re-enter, work over, complete or recomplete a well or suspend or abandon a well or part of it, a detailed description of that well, the proposed work or activity and the rationale for conducting it;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751208" lims:id="751208"><Label>(b)</Label><Text>if the well approval sought is to complete a well, in addition to the information required under paragraph (a), information that demonstrates that section 46 will be complied with; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751209" lims:id="751209"><Label>(c)</Label><Text>if the well approval sought is to suspend a well or part of it, in addition to the information required under paragraph (a), an indication of the period within which the suspended well or part of it will be abandoned or completed.</Text></Paragraph></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751210" lims:id="751210"><Label>13</Label><Text>The Board shall grant the well approval if the operator demonstrates that the work or activity will be conducted safely, without waste and without pollution, in compliance with these Regulations.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751211" lims:id="751211" level="2"><TitleText>Suspension and Revocation of a Well Approval</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751212" lims:id="751212"><Label>14</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751213" lims:id="751213"><Label>(1)</Label><Text>The Board may suspend the well approval if</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751214" lims:id="751214"><Label>(a)</Label><Text>the operator fails to comply with the approval and the work or activity cannot be conducted safely, without waste or without pollution;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751215" lims:id="751215"><Label>(b)</Label><Text>the safety of the work or activity becomes uncertain because</Text><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751216" lims:id="751216"><Label>(i)</Label><Text>the level of performance of the installation or service equipment, any ancillary equipment or any support craft is demonstrably less than the level of performance indicated in the application, or</Text></Subparagraph><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751217" lims:id="751217"><Label>(ii)</Label><Text>the physical environmental conditions encountered in the area of the activity for which the well approval was granted are more severe than the equipment’s operating limits as specified by the manufacturer; or</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751218" lims:id="751218"><Label>(c)</Label><Text>the operator fails to comply with the approvals issued under subsection 7(2), 52(4) or 66(2).</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751219" lims:id="751219"><Label>(2)</Label><Text>The Board may revoke the well approval if the operator fails to remedy the situation causing the suspension within 120 days after the date of that suspension.</Text></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751220" lims:id="751220" level="2"><TitleText>Development Plans</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751221" lims:id="751221"><Label>15</Label><Text>For the purpose of subsection 5.1(1) of the Act, the well approval relating to a production project is prescribed.</Text></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751222" lims:id="751222"><Label>16</Label><Text>For the purpose of paragraph 5.1(3)(b) of the Act, Part II of the development plan relating to a proposed development of a pool or field shall contain a resource management plan.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751223" lims:id="751223" level="1"><Label>PART 3</Label><TitleText>Operator’s Duties</TitleText></Heading><Heading lims:inforce-start-date="2009-12-31" lims:fid="751224" lims:id="751224" level="2"><TitleText>Availability of Documents</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751225" lims:id="751225"><Label>17</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751226" lims:id="751226"><Label>(1)</Label><Text>The operator shall keep a copy of the authorization, the well approval and all other approvals and plans required under these Regulations, the Act and the regulations made under the Act at each installation and shall make them available for examination at the request of any person at each installation.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751227" lims:id="751227"><Label>(2)</Label><Text>The operator shall ensure that a copy of all operating manuals and other procedures and documents necessary to execute the work or activity and to operate the installation safely without pollution are readily accessible at each installation.</Text></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751228" lims:id="751228" level="2"><TitleText>Management System</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751229" lims:id="751229"><Label>18</Label><Text>The operator shall ensure compliance with the management system referred to in section 5.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751230" lims:id="751230" level="2"><TitleText>Safety and Environmental Protection</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751231" lims:id="751231"><Label>19</Label><Text>The operator shall take all reasonable precautions to ensure safety and environmental protection, including ensuring that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751232" lims:id="751232"><Label>(a)</Label><Text>any operation necessary for the safety of persons at an installation or on a support craft has priority, at all times, over any work or activity at that installation or on that support craft;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751233" lims:id="751233"><Label>(b)</Label><Text>safe work methods are followed during all drilling, well or production operations;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751234" lims:id="751234"><Label>(c)</Label><Text>there is a shift handover system to effectively communicate any conditions, mechanical or procedural deficiencies or other problems that might have an impact on safety or environmental protection;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751235" lims:id="751235"><Label>(d)</Label><Text>differences in language or other barriers to effective communication do not jeopardize safety or environmental protection;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751236" lims:id="751236"><Label>(e)</Label><Text>all persons at an installation, or in transit to or from an installation, receive instruction in and are familiar with safety and evacuation procedures and with their roles and responsibilities in the contingency plans, including emergency response procedures;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751237" lims:id="751237"><Label>(f)</Label><Text>any drilling or well operation is conducted in a manner that maintains full control of the well at all times;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751238" lims:id="751238"><Label>(g)</Label><Text>if there is loss of control of a well at an installation, all other wells at that installation are shut in until the well that is out of control is secured;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751239" lims:id="751239"><Label>(h)</Label><Text>plans are in place to deal with potential hazards;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751240" lims:id="751240"><Label>(i)</Label><Text>all equipment required for safety and environmental protection is available and in an operable condition;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751241" lims:id="751241"><Label>(j)</Label><Text>the inventory of all equipment identified in the safety plan and the environmental protection plan is updated after the completion of any significant modification or repair to any major component of the equipment;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751242" lims:id="751242"><Label>(k)</Label><Text>the administrative and logistical support that is provided for drilling, well or production operations includes accommodation, transportation, first aid and storage, repair facilities and communication systems suitable for the area of operations;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751243" lims:id="751243"><Label>(l)</Label><Text>a sufficient number of trained and competent individuals are available to complete the authorized work or activities and to carry out any work or activity safely and without pollution; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751244" lims:id="751244"><Label>(m)</Label><Text>any operational procedure that is a hazard to safety or the environment is corrected and all affected persons are informed of the alteration.</Text></Paragraph></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751245" lims:id="751245"><Label>20</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751246" lims:id="751246"><Label>(1)</Label><Text>No person shall tamper with, activate without cause, or misuse any safety or environmental protection equipment.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751247" lims:id="751247"><Label>(2)</Label><Text>A passenger on a helicopter, supply vessel or any other support craft engaged in a drilling program or production project shall comply with all applicable safety instructions.</Text></Subsection></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751248" lims:id="751248"><Label>21</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751249" lims:id="751249"><Label>(1)</Label><Text>No person shall smoke on an installation except in those areas set aside by the operator for that use.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751250" lims:id="751250"><Label>(2)</Label><Text>The operator shall ensure compliance with subsection (1).