<?xml version="1.0"?><Regulation lims:pit-date="2024-10-28" hasPreviousVersion="true" lims:lastAmendedDate="2024-10-28" lims:current-date="2024-10-30" lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1441799" lims:id="1441799" gazette-part="II" regulation-type="SOR" xml:lang="en" xmlns:lims="http://justice.gc.ca/lims"><Identification lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1441800" lims:id="1441800"><InstrumentNumber>SOR/2024-25</InstrumentNumber><RegistrationDate><Date><YYYY>2024</YYYY><MM>2</MM><DD>19</DD></Date></RegistrationDate><ConsolidationDate><Date><YYYY>2024</YYYY><MM>10</MM><DD>31</DD></Date></ConsolidationDate><EnablingAuthority lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1441801" lims:id="1441801"><XRefExternal reference-type="act" link="C-7.5">CANADA–NEWFOUNDLAND AND LABRADOR ATLANTIC ACCORD IMPLEMENTATION ACT</XRefExternal></EnablingAuthority><LongTitle lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1441802" lims:id="1441802">Canada–Newfoundland and Labrador Offshore Area Petroleum Operations Framework Regulations</LongTitle><RegulationMakerOrder><RegulationMaker>P.C.</RegulationMaker><OrderNumber>2024-143</OrderNumber><Date><YYYY>2024</YYYY><MM>2</MM><DD>19</DD></Date></RegulationMakerOrder></Identification><Order lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1441803" lims:id="1441803"><Provision lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1441804" lims:id="1441804" format-ref="indent-0-0" language-align="yes" list-item="no"><Text>Whereas, under subsection 150(1) of the <XRefExternal reference-type="act" link="C-7.5">Canada–Newfoundland and Labrador Atlantic Accord Implementation Act</XRefExternal><FootnoteRef idref="fn_81000-2-4108_hq_30621">a</FootnoteRef>, a copy of the proposed <XRefExternal reference-type="regulation" link="SOR-2024-25">Canada–Newfoundland and Labrador Offshore Area Petroleum Operations Framework Regulations</XRefExternal>, substantially in the annexed form, was published in the <XRefExternal reference-type="other" link="gazette">Canada Gazette</XRefExternal>, Part I, on June 18, 2022 and a reasonable opportunity was afforded to interested persons to make representations to the Minister of Natural Resources with respect to the proposed Regulations;</Text><Footnote id="fn_81000-2-4108_hq_30621" placement="page" status="official"><Label>a</Label><Text>S.C. 1987, c. 3; S.C. 2014, c. 13, s. 3</Text></Footnote></Provision><Provision lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1441805" lims:id="1441805" format-ref="indent-0-0" language-align="yes" list-item="no"><Text>And whereas, under subsection 7(1)<FootnoteRef idref="fn_81000-2-4108_hq_30334">b</FootnoteRef> of that Act, the Minister of Natural Resources consulted the Provincial Minister for Newfoundland and Labrador with respect to the proposed Regulations and that minister approved the making of those Regulations;</Text><Footnote id="fn_81000-2-4108_hq_30334" placement="page" status="official"><Label>b</Label><Text>S.C. 2015, c. 4, s. 117(4)</Text></Footnote></Provision><Provision lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1441806" lims:id="1441806" format-ref="indent-0-0" language-align="yes" list-item="no"><Text>Therefore, Her Excellency the Governor General in Council, on the recommendation of the Minister of Natural Resources and the Minister of the Environment, makes the annexed <XRefExternal reference-type="regulation" link="SOR-2024-25">Canada–Newfoundland and Labrador Offshore Area Petroleum Operations Framework Regulations</XRefExternal> under section 149<FootnoteRef idref="fn_81000-2-4108_hq_30627">c</FootnoteRef> of the <XRefExternal reference-type="act" link="C-7.5">Canada–Newfoundland and Labrador Atlantic Accord Implementation Act</XRefExternal><FootnoteRef idref="fn_81000-2-4108_hq_30621">a</FootnoteRef>.</Text><Footnote id="fn_81000-2-4108_hq_30627" placement="page" status="official"><Label>c</Label><Text>S.C. 2015, c. 4, ss. 54 and 117(7)</Text></Footnote></Provision></Order><Body lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1441807" lims:id="1441807"><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1441808" lims:id="1441808" level="1"><Label>PART 1</Label><TitleText>General</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1441809" lims:id="1441809"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441810" lims:id="1441810">Definitions</MarginalNote><Label>1</Label><Text>The following definitions apply in these Regulations.</Text><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441811" lims:id="1441811"><Text><DefinedTermEn>accidental event</DefinedTermEn> means an unexpected or unplanned event or circumstance or series of unexpected or unplanned events or circumstances that may lead to the loss of life or damage to the environment, including pollution. (<DefinedTermFr>événement accidentel</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441812" lims:id="1441812"><Text><DefinedTermEn>accommodations area</DefinedTermEn> means the area of an installation or vessel that contains the sleeping quarters, dining areas, food preparation areas, general recreation areas, offices and medical rooms and includes all washrooms in that area. (<DefinedTermFr>aire d’habitation</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441813" lims:id="1441813"><Text><DefinedTermEn>accommodations installation</DefinedTermEn> means an installation that is used to accommodate persons at a production site, drill site or dive site and that functions independently of a production installation, drilling installation or diving installation. (<DefinedTermFr>installation d’habitation</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441814" lims:id="1441814"><Text><DefinedTermEn>Act</DefinedTermEn> means the <XRefExternal reference-type="act" link="C-7.5">Canada–Newfoundland and Labrador Atlantic Accord Implementation Act</XRefExternal>. (<DefinedTermFr>Loi</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441815" lims:id="1441815"><Text><DefinedTermEn>authorization</DefinedTermEn> means an authorization issued by the Board under paragraph 138(1)(b) of the Act. (<DefinedTermFr>autorisation</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441816" lims:id="1441816"><Text><DefinedTermEn>authorized inspector</DefinedTermEn> means a person who is recognized under the laws of Canada or of a province as qualified to inspect boilers and pressure systems or a representative of a certifying authority who is qualified to carry out that function. (<DefinedTermFr>inspecteur autorisé</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441817" lims:id="1441817"><Text><DefinedTermEn>barrier element</DefinedTermEn> means a physical element that on its own does not prevent the flow of fluids but that in combination with other physical elements forms a well barrier. (<DefinedTermFr>élément de barrière</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441818" lims:id="1441818"><Text><DefinedTermEn>barrier envelope</DefinedTermEn> means an envelope consisting of a set of barrier elements that prevents any unintended flow of fluids from the formation into the well-bore, another formation or the environment. (<DefinedTermFr>enveloppe de barrière</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441819" lims:id="1441819"><Text><DefinedTermEn>certificate of fitness</DefinedTermEn> means a certificate referred to in section 139.2 of the Act. (<DefinedTermFr>certificat d’aptitude</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441820" lims:id="1441820"><Text><DefinedTermEn>certifying authority</DefinedTermEn> means the American Bureau of Shipping, Bureau Veritas, Det norske Veritas or Lloyd’s Register. (<DefinedTermFr>autorité</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441821" lims:id="1441821"><Text><DefinedTermEn>classification society</DefinedTermEn> means a member of the International Association of Classification Societies that has recognized and relevant competence and experience in, and established rules and procedures for, the classification of fixed and floating structures, including vessels, that are used in oil or gas activities in locations with physical and environmental conditions similar to those of the offshore area. (<DefinedTermFr>société de classification</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441822" lims:id="1441822"><Text><DefinedTermEn>commingled production</DefinedTermEn> means the production of petroleum from more than one pool or zone through a common well where the production from each pool or zone is not measured separately. (<DefinedTermFr>production mélangée</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441823" lims:id="1441823"><Text><DefinedTermEn>completion interval</DefinedTermEn> means a section within a well that is prepared to permit</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441824" lims:id="1441824"><Label>(a)</Label><Text>the production of fluids from the well;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441825" lims:id="1441825"><Label>(b)</Label><Text>the observation of the performance of the reservoir; or</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441826" lims:id="1441826"><Label>(c)</Label><Text>the injection of fluids into the well. (<DefinedTermFr>intervalle de complétion</DefinedTermFr>)</Text></Paragraph></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441827" lims:id="1441827"><Text><DefinedTermEn>control centre</DefinedTermEn> means a continuously staffed work area in which a control system that is critical to the operation of an installation or a pipeline, to safety or to the prevention of waste and pollution is located. (<DefinedTermFr>centre de commande</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441828" lims:id="1441828"><Text><DefinedTermEn>control system</DefinedTermEn> means any system, station or panel used to monitor the status and control the operation of equipment used for or in support of the drilling for, or the production, processing or transportation of, petroleum or any system, station or panel used to monitor and control the operation of an installation. (<DefinedTermFr>système de commande</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441829" lims:id="1441829"><Text><DefinedTermEn>decommissioning and abandonment</DefinedTermEn> means the carrying out of the following processes in accordance with any applicable Act of Parliament, any applicable regulation made under an Act of Parliament, the applicable authorization and any approved development plans:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441830" lims:id="1441830"><Label>(a)</Label><Text>the cessation of operations;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441831" lims:id="1441831"><Label>(b)</Label><Text>the controlled abandonment of all wells;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441832" lims:id="1441832"><Label>(c)</Label><Text>the retirement from service and abandonment or removal of all installations, including their systems and equipment; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441833" lims:id="1441833"><Label>(d)</Label><Text>the retirement from service and abandonment or removal of all pipelines and materials. (<DefinedTermFr>désaffectation et abandon</DefinedTermFr>)</Text></Paragraph></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441834" lims:id="1441834"><Text><DefinedTermEn>delineation well</DefinedTermEn> has the same meaning as in subsection 119(1) of the Act. (<DefinedTermFr>puits de délimitation</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441835" lims:id="1441835"><Text><DefinedTermEn>development well</DefinedTermEn> has the same meaning as in subsection 119(1) of the Act. (<DefinedTermFr>puits d’exploitation</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441836" lims:id="1441836"><Text><DefinedTermEn>diving installation</DefinedTermEn> means an installation or vessel on which a diving system is installed. (<DefinedTermFr>installation de plongée</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441837" lims:id="1441837"><Text><DefinedTermEn>diving project</DefinedTermEn> means any work or activity that is related to the exploration or drilling for, or the production, conservation, processing or transportation of, petroleum and that involves diving. (<DefinedTermFr>projet de plongée</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441838" lims:id="1441838"><Text><DefinedTermEn>diving system</DefinedTermEn> means the equipment that is required to execute a dive, including that required for compression, decompression, rescue and recovery. (<DefinedTermFr>système de plongée</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441839" lims:id="1441839"><Text><DefinedTermEn>drilling installation</DefinedTermEn> means a drilling unit or a drilling rig, and the stable foundation on which it is installed — including an artificial island, an ice platform, a floating platform, a platform fixed to the seabed and any other foundation specifically used for drilling — and any associated accommodations area. (<DefinedTermFr>installation de forage</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441840" lims:id="1441840"><Text><DefinedTermEn>drilling program</DefinedTermEn> means a program for the drilling of one or more wells within a specified time and within specified areas through the use of one or more drilling installations and includes any work or activity related to the program. (<DefinedTermFr>programme de forage</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441841" lims:id="1441841"><Text><DefinedTermEn>drilling rig</DefinedTermEn> means the equipment used to conduct well operations and associated systems, including power systems, control systems and monitoring systems. (<DefinedTermFr>appareil de forage</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441842" lims:id="1441842"><Text><DefinedTermEn>drilling riser</DefinedTermEn> means the connection between a subsea blowout preventer and a mobile offshore platform. (<DefinedTermFr>tube prolongateur de forage</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441843" lims:id="1441843"><Text><DefinedTermEn>drilling unit</DefinedTermEn> means a fixed or mobile offshore platform, or a vessel used in any well operation, that is fitted with a drilling rig, including all systems and equipment installed on the platform or vessel that are related to well operations and marine activities. (<DefinedTermFr>unité de forage</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441844" lims:id="1441844"><Text><DefinedTermEn>drill site</DefinedTermEn> means a location where a drilling rig is or is proposed to be installed. (<DefinedTermFr>emplacement de forage</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441845" lims:id="1441845"><Text><DefinedTermEn>environmental load</DefinedTermEn> means a load imposed by meteorological or oceanographic conditions, such as winds, waves, tides, currents or snow, ice conditions, regional ice features, such as sea ice or icebergs, a seismic event or any other naturally occurring phenomenon. (<DefinedTermFr>charge environnementale</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441846" lims:id="1441846"><Text><DefinedTermEn>environmental program</DefinedTermEn> means a program pertaining to an <DefinitionRef>environmental study</DefinitionRef> as defined in subsection 119(1) of the Act. (<DefinedTermFr>programme environnemental</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441847" lims:id="1441847"><Text><DefinedTermEn>exploratory well</DefinedTermEn> has the same meaning as in subsection 119(1) of the Act. (<DefinedTermFr>puits d’exploration</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441848" lims:id="1441848"><Text><DefinedTermEn>floating platform</DefinedTermEn> means a column-stabilized mobile offshore platform, a surface mobile offshore platform or a fixed floating offshore platform, including a tension leg platform or a spar platform. (<DefinedTermFr>plate-forme flottante</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441849" lims:id="1441849"><Text><DefinedTermEn>flow allocation procedure</DefinedTermEn> means the procedure</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441850" lims:id="1441850"><Label>(a)</Label><Text>to allocate total measured quantities of petroleum and water produced from or injected into a pool or zone back to individual wells in a pool or zone where individual well production or injection is not measured separately; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441851" lims:id="1441851"><Label>(b)</Label><Text>to allocate production among fields whose petroleum is combined for the purpose of storage or processing. (<DefinedTermFr>méthode de répartition du débit</DefinedTermFr>)</Text></Paragraph></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441852" lims:id="1441852"><Text><DefinedTermEn>flow calculation procedure</DefinedTermEn> means the procedure to convert raw meter output to a measured quantity of petroleum or water. (<DefinedTermFr>méthode de calcul du débit</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441853" lims:id="1441853"><Text><DefinedTermEn>flowline</DefinedTermEn> means any line, other than a pipeline, that is used to transport fluids between a well and equipment used for the production of petroleum that is located at a production site or to transport fluids between a well and any systems or equipment that are used in support of that production and between those systems or equipment and the production equipment. (<DefinedTermFr>conduite d’écoulement</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441854" lims:id="1441854"><Text><DefinedTermEn>flow system</DefinedTermEn> means the flow meters, auxiliary equipment attached to the flow meters, fluid sampling devices, production test equipment, master meter and meter prover used to measure and record the rate and volumes at which fluids are</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441855" lims:id="1441855"><Label>(a)</Label><Text>produced from or injected into a pool;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441856" lims:id="1441856"><Label>(b)</Label><Text>used as a fuel;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441857" lims:id="1441857"><Label>(c)</Label><Text>used for artificial lift; or</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441858" lims:id="1441858"><Label>(d)</Label><Text>flared, vented or transferred from a production installation. (<DefinedTermFr>système d’écoulement</DefinedTermFr>)</Text></Paragraph></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441859" lims:id="1441859"><Text><DefinedTermEn>formation flow test</DefinedTermEn> means an operation</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441860" lims:id="1441860"><Label>(a)</Label><Text>to induce the flow of formation fluids to procure reservoir fluid samples and determine reservoir flow characteristics; or</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441861" lims:id="1441861"><Label>(b)</Label><Text>to inject fluids into a formation to evaluate injectivity. (<DefinedTermFr>essai d’écoulement de formation</DefinedTermFr>)</Text></Paragraph></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441862" lims:id="1441862"><Text><DefinedTermEn>functional load</DefinedTermEn> means any construction load or operating load other than an environmental load or accidental load. (<DefinedTermFr>charge fonctionnelle</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441863" lims:id="1441863"><Text><DefinedTermEn>geoscientific program</DefinedTermEn> means any program that involves <DefinitionRef>geological work</DefinitionRef> or <DefinitionRef>geophysical work</DefinitionRef>, as those terms are defined in subsection 119(1) of the Act. (<DefinedTermFr>programme géoscientifique</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441864" lims:id="1441864"><Text><DefinedTermEn>geotechnical program</DefinedTermEn> means any program that involves <DefinitionRef>geotechnical work</DefinitionRef>, as defined in subsection 119(1) of the Act, that is undertaken to assess whether the seabed or shallow subsurface, as the case may be, is suitable to support installations or any other structures. (<DefinedTermFr>programme géotechnique</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441865" lims:id="1441865"><Text><DefinedTermEn>installation</DefinedTermEn> means, except in Part 5, a drilling installation, production installation or accommodations installation. (<DefinedTermFr>installation</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441866" lims:id="1441866"><Text><DefinedTermEn>life-saving appliances</DefinedTermEn> includes lifebuoys, survival craft, launching and embarkation appliances, marine evacuation systems and visual signals. (<DefinedTermFr>engins de sauvetage</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441867" lims:id="1441867"><Text><DefinedTermEn>load</DefinedTermEn> includes a functional load, environmental load, accidental load and abnormal load. (<DefinedTermFr>charge</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441868" lims:id="1441868"><Text><DefinedTermEn>LSA Code</DefinedTermEn> means the annex to International Maritime Organization Resolution MSC.48(66), <XRefExternal reference-type="standard">International Life-Saving Appliance (LSA) Code</XRefExternal>. (<DefinedTermFr>recueil LSA</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441869" lims:id="1441869"><Text><DefinedTermEn>major accidental event</DefinedTermEn> means an unexpected or unplanned event or circumstance or series of unexpected or unplanned events or circumstances that may lead to the loss of more than one life or uncontrolled pollution. (<DefinedTermFr>événement accidentel majeur</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441870" lims:id="1441870"><Text><DefinedTermEn>marine activities</DefinedTermEn> means activities related to the stability, station-keeping and collision avoidance of floating platforms and includes mooring, dynamic positioning and ballasting. (<DefinedTermFr>activités maritimes</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441871" lims:id="1441871"><Text><DefinedTermEn>mobile offshore platform</DefinedTermEn> means a platform that is designed to operate in a floating or buoyant mode or that can be moved from place to place without major dismantling or modification, whether or not it has its own motive power. (<DefinedTermFr>plate-forme mobile extracôtière</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441872" lims:id="1441872"><Text><DefinedTermEn>operations site</DefinedTermEn> means a site where an authorized work or activity is carried out. (<DefinedTermFr>emplacement des opérations</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441873" lims:id="1441873"><Text><DefinedTermEn>operator</DefinedTermEn> means a person that holds an operating licence issued by the Board under paragraph 138(1)(a) of the Act and applies for or has been granted an authorization. (<DefinedTermFr>exploitant</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441874" lims:id="1441874"><Text><DefinedTermEn>physical and environmental conditions</DefinedTermEn> means the physical, geotechnical, seismic, oceanographic, meteorological or ice conditions that might affect an authorized work or activity. (<DefinedTermFr>conditions physiques et environnementales</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441875" lims:id="1441875"><Text><DefinedTermEn>pipeline</DefinedTermEn> has the same meaning as in CSA Group standard Z662, <XRefExternal reference-type="standard">Oil and gas pipeline systems</XRefExternal>, as it relates to offshore pipelines. (<DefinedTermFr>pipeline</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441876" lims:id="1441876"><Text><DefinedTermEn>pollution</DefinedTermEn> means the introduction into the environment of any substance or form of energy outside the limits applicable to an authorized work or activity. (<DefinedTermFr>pollution</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441877" lims:id="1441877"><Text><DefinedTermEn>pressure system</DefinedTermEn> means piping, pressure vessels, safety components and pressure components, including elements attached to pressurized parts, such as flanges, nozzles, couplings, supports, lifting lugs, safety valves and gauges. (<DefinedTermFr>système sous pression</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441878" lims:id="1441878"><Text><DefinedTermEn>production installation</DefinedTermEn> means</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441879" lims:id="1441879"><Label>(a)</Label><Text>the systems and equipment used for or in support of the production of petroleum, including those that are used for separation, treatment and processing;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441880" lims:id="1441880"><Label>(b)</Label><Text>the systems and equipment used to conduct well operations;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441881" lims:id="1441881"><Label>(c)</Label><Text>any systems and equipment related to marine activities;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441882" lims:id="1441882"><Label>(d)</Label><Text>any associated aircraft landing areas, storage areas or tanks and accommodations areas; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441883" lims:id="1441883"><Label>(e)</Label><Text>any associated platforms, artificial islands, subsea production systems and offshore loading systems. (<DefinedTermFr>ouvrage de production</DefinedTermFr>)</Text></Paragraph></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441884" lims:id="1441884"><Text><DefinedTermEn>production project</DefinedTermEn> means a project for the purpose of developing a production site on, or producing petroleum from, a pool or field, including any work or activity related to the project. (<DefinedTermFr>projet de production</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441885" lims:id="1441885"><Text><DefinedTermEn>production riser</DefinedTermEn> means the connection between subsea production equipment and a production platform. (<DefinedTermFr>tube prolongateur de production</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441886" lims:id="1441886"><Text><DefinedTermEn>production site</DefinedTermEn> means a site where a production installation is or is proposed to be installed. (<DefinedTermFr>emplacement de production</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441887" lims:id="1441887"><Text><DefinedTermEn>recovery of petroleum</DefinedTermEn> means the recovery of petroleum under foreseeable economic and operational conditions. (<DefinedTermFr>récupération des hydrocarbures</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441888" lims:id="1441888"><Text><DefinedTermEn>relief well</DefinedTermEn> means a well that is drilled to assist in controlling a blowout in an existing well. (<DefinedTermFr>puits de secours</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441889" lims:id="1441889"><Text><DefinedTermEn>reportable incident</DefinedTermEn> means an event that resulted in any of the following occurrences or in which an occurrence referred to in any of paragraphs (a) to (f) was narrowly avoided:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441890" lims:id="1441890"><Label>(a)</Label><Text>loss of life;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441891" lims:id="1441891"><Label>(b)</Label><Text>fire or explosion;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441892" lims:id="1441892"><Label>(c)</Label><Text>collision;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441893" lims:id="1441893"><Label>(d)</Label><Text>pollution;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441894" lims:id="1441894"><Label>(e)</Label><Text>leak of a hazardous substance;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441895" lims:id="1441895"><Label>(f)</Label><Text>loss of well control;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441896" lims:id="1441896"><Label>(g)</Label><Text>impairment of a support craft or of any of the structural elements of an installation — or any system or equipment — that is critical to safety;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441897" lims:id="1441897"><Label>(h)</Label><Text>impairment of any of the structural elements of an installation — or any system or equipment — critical to environmental protection;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441898" lims:id="1441898"><Label>(i)</Label><Text>implementation of emergency response procedures. (<DefinedTermFr>incident à signaler</DefinedTermFr>)</Text></Paragraph></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441899" lims:id="1441899"><Text><DefinedTermEn>safety-critical element</DefinedTermEn> means any system or equipment, including software and temporary or portable equipment, that is critical to the safety or integrity of an installation or to preventing the installation from polluting, including</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441900" lims:id="1441900"><Label>(a)</Label><Text>any system or equipment</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441901" lims:id="1441901"><Label>(i)</Label><Text>that is intended to prevent or limit the effects of a hazard that could cause a major accidental event, or</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441902" lims:id="1441902"><Label>(ii)</Label><Text>whose failure could</Text><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441903" lims:id="1441903"><Label>(A)</Label><Text>cause a hazard that could cause a major accidental event, or</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441904" lims:id="1441904"><Label>(B)</Label><Text>worsen the effects on the installation of a major accidental event; and</Text></Clause></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441905" lims:id="1441905"><Label>(b)</Label><Text>any software or temporary or portable equipment that affects any system or equipment referred to in paragraph (a). (<DefinedTermFr>élément essentiel à la sécurité</DefinedTermFr>)</Text></Paragraph></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441906" lims:id="1441906"><Text><DefinedTermEn>subsea production system</DefinedTermEn> means equipment and structures that are located on or below the seabed for the production of petroleum from, or for the injection of fluids into, a field under a production site and includes production risers, flowlines and associated control systems that are located upstream of the isolation valve. (<DefinedTermFr>système de production sous-marin</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441907" lims:id="1441907"><Text><DefinedTermEn>support craft</DefinedTermEn> means a vessel, vehicle, aircraft or other craft used to provide transportation or assistance to persons at an operations site. (<DefinedTermFr>véhicule de service</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441908" lims:id="1441908"><Text><DefinedTermEn>waste material</DefinedTermEn> means any garbage, refuse, sewage or waste fluids or any other useless material that is generated during the carrying out of any work or activity, including used or surplus drill cuttings and drilling fluid as well as produced water. (<DefinedTermFr>déchets</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441909" lims:id="1441909"><Text><DefinedTermEn>watertight</DefinedTermEn> means designed and constructed to withstand a static head of water without any leakage. (<DefinedTermFr>étanche</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441910" lims:id="1441910"><Text><DefinedTermEn>well control</DefinedTermEn> means the control of the movement of fluids into or from a well. (<DefinedTermFr>maîtrise du puits</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441911" lims:id="1441911"><Text><DefinedTermEn>well operation</DefinedTermEn> means an operation related to the drilling, completion, recompletion, re-entry, intervention, workover, suspension or abandonment of a well. (<DefinedTermFr>travaux relatifs au puits</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441912" lims:id="1441912"><Text><DefinedTermEn>workover</DefinedTermEn> means an operation on a completed well that requires removal of the tree or the tubing. (<DefinedTermFr>reconditionnement</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441913" lims:id="1441913"><Text><DefinedTermEn>zone</DefinedTermEn> means any stratum or any sequence of strata, including a zone that has been designated as such by the Board under paragraph <XRefInternal>60</XRefInternal>(a). (<DefinedTermFr>couche</DefinedTermFr>)</Text></Definition></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1441914" lims:id="1441914"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441915" lims:id="1441915">Incorporation by reference</MarginalNote><Label>2</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441916" lims:id="1441916"><Label>(1)</Label><Text>In these Regulations, any incorporation by reference of a document is an incorporation of that document as amended from time to time.