</Text></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751251" lims:id="751251" level="2"><TitleText>Storing and Handling of Consumables</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751252" lims:id="751252"><Label>22</Label><Text>The operator shall ensure that fuel, potable water, spill containment products, safety-related chemicals, drilling fluids, cement and other consumables are</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751253" lims:id="751253"><Label>(a)</Label><Text>readily available and stored on an installation in quantities sufficient for any normal and reasonably foreseeable emergency condition; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751254" lims:id="751254"><Label>(b)</Label><Text>stored and handled in a manner that minimizes their deterioration, ensures safety and prevents pollution.</Text></Paragraph></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751255" lims:id="751255" level="2"><TitleText>Handling of Chemical Substances, Waste Material and Oil</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751256" lims:id="751256"><Label>23</Label><Text>The operator shall ensure that all chemical substances, including process fluids and diesel fuel, waste material, drilling fluid and drill cuttings generated at an installation, are handled in a way that does not create a hazard to safety or the environment.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751257" lims:id="751257" level="2"><TitleText>Cessation of a Work or Activity</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751258" lims:id="751258"><Label>24</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751259" lims:id="751259"><Label>(1)</Label><Text>The operator shall ensure that any work or activity ceases without delay if that work or activity</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751260" lims:id="751260"><Label>(a)</Label><Text>endangers or is likely to endanger the safety of persons;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751261" lims:id="751261"><Label>(b)</Label><Text>endangers or is likely to endanger the safety or integrity of the well or the installation; or</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751262" lims:id="751262"><Label>(c)</Label><Text>causes or is likely to cause pollution.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751263" lims:id="751263"><Label>(2)</Label><Text>If the work or activity ceases, the operator shall ensure that it does not resume until it can do so safely and without pollution.</Text></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751264" lims:id="751264" level="1"><Label>PART 4</Label><TitleText>Equipment and Operations</TitleText></Heading><Heading lims:inforce-start-date="2009-12-31" lims:fid="751265" lims:id="751265" level="2"><TitleText>Wells, Installations, Equipment, Facilities and Support Craft</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751266" lims:id="751266"><Label>25</Label><Text>The operator shall ensure that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751267" lims:id="751267"><Label>(a)</Label><Text>all wells, installations, equipment and facilities are designed, constructed, tested, maintained and operated to prevent incidents and waste under the maximum load conditions that may be reasonably anticipated during any operation;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751268" lims:id="751268"><Label>(b)</Label><Text>a comprehensive inspection that includes a non-destructive examination of critical joints and structural members of an installation and any critical drilling or production equipment is made at an interval to ensure continued safe operation of the installation or equipment and in any case, at least once in every five-year period; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751269" lims:id="751269"><Label>(c)</Label><Text>records of maintenance, tests and inspections are kept.</Text></Paragraph></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751270" lims:id="751270"><Label>26</Label><Text>The operator shall ensure that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751271" lims:id="751271"><Label>(a)</Label><Text>the components of an installation and well tubulars, Christmas trees and wellheads are operated in accordance with good engineering practices; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751272" lims:id="751272"><Label>(b)</Label><Text>any part of an installation that may be exposed to a sour environment is designed, constructed and maintained to operate safely in that environment.</Text></Paragraph></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751273" lims:id="751273"><Label>27</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751274" lims:id="751274"><Label>(1)</Label><Text>The operator shall ensure that any defect in the installation, equipment, facilities and support craft that may be a hazard to safety or the environment is rectified without delay.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751275" lims:id="751275"><Label>(2)</Label><Text>If it is not possible to rectify the defect without delay, the operator shall ensure that it is rectified as soon as the circumstances permit and that mitigation measures are put in place to minimize the hazards while the defect is being rectified.</Text></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751276" lims:id="751276" level="2"><TitleText>Drilling Fluid System</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751277" lims:id="751277"><Label>28</Label><Text>The operator shall ensure that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751278" lims:id="751278"><Label>(a)</Label><Text>the drilling fluid system and associated monitoring equipment is designed, installed, operated and maintained to provide an effective barrier against formation pressure, to allow for proper well evaluation, to ensure safe drilling operations and to prevent pollution; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751279" lims:id="751279"><Label>(b)</Label><Text>the indicators and alarms associated with the monitoring equipment are strategically located on the drilling rig to alert onsite personnel.</Text></Paragraph></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751280" lims:id="751280" level="2"><TitleText>Marine Riser</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751281" lims:id="751281"><Label>29</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751282" lims:id="751282"><Label>(1)</Label><Text>The operator shall ensure that every marine riser is capable of</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751283" lims:id="751283"><Label>(a)</Label><Text>furnishing access to the well;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751284" lims:id="751284"><Label>(b)</Label><Text>isolating the well-bore from the sea;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751285" lims:id="751285"><Label>(c)</Label><Text>withstanding the differential pressure of the drilling fluid relative to the sea;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751286" lims:id="751286"><Label>(d)</Label><Text>withstanding the physical forces anticipated in the drilling program; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751287" lims:id="751287"><Label>(e)</Label><Text>permitting the drilling fluid to be returned to the installation.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751288" lims:id="751288"><Label>(2)</Label><Text>The operator shall ensure that every marine riser is supported in a manner that effectively compensates for the forces caused by the motion of the installation.</Text></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751289" lims:id="751289" level="2"><TitleText>Drilling Practices</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751290" lims:id="751290"><Label>30</Label><Text>The operator shall ensure that adequate equipment, procedures and personnel are in place to recognize and control normal and abnormal pressures, to allow for safe, controlled drilling operations and to prevent pollution.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751291" lims:id="751291" level="2"><TitleText>Reference for Well Depths</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751292" lims:id="751292"><Label>31</Label><Text>The operator shall ensure that any depth in a well is measured from a single reference point, which is either the kelly bushing or the rotary table of the drilling rig.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751293" lims:id="751293" level="2"><TitleText>Directional and Deviation Surveys</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751294" lims:id="751294"><Label>32</Label><Text>The operator shall ensure that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751295" lims:id="751295"><Label>(a)</Label><Text>directional and deviation surveys are taken at intervals that allow the position of the well-bore to be determined accurately; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751296" lims:id="751296"><Label>(b)</Label><Text>except in the case of a relief well, a well is drilled in a manner that does not intersect an existing well.</Text></Paragraph></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751297" lims:id="751297" level="2"><TitleText>Formation Leak-Off Test</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751298" lims:id="751298"><Label>33</Label><Text>The operator shall ensure that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751299" lims:id="751299"><Label>(a)</Label><Text>a formation leak-off test or a formation integrity test is conducted before drilling more than 10 m below the shoe of any casing other than the conductor casing;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751300" lims:id="751300"><Label>(b)</Label><Text>the formation leak-off test or the formation integrity test is conducted to a pressure that allows for safe drilling to the next planned casing depth; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751301" lims:id="751301"><Label>(c)</Label><Text>a record is retained of each formation leak-off test and the results included in the daily drilling report referred to in paragraph 83(a) and in the well history report referred to in section 88.</Text></Paragraph></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751302" lims:id="751302" level="2"><TitleText>Formation Flow and Well Testing Equipment</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751303" lims:id="751303"><Label>34</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751304" lims:id="751304"><Label>(1)</Label><Text>The operator shall ensure that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751305" lims:id="751305"><Label>(a)</Label><Text>the equipment used in a formation flow test is designed to safely control well pressure, properly evaluate the formation and prevent pollution;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751306" lims:id="751306"><Label>(b)</Label><Text>the rated working pressure of formation flow test equipment upstream of and including the well testing manifold exceeds the maximum anticipated shut-in pressure; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751307" lims:id="751307"><Label>(c)</Label><Text>the equipment downstream of the well testing manifold is sufficiently protected against overpressure.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751308" lims:id="751308"><Label>(2)</Label><Text>The operator of an offshore well or a well in a sour environment shall ensure that the formation flow test equipment includes a down-hole safety valve that permits closure of the test string above the packer.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751309" lims:id="751309"><Label>(3)</Label><Text>The operator shall ensure that any formation flow test equipment used in testing an offshore well that is drilled with a floating drilling unit has a subsea test tree that includes</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751310" lims:id="751310"><Label>(a)</Label><Text>a valve that may be operated from the surface and automatically closes when required to prevent uncontrolled well flow; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751311" lims:id="751311"><Label>(b)</Label><Text>a release system that permits the test string to be hydraulically or mechanically disconnected within or below the blow-out preventers.</Text></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751312" lims:id="751312" level="2"><TitleText>Well Control</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751313" lims:id="751313"><Label>35</Label><Text>The operator shall ensure that adequate procedures, materials and equipment are in place and utilized to minimize the risk of loss of well control in the event of lost circulation.</Text></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751314" lims:id="751314"><Label>36</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751315" lims:id="751315"><Label>(1)</Label><Text>The operator shall ensure that, during all well operations, reliably operating well control equipment is installed to control kicks, prevent blow-outs and safely carry out all well activities and operations, including drilling, completion and workover operations.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751316" lims:id="751316"><Label>(2)</Label><Text>After setting the surface casing, the operator shall ensure that at least two independent and tested well barriers are in place during all well operations.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751317" lims:id="751317"><Label>(3)</Label><Text>If a barrier fails, the operator shall ensure that no other activities, other than those intended to restore or replace the barrier, take place in the well.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751318" lims:id="751318"><Label>(4)</Label><Text>The operator shall ensure that, during drilling, except when drilling under-balanced, one of the two barriers to be maintained is the drilling fluid column.</Text></Subsection></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751319" lims:id="751319"><Label>37</Label><Text>The operator shall ensure that pressure control equipment associated with drilling, coil tubing, slick line and wire line operations is pressure-tested on installation and as often as necessary to ensure its continued safe operation.</Text></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751320" lims:id="751320"><Label>38</Label><Text>If the well control is lost or if safety, environmental protection or resource conservation is at risk, the operator shall ensure that any action necessary to rectify the situation is taken without delay, despite any condition to the contrary in the well approval.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751321" lims:id="751321" level="2"><TitleText>Casing and Cementing</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751322" lims:id="751322"><Label>39</Label><Text>The operator shall ensure that the well and casing are designed so that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751323" lims:id="751323"><Label>(a)</Label><Text>the well can be drilled safely, the targeted formations evaluated and waste prevented;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751324" lims:id="751324"><Label>(b)</Label><Text>the anticipated conditions, forces and stresses that may be placed upon them are withstood; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751325" lims:id="751325"><Label>(c)</Label><Text>the integrity of gas hydrate and permafrost zones — and, in the case of an onshore well, potable water zones — is protected.</Text></Paragraph></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751326" lims:id="751326"><Label>40</Label><Text>The operator shall ensure that the well and casing are installed at a depth that provides for adequate kick tolerances and well control operations that provide for safe, constant bottom hole pressure.</Text></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751327" lims:id="751327"><Label>41</Label><Text>The operator shall ensure that cement slurry is designed and installed so that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751328" lims:id="751328"><Label>(a)</Label><Text>the movement of formation fluids in the casing annuli is prevented and, where required for safety, resource evaluation or prevention of waste, the isolation of the oil, gas and water zones is ensured;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751329" lims:id="751329"><Label>(b)</Label><Text>support for the casing is provided;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751330" lims:id="751330"><Label>(c)</Label><Text>corrosion of the casing over the cemented interval is retarded; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751331" lims:id="751331"><Label>(d)</Label><Text>the integrity of gas hydrate and permafrost zones — and, in the case of an onshore well, potable water zones — is protected.</Text></Paragraph></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751332" lims:id="751332" level="2"><TitleText>Waiting on Cement Time</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751333" lims:id="751333"><Label>42</Label><Text>After the cementing of any casing or casing liner and before drilling out the casing shoe, the operator shall ensure that the cement has reached the minimum compressive strength sufficient to support the casing and provide zonal isolation.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751334" lims:id="751334" level="2"><TitleText>Casing Pressure Testing</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751335" lims:id="751335"><Label>43</Label><Text>After installing and cementing the casing and before drilling out the casing shoe, the operator shall ensure that the casing is pressure-tested to the value required to confirm its integrity for maximum anticipated operating pressure.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751336" lims:id="751336" level="2"><TitleText>Production Tubing</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751337" lims:id="751337"><Label>44</Label><Text>The operator shall ensure that the production tubing used in a well is designed to withstand the maximum conditions, forces and stresses that may be placed on it and to maximize recovery from the pool.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751338" lims:id="751338" level="2"><TitleText>Monitoring and Control of Process Operations</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751339" lims:id="751339"><Label>45</Label><Text>The operator shall ensure that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751340" lims:id="751340"><Label>(a)</Label><Text>operations such as processing, transportation, storage, re-injection and handling of oil and gas on the installation are effectively monitored to prevent incidents and waste;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751341" lims:id="751341"><Label>(b)</Label><Text>all alarm, safety, monitoring, warning and control systems associated with those operations are managed to prevent incidents and waste; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751342" lims:id="751342"><Label>(c)</Label><Text>all appropriate persons are informed of the applicable alarm, safety, monitoring, warning or control systems associated with those operations that are taken out of service, and when those systems are returned to service.