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441917" lims:id="1441917"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441918" lims:id="1441918">Bilingual documents</MarginalNote><Label>(2)</Label><Text>Despite subsection (1), if a document that is incorporated by reference is available in both official languages, any amendment to it is incorporated only when the amended version is available in both official languages.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1441919" lims:id="1441919" level="1"><Label>PART 2</Label><TitleText>Experience, Training, Qualifications and Competence</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1441920" lims:id="1441920"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441921" lims:id="1441921">Requirements</MarginalNote><Label>3</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441922" lims:id="1441922"><Label>(1)</Label><Text>An operator must ensure that any person to whom a duty is assigned or who carries out a work or activity under these Regulations has the necessary experience, training, qualifications and competence to carry out that duty, work or activity safely, in a manner that protects the environment and in compliance with these Regulations.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441923" lims:id="1441923"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441924" lims:id="1441924">Sufficient number and supervision</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the persons referred to in subsection (1) are sufficient in number and receive the necessary supervision to ensure safety and the protection of the environment.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1441925" lims:id="1441925" level="1"><Label>PART 3</Label><TitleText>Management System</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1441926" lims:id="1441926"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441927" lims:id="1441927">Requirements</MarginalNote><Label>4</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441928" lims:id="1441928"><Label>(1)</Label><Text>An operator must, for the purposes of reducing safety and environmental risks, preventing pollution and ensuring the conservation of petroleum resources, develop a management system that meets the following requirements:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441929" lims:id="1441929"><Label>(a)</Label><Text>it must be set out in writing;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441930" lims:id="1441930"><Label>(b)</Label><Text>it must apply to all of the works and activities referred to in the operator’s application for authorization;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441931" lims:id="1441931"><Label>(c)</Label><Text>it must correspond to the scope, nature and complexity of the works and activities and the associated hazards and risks;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441932" lims:id="1441932"><Label>(d)</Label><Text>it must be explicit, comprehensive and proactive;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441933" lims:id="1441933"><Label>(e)</Label><Text>it must foster a culture of safety;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441934" lims:id="1441934"><Label>(f)</Label><Text>it must establish conditions under which a person who makes a report that relates to safety or protection of the environment will be protected from reprisal;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441935" lims:id="1441935"><Label>(g)</Label><Text>it must include processes for integrating works and activities and technical systems with the management of human and financial resources;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441936" lims:id="1441936"><Label>(h)</Label><Text>it must include processes to ensure that all persons have the necessary experience, training, qualifications and competence and receive the necessary supervision to carry out the duties they are assigned;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441937" lims:id="1441937"><Label>(i)</Label><Text>it must set out the roles, responsibilities and authorities of all persons exercising functions under it, as well as the processes for making those persons aware of their roles, responsibilities and authorities;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441938" lims:id="1441938"><Label>(j)</Label><Text>it must include processes for coordinating the carrying out and management of the works and activities among the operator, employers, suppliers, service providers and other persons that are subject to it;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441939" lims:id="1441939"><Label>(k)</Label><Text>it must include processes for the internal and external communication of documents and information relating to safety or the protection of the environment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441940" lims:id="1441940"><Label>(l)</Label><Text>it must include a process for the efficient and immediate transmission, at every shift handover, of documents and information relating to any conditions, mechanical or procedural deficiencies or other problems that may have an impact on safety or the protection of the environment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441941" lims:id="1441941"><Label>(m)</Label><Text>it must include processes</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441942" lims:id="1441942"><Label>(i)</Label><Text>for identifying hazards that may arise during routine and non-routine operations,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441943" lims:id="1441943"><Label>(ii)</Label><Text>for assessing the risks associated with those hazards and for reducing those risks through the implementation of control measures, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441944" lims:id="1441944"><Label>(iii)</Label><Text>for establishing an inventory of those hazards and control measures and for maintaining that inventory;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441945" lims:id="1441945"><Label>(n)</Label><Text>it must include processes for investigating and reporting, for the purposes of section <XRefInternal>179</XRefInternal>, the root causes of any reportable incident, the contributing factors and the measures to be implemented to prevent recurrence of the incident;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441946" lims:id="1441946"><Label>(o)</Label><Text>it must include a process for establishing a system to analyze trends in hazards and reportable incidents;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441947" lims:id="1441947"><Label>(p)</Label><Text>it must include processes for identifying, evaluating and managing all systems and equipment that are critical to safety or to the protection of the environment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441948" lims:id="1441948"><Label>(q)</Label><Text>it must include processes for identifying, evaluating and managing any changes that could affect safety, the protection of the environment and the conservation of petroleum resources;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441949" lims:id="1441949"><Label>(r)</Label><Text>it must include processes for identifying tasks that are critical to safety, the protection of the environment and the conservation of petroleum resources;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441950" lims:id="1441950"><Label>(s)</Label><Text>it must include processes for establishing and maintaining measurable goals and performance indicators that are applicable to it;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441951" lims:id="1441951"><Label>(t)</Label><Text>it must include processes for its periodic internal audit and review to identify areas for improvement and the preventive and corrective measures to be taken if deficiencies are identified;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441952" lims:id="1441952"><Label>(u)</Label><Text>it must include processes for monitoring compliance and preventing non-compliance with the requirements of these Regulations, the provisions of Part III of the Act and any requirements that are determined by the Board under that Part;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441953" lims:id="1441953"><Label>(v)</Label><Text>it must include processes for inspection, monitoring, testing and maintenance to ensure the continued integrity of all installations, including their systems and equipment, pipelines and vessels, and for the taking of corrective measures if deficiencies are identified;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441954" lims:id="1441954"><Label>(w)</Label><Text>it must include the policies and indicate the standards on which it is based;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441955" lims:id="1441955"><Label>(x)</Label><Text>it must include a process to ensure that all documents associated with it are approved by a person with the necessary authority, periodically reviewed and updated when necessary;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441956" lims:id="1441956"><Label>(y)</Label><Text>it must include a process for establishing a system to manage any records associated with it, and the records necessary to support operational and regulatory requirements, for the purpose of ensuring that those records are generated, identified, controlled and retained and are readily accessible for consultation and examination; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441957" lims:id="1441957"><Label>(z)</Label><Text>it must include processes for controlling and coordinating work, including with respect to the issuance of work permits required under Part 10 and the identification of the works and activities for which a work permit is required.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441958" lims:id="1441958"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441959" lims:id="1441959">Documentation</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the processes and policies included in the management system and the standards referred to in it are readily accessible for consultation and examination.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441960" lims:id="1441960"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441961" lims:id="1441961">Organization</MarginalNote><Label>(3)</Label><Text>The documentation associated with the management system must be organized and set out in a logical fashion to allow for ease of understanding and efficient implementation.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441962" lims:id="1441962"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441963" lims:id="1441963">Processes and procedures</MarginalNote><Label>(4)</Label><Text>In this section, a reference to a process includes any procedures that are necessary to implement the process.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1441964" lims:id="1441964"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441965" lims:id="1441965">Human resources</MarginalNote><Label>5</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441966" lims:id="1441966"><Label>(1)</Label><Text>An operator must put in place an organizational structure that includes sufficient human resources to implement and continually improve the management system.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441967" lims:id="1441967"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441968" lims:id="1441968">Accountable person</MarginalNote><Label>(2)</Label><Text>The operator must designate an employee as the accountable person for the management system and must ensure that the accountable person has the necessary authority over the human and financial resources that are required to implement and continually improve the system.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441969" lims:id="1441969"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441970" lims:id="1441970">Name, position and contact information</MarginalNote><Label>(3)</Label><Text>The operator must ensure that the name, position and contact information of the accountable person is submitted to the Board at the time the application for an authorization is made, when a new designation is made under subsection (2) and any time a change is made to the name, position or contact information of the accountable person.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1441971" lims:id="1441971"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441972" lims:id="1441972">Implementation</MarginalNote><Label>6</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441973" lims:id="1441973"><Label>(1)</Label><Text>An operator must ensure that the management system is implemented before the commencement of any authorized work or activity.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441974" lims:id="1441974"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441975" lims:id="1441975">Compliance</MarginalNote><Label>(2)</Label><Text>The operator must ensure that all employees, employers, suppliers, service providers and other persons that are subject to the management system comply with the requirements of the management system.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1441976" lims:id="1441976"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441977" lims:id="1441977">Continual improvement</MarginalNote><Label>7</Label><Text>The accountable person referred to in subsection <XRefInternal>5</XRefInternal>(2) must ensure that the management system is continually improved.</Text></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1441978" lims:id="1441978" level="1"><Label>PART 4</Label><TitleText>Authorization</TitleText></Heading><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1441979" lims:id="1441979" level="2"><TitleText>Application</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1441980" lims:id="1441980"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441981" lims:id="1441981">Documents and information</MarginalNote><Label>8</Label><Text>The application for an authorization must be accompanied by the following documents and information:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441982" lims:id="1441982"><Label>(a)</Label><Text>the scope of the proposed work or activity;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441983" lims:id="1441983"><Label>(b)</Label><Text>an execution plan and schedule for undertaking the proposed work or activity;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441984" lims:id="1441984"><Label>(c)</Label><Text>the safety plan referred to in section <XRefInternal>9</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441985" lims:id="1441985"><Label>(d)</Label><Text>the environmental protection plan referred to in section <XRefInternal>10</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441986" lims:id="1441986"><Label>(e)</Label><Text>the contingency plan referred to in section <XRefInternal>11</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441987" lims:id="1441987"><Label>(f)</Label><Text>a description of the installations, including their systems and equipment, pipelines, vessels and support craft, that are to be used for carrying out the work or activity, including the layouts of the installations;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441988" lims:id="1441988"><Label>(g)</Label><Text>in the case of a production project, a description of the field data acquisition program referred to in section <XRefInternal>13</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441989" lims:id="1441989"><Label>(h)</Label><Text>in the case of a drilling program or a production project,</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441990" lims:id="1441990"><Label>(i)</Label><Text>information on</Text><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441991" lims:id="1441991"><Label>(A)</Label><Text>any proposed flaring or venting of gas, including the rationale for flaring or venting and the estimated rate, quantity and period of the flaring or venting, and</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441992" lims:id="1441992"><Label>(B)</Label><Text>any proposed burning of oil, including the rationale for burning and the estimated quantity of oil to be burned, and</Text></Clause></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441993" lims:id="1441993"><Label>(ii)</Label><Text>the decommissioning and abandonment plan referred to in section <XRefInternal>15</XRefInternal>;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441994" lims:id="1441994"><Label>(i)</Label><Text>in the case of a geoscientific program, geotechnical program or environmental program,</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441995" lims:id="1441995"><Label>(i)</Label><Text>a map illustrating the location of the program works and activities and their proximity to any man-made structures or vulnerable natural structures, as well as any territorial or other boundaries,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441996" lims:id="1441996"><Label>(ii)</Label><Text>a description of the methods to be used in carrying out the program works and activities and a description of any aircraft or vessel to be used, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441997" lims:id="1441997"><Label>(iii)</Label><Text>a description of the proposed data acquisition plan;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441998" lims:id="1441998"><Label>(j)</Label><Text>in the case of a diving project, the dive project plan required under section 171 of the <XRefExternal reference-type="regulation" link="SOR-2021-247">Canada–Newfoundland and Labrador Offshore Area Occupational Health and Safety Regulations</XRefExternal>; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1441999" lims:id="1441999"><Label>(k)</Label><Text>if applicable, the list required under paragraph <XRefInternal>151</XRefInternal>(a), the records made in the course of conducting the risk assessment required under paragraph <XRefInternal>151</XRefInternal>(b) and the action plan required under paragraph <XRefInternal>151</XRefInternal>(c).</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442000" lims:id="1442000"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442001" lims:id="1442001">Safety plan</MarginalNote><Label>9</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442002" lims:id="1442002"><Label>(1)</Label><Text>An operator must develop a safety plan that sets out the procedures, practices, resources, sequence of key safety-related activities and monitoring measures that are necessary to safely carry out a proposed work or activity, as well as the target levels of safety in respect of the work or activity and measures for hazard management.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442003" lims:id="1442003"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442004" lims:id="1442004">Documents and information</MarginalNote><Label>(2)</Label><Text>The safety plan must include the following documents and information:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442005" lims:id="1442005"><Label>(a)</Label><Text>specific references to and detailed descriptions of the provisions of the management system that relate to safety, sufficient to demonstrate how the obligations set out in these Regulations with regard to safety will be fulfilled;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442006" lims:id="1442006"><Label>(b)</Label><Text>a document that includes</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442007" lims:id="1442007"><Label>(i)</Label><Text>a summary of the studies that have been carried out, and a description of the processes that will be followed, for the purposes of</Text><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442008" lims:id="1442008"><Label>(A)</Label><Text>identifying hazards related to the proposed work or activity that may occur during routine and non-routine operations, including any hazards posed by any other activities taking place near the proposed work or activity, and</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442009" lims:id="1442009"><Label>(B)</Label><Text>assessing safety risks associated with the identified hazards,</Text></Clause></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442010" lims:id="1442010"><Label>(ii)</Label><Text>a description of the identified hazards referred to in clause (i)(A) and the results of the assessments referred to in clause (i)(B),</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442011" lims:id="1442011"><Label>(iii)</Label><Text>a summary of the measures to be implemented to anticipate safety risks related to the identified hazards,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442012" lims:id="1442012"><Label>(iv)</Label><Text>a summary and evaluation of the measures to be implemented to reduce the safety risks associated with the identified hazards, including, if the possibility of ice hazards exists, measures for ice detection, forecasting, surveillance and reporting, including data collection, and any measures for ice avoidance or deflection,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442013" lims:id="1442013"><Label>(v)</Label><Text>a detailed description of the measures to be implemented to reduce safety risks to a level that is as low as reasonably practicable in respect of</Text><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442014" lims:id="1442014"><Label>(A)</Label><Text>the design of all installations, including their systems and equipment,</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442015" lims:id="1442015"><Label>(B)</Label><Text>the design, winterization and operation of any installation that is to be operated in a cold climate,</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442016" lims:id="1442016"><Label>(C)</Label><Text>the design, arrangement, installation and maintenance of barriers to provide fire and blast protection,</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442017" lims:id="1442017"><Label>(D)</Label><Text>the design of all control systems,</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442018" lims:id="1442018"><Label>(E)</Label><Text>the design, selection, location, installation, commissioning, protection, operation, inspection and maintenance of mechanical equipment,</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442019" lims:id="1442019"><Label>(F)</Label><Text>the design, construction, installation, commissioning, operation, inspection, monitoring, testing and maintenance of any subsea production system under all foreseeable physical and environmental conditions and operating conditions for all modes of operation,</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442020" lims:id="1442020"><Label>(G)</Label><Text>the management of temporary or portable equipment, and</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442021" lims:id="1442021"><Label>(H)</Label><Text>the arrangement and specification of watertight and weathertight appliances,</Text></Clause></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442022" lims:id="1442022"><Label>(vi)</Label><Text>a detailed description of the measures to be implemented in respect of</Text><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442023" lims:id="1442023"><Label>(A)</Label><Text>the design and location of any vent that is used to release gas into the atmosphere without combustion in order to minimize the risk of accidental ignition of the gas,</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442024" lims:id="1442024"><Label>(B)</Label><Text>the design, selection, operation, inspection, testing and maintenance of fire protection systems and equipment in order to minimize the risk of hazards to persons who use those systems and equipment,</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442025" lims:id="1442025"><Label>(C)</Label><Text>the design of boilers and pressure systems in order to minimize the risk of hazards to the installation and to persons present on it and to any other installations, vessel or persons in proximity to it, and</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442026" lims:id="1442026"><Label>(D)</Label><Text>the design and maintenance of any disconnectable mooring system on a floating platform to ensure that the risk that the system will fail to safely disconnect if exposed to situations that would exceed the platform’s structural limits or the system’s design limits is reduced to a level that is as low as reasonably practicable, without compromising the ability to achieve the target levels of safety set out in the safety plan and environmental protection plan, and</Text></Clause></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442027" lims:id="1442027"><Label>(vii)</Label><Text>a summary of the measures to be implemented for communicating the identified hazards and for mitigating the safety risks associated with those hazards to all persons who are directly affected;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442028" lims:id="1442028"><Label>(c)</Label><Text>a description of all installations or vessels that are to be used during the proposed work or activity, a description of their systems and equipment that are critical to safety and a brief description of the systems in place for the inspection, testing and maintenance of those systems and that equipment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442029" lims:id="1442029"><Label>(d)</Label><Text>a description of the organizational structure and chain of command for the proposed work or activity that</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442030" lims:id="1442030"><Label>(i)</Label><Text>explains the relationship between the organizational structure and chain of command, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442031" lims:id="1442031"><Label>(ii)</Label><Text>includes the name, position and contact information of the employee who is responsible for the management of the safety plan; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442032" lims:id="1442032"><Label>(e)</Label><Text>a description of the measures to be implemented to monitor compliance with the plan and to evaluate performance in relation to its objectives.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442033" lims:id="1442033"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442034" lims:id="1442034">Environmental protection plan</MarginalNote><Label>10</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442035" lims:id="1442035"><Label>(1)</Label><Text>An operator must develop an environmental protection plan that sets out the procedures, practices, resources and monitoring measures that are necessary to protect the environment from the effects of a proposed work or activity, the target levels of safety in respect of the work or activity and measures for hazard management.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442036" lims:id="1442036"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442037" lims:id="1442037">Documents and information</MarginalNote><Label>(2)</Label><Text>The environmental protection plan must include the following documents and information:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442038" lims:id="1442038"><Label>(a)</Label><Text>specific references to and detailed descriptions of the provisions of the management system that relate to the protection of the environment, sufficient to demonstrate how the obligations set out in these Regulations with regard to environmental protection will be fulfilled;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442039" lims:id="1442039"><Label>(b)</Label><Text>a document that includes</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442040" lims:id="1442040"><Label>(i)</Label><Text>a summary of the studies that have been carried out, and a description of the processes that will be followed, for the purposes of</Text><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442041" lims:id="1442041"><Label>(A)</Label><Text>identifying hazards related to the proposed work or activity that may occur during routine and non-routine operations, including any hazards posed by any other activities taking place near the proposed work or activity, and</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442042" lims:id="1442042"><Label>(B)</Label><Text>assessing environmental risks associated with the identified hazards,</Text></Clause></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442043" lims:id="1442043"><Label>(ii)</Label><Text>a description of the identified hazards referred to in clause (i)(A) and the results of the assessments referred to in clause (i)(B),</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442044" lims:id="1442044"><Label>(iii)</Label><Text>a summary of the measures to be implemented to anticipate environmental risks related to the identified hazards,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442045" lims:id="1442045"><Label>(iv)</Label><Text>a summary and evaluation of the measures to be implemented to reduce the environmental risks associated with the identified hazards, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442046" lims:id="1442046"><Label>(v)</Label><Text>a detailed description of the measures to be implemented to reduce environmental risks to a level that is as low as reasonably practicable in respect of</Text><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442047" lims:id="1442047"><Label>(A)</Label><Text>the design of all installations, including their systems and equipment,</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442048" lims:id="1442048"><Label>(B)</Label><Text>the design, winterization and operation of any installation that is to be operated in a cold climate,</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442049" lims:id="1442049"><Label>(C)</Label><Text>the design, arrangement, installation and maintenance of barriers to provide fire and blast protection,</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442050" lims:id="1442050"><Label>(D)</Label><Text>the design of all control systems,</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442051" lims:id="1442051"><Label>(E)</Label><Text>the design, selection, location, installation, commissioning, protection, operation, inspection and maintenance of mechanical equipment,</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442052" lims:id="1442052"><Label>(F)</Label><Text>the design, construction, installation, commissioning, operation, inspection, monitoring, testing and maintenance of any subsea production system under all foreseeable physical and environmental conditions and operating conditions for all modes of operation, and</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442053" lims:id="1442053"><Label>(G)</Label><Text>the management of temporary or portable equipment, and</Text></Clause></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442054" lims:id="1442054"><Label>(vi)</Label><Text>a detailed description of the measures to be implemented in respect of the design and location of any vent that is used to release gas into the atmosphere without combustion in order to minimize the risk of accidental ignition of the gas, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442055" lims:id="1442055"><Label>(vii)</Label><Text>a summary of the measures to be implemented for communicating the identified hazards and for mitigating the environmental risks associated with those hazards to all persons who are directly affected;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442056" lims:id="1442056"><Label>(c)</Label><Text>a description of all installations or vessels that are to be used during the proposed work or activity, a description of their systems and equipment that are critical to the protection of the environment and a brief description of the systems in place for the inspection, testing and maintenance of those systems and that equipment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442057" lims:id="1442057"><Label>(d)</Label><Text>in the case of a drilling program or a production project, the procedures for the selection, evaluation and use of chemical substances, including process chemicals and drilling fluid ingredients;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442058" lims:id="1442058"><Label>(e)</Label><Text>a description of the equipment and procedures for the treatment, handling and disposal of waste material;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442059" lims:id="1442059"><Label>(f)</Label><Text>a description of all of the discharge streams and the limits of any discharge into the environment, including any discharge of waste material;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442060" lims:id="1442060"><Label>(g)</Label><Text>a description of the system for monitoring compliance with the discharge limits referred to in paragraph (f), including the sampling and analytical programs for determining whether discharges are within the specified limits;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442061" lims:id="1442061"><Label>(h)</Label><Text>a description of the organizational structure and chain of command for the proposed work or activity that</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442062" lims:id="1442062"><Label>(i)</Label><Text>explains the relationship between the organizational structure and chain of command, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442063" lims:id="1442063"><Label>(ii)</Label><Text>includes the name, position and contact information of the employee who is responsible for the management of the environmental protection plan;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442064" lims:id="1442064"><Label>(i)</Label><Text>a description of the measures to be implemented to monitor compliance with the plan and to evaluate performance in relation to its objectives; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442065" lims:id="1442065"><Label>(j)</Label><Text>a description of the procedure to be followed if an archaeological site or a burial ground is discovered during the proposed work or activity.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442066" lims:id="1442066"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442067" lims:id="1442067">Contingency plan</MarginalNote><Label>11</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442068" lims:id="1442068"><Label>(1)</Label><Text>An operator must develop a contingency plan that sets out the procedures, including emergency response procedures, and the practices, resources and monitoring measures that are necessary to effectively prepare for and mitigate the effects of any accidental event.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442069" lims:id="1442069"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442070" lims:id="1442070">Documents and information</MarginalNote><Label>(2)</Label><Text>The contingency plan must include the following documents and information:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442071" lims:id="1442071"><Label>(a)</Label><Text>a description of the method to be used for classifying accidental events and a description of the emergency response procedures for each event;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442072" lims:id="1442072"><Label>(b)</Label><Text>a description of the procedures for the internal and external reporting of accidental events;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442073" lims:id="1442073"><Label>(c)</Label><Text>a description of the procedures for accessing safety-related and environmental information that is necessary to mitigate the effects of any accidental event;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442074" lims:id="1442074"><Label>(d)</Label><Text>a description of the organizational structure, chain of command and resources for managing any accidental event, including</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442075" lims:id="1442075"><Label>(i)</Label><Text>a list of key emergency response positions and a description of the roles, responsibilities and authorities associated with each of those positions, including a description of related tasks and checklists of actions that must be taken in the context of the contingency plan,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442076" lims:id="1442076"><Label>(ii)</Label><Text>a description of the available support craft and the contact information for its crew or a reference to the number or title of a document that provides that description and contact information,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442077" lims:id="1442077"><Label>(iii)</Label><Text>a description, or a reference to the number or title of a document that provides the description, of available emergency response equipment, including life-saving appliances, and the equipment’s location, as well as the limits on its use and the mitigation measures to be taken in the event that it is not available,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442078" lims:id="1442078"><Label>(iv)</Label><Text>a description, or a reference to a number or title of a document that provides the description, of all available medical equipment and the equipment’s location,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442079" lims:id="1442079"><Label>(v)</Label><Text>a description of the communication system referred to in section <XRefInternal>129</XRefInternal> and the operating procedures for that system,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442080" lims:id="1442080"><Label>(vi)</Label><Text>a description of all emergency response operations centres and their locations,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442081" lims:id="1442081"><Label>(vii)</Label><Text>a description of any good or service that must be obtained on a contractual basis for each response measure, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442082" lims:id="1442082"><Label>(viii)</Label><Text>a description of the location and the contents of any temporary safe refuges or a reference to the number or title of a document that provides that description;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442083" lims:id="1442083"><Label>(e)</Label><Text>details of all mutual aid agreements entered into with other operators;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442084" lims:id="1442084"><Label>(f)</Label><Text>a description of the procedures for coordinating and liaising with all relevant emergency response organizations;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442085" lims:id="1442085"><Label>(g)</Label><Text>a description of the communication protocols with all relevant federal, provincial, territorial and municipal agencies and Indigenous governing bodies;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442086" lims:id="1442086"><Label>(h)</Label><Text>a copy of all personnel evacuation plans, including any evacuation plan for divers engaged in a dive; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442087" lims:id="1442087"><Label>(i)</Label><Text>an indication of the frequency with which emergency response drills and exercises are to be completed and their scope.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442088" lims:id="1442088"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442089" lims:id="1442089">Uncontrolled flow</MarginalNote><Label>(3)</Label><Text>In the case of a drilling program or a production project, the contingency plan must also include a description of the source control and containment measures to be taken to stop uncontrolled flow from a well and to minimize the duration and environmental effects of any resulting spill, as well as the following documents and information:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442090" lims:id="1442090"><Label>(a)</Label><Text>a description of the source control and containment equipment to be used in the event of a loss of well control;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442091" lims:id="1442091"><Label>(b)</Label><Text>details of the contractual arrangements for the source control and containment equipment, other than a relief well drilling installation, including</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442092" lims:id="1442092"><Label>(i)</Label><Text>the name and contact information of the owner or owners of the equipment,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442093" lims:id="1442093"><Label>(ii)</Label><Text>the arrangements for transport of the equipment to the location of the uncontrolled well, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442094" lims:id="1442094"><Label>(iii)</Label><Text>the arrangements for the mode of deployment of the equipment at the location of the uncontrolled well;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442095" lims:id="1442095"><Label>(c)</Label><Text>the schedule and plan for the mobilization, deployment and operation of the source control and containment equipment, including measures to minimize deployment time that take required regulatory approvals into account;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442096" lims:id="1442096"><Label>(d)</Label><Text>details regarding the accessibility of the source control and containment equipment and the documents and information referred to in paragraphs (a) to (c);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442097" lims:id="1442097"><Label>(e)</Label><Text>an explanation of the adequacy of each of the source control and containment measures; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442098" lims:id="1442098"><Label>(f)</Label><Text>a description of any support systems and equipment that are available, including vessels and remotely operated vehicles and any consumables that may be used, such as, in the case of a relief well, a spare wellhead, spare casing and spare bulk additives.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442099" lims:id="1442099"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442100" lims:id="1442100">Spill-treating agent</MarginalNote><Label>(4)</Label><Text>If a spill-treating agent is being considered for use as a spill response measure, the contingency plan must include the following additional documents and information:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442101" lims:id="1442101"><Label>(a)</Label><Text>the name of the chosen spill-treating agent and details of an assessment of its efficacy in treating the potential sources of pollutants, including the results of any tests conducted for the assessment and a description of those tests;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442102" lims:id="1442102"><Label>(b)</Label><Text>the results of an analysis that demonstrates that a net environmental benefit is likely to be achieved through the use of the spill-treating agent under certain circumstances;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442103" lims:id="1442103"><Label>(c)</Label><Text>a description of the circumstances under which the spill-treating agent will be used and the estimated period within which its use will be effective;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442104" lims:id="1442104"><Label>(d)</Label><Text>a description of the methods and protocols, including the amount and application rate, for safe, effective and efficient use of the spill-treating agent;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442105" lims:id="1442105"><Label>(e)</Label><Text>a list of the personnel roles, equipment and materials that an operator will have available for the purpose of using the spill-treating agent, including any to be provided through contractual arrangements, and a description of the requirements that must be met for those contracts to be activated; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442106" lims:id="1442106"><Label>(f)</Label><Text>a monitoring plan for the use of the spill-treating agent.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442107" lims:id="1442107"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442108" lims:id="1442108">Assessment of efficacy</MarginalNote><Label>(5)</Label><Text>The assessment of efficacy under paragraph (4)(a) must be carried out using oil obtained directly from the operations site where the spill-treating agent is being considered for use or, if oil is not available from that operations site, it must be carried out using an oil that most closely resembles the oil that is expected to be obtained from the operations site and must be repeated when oil becomes available from that operations site.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442109" lims:id="1442109"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442110" lims:id="1442110">International standard or alternative</MarginalNote><Label>(6)</Label><Text>The assessment, analysis, methods and protocols referred to in paragraphs (4)(a), (b) and (d) must be based, taking the local environment into account, on an international standard or an alternative recognized by the Board and the contingency plan must identify each of those standards or alternatives.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442111" lims:id="1442111"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442112" lims:id="1442112">Methods and protocols</MarginalNote><Label>(7)</Label><Text>The methods and protocols referred to in paragraph (4)(d) and the monitoring plan referred to in paragraph (4)(f) must conform to industry standards and best practices for spill-treating agent use, taking the local environment into account.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442113" lims:id="1442113"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442114" lims:id="1442114">Definition of <DefinitionRef>source control and containment equipment</DefinitionRef></MarginalNote><Label>(8)</Label><Text>In this section, <DefinedTermEn>source control and containment equipment</DefinedTermEn> means the capping stack, containment dome, any subsea and surface equipment, devices or vessels and any relief well drilling installations that are used to contain and control a spill source and to minimize the duration of a spill and its environmental effects until well control is regained.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442115" lims:id="1442115"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442116" lims:id="1442116">Spill-treating agent — section 138.21 of Act</MarginalNote><Label>12</Label><Text>In determining for the purpose of section 138.21 of the Act whether the use of a spill-treating agent is likely to achieve a net environmental benefit, the Board must take into account</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442117" lims:id="1442117"><Label>(a)</Label><Text>the assessment of the spill-treating agent’s efficacy referred to in paragraph <XRefInternal>11</XRefInternal>(4)(a);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442118" lims:id="1442118"><Label>(b)</Label><Text>the results of the analysis referred to in paragraph <XRefInternal>11</XRefInternal>(4)(b);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442119" lims:id="1442119"><Label>(c)</Label><Text>the circumstances referred to in paragraph <XRefInternal>11</XRefInternal>(4)(c);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442120" lims:id="1442120"><Label>(d)</Label><Text>the methods and protocols referred to in paragraph <XRefInternal>11</XRefInternal>(4)(d); and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442121" lims:id="1442121"><Label>(e)</Label><Text>the monitoring plan referred to in paragraph <XRefInternal>11</XRefInternal>(4)(f).</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442122" lims:id="1442122"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442123" lims:id="1442123">Field data acquisition program</MarginalNote><Label>13</Label><Text>In the case of a production project, an operator must develop a field data acquisition program that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442124" lims:id="1442124"><Label>(a)</Label><Text>provides for the collection of sufficient pool pressure measurements, drill cutting and fluid samples, cores and well logs, and the carrying out of sufficient formation flow tests, analyses and surveys, to enable a comprehensive assessment of the field, of the performance of development wells, of the pool depletion scheme and of any injection scheme; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442125" lims:id="1442125"><Label>(b)</Label><Text>identifies the quantity of samples and cores, the evaluation data and any associated analyses, surveys and reports that are to be provided to the Board.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442126" lims:id="1442126"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442127" lims:id="1442127">Flow system, calculation and allocation</MarginalNote><Label>14</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442128" lims:id="1442128"><Label>(1)</Label><Text>If the application for an authorization is in respect of a production project, the operator must submit to the Board for its approval the flow system, the flow calculation procedure and the flow allocation procedure that will be used to conduct the measurements referred to in sections <XRefInternal>74</XRefInternal> to <XRefInternal>78</XRefInternal>, as well as any alternate measurements referred to in subsection <XRefInternal>74</XRefInternal>(2) that the operator proposes to conduct.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442129" lims:id="1442129"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442130" lims:id="1442130">Board approval</MarginalNote><Label>(2)</Label><Text>The Board must approve the flow system, the flow calculation procedure and the flow allocation procedure if the applicant demonstrates that the system and procedures facilitate accurate measurements and the allocation, on a pool or zone basis, of the production from and injection into individual wells.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442131" lims:id="1442131"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442132" lims:id="1442132">Decommissioning and abandonment plan</MarginalNote><Label>15</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442133" lims:id="1442133"><Label>(1)</Label><Text>An operator must, in the case of a drilling program or production project, develop a decommissioning and abandonment plan that includes the following information:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442134" lims:id="1442134"><Label>(a)</Label><Text>a description of the safety and environmental protection measures to be implemented during the decommissioning and abandonment to comply with the requirements of these Regulations, the provisions of Part III of the Act and any federal or provincial legislation or international conventions or agreements relating to safety and the protection of the environment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442135" lims:id="1442135"><Label>(b)</Label><Text>a description of the potential effects of the decommissioning and abandonment on the environment and on any future uses of the site where the program or project is carried out;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442136" lims:id="1442136"><Label>(c)</Label><Text>the methods for restoring the site after the decommissioning and abandonment; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442137" lims:id="1442137"><Label>(d)</Label><Text>the forecasted costs of the decommissioning and abandonment and the manner in which the operator will finance or pay for those costs.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442138" lims:id="1442138"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442139" lims:id="1442139">Costs and financing or payment</MarginalNote><Label>(2)</Label><Text>The operator must submit to the Board an update on the forecasted costs of decommissioning and abandonment and the manner in which the operator will finance or pay for those costs</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442140" lims:id="1442140"><Label>(a)</Label><Text>whenever there is a significant change to that information, and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442141" lims:id="1442141"><Label>(b)</Label><Text>beginning no less than five years before the day on which the decommissioning and abandonment is forecasted to begin, at least once a year.</Text></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442142" lims:id="1442142" level="2"><TitleText>Requirements for Authorization</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442143" lims:id="1442143"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442144" lims:id="1442144">Definitions — paragraph 138(4)(c) of Act</MarginalNote><Label>16</Label><Text>The following definitions apply for the purposes of paragraph 138(4)(c) of the Act.</Text><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442145" lims:id="1442145"><Text><DefinedTermEn>production facility</DefinedTermEn> means the systems and equipment referred to in paragraph (a) of the definition <DefinitionRef>production installation</DefinitionRef>, other than a diving system, as well as any associated aircraft landing areas, storage areas or tanks and accommodations areas. (<DefinedTermFr>installation de production</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442146" lims:id="1442146"><Text><DefinedTermEn>production platform</DefinedTermEn> means a production installation. (<DefinedTermFr>plate-forme de production</DefinedTermFr>)</Text></Definition></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442147" lims:id="1442147" level="2"><TitleText>Well Approvals</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442148" lims:id="1442148"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442149" lims:id="1442149">Well operation</MarginalNote><Label>17</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442150" lims:id="1442150"><Label>(1)</Label><Text>Subject to subsection (2), an operator that intends to conduct a well operation must obtain a well approval.