</Text></Paragraph></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751343" lims:id="751343" level="2"><TitleText>Well Completion</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751344" lims:id="751344"><Label>46</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751345" lims:id="751345"><Label>(1)</Label><Text>An operator that completes a well shall ensure that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751346" lims:id="751346"><Label>(a)</Label><Text>it is completed in a safe manner and allows for maximum recovery;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751347" lims:id="751347"><Label>(b)</Label><Text>except in the case of commingled production, each completion interval is isolated from any other porous or permeable interval penetrated by the well;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751348" lims:id="751348"><Label>(c)</Label><Text>the testing and production of any completion interval are conducted safely and do not cause waste or pollution;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751349" lims:id="751349"><Label>(d)</Label><Text>if applicable, sand production is controlled and does not create a safety hazard or cause waste;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751350" lims:id="751350"><Label>(e)</Label><Text>each packer is set as close as practical to the top of the completion interval and that the pressure testing of the packer to a differential pressure is greater than the maximum differential pressure anticipated under the production or injection conditions;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751351" lims:id="751351"><Label>(f)</Label><Text>if practical, any mechanical well condition that may have an adverse effect on production of oil and gas from, or the injection of fluids into, the well is corrected;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751352" lims:id="751352"><Label>(g)</Label><Text>the injection or production profile of the well is improved, or the completion interval of the well is changed, if it is necessary to do so to prevent waste;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751353" lims:id="751353"><Label>(h)</Label><Text>if different pressure and inflow characteristics of two or more pools might adversely affect the recovery from any of those pools, the well is operated as a single pool well or as a segregated multi-pool well;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751354" lims:id="751354"><Label>(i)</Label><Text>after initial completion, all barriers are tested to the maximum pressure to which they are likely to be subjected; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751355" lims:id="751355"><Label>(j)</Label><Text>following any workover, any affected barriers are pressure-tested.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751356" lims:id="751356"><Label>(2)</Label><Text>The operator of a segregated multi-pool well shall ensure that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751357" lims:id="751357"><Label>(a)</Label><Text>after the well is completed, segregation has been established within and outside the well casing and is confirmed; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751358" lims:id="751358"><Label>(b)</Label><Text>if there is reason to doubt that segregation is being maintained, a segregation test is conducted within a reasonable time frame.</Text></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751359" lims:id="751359" level="2"><TitleText>Subsurface Safety Valve</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751360" lims:id="751360"><Label>47</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751361" lims:id="751361"><Label>(1)</Label><Text>The operator of an offshore development well capable of flow shall ensure that the well is equipped with a fail-safe subsurface safety valve that is designed, installed, operated and tested to prevent uncontrolled well flow when it is activated.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751362" lims:id="751362"><Label>(2)</Label><Text>If a development well is located in a zone where permafrost is present in unconsolidated sediments, the operator shall ensure that a subsurface safety valve is installed in the tubing below the base of the permafrost.</Text></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751363" lims:id="751363" level="2"><TitleText>Wellhead and Christmas Tree Equipment</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751364" lims:id="751364"><Label>48</Label><Text>The operator shall ensure that the wellhead and Christmas tree equipment, including valves, are designed to operate safely and efficiently under the maximum load conditions anticipated during the life of the well.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751365" lims:id="751365" level="1"><Label>PART 5</Label><TitleText>Evaluation of Wells, Pools and Fields</TitleText></Heading><Heading lims:inforce-start-date="2009-12-31" lims:fid="751366" lims:id="751366" level="2"><TitleText>General</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751367" lims:id="751367"><Label>49</Label><Text>The operator shall ensure that the well data acquisition program and the field data acquisition program are implemented in accordance with good oilfield practices.</Text></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751368" lims:id="751368"><Label>50</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751369" lims:id="751369"><Label>(1)</Label><Text>If part of the well or field data acquisition program cannot be implemented, the operator shall ensure that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751370" lims:id="751370"><Label>(a)</Label><Text>a conservation officer is notified as soon as the circumstances permit; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751371" lims:id="751371"><Label>(b)</Label><Text>the procedures to otherwise achieve the goals of the program are submitted to the Board for approval.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751372" lims:id="751372"><Label>(2)</Label><Text>If the operator can demonstrate that those procedures can achieve the goals of the well or field data acquisition program or are all that can be reasonably expected in the circumstances, the Board shall approve them.</Text></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751373" lims:id="751373" level="2"><TitleText>Testing and Sampling of Formations</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751374" lims:id="751374"><Label>51</Label><Text>The operator shall ensure that every formation in a well is tested and sampled to obtain reservoir pressure data and fluid samples from the formation, if there is an indication that the data or samples would contribute substantially to the geological and reservoir evaluation.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751375" lims:id="751375" level="2"><TitleText>Formation Flow Testing</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751376" lims:id="751376"><Label>52</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751377" lims:id="751377"><Label>(1)</Label><Text>The operator shall ensure that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751378" lims:id="751378"><Label>(a)</Label><Text>no development well is put into production unless the Board has approved a formation flow test in respect of the development well; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751379" lims:id="751379"><Label>(b)</Label><Text>if a development well is subjected to a well operation that might change its deliverability, productivity or injectivity, a formation flow test is conducted within a reasonable time frame after the well operation is ended to determine the effects of that operation on the well’s deliverability, productivity or injectivity.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751380" lims:id="751380"><Label>(2)</Label><Text>The operator may conduct a formation flow test on a well drilled on a geological feature if, before conducting that test, the operator</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751381" lims:id="751381"><Label>(a)</Label><Text>submits to the Board a detailed testing program; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751382" lims:id="751382"><Label>(b)</Label><Text>obtains the Board’s approval to conduct the test.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751383" lims:id="751383"><Label>(3)</Label><Text>The Board may require that the operator conduct a formation flow test on a well drilled on a geological feature, other than the first well, if there is an indication that the test would contribute substantially to the geological and reservoir evaluation.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751384" lims:id="751384"><Label>(4)</Label><Text>The Board shall approve a formation flow test if the operator demonstrates that the test will be conducted safely, without pollution and in accordance with good oilfield practices and that the test will enable the operator to</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751385" lims:id="751385"><Label>(a)</Label><Text>obtain data on the deliverability or productivity of the well;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751386" lims:id="751386"><Label>(b)</Label><Text>establish the characteristics of the reservoir; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751387" lims:id="751387"><Label>(c)</Label><Text>obtain representative samples of the formation fluids.</Text></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751388" lims:id="751388" level="2"><TitleText>Submission of Samples and Data</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751389" lims:id="751389"><Label>53</Label><Text>The operator shall ensure that all cutting samples, fluid samples and cores collected as part of the well and field data acquisition programs are</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751390" lims:id="751390"><Label>(a)</Label><Text>transported and stored in a manner that prevents any loss or deterioration;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751391" lims:id="751391"><Label>(b)</Label><Text>delivered to the Board within 60 days after the rig release date unless analyses are ongoing, in which case those samples and cores, or the remaining parts, are to be delivered on completion of the analyses; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751392" lims:id="751392"><Label>(c)</Label><Text>stored in durable containers properly labelled for identification.</Text></Paragraph></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751393" lims:id="751393"><Label>54</Label><Text>The operator shall ensure that after any samples necessary for analysis or for research or academic studies have been removed from a conventional core, the remaining core, or a longitudinal slab that is not less than one half of the cross-sectional area of that core, is submitted to the Board.</Text></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751394" lims:id="751394"><Label>55</Label><Text>Before disposing of cutting samples, fluid samples, cores or evaluation data under these Regulations, the operator shall ensure that the Board is notified in writing and is given an opportunity to request delivery of the samples, cores or data.