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442151" lims:id="1442151"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442152" lims:id="1442152">Approval not necessary</MarginalNote><Label>(2)</Label><Text>A well approval is not necessary to conduct a wire line operation, slick line operation, coiled tubing operation or other similar operation through a tree located above sea level if</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442153" lims:id="1442153"><Label>(a)</Label><Text>the operation does not alter the completion interval or is not expected to adversely affect the recovery of petroleum; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442154" lims:id="1442154"><Label>(b)</Label><Text>the equipment, operating procedures and qualifications of the persons carrying out the work are in compliance with the requirements of the authorization.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442155" lims:id="1442155"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442156" lims:id="1442156">Definitions</MarginalNote><Label>(3)</Label><Text>The following definitions apply in subsection (2).</Text><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442157" lims:id="1442157"><Text><DefinedTermEn>slick line</DefinedTermEn> means a single steel cable that is used to run tools in a well. (<DefinedTermFr>câble lisse</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442158" lims:id="1442158"><Text><DefinedTermEn>wire line</DefinedTermEn> means a line that contains a conductor wire and that is used to run survey instruments or other tools in a well. (<DefinedTermFr>câble</DefinedTermFr>)</Text></Definition></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442159" lims:id="1442159"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442160" lims:id="1442160">Approval application contents</MarginalNote><Label>(4)</Label><Text>The application for a well approval must include the estimated cost breakdown of the well operation and the following information:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442161" lims:id="1442161"><Label>(a)</Label><Text>if the well approval is being sought to drill a well,</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442162" lims:id="1442162"><Label>(i)</Label><Text>a comprehensive description of the drilling program, a geoscientific description of the reservoir targets and a description of any geohazard,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442163" lims:id="1442163"><Label>(ii)</Label><Text>the digital data necessary to allow for an independent geohazard assessment,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442164" lims:id="1442164"><Label>(iii)</Label><Text>a description of the well data acquisition program referred to in section <XRefInternal>18</XRefInternal>, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442165" lims:id="1442165"><Label>(iv)</Label><Text>a description of the well verification scheme referred to in section <XRefInternal>19</XRefInternal>;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442166" lims:id="1442166"><Label>(b)</Label><Text>if the well approval is being sought to perform a workover on, to re-enter, to complete or to recomplete a well or to suspend or abandon a well or a part of one, a description of the well or part, a description of the proposed work or activity and the rationale for carrying it out and barrier envelope diagrams that demonstrate that two barrier envelopes will be in place throughout the operation;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442167" lims:id="1442167"><Label>(c)</Label><Text>if the well approval is being sought to complete a well, information that demonstrates that section <XRefInternal>71</XRefInternal> will be complied with;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442168" lims:id="1442168"><Label>(d)</Label><Text>if the well approval is being sought to suspend a well or a part of one, an indication of the period within which the suspended well or part will be abandoned or completed; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442169" lims:id="1442169"><Label>(e)</Label><Text>if the well approval is being sought to suspend or abandon a well or a part of one, the methods for verifying the effectiveness of the isolation of pools and zones that is required under subparagraph <XRefInternal>90</XRefInternal>(1)(b)(i).</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442170" lims:id="1442170"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442171" lims:id="1442171">Well approval granted by the Board</MarginalNote><Label>(5)</Label><Text>The Board must grant the well approval if the operator demonstrates that the well operation will be conducted safely, without waste or pollution and in compliance with these Regulations.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442172" lims:id="1442172"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442173" lims:id="1442173">Well data acquisition program</MarginalNote><Label>18</Label><Text>In the case of a drilling program, an operator must develop a well data acquisition program that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442174" lims:id="1442174"><Label>(a)</Label><Text>provides for the collection of sufficient pressure measurements, drill cutting and fluid samples, conventional cores, sidewall cores and well logs, and the carrying out of sufficient formation flow tests, analyses and surveys, to enable a comprehensive geophysical, geological and reservoir evaluation to be made; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442175" lims:id="1442175"><Label>(b)</Label><Text>identifies the quantity of samples and cores, the evaluation data and any associated analyses, surveys and reports that are to be provided to the Board.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442176" lims:id="1442176"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442177" lims:id="1442177">Well verification scheme</MarginalNote><Label>19</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442178" lims:id="1442178"><Label>(1)</Label><Text>An operator must establish a well verification scheme based on criteria that the operator establishes to ensure that the design of any well is in accordance with industry standards and best practices so that the well’s integrity is maintained throughout its life cycle.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442179" lims:id="1442179"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442180" lims:id="1442180">Well ranking</MarginalNote><Label>(2)</Label><Text>For the purposes of subsection (1), the operator must rank a well according to its level of risk and ensure that the well ranking is confirmed by an independent person.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442181" lims:id="1442181"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442182" lims:id="1442182">Verification requirements</MarginalNote><Label>(3)</Label><Text>The verification scheme must set out the verification requirements that are applicable to the design of a well according to the well’s ranking and to any changes made to the design during the well’s construction or operation that would affect any previously undertaken verification.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442183" lims:id="1442183"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442184" lims:id="1442184">Verification by independent person</MarginalNote><Label>(4)</Label><Text>The operator must ensure that the required verifications are carried out by an independent person that was not involved in the original design.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442185" lims:id="1442185"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442186" lims:id="1442186">Suspension of well approval</MarginalNote><Label>20</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442187" lims:id="1442187"><Label>(1)</Label><Text>The Board may suspend a well approval if</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442188" lims:id="1442188"><Label>(a)</Label><Text>the operator conducts the well operation other than as described in the application for the well approval;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442189" lims:id="1442189"><Label>(b)</Label><Text>the physical and environmental conditions encountered in the area of the work or activity for which the well approval was granted are more severe than those on the basis of which the manufacturer of any equipment used in the well operation established the equipment’s operating limits; or</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442190" lims:id="1442190"><Label>(c)</Label><Text>the operator uses a flow system, flow calculation procedure or flow allocation procedure that has not been approved under subsection <XRefInternal>14</XRefInternal>(2), conducts a formation flow test that has not been approved under subsection <XRefInternal>63</XRefInternal>(5) or engages in commingled production that has not been approved under subsection <XRefInternal>80</XRefInternal>(2).</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442191" lims:id="1442191"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442192" lims:id="1442192">Factors for suspension</MarginalNote><Label>(2)</Label><Text>In deciding whether to suspend a well approval, the Board must consider</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442193" lims:id="1442193"><Label>(a)</Label><Text>the effects or potential effects of the applicable situation referred to in subsection (1) on safety, the environment and the conservation of petroleum resources; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442194" lims:id="1442194"><Label>(b)</Label><Text>the operator’s history of non-compliance with the requirements of these Regulations, the provisions of Part III of the Act or any requirements that are established by the Board under that Part with respect to well operations.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442195" lims:id="1442195"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442196" lims:id="1442196">Revocation of well approval</MarginalNote><Label>21</Label><Text>The Board must revoke a well approval if</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442197" lims:id="1442197"><Label>(a)</Label><Text>the operator fails to remedy the situation that caused the suspension of the well approval as soon as the circumstances permit within 60 days after the date of that suspension unless, on written request by the operator, the Board grants the operator an extension of time to remedy the situation; or</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442198" lims:id="1442198"><Label>(b)</Label><Text>the operator continues to operate the well despite the suspension of the well approval.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442199" lims:id="1442199"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442200" lims:id="1442200">Suspension or abandonment of well</MarginalNote><Label>22</Label><Text>If a well approval is revoked, the operator must ensure that the well is suspended or abandoned in accordance with Part 8.</Text></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442201" lims:id="1442201" level="2"><TitleText>Development Plan</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442202" lims:id="1442202"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442203" lims:id="1442203">Well approval — subsection 139(1) of Act</MarginalNote><Label>23</Label><Text>For the purposes of subsection 139(1) of the Act, a well approval relating to a production project is prescribed.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442204" lims:id="1442204"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442205" lims:id="1442205">Concept safety analysis</MarginalNote><Label>24</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442206" lims:id="1442206"><Label>(1)</Label><Text>The approvals referred to in subsection 139(4) of the Act are subject to the operator’s submission of a concept safety analysis to the Chief Safety Officer at the time the operator submits the application and proposed development plan to the Board under subsection 139(2) of the Act.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442207" lims:id="1442207"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442208" lims:id="1442208">Content</MarginalNote><Label>(2)</Label><Text>The concept safety analysis must</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442209" lims:id="1442209"><Label>(a)</Label><Text>be based on the development concept chosen by the operator as a general approach and described in Part I of the development plan;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442210" lims:id="1442210"><Label>(b)</Label><Text>take into account all works and activities associated with each phase in the life cycle of the development;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442211" lims:id="1442211"><Label>(c)</Label><Text>determine target levels of safety that are to be achieved to ensure safety and the protection of the environment for all works and activities within each phase of the life cycle of an installation, including its systems and equipment, from the installation’s design up to and including its decommissioning and abandonment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442212" lims:id="1442212"><Label>(d)</Label><Text>identify all hazards having the potential to cause a major accidental event;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442213" lims:id="1442213"><Label>(e)</Label><Text>include a systematic assessment of the unmitigated risks associated with each of the identified hazards, including the likelihood of a major accidental event occurring and the consequences that would result;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442214" lims:id="1442214"><Label>(f)</Label><Text>identify the control measures that are to be implemented to reduce the risks associated with the identified hazards to a level that is as low as reasonably practicable;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442215" lims:id="1442215"><Label>(g)</Label><Text>identify the effects of any additional risks that may result from the implementation of the identified control measures; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442216" lims:id="1442216"><Label>(h)</Label><Text>identify all assumptions on which any aspect of the concept safety analysis is based.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442217" lims:id="1442217"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442218" lims:id="1442218">Quantitative and qualitative risk assessments</MarginalNote><Label>(3)</Label><Text>The target levels of safety must be based on risk assessments that are</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442219" lims:id="1442219"><Label>(a)</Label><Text>quantitative, if it can be demonstrated that input data are available in the quantity and quality necessary to demonstrate the reliability of the results; or</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442220" lims:id="1442220"><Label>(b)</Label><Text>qualitative, if the criteria in paragraph (a) are not met or if a quantitative assessment would otherwise be inappropriate.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442221" lims:id="1442221"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442222" lims:id="1442222">Contents of risk assessment</MarginalNote><Label>(4)</Label><Text>The operator must include in the risk assessment a description of the circumstances that will necessitate an update of the risk assessment, including changes in</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442223" lims:id="1442223"><Label>(a)</Label><Text>the physical and environmental conditions;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442224" lims:id="1442224"><Label>(b)</Label><Text>the operating conditions and the limits taken into account in the design assumptions; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442225" lims:id="1442225"><Label>(c)</Label><Text>the operating procedures.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442226" lims:id="1442226"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442227" lims:id="1442227">Review of risk assessment</MarginalNote><Label>(5)</Label><Text>The operator must update the risk assessment as often as necessary and at least once every five years throughout the life cycle of the development to</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442228" lims:id="1442228"><Label>(a)</Label><Text>account for the circumstances described in subsection (4); and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442229" lims:id="1442229"><Label>(b)</Label><Text>ensure the ongoing suitability of the control measures to maintain risks at a level as low as reasonably practicable.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442230" lims:id="1442230"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442231" lims:id="1442231">Resource management plan — paragraph 139(3)(b) of Act</MarginalNote><Label>25</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442232" lims:id="1442232"><Label>(1)</Label><Text>For the purposes of paragraph 139(3)(b) of the Act, Part II of the development plan must contain a resource management plan.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442233" lims:id="1442233"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442234" lims:id="1442234">Contents of resource management plan</MarginalNote><Label>(2)</Label><Text>The resource management plan must include a description and analysis of the following:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442235" lims:id="1442235"><Label>(a)</Label><Text>the geological setting and features of the field and of each pool or petroleum-bearing reservoir;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442236" lims:id="1442236"><Label>(b)</Label><Text>the petrophysical data and analytical procedures for each pool;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442237" lims:id="1442237"><Label>(c)</Label><Text>the reservoir engineering data for each pool;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442238" lims:id="1442238"><Label>(d)</Label><Text>estimates of in-place resources and recoverable reserves for each pool, fault block and reservoir subdivision;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442239" lims:id="1442239"><Label>(e)</Label><Text>the proposed reservoir exploitation scheme;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442240" lims:id="1442240"><Label>(f)</Label><Text>potential developments and the reasons why they are not included in the proposed development of the field or pool;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442241" lims:id="1442241"><Label>(g)</Label><Text>any past drilling in the area related to the proposed development of the field or pool as well as the proposed drilling program and typical completion designs for the development wells;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442242" lims:id="1442242"><Label>(h)</Label><Text>the production and export systems related to the proposed development of the field or pool;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442243" lims:id="1442243"><Label>(i)</Label><Text>the expected overall operating efficiency and reliability of the proposed development of the field or pool; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442244" lims:id="1442244"><Label>(j)</Label><Text>past expenditures and predicted capital and operating cost data, with sufficient detail to permit an economic analysis of the proposed development of the field or pool.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442245" lims:id="1442245"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442246" lims:id="1442246">Organizational structure</MarginalNote><Label>(3)</Label><Text>The resource management plan must also contain a description of the operator’s organizational structure as it relates to the implementation of the plan.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442247" lims:id="1442247" level="1"><Label>PART 5</Label><TitleText>Certificate of Fitness</TitleText></Heading><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442248" lims:id="1442248" level="2"><TitleText>Application</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442249" lims:id="1442249"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442250" lims:id="1442250">Prescribed installations — section 139.2 of Act</MarginalNote><Label>26</Label><Text>For the purpose of section 139.2 of the Act, a production installation, drilling installation, accommodations installation and diving installation are prescribed installations.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442251" lims:id="1442251"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442252" lims:id="1442252">Definition of <DefinitionRef>installation</DefinitionRef></MarginalNote><Label>27</Label><Text>In this Part, <DefinedTermEn>installation</DefinedTermEn> means an installation referred to in section <XRefInternal>26</XRefInternal>.</Text></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442253" lims:id="1442253" level="2"><TitleText>Requirements for Certification</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442254" lims:id="1442254"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442255" lims:id="1442255">Issuance of certificate — requirements and conditions</MarginalNote><Label>28</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442256" lims:id="1442256"><Label>(1)</Label><Text>Before a certifying authority issues a certificate of fitness in respect of an installation,</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442257" lims:id="1442257"><Label>(a)</Label><Text>the person that applies for the certificate must</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442258" lims:id="1442258"><Label>(i)</Label><Text>provide the certifying authority with all the information that the certifying authority requires in relation to the application for certification, such as design specifications for the installation, including its systems and equipment,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442259" lims:id="1442259"><Label>(ii)</Label><Text>conduct or assist the certifying authority in conducting any inspection, test or survey that the certifying authority requires,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442260" lims:id="1442260"><Label>(iii)</Label><Text>except in the case of a diving installation, submit to the certifying authority for approval a maintenance program that meets the requirements set out in section <XRefInternal>159</XRefInternal> and a weight control program that meets the requirements set out in section <XRefInternal>161</XRefInternal>, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442261" lims:id="1442261"><Label>(iv)</Label><Text>in the case of a diving installation, submit a maintenance program to the certifying authority for approval;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442262" lims:id="1442262"><Label>(b)</Label><Text>the certifying authority must determine that, in relation to the production site, the drill site or the region in which the particular installation is to be operated,</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442263" lims:id="1442263"><Label>(i)</Label><Text>the installation, including its systems and equipment, is fit for the purposes for which it is to be used and can be operated without posing a threat to persons or the environment,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442264" lims:id="1442264"><Label>(ii)</Label><Text>in the case of an installation other than a diving installation, the requirements set out in the following provisions have been met:</Text><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442265" lims:id="1442265"><Label>(A)</Label><Text>the provisions of these Regulations listed in Part 1 of Schedule 1, and</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442266" lims:id="1442266"><Label>(B)</Label><Text>the provisions of the <XRefExternal reference-type="regulation" link="SOR-2021-247">Canada–Newfoundland and Labrador Offshore Area Occupational Health and Safety Regulations</XRefExternal> listed in Part 2 of Schedule 1, other than paragraph 22(5)(b), subsection 28(3), paragraph 28(5)(a), subsection 171(3) and paragraphs 172(1)(a), (g), (j) to (m), (o) and (p), (2)(e) and (3)(c) and (f) of those Regulations,</Text></Clause></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442267" lims:id="1442267"><Label>(iii)</Label><Text>in the case of a diving installation, the requirements set out in the following provisions have been met:</Text><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442268" lims:id="1442268"><Label>(A)</Label><Text>section <XRefInternal>174</XRefInternal> and the provisions of Part 9, and</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442269" lims:id="1442269"><Label>(B)</Label><Text>the provisions of the <XRefExternal reference-type="regulation" link="SOR-2021-247">Canada–Newfoundland and Labrador Offshore Area Occupational Health and Safety Regulations</XRefExternal> listed in Part 2 of Schedule 1, and</Text></Clause></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442270" lims:id="1442270"><Label>(iv)</Label><Text>the installation, including its systems and equipment, will continue to meet the requirements set out in subparagraph (i) and the applicable requirements set out in subparagraph (ii) or (iii), as the case may be, for the time set out in the certificate of fitness if</Text><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442271" lims:id="1442271"><Label>(A)</Label><Text>the installation — other than a diving installation — including its systems and equipment, is inspected, monitored, tested and maintained in accordance with the maintenance program and is maintained in accordance with the weight control program referred to in subparagraph (a)(iii), or</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442272" lims:id="1442272"><Label>(B)</Label><Text>the diving installation, including its systems and equipment, is maintained in accordance with the maintenance program referred to in subparagraph (a)(iv);</Text></Clause></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442273" lims:id="1442273"><Label>(c)</Label><Text>the certifying authority must</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442274" lims:id="1442274"><Label>(i)</Label><Text>in the case of an installation other than a diving installation, determine that the maintenance program and the weight control program are adequate to ensure the continued integrity of the installation, including its systems and equipment, and approve them, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442275" lims:id="1442275"><Label>(ii)</Label><Text>in the case of a diving installation, determine that the maintenance program is adequate to ensure the continued integrity of the installation, including its systems and equipment, and approve it; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442276" lims:id="1442276"><Label>(d)</Label><Text>the certifying authority must carry out the scope of work in respect of which the certificate of fitness is issued.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442277" lims:id="1442277"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442278" lims:id="1442278">Substitution — section 151 and subsection 205.069(1) of Act</MarginalNote><Label>(2)</Label><Text>For the purposes of subparagraphs (1)(b)(ii) and (iii), the certifying authority may substitute, for any equipment, methods, measures, standards or other things required under any regulation referred to in those subparagraphs, any other equipment, methods, measures, standards or other things the use of which is authorized by the Chief Safety Officer or the Chief Conservation Officer, as the case may be, under section 151 of the Act or subsection 205.069(1) of the Act.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442279" lims:id="1442279"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442280" lims:id="1442280">Limitations</MarginalNote><Label>(3)</Label><Text>The certifying authority must set out in any certificate of fitness that it issues the details of any limitation on the operation of the installation that is necessary to ensure that the installation, including its systems and equipment, meets the requirements set out in paragraph (1)(b).</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442281" lims:id="1442281"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442282" lims:id="1442282">Conflict of interest — paragraph 139.2(4)(b) of Act</MarginalNote><Label>29</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442283" lims:id="1442283"><Label>(1)</Label><Text>For the purposes of paragraph 139.2(4)(b) of the Act, the extent to which a certifying authority may participate in the design, construction or installation of an installation in respect of which a certificate of fitness is issued is as follows:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442284" lims:id="1442284"><Label>(a)</Label><Text>the certifying authority or one of its subsidiaries or affiliates may be the certifying authority or classification society for the original design, construction or installation of the installation or any modification to it; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442285" lims:id="1442285"><Label>(b)</Label><Text>a subsidiary or affiliate of the certifying authority may participate in the design, construction or installation of the installation to any other extent as long as it does not participate in any of the certification or verification activities in respect of the installation.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442286" lims:id="1442286"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442287" lims:id="1442287">Notice of non-compliance</MarginalNote><Label>(2)</Label><Text>The certifying authority must monitor for any participation beyond that described in subsection (1) and must, without delay, inform the person that applied for the certificate and the Board of any such participation.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442288" lims:id="1442288"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442289" lims:id="1442289">Certification plan</MarginalNote><Label>30</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442290" lims:id="1442290"><Label>(1)</Label><Text>A person that applies for a certificate of fitness must submit a certification plan to the Chief Safety Officer and to the certifying authority for the purposes of the approval of the scope of work under section <XRefInternal>31</XRefInternal>.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442291" lims:id="1442291"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442292" lims:id="1442292">Contents</MarginalNote><Label>(2)</Label><Text>The certification plan must include the following documents and information:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442293" lims:id="1442293"><Label>(a)</Label><Text>a description of the installation that is to be certified, including its systems and equipment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442294" lims:id="1442294"><Label>(b)</Label><Text>a list of the standards that will apply to the installation to be certified, including its systems and equipment, and a list of the standards on which the measures to reduce risks that are described in the safety plan and the environmental protection plan are based or, if there are no applicable standards, any studies and analyses that demonstrate that the measures to be implemented are adequate to reduce the risks to safety and the environment to a level that is as low as reasonably practicable or to minimize the risk of hazards, as the case may be; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442295" lims:id="1442295"><Label>(c)</Label><Text>other than in the case of a diving installation, a list of all safety-critical elements, as well as a description of how the associated performance standards are to be developed.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442296" lims:id="1442296"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442297" lims:id="1442297">Scope of work</MarginalNote><Label>31</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442298" lims:id="1442298"><Label>(1)</Label><Text>A certifying authority must submit to the Chief Safety Officer for approval a scope of work that takes into account the certification plan.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442299" lims:id="1442299"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442300" lims:id="1442300">Contents of scope of work</MarginalNote><Label>(2)</Label><Text>The scope of work must include</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442301" lims:id="1442301"><Label>(a)</Label><Text>a description of the following activities to be conducted by the certifying authority:</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442302" lims:id="1442302"><Label>(i)</Label><Text>activities to verify compliance with the requirements referred to in paragraph <XRefInternal>28</XRefInternal>(1)(b),</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442303" lims:id="1442303"><Label>(ii)</Label><Text>activities to verify the validity of the certificate of fitness, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442304" lims:id="1442304"><Label>(iii)</Label><Text>any additional activities to be carried out before the renewal of the certificate; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442305" lims:id="1442305"><Label>(b)</Label><Text>a schedule of the activities referred to in paragraph (a).</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442306" lims:id="1442306"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442307" lims:id="1442307">Approval of scope of work</MarginalNote><Label>(3)</Label><Text>The Chief Safety Officer must approve the scope of work if the Chief Safety Officer determines that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442308" lims:id="1442308"><Label>(a)</Label><Text>in the case of any installation, the scope of work</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442309" lims:id="1442309"><Label>(i)</Label><Text>is sufficiently detailed to permit the certifying authority to determine whether the requirements referred to in paragraph <XRefInternal>28</XRefInternal>(1)(b) are met,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442310" lims:id="1442310"><Label>(ii)</Label><Text>describes the type and extent of reporting in respect of continual monitoring of the certification process being undertaken by the certifying authority, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442311" lims:id="1442311"><Label>(iii)</Label><Text>demonstrates how the certifying authority has complied with section <XRefInternal>29</XRefInternal>;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442312" lims:id="1442312"><Label>(b)</Label><Text>in the case of an installation other than a diving installation, the scope of work</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442313" lims:id="1442313"><Label>(i)</Label><Text>provides the means for determining whether</Text><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442314" lims:id="1442314"><Label>(A)</Label><Text>the environmental criteria for the region or site and the loads estimated for the installation are correct,</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442315" lims:id="1442315"><Label>(B)</Label><Text>the list of safety-critical elements included in the certification plan is complete and the elements are in place and functioning as intended,</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442316" lims:id="1442316"><Label>(C)</Label><Text>in respect of any installation referred to in a development plan, the concept safety analysis submitted under section <XRefInternal>24</XRefInternal> meets the requirements set out in that section,</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442317" lims:id="1442317"><Label>(D)</Label><Text>in respect of a new installation, the installation has been constructed in accordance with the quality assurance program referred to in section <XRefInternal>100</XRefInternal>,</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442318" lims:id="1442318"><Label>(E)</Label><Text>the operations manual meets the requirements set out in section <XRefInternal>157</XRefInternal>, and</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442319" lims:id="1442319"><Label>(F)</Label><Text>the installation’s construction and installation, including the materials used for those purposes, meet the design specifications,</Text></Clause></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442320" lims:id="1442320"><Label>(ii)</Label><Text>includes the list of performance standards and methods that the certifying authority will use to verify compliance with those standards and to verify whether the installation, including its systems and equipment, continues to be fit for the purposes for which it is to be used, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442321" lims:id="1442321"><Label>(iii)</Label><Text>provides the means for determining whether the provisions listed in Schedule 2 have been complied with and whether the structures, systems and equipment referred to in those provisions are in place and functioning as intended; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442322" lims:id="1442322"><Label>(c)</Label><Text>in the case of a diving installation, the scope of work provides the means for determining whether the processes referred to in subparagraph <XRefInternal>4</XRefInternal>(1)(m)(iii) and paragraph <XRefInternal>4</XRefInternal>(1)(v) that are included in the operator’s management system have been implemented.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442323" lims:id="1442323"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442324" lims:id="1442324">Period of validity</MarginalNote><Label>32</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442325" lims:id="1442325"><Label>(1)</Label><Text>A certificate of fitness is valid for five years from the day on which it is issued if the certifying authority determines that the requirements referred to in paragraph <XRefInternal>28</XRefInternal>(1)(b) will be met for a period of at least five years from that day.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442326" lims:id="1442326"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442327" lims:id="1442327">Less than five years</MarginalNote><Label>(2)</Label><Text>If the certifying authority determines that the requirements referred to in paragraph <XRefInternal>28</XRefInternal>(1)(b) can be met only for a period that is less than five years, the certificate of fitness is valid for the corresponding lesser period.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442328" lims:id="1442328"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442329" lims:id="1442329">Expiry date</MarginalNote><Label>(3)</Label><Text>The certifying authority must indicate on the certificate of fitness its expiry date.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442330" lims:id="1442330"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442331" lims:id="1442331">Extension of period of validity</MarginalNote><Label>(4)</Label><Text>The certifying authority may, on request of the holder of a certificate of fitness, extend the period of validity of the certificate of fitness for a period of up to three months, subject to the approval of the Chief Safety Officer.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442332" lims:id="1442332"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442333" lims:id="1442333">Approval by Chief Safety Officer</MarginalNote><Label>(5)</Label><Text>The Chief Safety Officer must approve the extension of the period of validity of the certificate of fitness if the extension does not compromise safety or the protection of the environment.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442334" lims:id="1442334"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442335" lims:id="1442335">Applicable site or region</MarginalNote><Label>33</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442336" lims:id="1442336"><Label>(1)</Label><Text>A certifying authority must indicate on a certificate of fitness the site or region where the installation is to be operated.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442337" lims:id="1442337"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442338" lims:id="1442338">Validity</MarginalNote><Label>(2)</Label><Text>A certificate of fitness is valid for the operation of the installation at the site or in the region that is indicated on the certificate of fitness.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442339" lims:id="1442339"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442340" lims:id="1442340">Revalidation — scope of work</MarginalNote><Label>34</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442341" lims:id="1442341"><Label>(1)</Label><Text>The certifying authority must revalidate the scope of work against the criteria referred to in subsection <XRefInternal>31</XRefInternal>(3) and make any modifications that are necessary</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442342" lims:id="1442342"><Label>(a)</Label><Text>before renewing a certificate of fitness; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442343" lims:id="1442343"><Label>(b)</Label><Text>if new circumstances such as the following arise that have or could have a significant impact on the scope of work:</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442344" lims:id="1442344"><Label>(i)</Label><Text>these Regulations or the <XRefExternal reference-type="regulation" link="SOR-2021-247">Canada–Newfoundland and Labrador Offshore Area Occupational Health and Safety Regulations</XRefExternal> are amended,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442345" lims:id="1442345"><Label>(ii)</Label><Text>new information regarding a major accidental event that occurred in any place is disclosed,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442346" lims:id="1442346"><Label>(iii)</Label><Text>amendments are made to any of the standards on which the certification was based, or</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442347" lims:id="1442347"><Label>(iv)</Label><Text>the installation has transitioned from one life cycle phase to another.</Text></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442348" lims:id="1442348"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442349" lims:id="1442349">Revalidation approval</MarginalNote><Label>(2)</Label><Text>The revalidated scope of work must be submitted to the Chief Safety Officer for approval under subsection <XRefInternal>31</XRefInternal>(3).</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442350" lims:id="1442350"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442351" lims:id="1442351">Renewal of certificate</MarginalNote><Label>35</Label><Text>The certifying authority must renew the certificate of fitness in relation to an installation before or on its expiry date if</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442352" lims:id="1442352"><Label>(a)</Label><Text>the certifying authority determines that the requirements referred to in paragraph <XRefInternal>28</XRefInternal>(1)(b) have been met;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442353" lims:id="1442353"><Label>(b)</Label><Text>the certifying authority has carried out the activities referred to in subparagraph <XRefInternal>31</XRefInternal>(2)(a)(iii); and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442354" lims:id="1442354"><Label>(c)</Label><Text>the certifying authority has revalidated the scope of work and it has been approved by the Chief Safety Officer.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442355" lims:id="1442355"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442356" lims:id="1442356">Invalidity</MarginalNote><Label>36</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442357" lims:id="1442357"><Label>(1)</Label><Text>Subject to subsections (2) and (3), a certificate of fitness ceases to be valid if</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442358" lims:id="1442358"><Label>(a)</Label><Text>the certifying authority or the Chief Safety Officer determines that</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442359" lims:id="1442359"><Label>(i)</Label><Text>any of the information provided under subparagraph <XRefInternal>28</XRefInternal>(1)(a)(i) on the basis of which the certificate of fitness was issued is incorrect,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442360" lims:id="1442360"><Label>(ii)</Label><Text>any of the requirements referred to in paragraph <XRefInternal>28</XRefInternal>(1)(b) are no longer being met, or</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442361" lims:id="1442361"><Label>(iii)</Label><Text>any limitation set out in the certificate of fitness under subsection <XRefInternal>28</XRefInternal>(3) has not been respected; or</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442362" lims:id="1442362"><Label>(b)</Label><Text>the Chief Safety Officer determines that the certifying authority has failed to carry out the scope of work relating to the installation in respect of which the certificate of fitness was issued.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442363" lims:id="1442363"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442364" lims:id="1442364">Notice in writing</MarginalNote><Label>(2)</Label><Text>At least 30 days before a determination referred to in subsection (1) is made, notice of the impending determination must be given in writing</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442365" lims:id="1442365"><Label>(a)</Label><Text>in the case of a determination to be made by the certifying authority, by the certifying authority to the Chief Safety Officer and to the holder of the certificate of fitness; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442366" lims:id="1442366"><Label>(b)</Label><Text>in the case of a determination to be made by the Chief Safety Officer, by the Chief Safety Officer to the certifying authority and to the holder of the certificate of fitness.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442367" lims:id="1442367"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442368" lims:id="1442368">Consideration of information</MarginalNote><Label>(3)</Label><Text>Before making a determination referred to in subsection (1), the certifying authority or the Chief Safety Officer, as the case may be, must consider any information in relation to that determination that is submitted by any person notified under subsection (2).</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442369" lims:id="1442369"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442370" lims:id="1442370">Change of certifying authority</MarginalNote><Label>37</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442371" lims:id="1442371"><Label>(1)</Label><Text>If the person that applies for a certificate of fitness decides to change the certifying authority in relation to an installation before the initial certificate of fitness is issued, the new certifying authority must undertake its own independent verification activities for the purpose of issuing the certificate of fitness.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442372" lims:id="1442372"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442373" lims:id="1442373">After issuance of certificate</MarginalNote><Label>(2)</Label><Text>If the holder of a certificate of fitness decides to change the certifying authority in relation to an installation, the holder must</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442374" lims:id="1442374"><Label>(a)</Label><Text>notify the Chief Safety Officer as soon as the circumstances permit;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442375" lims:id="1442375"><Label>(b)</Label><Text>develop and submit to the Chief Safety Officer a transition plan outlining all of the activities to be carried out before transitioning from the outgoing to the incoming certifying authority and demonstrating that there will not be any gaps or delays in the carrying out of verification activities or any negative effects on the extent and quality of those activities as a result of the transition from one certifying authority to another; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442376" lims:id="1442376"><Label>(c)</Label><Text>ensure that the incoming certifying authority has submitted for approval to the Chief Safety Officer, in accordance with section <XRefInternal>31</XRefInternal>, a new scope of work before commencing transition activities.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442377" lims:id="1442377"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442378" lims:id="1442378">Transition plan implementation</MarginalNote><Label>(3)</Label><Text>The holder of a certificate of fitness must ensure that the transition plan referred to in paragraph (2)(b) is implemented.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442379" lims:id="1442379"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442380" lims:id="1442380">One certificate — one authority</MarginalNote><Label>(4)</Label><Text>There must be no more than one certificate of fitness and certifying authority in relation to an installation at any given time.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442381" lims:id="1442381" level="2"><TitleText>Certifying Authority</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442382" lims:id="1442382"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442383" lims:id="1442383">Organizational structure</MarginalNote><Label>38</Label><Text>A certifying authority must, without delay, notify the Board, the Federal Minister and the Provincial Minister of any changes to its organizational structure, including amalgamations and legal name changes.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442384" lims:id="1442384"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442385" lims:id="1442385">Reports and information</MarginalNote><Label>39</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442386" lims:id="1442386"><Label>(1)</Label><Text>A certifying authority must submit to the Board, the Federal Minister and the Provincial Minister, not later than March 31 of each year, an annual report that contains</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442387" lims:id="1442387"><Label>(a)</Label><Text>a summary of the certification activities the certifying authority carried out during the previous calendar year as a certifying authority under the Act; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442388" lims:id="1442388"><Label>(b)</Label><Text>proof of its technical capabilities and experience as a certifying authority.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442389" lims:id="1442389"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442390" lims:id="1442390">Monthly reports</MarginalNote><Label>(2)</Label><Text>The certifying authority must submit a monthly report to the Board that describes the certification activities it carried out during the previous month as a certifying authority under the Act.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442391" lims:id="1442391"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442392" lims:id="1442392">Information and documents to Board</MarginalNote><Label>(3)</Label><Text>On the Board’s request, the certifying authority must submit to the Board any information obtained or documents generated in the course of carrying out its certification and verification activities.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442393" lims:id="1442393"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442394" lims:id="1442394">Record retention</MarginalNote><Label>(4)</Label><Text>The certifying authority must retain records, including technical drawings, for any activity carried out during its certification or verification activities in respect of an installation until the day that is seven years after the day on which the last certificate of fitness issued for that installation expires.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442395" lims:id="1442395" level="1"><Label>PART 6</Label><TitleText>General Requirements for Authorized Works and Activities</TitleText></Heading><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442396" lims:id="1442396" level="2"><TitleText>General</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442397" lims:id="1442397"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442398" lims:id="1442398">Installation manager</MarginalNote><Label>40</Label><Text>For the purposes of section 193.2 of the Act, every installation is a prescribed installation.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442399" lims:id="1442399"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442400" lims:id="1442400">Safety and protection of environment</MarginalNote><Label>41</Label><Text>An operator must take all measures necessary to ensure safety and the protection of the environment during any authorized work or activity, including measures to ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442401" lims:id="1442401"><Label>(a)</Label><Text>the safety of persons at an operations site or on a support craft has priority, at all times, over any work or activity at the operations site or on the support craft;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442402" lims:id="1442402"><Label>(b)</Label><Text>safe work methods are adopted;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442403" lims:id="1442403"><Label>(c)</Label><Text>differences in language or other barriers to effective communication do not jeopardize safety or the protection of the environment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442404" lims:id="1442404"><Label>(d)</Label><Text>if there is a loss of well control, all other wells at the same installation are shut in until the well that is out of control is secured;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442405" lims:id="1442405"><Label>(e)</Label><Text>any equipment that is necessary for safety and the protection of the environment is available and in a condition to perform as intended at all times;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442406" lims:id="1442406"><Label>(f)</Label><Text>fires can be controlled and extinguished and any related hazard to safety or the environment is minimized;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442407" lims:id="1442407"><Label>(g)</Label><Text>the administrative and logistical support that is provided for any work or activity includes accommodation and transportation and storage and repair facilities that are fit for the purposes for which they are to be used;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442408" lims:id="1442408"><Label>(h)</Label><Text>every operations site is equipped with a communication system that meets the requirements set out in subsection <XRefInternal>129</XRefInternal>(1);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442409" lims:id="1442409"><Label>(i)</Label><Text>any operating procedure that creates a hazard to safety or the environment is corrected; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442410" lims:id="1442410"><Label>(j)</Label><Text>all affected persons are informed of any correction made under paragraph (i).</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442411" lims:id="1442411"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442412" lims:id="1442412">Physical and environmental conditions</MarginalNote><Label>42</Label><Text>An operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442413" lims:id="1442413"><Label>(a)</Label><Text>physical and environmental conditions, including sea states and ice movements, are observed and forecasts of those conditions are obtained;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442414" lims:id="1442414"><Label>(b)</Label><Text>the observations and forecasts are recorded each day, as well as each time there are substantial differences between the observations and the forecasts; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442415" lims:id="1442415"><Label>(c)</Label><Text>the records are maintained at the operations site.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442416" lims:id="1442416"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442417" lims:id="1442417">Location of infrastructure or equipment</MarginalNote><Label>43</Label><Text>An operator must keep data or information that accurately describes the location of any infrastructure or equipment at an operations site that is on or attached to the seabed, including any abandoned installation or part of it.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442418" lims:id="1442418"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442419" lims:id="1442419">Accessibility, storage and handling of consumables</MarginalNote><Label>44</Label><Text>An operator must ensure that explosives, fuel, spill-treating agents, spill containment products, drilling, completion and well stimulation fluids and cement, as well as chemicals and other consumables that are necessary for safe operations, are</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442420" lims:id="1442420"><Label>(a)</Label><Text>readily accessible and stored in quantities that are sufficient for normal conditions and any emergency situation; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442421" lims:id="1442421"><Label>(b)</Label><Text>stored and handled in a manner that does not create a hazard to safety or the environment, including any hazard that could result from their deterioration.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442422" lims:id="1442422"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442423" lims:id="1442423">Storage and handling of chemical substances</MarginalNote><Label>45</Label><Text>An operator must ensure that all chemical substances present at an operations site, including process fluids, fuel, lubricants, waste material, drilling fluids and drill cuttings, are stored and handled in a manner that does not create a hazard to safety or the environment.