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751395" lims:id="751395" level="1"><Label>PART 6</Label><TitleText>Well Termination</TitleText></Heading><Heading lims:inforce-start-date="2009-12-31" lims:fid="751396" lims:id="751396" level="2"><TitleText>Suspension or Abandonment</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751397" lims:id="751397"><Label>56</Label><Text>The operator shall ensure that every well that is suspended or abandoned can be readily located and left in a condition that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751398" lims:id="751398"><Label>(a)</Label><Text>provides for isolation of all oil or gas bearing zones and discrete pressure zones; and, in the case of an onshore well, potable water zones; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751399" lims:id="751399"><Label>(b)</Label><Text>prevents any formation fluid from flowing through or escaping from the well-bore.</Text></Paragraph></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751400" lims:id="751400"><Label>57</Label><Text>The operator of a suspended well shall ensure that the well is monitored and inspected to maintain its continued integrity and to prevent pollution.</Text></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751401" lims:id="751401"><Label>58</Label><Text>The operator shall ensure that, on the abandonment of any offshore well, the seafloor is cleared of any material or equipment that might interfere with other commercial uses of the sea.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751402" lims:id="751402" level="2"><TitleText>Installation Removal</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751403" lims:id="751403"><Label>59</Label><Text>No operator shall remove or cause to have removed a drilling installation from a well drilled under these Regulations unless the well has been terminated in accordance with these Regulations.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751404" lims:id="751404" level="1"><Label>PART 7</Label><TitleText>Measurements</TitleText></Heading><Heading lims:inforce-start-date="2009-12-31" lims:fid="751405" lims:id="751405" level="2"><TitleText>Flow and Volume</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751406" lims:id="751406"><Label>60</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751407" lims:id="751407"><Label>(1)</Label><Text>Unless otherwise included in the approval issued under subsection 7(2), the operator shall ensure that the rate of flow and the volume of the following are measured and recorded:</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751408" lims:id="751408"><Label>(a)</Label><Text>the fluid that is produced from each well;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751409" lims:id="751409"><Label>(b)</Label><Text>the fluid that is injected into each well;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751410" lims:id="751410"><Label>(c)</Label><Text>any produced fluid that enters, leaves, is used or is flared, vented, burned or otherwise disposed of on an installation, including any battery room, treatment facility or processing plant; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751411" lims:id="751411"><Label>(d)</Label><Text>any air or materials injected for the purposes of disposal, storage or cycling, including drill cuttings and other useless material that is generated during drilling, well or production operations.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751412" lims:id="751412"><Label>(2)</Label><Text>The operator shall ensure that any measurements are conducted in accordance with the flow system, flow calculation procedure and flow allocation procedure, approved under subsection 7(2).</Text></Subsection></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751413" lims:id="751413"><Label>61</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751414" lims:id="751414"><Label>(1)</Label><Text>The operator shall ensure that group production of oil and gas from wells and injection of a fluid into wells is allocated on a <Language xml:lang="la">pro rata</Language> basis, in accordance with the flow system, flow calculation procedure and flow allocation procedure approved under subsection 7(2).</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751415" lims:id="751415"><Label>(2)</Label><Text>If a well is completed over multiple pools or zones, the operator shall ensure that production or injection volumes for the well are allocated on a <Language xml:lang="la">pro rata</Language> basis to the pools or zones in accordance with the flow allocation procedure approved under subsection 7(2).</Text></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751416" lims:id="751416" level="2"><TitleText>Testing, Maintenance and Notification</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751417" lims:id="751417"><Label>62</Label><Text>The operator shall ensure</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751418" lims:id="751418"><Label>(a)</Label><Text>that meters and associated equipment are calibrated and maintained to ensure their continued accuracy;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751419" lims:id="751419"><Label>(b)</Label><Text>that equipment used to calibrate the flow system is calibrated in accordance with good measurement practices;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751420" lims:id="751420"><Label>(c)</Label><Text>that any component of the flow system that may have an impact on the accuracy or integrity of the flow system and that is not functioning in accordance with the manufacturer’s specifications is repaired or replaced without delay, or, if it is not possible to do so without delay, corrective measures are taken to minimize the impact on the accuracy and integrity of the flow system while the repair or replacement is proceeding; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751421" lims:id="751421"><Label>(d)</Label><Text>that a conservation officer is notified, as soon as the circumstances permit, of any malfunction or failure of any flow system component that may have an impact on the accuracy of the flow system and of the corrective measures taken.</Text></Paragraph></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751422" lims:id="751422" level="2"><TitleText>Transfer Meters</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751423" lims:id="751423"><Label>63</Label><Text>The operator shall ensure that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751424" lims:id="751424"><Label>(a)</Label><Text>a conservation officer is notified at least 14 days before the day on which any transfer meter prover or master meter used in conjunction with a transfer meter is calibrated; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751425" lims:id="751425"><Label>(b)</Label><Text>a copy of the calibration certificate is submitted to the Chief Conservation Officer as soon as the circumstances permit, following completion of the calibration.</Text></Paragraph></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751426" lims:id="751426" level="2"><TitleText>Proration Testing Frequency</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751427" lims:id="751427"><Label>64</Label><Text>The operator of a development well that is producing oil or gas shall ensure that sufficient proration tests are performed to permit reasonably accurate determination of the allocation of oil, gas and water production on a pool and zone basis.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751428" lims:id="751428" level="1"><Label>PART 8</Label><TitleText>Production Conservation</TitleText></Heading><Heading lims:inforce-start-date="2009-12-31" lims:fid="751429" lims:id="751429" level="2"><TitleText>Resource Management</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751430" lims:id="751430"><Label>65</Label><Text>The operator shall ensure that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751431" lims:id="751431"><Label>(a)</Label><Text>maximum recovery from a pool or zone is achieved in accordance with good oilfield practices;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751432" lims:id="751432"><Label>(b)</Label><Text>wells are located and operated to provide for maximum recovery from a pool; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751433" lims:id="751433"><Label>(c)</Label><Text>if there is reason to believe that infill drilling or implementation of an enhanced recovery scheme might result in increased recovery from a pool or field, studies on these methods are carried out and submitted to the Board.</Text></Paragraph></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751434" lims:id="751434" level="2"><TitleText>Commingled Production</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751435" lims:id="751435"><Label>66</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751436" lims:id="751436"><Label>(1)</Label><Text>No operator shall engage in commingled production except in accordance with the approval granted under subsection (2).</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751437" lims:id="751437"><Label>(2)</Label><Text>The Board shall approve the commingled production if the operator demonstrates that it would not reduce the recovery from the pools or zones.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751438" lims:id="751438"><Label>(3)</Label><Text>The operator engaging in commingled production shall ensure that the total volume and the rate of production of each fluid produced is measured and the volume from each pool or zone is allocated in accordance with the requirements of Part 7.