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442424" lims:id="1442424"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442425" lims:id="1442425">Misuse of equipment</MarginalNote><Label>46</Label><Text>It is prohibited for any person to tamper with, activate without cause or otherwise misuse equipment that is necessary for safety or the protection of the environment.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442426" lims:id="1442426"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442427" lims:id="1442427">Cessation of work or activity</MarginalNote><Label>47</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442428" lims:id="1442428"><Label>(1)</Label><Text>An operator must ensure that any work or activity ceases without delay if it</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442429" lims:id="1442429"><Label>(a)</Label><Text>endangers or is likely to endanger the safety of any other work or activity;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442430" lims:id="1442430"><Label>(b)</Label><Text>endangers or is likely to endanger the safety or integrity of any operations site or well; or</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442431" lims:id="1442431"><Label>(c)</Label><Text>causes or is likely to cause pollution.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442432" lims:id="1442432"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442433" lims:id="1442433">Condition for resumption</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the work or activity does not resume until it can be done safely and without causing pollution.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442434" lims:id="1442434" level="2"><TitleText>Document Availability</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442435" lims:id="1442435"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442436" lims:id="1442436">Copy of authorization and approvals</MarginalNote><Label>48</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442437" lims:id="1442437"><Label>(1)</Label><Text>The operator must ensure that a copy of the authorization and all related approvals that are required under these Regulations or Part III of the Act is displayed in a conspicuous location at every operations site.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442438" lims:id="1442438"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442439" lims:id="1442439">Additional copy and plans</MarginalNote><Label>(2)</Label><Text>An operator must keep an additional copy of the authorization and approvals, as well as all plans that are required under these Regulations or Part III of the Act, at every operations site and must ensure that they are readily accessible for consultation or examination.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442440" lims:id="1442440"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442441" lims:id="1442441">Emergency response procedures and other documentation</MarginalNote><Label>49</Label><Text>An operator must ensure that a copy of the most current version of the emergency response procedures and any documentation that is necessary to carry out an authorized work or activity and to operate and maintain an installation or pipeline is</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442442" lims:id="1442442"><Label>(a)</Label><Text>readily accessible at all times at every operations site and emergency response operations centre; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442443" lims:id="1442443"><Label>(b)</Label><Text>usable under all foreseeable circumstances at each location referred to in paragraph (a).</Text></Paragraph></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442444" lims:id="1442444" level="2"><TitleText>Plans</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442445" lims:id="1442445"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442446" lims:id="1442446">Implementation</MarginalNote><Label>50</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442447" lims:id="1442447"><Label>(1)</Label><Text>An operator must ensure that the safety plan referred to in section <XRefInternal>9</XRefInternal>, the environmental protection plan referred to in section <XRefInternal>10</XRefInternal> and the resource management plan referred to in section <XRefInternal>25</XRefInternal> are implemented at the commencement of any work or activity and that the contingency plan referred to in section <XRefInternal>11</XRefInternal> is implemented as soon as an accidental event occurs or appears imminent.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442448" lims:id="1442448"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442449" lims:id="1442449">Periodic updates</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the safety plan, environmental protection plan, resource management plan and contingency plan are periodically updated; however, the descriptions of installations, vessels, systems and equipment that are included in the safety plan and the environmental protection plan as required by paragraphs <XRefInternal>9</XRefInternal>(2)(c) and <XRefInternal>10</XRefInternal>(2)(c), respectively, must be updated as soon as the circumstances permit after the modification, replacement or addition of any major component.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442450" lims:id="1442450" level="1"><Label>PART 7</Label><TitleText>Geoscientific Programs, Geotechnical Programs and Environmental Programs</TitleText></Heading><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442451" lims:id="1442451" level="2"><TitleText>Equipment, Materials and Property</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442452" lims:id="1442452"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442453" lims:id="1442453">Measures</MarginalNote><Label>51</Label><Text>An operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442454" lims:id="1442454"><Label>(a)</Label><Text>all equipment and materials that are necessary to conduct a geoscientific program, geotechnical program or environmental program are handled, installed, inspected, tested, maintained and operated in a manner that takes into account the manufacturer’s instructions and industry standards and best practices; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442455" lims:id="1442455"><Label>(b)</Label><Text>if any of the equipment, its components or the materials are defective, they are, without delay, repaired or replaced in accordance with the manufacturer’s recommendations.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442456" lims:id="1442456"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442457" lims:id="1442457">Certification</MarginalNote><Label>52</Label><Text>An operator must ensure that a competent third party has certified that all equipment that is installed temporarily on a vessel to conduct a geoscientific program, geotechnical program or environmental program is fit for the purposes for which it is to be used.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442458" lims:id="1442458"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442459" lims:id="1442459">Damage to property</MarginalNote><Label>53</Label><Text>An operator must take all necessary measures to ensure that no property is damaged as a result of a geoscientific program, geotechnical program or environmental program.</Text></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442460" lims:id="1442460" level="2"><TitleText>Energy Sources</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442461" lims:id="1442461"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442462" lims:id="1442462">General requirements</MarginalNote><Label>54</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442463" lims:id="1442463"><Label>(1)</Label><Text>An operator must ensure that any energy source that is used in a geoscientific program, geotechnical program or environmental program is</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442464" lims:id="1442464"><Label>(a)</Label><Text>kept free from any substance that could create a hazard; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442465" lims:id="1442465"><Label>(b)</Label><Text>operated in a manner that prevents inadvertent activation of the energy source.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442466" lims:id="1442466"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442467" lims:id="1442467">Electrical or electromagnetic energy source</MarginalNote><Label>(2)</Label><Text>The operator must ensure that any electrical or electromagnetic energy source is equipped with circuit breakers on the charging and discharging circuits and with wiring that is adequately insulated and grounded to prevent current leakage and electrical shock.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442468" lims:id="1442468"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442469" lims:id="1442469">Elimination of risk to divers</MarginalNote><Label>(3)</Label><Text>The operator must ensure that the program is conducted in a manner that eliminates all safety risks to divers from any energy source used, including by determining the minimum distances that are required to be maintained between the divers and the energy source and ensuring compliance with those distances.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442470" lims:id="1442470"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442471" lims:id="1442471">Testing of energy sources</MarginalNote><Label>55</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442472" lims:id="1442472"><Label>(1)</Label><Text>An operator must minimize energy source testing on the deck of an operations site while a geoscientific program, geotechnical program or environmental program is being conducted.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442473" lims:id="1442473"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442474" lims:id="1442474">Energy source activation</MarginalNote><Label>(2)</Label><Text>Before an energy source is activated for testing purposes, the operator must ensure that measures are taken to protect persons at the operations site where the test will be conducted from exposure to any hazard associated with the energy source, including</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442475" lims:id="1442475"><Label>(a)</Label><Text>advising those persons that a test will be conducted;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442476" lims:id="1442476"><Label>(b)</Label><Text>safely securing all equipment; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442477" lims:id="1442477"><Label>(c)</Label><Text>in the case of an electrical or electromagnetic energy source, fully immersing it in water.</Text></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442478" lims:id="1442478" level="2"><TitleText>Primary Vessel</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442479" lims:id="1442479"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442480" lims:id="1442480">Classification</MarginalNote><Label>56</Label><Text>An operator must ensure that the primary vessel used in a geoscientific program, geotechnical program or environmental program holds a valid certificate of class issued by a classification society.</Text></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442481" lims:id="1442481" level="2"><TitleText>Destruction, Discard or Removal from Canada</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442482" lims:id="1442482"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442483" lims:id="1442483">Prohibited without approval</MarginalNote><Label>57</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442484" lims:id="1442484"><Label>(1)</Label><Text>It is prohibited for any person to destroy, discard or, subject to subsection (2), remove from Canada the following materials and information that are obtained in the context of a geoscientific program, geotechnical program or environmental program unless the destruction, discard or removal is approved by the Board under subsection (3):</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442485" lims:id="1442485"><Label>(a)</Label><Text>all field data and final processed data that are in a digital format, together with a description of that data format;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442486" lims:id="1442486"><Label>(b)</Label><Text>any samples; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442487" lims:id="1442487"><Label>(c)</Label><Text>all other data, observations, readings and supporting information obtained during the program.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442488" lims:id="1442488"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442489" lims:id="1442489">Exception</MarginalNote><Label>(2)</Label><Text>The materials and information may be removed from Canada without the approval of the Board for the purpose of being processed in a foreign country if they are returned to Canada as soon as the processing is complete.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442490" lims:id="1442490"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442491" lims:id="1442491">Approval of application</MarginalNote><Label>(3)</Label><Text>Within 60 days after the day on which the Board receives an application for approval to destroy, discard or remove from Canada materials or information, the Board must approve the application if the Board is satisfied that the materials or information are not of much use or value.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442492" lims:id="1442492"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442493" lims:id="1442493">Provision of materials or information</MarginalNote><Label>(4)</Label><Text>The Board may, after receiving an application referred to in subsection (3), require that the materials or information, or a copy of the information, be provided to the Board within the period that it specifies.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442494" lims:id="1442494" level="1"><Label>PART 8</Label><TitleText>Drilling and Production</TitleText></Heading><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442495" lims:id="1442495" level="2"><TitleText>General</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442496" lims:id="1442496"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442497" lims:id="1442497">Allocation of areas</MarginalNote><Label>58</Label><Text>The Board may make orders respecting the allocation of areas, including respecting the determination of the size of spacing units and the determination of well production rates, for the purpose of drilling for or producing petroleum.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442498" lims:id="1442498"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442499" lims:id="1442499">Name, classification or status of well</MarginalNote><Label>59</Label><Text>The Board may give a name, classification or status to any well and may change that name, classification or status.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442500" lims:id="1442500"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442501" lims:id="1442501">Pool, zone or field</MarginalNote><Label>60</Label><Text>The Board may</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442502" lims:id="1442502"><Label>(a)</Label><Text>designate a zone as such for the purposes of these Regulations;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442503" lims:id="1442503"><Label>(b)</Label><Text>give a name to a pool, zone or field and change that name; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442504" lims:id="1442504"><Label>(c)</Label><Text>define the boundaries of a pool, zone or field.</Text></Paragraph></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442505" lims:id="1442505" level="2"><TitleText>Evaluation of Wells, Pools and Fields</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442506" lims:id="1442506"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442507" lims:id="1442507">Data acquisition programs</MarginalNote><Label>61</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442508" lims:id="1442508"><Label>(1)</Label><Text>An operator must ensure that the field data acquisition program referred to in section <XRefInternal>13</XRefInternal> and the well data acquisition program referred to in section <XRefInternal>18</XRefInternal> are implemented in accordance with good oilfield practices.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442509" lims:id="1442509"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442510" lims:id="1442510">Partial implementation</MarginalNote><Label>(2)</Label><Text>If part of the field or well data acquisition program cannot be implemented, the operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442511" lims:id="1442511"><Label>(a)</Label><Text>a conservation officer is notified as soon as the circumstances permit;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442512" lims:id="1442512"><Label>(b)</Label><Text>measures to otherwise achieve the goals of the program are submitted to the Board for approval; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442513" lims:id="1442513"><Label>(c)</Label><Text>the measures approved by the Board are implemented.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442514" lims:id="1442514"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442515" lims:id="1442515">Board approval of alternate measures</MarginalNote><Label>(3)</Label><Text>The Board must approve the measures submitted under paragraph (2)(b) if the operator demonstrates that the measures can achieve the goals of the field data acquisition program or the well data acquisition program, as the case may be, or are the only ones that can be taken in the circumstances.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442516" lims:id="1442516"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442517" lims:id="1442517">Periodic updates</MarginalNote><Label>(4)</Label><Text>The operator must ensure that the field data acquisition program is periodically updated.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442518" lims:id="1442518"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442519" lims:id="1442519">Formation evaluation, testing and sampling</MarginalNote><Label>62</Label><Text>If the Board determines that data or samples from a formation in a well would contribute substantially to the geological and reservoir evaluation, the operator must ensure that the formation is evaluated, tested and sampled as necessary to obtain the data or samples.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442520" lims:id="1442520"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442521" lims:id="1442521">Formation flow test</MarginalNote><Label>63</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442522" lims:id="1442522"><Label>(1)</Label><Text>An operator must ensure that no development well is put into production unless a formation flow test that has been approved by the Board under subsection (5) is conducted.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442523" lims:id="1442523"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442524" lims:id="1442524">Well operation</MarginalNote><Label>(2)</Label><Text>If a development well is subjected to a well operation that might change its deliverability, productivity or injectivity, the operator must, for the purpose of determining the effects of the operation on the well’s deliverability, productivity or injectivity, ensure that a formation flow test that has been approved by the Board under subsection (5) is conducted as soon as the circumstances permit after the well operation has ended and the flow or injection conditions have stabilized.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442525" lims:id="1442525"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442526" lims:id="1442526">Conditions</MarginalNote><Label>(3)</Label><Text>Before conducting a formation flow test on a well drilled on a geological feature, the operator must</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442527" lims:id="1442527"><Label>(a)</Label><Text>submit a formation flow test program to the Board; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442528" lims:id="1442528"><Label>(b)</Label><Text>obtain the Board’s approval under subsection (5) to conduct the formation flow test.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442529" lims:id="1442529"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442530" lims:id="1442530">Contribution to geological and reservoir evaluation</MarginalNote><Label>(4)</Label><Text>The Board may require that the operator conduct a formation flow test on a well drilled on a geological feature, other than the first well, if the Board determines that the test would contribute to the geological and reservoir evaluation.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442531" lims:id="1442531"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442532" lims:id="1442532">Approval of formation flow test</MarginalNote><Label>(5)</Label><Text>The Board must approve a formation flow test if the operator demonstrates that the test will be conducted in a manner that ensures safety and the protection of the environment and in accordance with good oilfield practices and that the test will enable the operator to</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442533" lims:id="1442533"><Label>(a)</Label><Text>obtain data on the deliverability of the reservoir and the productivity of the well;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442534" lims:id="1442534"><Label>(b)</Label><Text>establish the characteristics of the reservoir; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442535" lims:id="1442535"><Label>(c)</Label><Text>obtain representative samples of the formation fluids.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442536" lims:id="1442536"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442537" lims:id="1442537">Samples and cores</MarginalNote><Label>64</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442538" lims:id="1442538"><Label>(1)</Label><Text>An operator must ensure that all drill cutting and fluid samples and cores collected as part of the field data acquisition program referred to in section <XRefInternal>13</XRefInternal> and the well data acquisition program referred to in section <XRefInternal>18</XRefInternal> are</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442539" lims:id="1442539"><Label>(a)</Label><Text>stored in durable containers that are correctly labelled for identification;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442540" lims:id="1442540"><Label>(b)</Label><Text>transported and stored in a manner that prevents any loss or deterioration; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442541" lims:id="1442541"><Label>(c)</Label><Text>delivered to the Board within 60 days after the day on which the well is abandoned, suspended or completed, unless the analyses are ongoing, in which case the samples or cores, or any remaining parts, are to be delivered to the Board on completion of the analyses.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442542" lims:id="1442542"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442543" lims:id="1442543">Remaining conventional core</MarginalNote><Label>(2)</Label><Text>An operator must ensure that, after any samples necessary for analysis or for research or academic studies have been removed from a conventional core, the remaining core, or a longitudinal slab that is not less than one half of the cross-sectional area of that core, is delivered to the Board.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442544" lims:id="1442544"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442545" lims:id="1442545">Remaining sidewall core</MarginalNote><Label>(3)</Label><Text>The operator must ensure that, after any samples necessary for analysis or for research or academic studies have been removed from a sidewall core, the remaining core is delivered to the Board.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442546" lims:id="1442546"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442547" lims:id="1442547">Notice before disposal</MarginalNote><Label>65</Label><Text>Before disposing of any drill cutting or fluid samples, cores or evaluation data, an operator must ensure that the Board is notified in writing and given an opportunity to request delivery of the samples, cores or data.</Text></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442548" lims:id="1442548" level="2"><TitleText>Location of Wells</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442549" lims:id="1442549"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442550" lims:id="1442550">Depth measurements</MarginalNote><Label>66</Label><Text>An operator must ensure that no record is made of any depth in a well unless the depth is measured from the rotary table of the drilling rig.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442551" lims:id="1442551"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442552" lims:id="1442552">Directional and deviation surveys</MarginalNote><Label>67</Label><Text>An operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442553" lims:id="1442553"><Label>(a)</Label><Text>directional and deviation surveys are taken at intervals that allow the position of the well-bore to be accurately known during drilling;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442554" lims:id="1442554"><Label>(b)</Label><Text>the directional and deviation surveys are adequate to permit the management, in relation to the well-bore, of identified geohazards, the intersection of the geological targets for the well and the intersection of the well-bore in the event that a relief well is required; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442555" lims:id="1442555"><Label>(c)</Label><Text>except in the case of a relief well, every well is drilled in compliance with internationally recognized well-bore collision avoidance practices and procedures and in a manner that does not intersect an existing well.</Text></Paragraph></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442556" lims:id="1442556" level="2"><TitleText>Well Integrity</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442557" lims:id="1442557"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442558" lims:id="1442558">Well control</MarginalNote><Label>68</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442559" lims:id="1442559"><Label>(1)</Label><Text>An operator must ensure that adequate procedures, materials and equipment are in place and used throughout the life cycle of the well to prevent the loss of well control.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442560" lims:id="1442560"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442561" lims:id="1442561">Reliable well control equipment</MarginalNote><Label>(2)</Label><Text>The equipment referred to in subsection (1) must include reliable well control equipment to detect and control kicks, prevent blowouts and safely conduct all well operations.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442562" lims:id="1442562"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442563" lims:id="1442563">Shallow hazards</MarginalNote><Label>(3)</Label><Text>During well operations conducted without a riser, the operator must ensure that measures are implemented to reduce the risk of shallow hazards while drilling.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442564" lims:id="1442564"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442565" lims:id="1442565">Surface casing</MarginalNote><Label>(4)</Label><Text>The operator must ensure that the surface casing of the well is installed to a sufficient depth, and in a competent formation, to establish well control for the continuation of the drilling operations.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442566" lims:id="1442566"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442567" lims:id="1442567">Blowout preventer and barrier envelopes</MarginalNote><Label>(5)</Label><Text>After the surface casing has been installed and cemented, the operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442568" lims:id="1442568"><Label>(a)</Label><Text>a blowout preventer is installed before the casing shoe is drilled out; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442569" lims:id="1442569"><Label>(b)</Label><Text>there are at least two independent barrier envelopes — each of which is to be verified by the operator — in place throughout the life cycle of the well.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442570" lims:id="1442570"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442571" lims:id="1442571">Barrier envelope failure</MarginalNote><Label>(6)</Label><Text>If there is a failure in a barrier envelope, the operator must ensure that no well operation, other than one that is intended to replace or restore the barrier envelope, takes place until the barrier envelope is replaced or restored.