</Text></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751439" lims:id="751439" level="2"><TitleText>Gas Flaring and Venting</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751440" lims:id="751440"><Label>67</Label><Text>No operator shall flare or vent gas unless</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751441" lims:id="751441"><Label>(a)</Label><Text>it is otherwise permitted in the approval issued under subsection 52(4) or in the authorization; or</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751442" lims:id="751442"><Label>(b)</Label><Text>it is necessary to do so because of an emergency situation and the Board is notified in the daily drilling report, daily production report or in any other written or electronic form, as soon as the circumstances permit, of the flaring or venting and of the amount flared or vented.</Text></Paragraph></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751443" lims:id="751443" level="2"><TitleText>Oil Burning</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751444" lims:id="751444"><Label>68</Label><Text>No operator shall burn oil unless</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751445" lims:id="751445"><Label>(a)</Label><Text>it is otherwise permitted in the approval issued under subsection 52(4) or in the authorization; or</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751446" lims:id="751446"><Label>(b)</Label><Text>it is necessary to do so because of an emergency situation and the Board is notified in the daily drilling report, daily production report or in any other written or electronic form, as soon as the circumstances permit, of the burning and the amount burned.</Text></Paragraph></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751447" lims:id="751447" level="1"><Label>PART 9</Label><TitleText>Support Operations</TitleText></Heading><Heading lims:inforce-start-date="2009-12-31" lims:fid="751448" lims:id="751448" level="2"><TitleText>Support Craft</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751449" lims:id="751449"><Label>69</Label><Text>The operator shall ensure that all support craft are designed, constructed and maintained to supply the necessary support functions and operate safely in the foreseeable physical environmental conditions prevailing in the area in which they operate.</Text></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751450" lims:id="751450"><Label>70</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751451" lims:id="751451"><Label>(1)</Label><Text>The operator of a manned installation shall ensure that at least one support craft is</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751452" lims:id="751452"><Label>(a)</Label><Text>available at a distance that is not greater than that required for a return time of twenty minutes; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751453" lims:id="751453"><Label>(b)</Label><Text>suitably equipped to supply the necessary emergency services including rescue and first aid treatment for all personnel on the installation in the event of an emergency.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751454" lims:id="751454"><Label>(2)</Label><Text>If the support craft exceeds the distance referred to in paragraph (1)(a), both the installation manager and the person in charge of the support craft shall log this fact and the reason why the distance or time was exceeded.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751455" lims:id="751455"><Label>(3)</Label><Text>Under the direction of the installation manager, the support craft crew shall keep the craft in close proximity to the installation, maintain open communication channels with the installation and be prepared to conduct rescue operations during any activity or condition that presents an increased level of risk to the safety of personnel or the installation.</Text></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751456" lims:id="751456" level="2"><TitleText>Safety Zone</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751457" lims:id="751457"><Label>71</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751458" lims:id="751458"><Label>(1)</Label><Text>For the purposes of this section, the safety zone around an offshore installation consists of the area within a line enclosing and drawn at a distance of 500 m from the outer edge of the installation.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751459" lims:id="751459"><Label>(2)</Label><Text>A support craft shall not enter the safety zone without the consent of the installation manager.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751460" lims:id="751460"><Label>(3)</Label><Text>The operator shall take all reasonable measures to warn persons who are in charge of vessels and aircraft of the safety zone boundaries, of the facilities within the safety zone and of any related potential hazards.</Text></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751461" lims:id="751461" level="1"><Label>PART 10</Label><TitleText>Training and Competency</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751462" lims:id="751462"><Label>72</Label><Text>The operator shall ensure that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751463" lims:id="751463"><Label>(a)</Label><Text>all personnel have, before assuming their duties, the necessary experience, training and qualifications and are able to conduct their duties safely, competently and in compliance with these Regulations; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751464" lims:id="751464"><Label>(b)</Label><Text>records of the experience, training and qualifications of all personnel are kept and made available to the Board upon request.</Text></Paragraph></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751465" lims:id="751465" level="1"><Label>PART 11</Label><TitleText>Submissions, Notifications, Records and Reports</TitleText></Heading><Heading lims:inforce-start-date="2009-12-31" lims:fid="751466" lims:id="751466" level="2"><TitleText>Reference to Names and Designations</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751467" lims:id="751467"><Label>73</Label><Text>When submitting any information for the purposes of these Regulations, the operator shall refer to each well, pool and field by the name given to it under sections 3 and 4, or if a zone, by its designation by the Board under section 4.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751468" lims:id="751468" level="2"><TitleText>Surveys</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751469" lims:id="751469"><Label>74</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751470" lims:id="751470"><Label>(1)</Label><Text>The operator shall ensure that a survey is used to confirm</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751471" lims:id="751471"><Label>(a)</Label><Text>for an onshore well, the surface location; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751472" lims:id="751472"><Label>(b)</Label><Text>for an offshore well, the location on the seafloor.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751473" lims:id="751473"><Label>(2)</Label><Text>The survey shall be certified by a person licensed under the <XRefExternal reference-type="act" link="L-5.8">Canada Lands Surveyors Act</XRefExternal>.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751474" lims:id="751474"><Label>(3)</Label><Text>The operator shall ensure that a copy of the survey plan filed with the Canada Lands Surveys Records is submitted to the Board.</Text></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751475" lims:id="751475" level="2"><TitleText>Incidents and Near-misses</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751476" lims:id="751476"><Label>75</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751477" lims:id="751477"><Label>(1)</Label><Text>The operator shall ensure that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751478" lims:id="751478"><Label>(a)</Label><Text>the Board is notified of any incident or near-miss as soon as the circumstances permit; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751479" lims:id="751479"><Label>(b)</Label><Text>the Board is notified at least 24 hours in advance of any press release or press conference held by the operator concerning any incident or near-miss during any activity to which these Regulations apply, except in an emergency situation, in which case it shall be notified without delay before the press release or press conference.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751480" lims:id="751480"><Label>(2)</Label><Text>The operator shall ensure that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751481" lims:id="751481"><Label>(a)</Label><Text>any incident or near-miss is investigated, its root cause and causal factors identified and corrective action taken; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751482" lims:id="751482"><Label>(b)</Label><Text>for any of the following incidents or near-misses, a copy of an investigation report identifying the root cause, causal factors and corrective action taken is submitted to the Board no later than 21 days after the day on which the incident or near-miss occurred:</Text><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751483" lims:id="751483"><Label>(i)</Label><Text>a lost or restricted workday injury,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751484" lims:id="751484"><Label>(ii)</Label><Text>death,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751485" lims:id="751485"><Label>(iii)</Label><Text>fire or explosion,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751486" lims:id="751486"><Label>(iv)</Label><Text>a loss of containment of any fluid from a well,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751487" lims:id="751487"><Label>(v)</Label><Text>an imminent threat to the safety of a person, installation or support craft, or</Text></Subparagraph><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751488" lims:id="751488"><Label>vi)</Label><Text>a significant pollution event.