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442572" lims:id="1442572"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442573" lims:id="1442573">Replacement or restoration of barrier envelope</MarginalNote><Label>(7)</Label><Text>The operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442574" lims:id="1442574"><Label>(a)</Label><Text>the barrier envelope is replaced or restored as soon as the circumstances permit;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442575" lims:id="1442575"><Label>(b)</Label><Text>every effort is made for the replacement or restoration to conform to the original design specifications; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442576" lims:id="1442576"><Label>(c)</Label><Text>the barrier envelope is verified after its replacement or restoration.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442577" lims:id="1442577"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442578" lims:id="1442578">Drilling fluid column</MarginalNote><Label>(8)</Label><Text>The operator must ensure that, during well operations, one of the two barrier envelopes is the drilling fluid column, except when drilling under-balanced or if, when a completion or test string is run, the other barrier envelope has already been installed downhole and tested.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442579" lims:id="1442579"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442580" lims:id="1442580">Pressure control equipment</MarginalNote><Label>(9)</Label><Text>The operator must ensure that all pressure control equipment associated with well operations is pressure-tested on installation and as often as necessary to ensure its continued safe operation.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442581" lims:id="1442581"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442582" lims:id="1442582">Corrective measures</MarginalNote><Label>(10)</Label><Text>If well control is lost or if safety, the protection of the environment or resource conservation is at risk, the operator must ensure that any necessary corrective measures are taken without delay.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442583" lims:id="1442583"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442584" lims:id="1442584">Casing and wellhead system</MarginalNote><Label>69</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442585" lims:id="1442585"><Label>(1)</Label><Text>An operator must ensure that a casing and wellhead system is designed, taking into account the wellhead’s fatigue life, so that, throughout the life cycle of the well,</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442586" lims:id="1442586"><Label>(a)</Label><Text>the well can be drilled safely, targeted formations can be evaluated and developed and waste can be prevented;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442587" lims:id="1442587"><Label>(b)</Label><Text>the maximum conditions, forces and stresses to which the casing and wellhead system may be subjected are withstood; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442588" lims:id="1442588"><Label>(c)</Label><Text>the integrity of gas hydrate and permafrost zones is protected.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442589" lims:id="1442589"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442590" lims:id="1442590">Barrier analysis</MarginalNote><Label>(2)</Label><Text>The operator must ensure that, during the design of the casing and wellhead system, if the annulus is to be used for fluid production or injection, a barrier analysis is conducted to confirm that two barrier envelopes can be maintained in place throughout the life cycle of the well.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442591" lims:id="1442591"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442592" lims:id="1442592">Casing depth</MarginalNote><Label>(3)</Label><Text>The operator must ensure that each casing is installed at a depth that provides for adequate kick tolerance and safe well control.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442593" lims:id="1442593"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442594" lims:id="1442594">Wellhead fatigue life</MarginalNote><Label>(4)</Label><Text>The operator must ensure that well operations do not continue beyond the wellhead’s fatigue life.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442595" lims:id="1442595"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442596" lims:id="1442596">Cement slurry</MarginalNote><Label>(5)</Label><Text>The operator must ensure that the cement slurry is designed and installed so that, throughout the life cycle of the well,</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442597" lims:id="1442597"><Label>(a)</Label><Text>the movement of formation fluids is prevented and, when required for safety, resource evaluation or waste prevention, the isolation of the petroleum and water zones is ensured;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442598" lims:id="1442598"><Label>(b)</Label><Text>support for the casing is provided;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442599" lims:id="1442599"><Label>(c)</Label><Text>corrosion of the casing over the cemented interval is minimized; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442600" lims:id="1442600"><Label>(d)</Label><Text>the integrity of gas hydrate and permafrost zones is protected.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442601" lims:id="1442601"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442602" lims:id="1442602">Cement integrity and placement</MarginalNote><Label>(6)</Label><Text>The operator must ensure that the cement integrity and placement are verified, subject to subsection (7), through pressure-testing and, if the cement is a common barrier element of the two barrier envelopes or if confirmation of zonal isolation is required, also through logging.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442603" lims:id="1442603"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442604" lims:id="1442604">Other methods of verification</MarginalNote><Label>(7)</Label><Text>The cement integrity and placement may be verified using other methods if the operator demonstrates that those methods provide a level of verification that is equivalent to those referred to in subsection (6).</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442605" lims:id="1442605"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442606" lims:id="1442606">Cement design and slurry analysis</MarginalNote><Label>(8)</Label><Text>The operator must ensure that the cement design is subjected to comprehensive laboratory testing and pre-cementing quality control, under all foreseeable conditions that could have an impact on cementing, so that the cement provides the expected isolation and can be efficiently installed.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442607" lims:id="1442607"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442608" lims:id="1442608">Waiting on cement time</MarginalNote><Label>(9)</Label><Text>The operator must ensure that, after cementing any casing or casing liner and before drilling out the casing shoe, the cement reaches the minimum compressive strength sufficient to support the casing and provide zonal isolation.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442609" lims:id="1442609"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442610" lims:id="1442610">Casing pressure testing</MarginalNote><Label>(10)</Label><Text>The operator must ensure that, after any casing is installed and cemented and before the casing shoe is drilled out, the casing is pressure-tested to the value required to confirm its integrity for maximum anticipated operating pressure throughout the life cycle of the well.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442611" lims:id="1442611"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442612" lims:id="1442612">Formation leak-off or integrity test</MarginalNote><Label>70</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442613" lims:id="1442613"><Label>(1)</Label><Text>An operator must ensure that a formation leak-off test or a formation integrity test is conducted</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442614" lims:id="1442614"><Label>(a)</Label><Text>before drilling more than 10 m of new formation below the shoe of any casing other than the conductor casing; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442615" lims:id="1442615"><Label>(b)</Label><Text>before drilling more than 10 m when sidetracking from the previous casing string.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442616" lims:id="1442616"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442617" lims:id="1442617">Pressure</MarginalNote><Label>(2)</Label><Text>The formation leak-off test or formation integrity test must be conducted at a pressure that allows for safe drilling to the next casing depth and for the adequacy of the cement at the level of the shoe to be verified before drilling ahead.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442618" lims:id="1442618"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442619" lims:id="1442619">Completion, testing and operation of development wells</MarginalNote><Label>71</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442620" lims:id="1442620"><Label>(1)</Label><Text>The operator of a development well must ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442621" lims:id="1442621"><Label>(a)</Label><Text>the well is completed, tested and operated in a safe manner that allows for maximum recovery of petroleum without waste or pollution throughout the life cycle of the well;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442622" lims:id="1442622"><Label>(b)</Label><Text>except in the case of commingled production, each completion interval is isolated from any other porous or permeable interval penetrated by the well;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442623" lims:id="1442623"><Label>(c)</Label><Text>if applicable, the production of sand, carbonate or other solids is controlled and does not create a safety hazard or cause waste;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442624" lims:id="1442624"><Label>(d)</Label><Text>the setting depth of each packer is as deep as possible and is such that any leak through the production casing below the packer will be contained by the barrier envelope outside the casing;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442625" lims:id="1442625"><Label>(e)</Label><Text>the formation and any annulus seal can withstand the pressures and temperatures expected throughout the life cycle of the well;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442626" lims:id="1442626"><Label>(f)</Label><Text>if practicable, any mechanical well condition that may have an adverse effect on the production of petroleum from, or the injection of fluids into, the well is corrected;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442627" lims:id="1442627"><Label>(g)</Label><Text>the injection or production profile of the well is improved or the completion interval of the well is changed if it is necessary to do so to prevent waste;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442628" lims:id="1442628"><Label>(h)</Label><Text>if different pressure and inflow characteristics of two or more pools might adversely affect the recovery of petroleum from any of those pools, the well is operated as a single pool well or as a segregated multi-pool well;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442629" lims:id="1442629"><Label>(i)</Label><Text>during completion operations and before the removal of pressure control equipment and handover for operations, all barrier elements are tested to the maximum pressure to which they are anticipated to be subjected and, if possible, pressure testing is in the direction of flow; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442630" lims:id="1442630"><Label>(j)</Label><Text>following any workover or intervention, any affected barrier elements are pressure-tested.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442631" lims:id="1442631"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442632" lims:id="1442632">Segregated multi-pool well</MarginalNote><Label>(2)</Label><Text>If the development well is a segregated multi-pool well, the operator must also ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442633" lims:id="1442633"><Label>(a)</Label><Text>after the well is completed, segregation within and outside the well casing is verified; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442634" lims:id="1442634"><Label>(b)</Label><Text>if there is reason to doubt that segregation is being maintained, a segregation test is conducted as soon as the circumstances permit.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442635" lims:id="1442635"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442636" lims:id="1442636">Definition of <DefinitionRef>multi-pool well</DefinitionRef></MarginalNote><Label>(3)</Label><Text>In this section, <DefinedTermEn>multi-pool well</DefinedTermEn> means a well that is completed in more than one pool.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442637" lims:id="1442637"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442638" lims:id="1442638">Production tubing</MarginalNote><Label>72</Label><Text>An operator must ensure that the production tubing used in a well is designed and maintained to be compatible with the fluids to which it will be exposed, to withstand the maximum conditions, forces and stresses to which it may be subjected and to maximize recovery of petroleum from the pool.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442639" lims:id="1442639"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442640" lims:id="1442640">Safe operations and production</MarginalNote><Label>73</Label><Text>An operator must ensure that equipment and procedures are in place to recognize and control normal and abnormal operating conditions, for the purposes of allowing for safe and controlled well operations and production and of preventing pollution.</Text></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442641" lims:id="1442641" level="2"><TitleText>Measurements</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442642" lims:id="1442642"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442643" lims:id="1442643">Flow and volume</MarginalNote><Label>74</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442644" lims:id="1442644"><Label>(1)</Label><Text>Subject to subsection (2), an operator must ensure that the following are measured:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442645" lims:id="1442645"><Label>(a)</Label><Text>the rate of flow and the volume of the fluid that is produced from each well;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442646" lims:id="1442646"><Label>(b)</Label><Text>the rate of flow and the volume of the fluid or waste material that is injected into each well; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442647" lims:id="1442647"><Label>(c)</Label><Text>the volume of the fluid that is produced from each well that is used, flared, vented, burned or otherwise disposed of.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442648" lims:id="1442648"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442649" lims:id="1442649">Alternate measurements</MarginalNote><Label>(2)</Label><Text>Alternate measurements may be conducted if approved by the Board under section <XRefInternal>14</XRefInternal>.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442650" lims:id="1442650"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442651" lims:id="1442651">Method</MarginalNote><Label>(3)</Label><Text>The operator must ensure that all measurements are conducted using the flow system, flow calculation procedure and flow allocation procedure approved under subsection <XRefInternal>14</XRefInternal>(2).</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442652" lims:id="1442652"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442653" lims:id="1442653">Allocation of group production</MarginalNote><Label>75</Label><Text>An operator must ensure that group production of oil, gas and water from wells and the volume of fluids injected into those wells are allocated on a <Language xml:lang="la">pro rata</Language> basis using the flow system, flow calculation procedure and flow allocation procedure approved under subsection <XRefInternal>14</XRefInternal>(2).</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442654" lims:id="1442654"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442655" lims:id="1442655">Allocation over multiple pools or zones</MarginalNote><Label>76</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442656" lims:id="1442656"><Label>(1)</Label><Text>If a well is completed over multiple pools or zones, the operator must ensure that the production of oil, gas and water from the well and the volume of fluids injected into the well are allocated on a <Language xml:lang="la">pro rata</Language> basis to the pools or zones using the flow allocation procedure approved under subsection <XRefInternal>14</XRefInternal>(2).</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442657" lims:id="1442657"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442658" lims:id="1442658">Proration tests</MarginalNote><Label>(2)</Label><Text>The operator must ensure that sufficient proration tests are conducted to measure the rates at which fluids are produced from the well to ensure that the allocation of oil, gas and water production to the pools and zones as a result of the flow allocation procedure is accurate.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442659" lims:id="1442659"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442660" lims:id="1442660">Testing and maintenance</MarginalNote><Label>77</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442661" lims:id="1442661"><Label>(1)</Label><Text>An operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442662" lims:id="1442662"><Label>(a)</Label><Text>meters and other associated components of the flow system are calibrated and maintained to ensure their accuracy;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442663" lims:id="1442663"><Label>(b)</Label><Text>the equipment used to calibrate the flow system is calibrated in accordance with good measurement practices; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442664" lims:id="1442664"><Label>(c)</Label><Text>any component of the flow system that may have an impact on the accuracy or integrity of the flow system and that is not functioning in accordance with the manufacturer’s specifications is repaired or replaced without delay or, if it is not possible to do so without delay, corrective measures are taken to minimize the impact on the accuracy and integrity of the flow system while the repair or replacement is in progress.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442665" lims:id="1442665"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442666" lims:id="1442666">Notice</MarginalNote><Label>(2)</Label><Text>The operator must ensure that a conservation officer is notified, as soon as the circumstances permit, of any modification to or malfunction or failure of any flow system component that may have an impact on the accuracy of the flow system and of the corrective measures taken.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442667" lims:id="1442667"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442668" lims:id="1442668">Calibration</MarginalNote><Label>78</Label><Text>An operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442669" lims:id="1442669"><Label>(a)</Label><Text>a conservation officer is notified of the calibration of any transfer meter prover or master meter used in conjunction with a transfer meter at least 30 days before the day on which it is calibrated or as agreed to in writing by the Chief Conservation Officer; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442670" lims:id="1442670"><Label>(b)</Label><Text>following completion of the calibration, a copy of the calibration certificate is submitted to the Chief Conservation Officer as soon as the circumstances permit.</Text></Paragraph></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442671" lims:id="1442671" level="2"><TitleText>Production Conservation</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442672" lims:id="1442672"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442673" lims:id="1442673">Resource management</MarginalNote><Label>79</Label><Text>An operator must, in respect of the recovery of petroleum, ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442674" lims:id="1442674"><Label>(a)</Label><Text>recovery from a pool or zone is maximized in accordance with good oilfield practices;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442675" lims:id="1442675"><Label>(b)</Label><Text>wells are located and operated to provide for maximum recovery from a pool or zone; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442676" lims:id="1442676"><Label>(c)</Label><Text>if there is reason to believe that infill drilling or the implementation of an enhanced recovery plan might result in increased recovery from a pool or field, studies on those methods are conducted and submitted to the Board.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442677" lims:id="1442677"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442678" lims:id="1442678">Commingled production</MarginalNote><Label>80</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442679" lims:id="1442679"><Label>(1)</Label><Text>It is prohibited for an operator to engage in commingled production unless approved by the Board.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442680" lims:id="1442680"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442681" lims:id="1442681">Approval by the Board</MarginalNote><Label>(2)</Label><Text>The Board must approve commingled production if the operator demonstrates that it will maximize the recovery of petroleum.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442682" lims:id="1442682"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442683" lims:id="1442683">Measurement and allocation</MarginalNote><Label>(3)</Label><Text>If the operator engages in commingled production, it must ensure that the total volume and the rate of production of each fluid produced is measured and the volume from each pool or zone is allocated in accordance with the requirements set out in sections <XRefInternal>74</XRefInternal> to <XRefInternal>78</XRefInternal>.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442684" lims:id="1442684"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442685" lims:id="1442685">Pilot scheme</MarginalNote><Label>81</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442686" lims:id="1442686"><Label>(1)</Label><Text>An operator may develop and implement a pilot scheme that applies technology in relation to the commercial production of petroleum from a pool, field or zone that is accessible from a production installation and in relation to which there is an approved development plan for the purpose of obtaining information on reservoir, production or technology performance in order to optimize production performance under the development plan or to determine whether the development plan requires an amendment for production performance to be optimized.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442687" lims:id="1442687"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442688" lims:id="1442688">Duration and interim evaluations</MarginalNote><Label>(2)</Label><Text>The Board must establish</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442689" lims:id="1442689"><Label>(a)</Label><Text>the duration of the pilot scheme, based on the time required to achieve the stated objectives; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442690" lims:id="1442690"><Label>(b)</Label><Text>the intervals at which interim evaluations of the pilot scheme are to be conducted and reported to the Board.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442691" lims:id="1442691"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442692" lims:id="1442692">Completion of pilot scheme</MarginalNote><Label>(3)</Label><Text>On completion of the pilot scheme, the operator must ensure that any production activities undertaken for the purpose of the scheme are discontinued.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442693" lims:id="1442693"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442694" lims:id="1442694">Prohibition against flaring or venting</MarginalNote><Label>82</Label><Text>It is prohibited for an operator to flare or vent gas unless</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442695" lims:id="1442695"><Label>(a)</Label><Text>the Board authorizes flaring or venting as part of the authorization;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442696" lims:id="1442696"><Label>(b)</Label><Text>the flaring or venting occurs during a formation flow test approved by the Board under subsection <XRefInternal>63</XRefInternal>(5); or</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442697" lims:id="1442697"><Label>(c)</Label><Text>it is necessary in order to remediate an emergency situation that may cause serious risk to human health or safety and the Board is notified, as soon as the circumstances permit, of the flaring or venting and of the volume flared or vented.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442698" lims:id="1442698"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442699" lims:id="1442699">Venting limit</MarginalNote><Label>83</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442700" lims:id="1442700"><Label>(1)</Label><Text>An operator must ensure that the volume of gas vented under paragraph <XRefInternal>82</XRefInternal>(a) per installation during a year is not greater than 15 000 standard m<Sup>3</Sup>.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442701" lims:id="1442701"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442702" lims:id="1442702">Definition of <DefinitionRef>vented</DefinitionRef></MarginalNote><Label>(2)</Label><Text>For the purpose of subsection (1), <DefinedTermEn>vented</DefinedTermEn> means emitted in a controlled manner, other than as a result of combustion, from an installation due to</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442703" lims:id="1442703"><Label>(a)</Label><Text>the design of equipment or operational procedures at the installation; or</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442704" lims:id="1442704"><Label>(b)</Label><Text>the occurrence of an event that pressurizes the gas beyond the capacity of the equipment at the installation to retain the gas.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442705" lims:id="1442705"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442706" lims:id="1442706">Gas emissions</MarginalNote><Label>84</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442707" lims:id="1442707"><Label>(1)</Label><Text>The operator must ensure that the emissions of gas from the seals of a centrifugal compressor or reciprocating compressor at an installation are</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442708" lims:id="1442708"><Label>(a)</Label><Text>captured and routed to gas conservation equipment or gas destruction equipment; or</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442709" lims:id="1442709"><Label>(b)</Label><Text>routed to vents that release those emissions into the atmosphere.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442710" lims:id="1442710"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442711" lims:id="1442711">Flow rate measurement device</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the flow rate of emissions of gas released from vents referred to in paragraph (1)(b) is measured by means of a continuous monitoring device that is</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442712" lims:id="1442712"><Label>(a)</Label><Text>calibrated in accordance with the manufacturer’s recommendations such that its measurements have a maximum margin of error of ±10%;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442713" lims:id="1442713"><Label>(b)</Label><Text>operated continuously, other than during periods when it is undergoing normal servicing or timely repairs; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442714" lims:id="1442714"><Label>(c)</Label><Text>equipped with an alarm that is triggered when the applicable flow rate limit referred to in subsections (3) and (4) for the vents of the compressor is reached.