</Text></Subparagraph></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751489" lims:id="751489" level="2"><TitleText>Submission of Data and Analysis</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751490" lims:id="751490"><Label>76</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751491" lims:id="751491"><Label>(1)</Label><Text>The operator shall ensure that a final copy of the results, data, analyses and schematics obtained from the following sources is submitted to the Board:</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751492" lims:id="751492"><Label>(a)</Label><Text>testing, sampling and pressure surveys carried out as part of the well and field data acquisition programs referred to in section 49 and testing and sampling of formations referred to in section 51; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751493" lims:id="751493"><Label>(b)</Label><Text>any segregation test or well operation.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751494" lims:id="751494"><Label>(2)</Label><Text>Unless otherwise indicated in these Regulations, the operator shall ensure that the results, data, analyses and schematics are submitted within 60 days after the day on which any activity referred to in paragraphs (1)(a) and (b) is completed.</Text></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751495" lims:id="751495" level="2"><TitleText>Records</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751496" lims:id="751496"><Label>77</Label><Text>The operator shall ensure that records are kept of</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751497" lims:id="751497"><Label>(a)</Label><Text>all persons arriving, leaving or present on the installation;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751498" lims:id="751498"><Label>(b)</Label><Text>the location and movement of support craft, the emergency drills and exercises, incidents, near-misses, the quantities of consumable substances that are required to ensure the safety of operations and other observations and information critical to the safety of persons on the installation or the protection of the environment;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751499" lims:id="751499"><Label>(c)</Label><Text>daily maintenance and operating activities, including any activity that may be critical to the safety of persons on the installation, the protection of the environment or the prevention of waste;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751500" lims:id="751500"><Label>(d)</Label><Text>in the case of a production installation,</Text><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751501" lims:id="751501"><Label>(i)</Label><Text>the inspection of the installation and related equipment for corrosion and erosion and any resulting maintenance carried out,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751502" lims:id="751502"><Label>(ii)</Label><Text>the pressure, temperature and flow rate data for compressors and treating and processing facilities,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751503" lims:id="751503"><Label>(iii)</Label><Text>the calibration of meters and instruments,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751504" lims:id="751504"><Label>(iv)</Label><Text>the testing of surface and subsurface safety valves,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751505" lims:id="751505"><Label>(v)</Label><Text>the status of each well and the status of well operations, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2009-12-31" lims:fid="751506" lims:id="751506"><Label>(vi)</Label><Text>the status of the equipment and systems critical to safety and protection of the environment including any unsuccessful test result or equipment failure leading to an impairment of the systems; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751507" lims:id="751507"><Label>(e)</Label><Text>in the case of a floating installation, all installation movements, data, observations, measurements and calculations related to the stability and station-keeping capability of the installation.</Text></Paragraph></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751508" lims:id="751508" level="2"><TitleText>Meteorological Observations</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751509" lims:id="751509"><Label>78</Label><Text>The operator of an offshore installation shall ensure</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751510" lims:id="751510"><Label>(a)</Label><Text>that the installation is equipped with facilities and equipment for observing, measuring and recording physical environmental conditions and that a comprehensive record of observations of physical environmental conditions is maintained onboard the installation; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751511" lims:id="751511"><Label>(b)</Label><Text>that forecasts of meteorological conditions, sea states and ice movements are obtained and recorded each day and each time during the day that they change substantially from those forecasted.</Text></Paragraph></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751512" lims:id="751512" level="2"><TitleText>Daily Production Record</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751513" lims:id="751513"><Label>79</Label><Text>The operator shall ensure that a daily production record, which includes the metering records and other information relating to the production of oil and gas and other fluids in respect of a pool or well, is retained and readily accessible to the Board until the field or well in which the pool is located is abandoned and at that time shall offer the record to the Board before destroying it.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751514" lims:id="751514" level="2"><TitleText>Management of Records</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751515" lims:id="751515"><Label>80</Label><Text>The operator shall ensure that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751516" lims:id="751516"><Label>(a)</Label><Text>all processes are in place and implemented to identify, generate, control and retain records necessary to support operational and regulatory requirements; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751517" lims:id="751517"><Label>(b)</Label><Text>the records are readily accessible for inspection by the Board.</Text></Paragraph></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751518" lims:id="751518" level="2"><TitleText>Formation Flow Test Reports</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751519" lims:id="751519"><Label>81</Label><Text>The operator shall ensure that</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751520" lims:id="751520"><Label>(a)</Label><Text>in respect of exploration and delineation wells, a daily record of formation flow test results is submitted to the Board; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751521" lims:id="751521"><Label>(b)</Label><Text>in respect of all wells, a formation flow test report is submitted to the Board as soon as the circumstances permit, following completion of the test.</Text></Paragraph></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751522" lims:id="751522" level="2"><TitleText>Pilot Scheme</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751523" lims:id="751523"><Label>82</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751524" lims:id="751524"><Label>(1)</Label><Text>For the purposes of this section, <DefinedTermEn>pilot scheme</DefinedTermEn> means a scheme that applies existing or experimental technology over a limited portion of a pool to obtain information on reservoir or production performance for the purpose of optimizing field development or improving reservoir or production performance.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751525" lims:id="751525"><Label>(2)</Label><Text>The operator shall ensure that interim evaluations of any pilot scheme respecting a pool, field or zone are submitted to the Board.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751526" lims:id="751526"><Label>(3)</Label><Text>When the operator completes a pilot scheme, the operator shall ensure that a report is submitted to the Board that sets out</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751527" lims:id="751527"><Label>(a)</Label><Text>the results of the scheme and supporting data and analyses; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751528" lims:id="751528"><Label>(b)</Label><Text>the operator’s conclusions as to the potential of the scheme for application to full-scale production.</Text></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751529" lims:id="751529" level="2"><TitleText>Daily Reports</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751530" lims:id="751530"><Label>83</Label><Text>The operator shall ensure that a copy of the following is submitted to the Board daily:</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751531" lims:id="751531"><Label>(a)</Label><Text>the daily drilling report;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751532" lims:id="751532"><Label>(b)</Label><Text>the daily geological report, including any formation evaluation logs and data; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751533" lims:id="751533"><Label>(c)</Label><Text>in the case of a production installation, a summary, in the form of a daily production report, of the records referred to in paragraph 77(d) and the daily production record.</Text></Paragraph></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751534" lims:id="751534" level="2"><TitleText>Monthly Production Report</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751535" lims:id="751535"><Label>84</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751536" lims:id="751536"><Label>(1)</Label><Text>The operator shall ensure that a report summarizing the production data collected during the preceding month is submitted to the Board not later than the 15th day of each month.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751537" lims:id="751537"><Label>(2)</Label><Text>The report shall use established production accounting procedures.</Text></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751538" lims:id="751538" level="2"><TitleText>Annual Production Report</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751539" lims:id="751539"><Label>85</Label><Text>The operator shall ensure that, not later than March 31 of each year, an annual production report relating to the preceding year for a pool, field or zone is submitted to the Board including details on the performance, production forecast, reserve revision, reasons for significant deviations in well performance from predictions in previous annual production reports, gas conservation resources, efforts to maximize recovery and reduce costs, and any other information required to demonstrate how the operator manages and intends to manage the resource without causing waste.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751540" lims:id="751540" level="2"><TitleText>Environmental Reports</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751541" lims:id="751541"><Label>86</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751542" lims:id="751542"><Label>(1)</Label><Text>For each production project, the operator shall ensure that, not later than March 31 of each year, an annual environmental report relating to the preceding year is submitted to the Board and includes</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751543" lims:id="751543"><Label>(a)</Label><Text>for an offshore installation, a summary of the general environmental conditions during the year and a description of ice management activities; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751544" lims:id="751544"><Label>(b)</Label><Text>a summary of environmental protection matters during the year, including a summary of any incidents that may have an environmental impact, discharges that occurred and waste material that was produced, a discussion of efforts undertaken to reduce pollution and waste material and a description of environmental contingency plan exercises.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751545" lims:id="751545"><Label>(2)</Label><Text>For each drilling installation for an exploration or delineation well, the operator shall ensure that an environmental report relating to each well is submitted to the Board within 90 days after the rig release date and includes</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751546" lims:id="751546"><Label>(a)</Label><Text>a description of the general environmental conditions during the drilling program and a description of ice management activities and downtime caused by weather or ice; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751547" lims:id="751547"><Label>(b)</Label><Text>a summary of environmental protection matters during the drilling program, including a summary of spills, discharges occurred and waste material produced, a discussion of efforts undertaken to reduce them, and a description of environmental contingency plan exercises.</Text></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751548" lims:id="751548" level="2"><TitleText>Annual Safety Report</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751549" lims:id="751549"><Label>87</Label><Text>The operator shall ensure that, not later than March 31 of each year, an annual safety report relating to the preceding year is submitted to the Board and includes</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751550" lims:id="751550"><Label>(a)</Label><Text>a summary of lost or restricted workday injuries, minor injuries and safety-related incidents and near-misses that have occurred during the preceding year; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751551" lims:id="751551"><Label>(b)</Label><Text>a discussion of efforts undertaken to improve safety.</Text></Paragraph></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751552" lims:id="751552" level="2"><TitleText>Well History Report</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751553" lims:id="751553"><Label>88</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751554" lims:id="751554"><Label>(1)</Label><Text>The operator shall ensure that a well history report is prepared for every well drilled by the operator under the well approval and that the report is submitted to the Board.</Text></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751555" lims:id="751555"><Label>(2)</Label><Text>The well history report shall contain a record of all operational, engineering, petrophysical and geological information that is relevant to the drilling and evaluation of the well.</Text></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751556" lims:id="751556" level="2"><TitleText>Well Operations Report</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751557" lims:id="751557"><Label>89</Label><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751558" lims:id="751558"><Label>(1)</Label><Text>The operator shall ensure that a report including the following information is submitted to the Board within 30 days after the end of a well operation:</Text><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751559" lims:id="751559"><Label>(a)</Label><Text>a summary of the well operation, including any problems encountered during the well operation;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751560" lims:id="751560"><Label>(b)</Label><Text>a description of the completion fluid properties;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751561" lims:id="751561"><Label>(c)</Label><Text>a schematic of, and relevant engineering data on, the down-hole equipment, tubulars, Christmas tree and production control system;</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751562" lims:id="751562"><Label>(d)</Label><Text>details of any impact of the well operation on the performance of the well, including any effect on recovery; and</Text></Paragraph><Paragraph lims:inforce-start-date="2009-12-31" lims:fid="751563" lims:id="751563"><Label>(e)</Label><Text>for any well completion, suspension or abandonment, the rig release date.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2009-12-31" lims:fid="751564" lims:id="751564"><Label>(2)</Label><Text>The report shall be signed and dated by the operator or the operator’s representative.</Text></Subsection></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751565" lims:id="751565" level="2"><TitleText>Other Reports</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751566" lims:id="751566"><Label>90</Label><Text>The operator shall ensure that the Board is made aware, at least once a year, of any report containing relevant information regarding applied research work or studies obtained or compiled by the operator relating to the operator’s work or activities and that a copy of any report is submitted to the Board on request.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751567" lims:id="751567" level="1"><Label>PART 12</Label><TitleText>Consequential Amendments, Transitional Provision, Repeals and Coming into Force</TitleText></Heading><Heading lims:inforce-start-date="2009-12-31" lims:fid="751568" lims:id="751568" level="2"><TitleText>Consequential Amendments</TitleText></Heading><Heading lims:inforce-start-date="2009-12-31" lims:fid="751569" lims:id="751569" level="3"><TitleText>Canada Oil and Gas Certificate of Fitness Regulations</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751570" lims:id="751570"><Label>91</Label><Text>[Amendments]</Text></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751571" lims:id="751571"><Label>92</Label><Text>[Amendment]</Text></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751572" lims:id="751572"><Label>93</Label><Text>[Amendments]</Text></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751573" lims:id="751573"><Label>94</Label><Text>[Amendment]</Text></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751574" lims:id="751574"><Label>95</Label><Text>[Amendment]</Text></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751575" lims:id="751575"><Label>96</Label><Text>[Amendments]</Text></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751576" lims:id="751576"><Label>97</Label><Text>[Amendment]</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751577" lims:id="751577" level="3"><TitleText>Canada Oil and Gas Installations Regulations</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751578" lims:id="751578"><Label>98</Label><Text>[Amendments]</Text></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751579" lims:id="751579"><Label>99</Label><Text>[Amendment]</Text></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751580" lims:id="751580"><Label>100</Label><Text>[Amendment]</Text></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751581" lims:id="751581"><Label>101</Label><Text>[Amendments]</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751582" lims:id="751582" level="2"><TitleText>Transitional Provision</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751583" lims:id="751583" type="transitional"><Label>102</Label><Text>An operator at the time of the coming into force of these Regulations shall comply with the requirements of section 5.</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751584" lims:id="751584" level="2"><TitleText>Repeals</TitleText></Heading><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751585" lims:id="751585"><Label>103</Label><Text>[Repeal]</Text></Section><Section lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751586" lims:id="751586"><Label>104</Label><Text>[Repeal]</Text></Section><Heading lims:inforce-start-date="2009-12-31" lims:fid="751587" lims:id="751587" level="2"><TitleText>Coming Into Force</TitleText></Heading><Section lims:inforce-start-date="2009-11-26" lims:lastAmendedDate="2009-11-26" lims:fid="751588" lims:id="751588" type="transitional"><Label>105</Label><Text>These Regulations come into force on December 31, 2009.</Text></Section></Body><Schedule lims:inforce-start-date="2009-12-31" lims:lastAmendedDate="2009-12-31" lims:fid="751589" lims:id="751589" spanlanguages="no" bilingual="no"><ScheduleFormHeading lims:inforce-start-date="2009-12-31" lims:fid="751590" lims:id="751590" type="amending"><Label>SCHEDULE</Label></ScheduleFormHeading><Provision lims:inforce-start-date="2009-12-31" lims:fid="751591" lims:id="751591" format-ref="centered" language-align="no" list-item="no"><Text>[Amendment]</Text></Provision></Schedule></Regulation>