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442715" lims:id="1442715"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442716" lims:id="1442716">Flow rate limit — centrifugal compressor</MarginalNote><Label>(3)</Label><Text>The operator must ensure that the flow rate limit of emissions from the vents of a centrifugal compressor on an installation is</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442717" lims:id="1442717"><Label>(a)</Label><Text>in the case of a compressor that is installed before January 1, 2023,</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442718" lims:id="1442718"><Label>(i)</Label><Text>0.68 standard m<Sup>3</Sup>/min if the compressor has a rated brake power of greater than or equal to 5 MW, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442719" lims:id="1442719"><Label>(ii)</Label><Text>0.34 standard m<Sup>3</Sup>/min if the compressor has a rated brake power of less than 5 MW; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442720" lims:id="1442720"><Label>(b)</Label><Text>in the case of a compressor that is installed on or after January 1, 2023, 0.14 standard m<Sup>3</Sup>/min.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442721" lims:id="1442721"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442722" lims:id="1442722">Flow rate limit — reciprocating compressor</MarginalNote><Label>(4)</Label><Text>The operator must ensure that the flow rate limit of emissions that are from the rod packings and distance pieces of a reciprocating compressor on an installation is</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442723" lims:id="1442723"><Label>(a)</Label><Text>if the compressor is installed before January 1, 2023, the product of 0.023 standard m<Sup>3</Sup>/min and the number of pressurized cylinders that the compressor has; or</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442724" lims:id="1442724"><Label>(b)</Label><Text>if the compressor is installed on or after January 1, 2023, the product of 0.001 standard m<Sup>3</Sup>/min and the number of pressurized cylinders that the compressor has.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442725" lims:id="1442725"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442726" lims:id="1442726">Corrective measures</MarginalNote><Label>(5)</Label><Text>If the alarm referred to in paragraph (2)(c) is triggered, the operator must ensure that corrective measures are taken as soon as the circumstances permit to reduce the flow rate to below or equal to the applicable flow rate limit.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442727" lims:id="1442727"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442728" lims:id="1442728">Prohibition against oil burning</MarginalNote><Label>85</Label><Text>It is prohibited for an operator to burn oil unless</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442729" lims:id="1442729"><Label>(a)</Label><Text>the Board authorizes burning as part of the authorization;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442730" lims:id="1442730"><Label>(b)</Label><Text>the burning occurs during a formation flow test approved by the Board under subsection <XRefInternal>63</XRefInternal>(5); or</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442731" lims:id="1442731"><Label>(c)</Label><Text>it is necessary in order to remediate an emergency situation that may cause serious risk to human health or safety and the Board is notified, as soon as the circumstances permit, of the burning and of the amount burned.</Text></Paragraph></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442732" lims:id="1442732" level="2"><TitleText>Spill-treating Agent</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442733" lims:id="1442733"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442734" lims:id="1442734">Determination of net environmental benefit</MarginalNote><Label>86</Label><Text>In determining for the purpose of subsection 161.1(3) of the Act whether the use of a spill-treating agent is likely to achieve a net environmental benefit, the Chief Conservation Officer must take into account</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442735" lims:id="1442735"><Label>(a)</Label><Text>the assessment of the spill-treating agent’s efficacy referred to in paragraph <XRefInternal>11</XRefInternal>(4)(a);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442736" lims:id="1442736"><Label>(b)</Label><Text>the results of the analysis referred to in paragraph <XRefInternal>11</XRefInternal>(4)(b);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442737" lims:id="1442737"><Label>(c)</Label><Text>the circumstances referred to in paragraph <XRefInternal>11</XRefInternal>(4)(c);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442738" lims:id="1442738"><Label>(d)</Label><Text>the methods and protocols referred to in paragraph <XRefInternal>11</XRefInternal>(4)(d);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442739" lims:id="1442739"><Label>(e)</Label><Text>the monitoring plan referred to in paragraph <XRefInternal>11</XRefInternal>(4)(f); and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442740" lims:id="1442740"><Label>(f)</Label><Text>the results of any small-scale test conducted in respect of the agent.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442741" lims:id="1442741"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442742" lims:id="1442742">Small-scale test</MarginalNote><Label>87</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442743" lims:id="1442743"><Label>(1)</Label><Text>An operator must, in respect of any small-scale test of a spill-treating agent referred to in section 161.1 of the Act, ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442744" lims:id="1442744"><Label>(a)</Label><Text>before the test is conducted, the Chief Conservation Officer approves the carrying out of the test;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442745" lims:id="1442745"><Label>(b)</Label><Text>during the test, the quantity of spill-treating agent applied is measured and recorded, the efficacy of the spill-treating agent is monitored and the factors that affect that efficacy are evaluated; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442746" lims:id="1442746"><Label>(c)</Label><Text>after the test, the following information is submitted in writing, without delay, to the Chief Conservation Officer:</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442747" lims:id="1442747"><Label>(i)</Label><Text>the volume of oil released and the volume treated,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442748" lims:id="1442748"><Label>(ii)</Label><Text>the quantity of spill-treating agent that was used to conduct the test,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442749" lims:id="1442749"><Label>(iii)</Label><Text>the circumstances under which the test was conducted, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442750" lims:id="1442750"><Label>(iv)</Label><Text>the efficacy of the use of the spill-treating agent.</Text></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442751" lims:id="1442751"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442752" lims:id="1442752">Conditions</MarginalNote><Label>(2)</Label><Text>The following conditions must be met before a small-scale test is approved:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442753" lims:id="1442753"><Label>(a)</Label><Text>the operator must demonstrate that the quantity of spill-treating agent to be used in the test is the minimum required to evaluate the efficacy of its use; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442754" lims:id="1442754"><Label>(b)</Label><Text>in the case of a request to conduct an offshore subsurface test, the operator must demonstrate that, due to physical and environmental conditions, a surface test cannot be done or its efficacy cannot be readily determined.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442755" lims:id="1442755"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442756" lims:id="1442756">Net environmental benefit already determined</MarginalNote><Label>(3)</Label><Text>No small-scale test is to be approved if the Chief Conservation Officer has made a determination for the purpose of section 161.1 of the Act regarding the net environmental benefit of the use of the spill-treating agent whose efficacy the test is intended to evaluate.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442757" lims:id="1442757"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442758" lims:id="1442758">Oral or written approval</MarginalNote><Label>(4)</Label><Text>Approval of a small-scale test may be provided orally or in writing but, if approval is provided orally, the Chief Conservation Officer must, as soon as the circumstances permit, provide to the operator written confirmation of the approval.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442759" lims:id="1442759"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442760" lims:id="1442760">Variation of approval</MarginalNote><Label>88</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442761" lims:id="1442761"><Label>(1)</Label><Text>The Chief Conservation Officer must vary the approval to use a spill-treating agent if new information indicates that a modification to the requirements set out in the approval is necessary to ensure that the approved use is likely to achieve a net environmental benefit.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442762" lims:id="1442762"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442763" lims:id="1442763">Revocation of approval</MarginalNote><Label>(2)</Label><Text>The Chief Conservation Officer must revoke the approval if new information indicates that, despite any modification, use of the agent will not likely achieve a net environmental benefit.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442764" lims:id="1442764"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442765" lims:id="1442765">Use of spill-treating agent</MarginalNote><Label>89</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442766" lims:id="1442766"><Label>(1)</Label><Text>An operator must ensure that any spill-treating agent is used in accordance with industry standards and best practices for spill-treating agent use, taking into account the local environment.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442767" lims:id="1442767"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442768" lims:id="1442768">Equipment and materials</MarginalNote><Label>(2)</Label><Text>The operator must ensure that all equipment and materials that are listed in the contingency plan as required by paragraph <XRefInternal>11</XRefInternal>(4)(e) are available and maintained in accordance with the manufacturers’ specifications and ready for use at all times.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442769" lims:id="1442769"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442770" lims:id="1442770">Monitoring plan implementation</MarginalNote><Label>(3)</Label><Text>The operator must implement the monitoring plan that is included in the contingency plan as required by paragraph <XRefInternal>11</XRefInternal>(4)(f) at the commencement of the use of a spill-treating agent in the case of a spill.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442771" lims:id="1442771"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442772" lims:id="1442772">Information to Chief Conservation Officer</MarginalNote><Label>(4)</Label><Text>The operator must inform the Chief Conservation Officer of the spill-treating agent’s efficacy, the effects of its use on the environment and any changes that may require a modification to its use.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442773" lims:id="1442773" level="2"><TitleText>Well Abandonment, Suspension or Completion</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442774" lims:id="1442774"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442775" lims:id="1442775">Conditions for suspension or abandonment</MarginalNote><Label>90</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442776" lims:id="1442776"><Label>(1)</Label><Text>An operator that suspends or abandons a well must ensure that the well</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442777" lims:id="1442777"><Label>(a)</Label><Text>can be readily located; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442778" lims:id="1442778"><Label>(b)</Label><Text>is left in a condition such that</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442779" lims:id="1442779"><Label>(i)</Label><Text>all petroleum-bearing pools and zones and discrete pressure zones are isolated, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442780" lims:id="1442780"><Label>(ii)</Label><Text>any formation fluid is prevented from flowing through or escaping from the well-bore.</Text></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442781" lims:id="1442781"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442782" lims:id="1442782">Verification of isolation</MarginalNote><Label>(2)</Label><Text>Before suspending or abandoning the well, the operator must verify the effectiveness of the isolations referred to in subparagraph (1)(b)(i) in accordance with the methods set out in its well approval application under paragraph <XRefInternal>17</XRefInternal>(4)(e).</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442783" lims:id="1442783"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442784" lims:id="1442784">Additional condition for suspension</MarginalNote><Label>91</Label><Text>An operator that suspends a well must ensure that it is inspected and monitored to maintain its integrity and prevent pollution.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442785" lims:id="1442785"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442786" lims:id="1442786">Additional condition for abandonment</MarginalNote><Label>92</Label><Text>The operator of a well must ensure that, on the abandonment of the well, the seabed is cleared of any material or equipment that might have an adverse effect on the marine environment or interfere with fishing activities or other uses of the sea.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442787" lims:id="1442787"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442788" lims:id="1442788">Conditions for drilling installation removal</MarginalNote><Label>93</Label><Text>It is prohibited for the operator of a drilling installation to remove the drilling installation from a well or cause it to be removed unless</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442789" lims:id="1442789"><Label>(a)</Label><Text>the well has been abandoned, suspended or completed in accordance with these Regulations; or</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442790" lims:id="1442790"><Label>(b)</Label><Text>the removal of the drilling installation is for emergency purposes.</Text></Paragraph></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442791" lims:id="1442791" level="1"><Label>PART 9</Label><TitleText>Diving Projects</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442792" lims:id="1442792"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442793" lims:id="1442793">Vessel used in diving project</MarginalNote><Label>94</Label><Text>An operator that conducts a diving project must, in respect of a vessel used in the diving project, ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442794" lims:id="1442794"><Label>(a)</Label><Text>the vessel is capable of providing the necessary dive support functions and operating safely;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442795" lims:id="1442795"><Label>(b)</Label><Text>the vessel is designed to withstand or avoid, without loss of its overall structural integrity or failure of its main safety functions, all foreseeable site-specific physical and environmental conditions or any foreseeable combination of those conditions;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442796" lims:id="1442796"><Label>(c)</Label><Text>the vessel is a <DefinitionRef>Safety Convention vessel</DefinitionRef>, as defined in section 2 of the <XRefExternal reference-type="act" link="C-10.15">Canada Shipping Act, 2001</XRefExternal>, and holds a valid certificate of class issued by a classification society;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442797" lims:id="1442797"><Label>(d)</Label><Text>if a permanent diving system is installed on the vessel, the certificate of class referred to in paragraph (c) includes a valid class notation for diving issued by the classification society referred to in that paragraph; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442798" lims:id="1442798"><Label>(e)</Label><Text>a competent third party has assessed and certified the sea fastening of any equipment that is temporarily installed on the vessel for the diving project.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442799" lims:id="1442799"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442800" lims:id="1442800">Dynamic positioning system</MarginalNote><Label>95</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442801" lims:id="1442801"><Label>(1)</Label><Text>An operator must ensure that the dynamic positioning system on a vessel that is used in a diving project</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442802" lims:id="1442802"><Label>(a)</Label><Text>includes safety-critical systems and components with sufficient segregation and redundancy to maintain the vessel’s position in the event that credible scenarios of equipment failure, fire or flooding are realized;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442803" lims:id="1442803"><Label>(b)</Label><Text>includes systems to monitor the parameters of critical system operability and the integrity of the dynamic positioning system and to provide alerts for critical system faults;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442804" lims:id="1442804"><Label>(c)</Label><Text>has sufficient redundancy to protect divers while diving;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442805" lims:id="1442805"><Label>(d)</Label><Text>is designed based on numerical analysis and model testing to ensure that the vessel’s position reference and directional control can be maintained within specified tolerances that satisfy design operational requirements in relation to all functional loads and environmental loads to which the system may be subjected; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442806" lims:id="1442806"><Label>(e)</Label><Text>is designed to ensure that, if the diving project involves saturation diving, the dynamic positioning system can withstand the loss from fire or flooding of all of its components situated in any one watertight compartment or fire subdivision of the vessel.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442807" lims:id="1442807"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442808" lims:id="1442808">Verification</MarginalNote><Label>(2)</Label><Text>After the design of the dynamic positioning system is completed, the operator must ensure that a failure modes and effects analysis is conducted to verify that the dynamic positioning system meets the requirements set out in subsection (1).</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442809" lims:id="1442809"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442810" lims:id="1442810">Maintenance</MarginalNote><Label>(3)</Label><Text>The operator must ensure that the dynamic positioning system is maintained so that it continues to perform in accordance with its design specifications.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442811" lims:id="1442811"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442812" lims:id="1442812">Light dive craft</MarginalNote><Label>96</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442813" lims:id="1442813"><Label>(1)</Label><Text>The operator must ensure that any light dive craft that is used for a diving project is</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442814" lims:id="1442814"><Label>(a)</Label><Text>fit for the purposes for which it is to be used; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442815" lims:id="1442815"><Label>(b)</Label><Text>designed to withstand or avoid, without loss of its overall structural integrity or failure of its main safety functions, all foreseeable site-specific physical and environmental conditions or any foreseeable combination of those conditions.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442816" lims:id="1442816"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442817" lims:id="1442817">Dive support vessel</MarginalNote><Label>(2)</Label><Text>The operator must ensure, during all dives from a light dive craft, the availability of a dive support vessel that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442818" lims:id="1442818"><Label>(a)</Label><Text>is fitted with emergency equipment, including a fast rescue boat, that can provide assistance to the light dive craft in any foreseeable emergency situation; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442819" lims:id="1442819"><Label>(b)</Label><Text>has a launch and recovery system for the light dive craft that has been verified and certified by the certifying authority as being fit for the purposes for which it is to be used.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442820" lims:id="1442820"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442821" lims:id="1442821">Definition of <DefinitionRef>light dive craft</DefinitionRef></MarginalNote><Label>(3)</Label><Text>In this section, <DefinedTermEn>light dive craft</DefinedTermEn> means a small vessel or secondary craft that is equipped to deploy divers from a primary vessel.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442822" lims:id="1442822" level="1"><Label>PART 10</Label><TitleText>Installations, Wells and Pipelines</TitleText></Heading><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442823" lims:id="1442823" level="2"><TitleText>Definitions</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442824" lims:id="1442824"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442825" lims:id="1442825">Definitions</MarginalNote><Label>97</Label><Text>The following definitions apply in this Part.</Text><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442826" lims:id="1442826"><Text><DefinedTermEn>air gap</DefinedTermEn> means the clearance between the highest water or ice surface that occurs during extreme environmental conditions and the lowest exposed part of an installation not designed to withstand wave or ice impingement. (<DefinedTermFr>tirant d’air</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442827" lims:id="1442827"><Text><DefinedTermEn>control station</DefinedTermEn> means a work area that is not continuously staffed that provides an alternative location to a control centre and the minimum necessary control equipment to enable essential management of the installation or of specific key systems. (<DefinedTermFr>poste de contrôle</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442828" lims:id="1442828"><Text><DefinedTermEn>damaged condition</DefinedTermEn> means, with respect to a floating platform, the condition of the platform after it has suffered damage up to the extent determined in accordance with the applicable provisions of the MODU Code or, in the case of a platform that is not a mobile offshore drilling unit, the applicable rules of a classification society. (<DefinedTermFr>état d’avarie</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442829" lims:id="1442829"><Text><DefinedTermEn>design service life</DefinedTermEn> means the anticipated period during which any installation, including its systems or equipment, is to be used for its intended purpose, with anticipated maintenance but without substantial repair. (<DefinedTermFr>vie utile</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442830" lims:id="1442830"><Text><DefinedTermEn>hazardous area</DefinedTermEn> means an area on an installation where flammable, explosive or combustible mixtures are or are likely to be present in sufficient quantities and for sufficient periods of time to require special precautions to be taken in the selection, installation or use of machinery and electrical equipment to prevent a fire or explosion. (<DefinedTermFr>aire dangereuse</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442831" lims:id="1442831"><Text><DefinedTermEn>IS Code</DefinedTermEn> means the annex to International Maritime Organization Resolution MSC.267(85), <XRefExternal reference-type="standard">International Code on Intact Stability, 2008</XRefExternal>. (<DefinedTermFr>recueil IS</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442832" lims:id="1442832"><Text><DefinedTermEn>MODU Code</DefinedTermEn> means the annex to International Maritime Organization Resolution A.1023(26), <XRefExternal reference-type="standard">Code for the Construction and Equipment of Mobile Offshore Drilling Units, 2009</XRefExternal>. (<DefinedTermFr>Code MODU</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442833" lims:id="1442833"><Text><DefinedTermEn>process vessel</DefinedTermEn> means a heater, dehydrator, separator, treater or any other pressurized vessel used in the processing or treatment of produced petroleum. (<DefinedTermFr>cuve de traitement</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442834" lims:id="1442834"><Text><DefinedTermEn>unattended installation</DefinedTermEn> means an installation on which persons are not normally present and in respect of which, when persons are present, it is for the purpose of performing operational duties, maintenance or inspections that will not require an overnight stay. (<DefinedTermFr>installation non fréquentée</DefinedTermFr>)</Text></Definition></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442835" lims:id="1442835" level="2"><TitleText>Installations</TitleText></Heading><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442836" lims:id="1442836" level="3"><TitleText>General</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442837" lims:id="1442837"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442838" lims:id="1442838">Safety and environmental protection</MarginalNote><Label>98</Label><Text>An operator must ensure that an installation, including its systems and equipment, is designed, constructed, installed, arranged and commissioned so that it is fit for the purposes for which it is to be used and can be operated safely without posing a threat to persons or the environment.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442839" lims:id="1442839"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442840" lims:id="1442840">Design of installation</MarginalNote><Label>99</Label><Text>For the purpose of meeting the requirement under section <XRefInternal>98</XRefInternal> in respect of design, an operator must ensure that an installation, including its systems and equipment, is designed in accordance with the measures referred to in clauses <XRefInternal>9</XRefInternal>(2)(b)(v)(A) and <XRefInternal>10</XRefInternal>(2)(b)(v)(A) that are described in the operator’s safety plan and environmental protection plan, respectively.</Text></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442841" lims:id="1442841" level="3"><TitleText>Quality Assurance</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442842" lims:id="1442842"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442843" lims:id="1442843">Quality assurance program</MarginalNote><Label>100</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442844" lims:id="1442844"><Label>(1)</Label><Text>An operator must, for the purpose of ensuring that an installation, including its systems and equipment, is fit for the purposes for which it is to be used, develop a quality assurance program that meets the following requirements:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442845" lims:id="1442845"><Label>(a)</Label><Text>it must be set out in writing;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442846" lims:id="1442846"><Label>(b)</Label><Text>it must be comprehensive;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442847" lims:id="1442847"><Label>(c)</Label><Text>it must include a process to achieve quality objectives and to comply with the requirements of these Regulations;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442848" lims:id="1442848"><Label>(d)</Label><Text>it must include the policies on which it is based and a process to communicate the policies to personnel and all other affected persons;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442849" lims:id="1442849"><Label>(e)</Label><Text>it must set out the roles, responsibilities and authorities of all persons exercising functions under it, as well as the processes for making those persons aware of their roles, responsibilities and authorities and ensuring that they comply with them;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442850" lims:id="1442850"><Label>(f)</Label><Text>it must include processes for establishing and maintaining measurable goals and performance indicators that are applicable to it;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442851" lims:id="1442851"><Label>(g)</Label><Text>it must include processes for its periodic internal audit and review to identify areas for improvement and the corrective measures to be implemented if deficiencies are identified;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442852" lims:id="1442852"><Label>(h)</Label><Text>it must include processes for ensuring that its integrity is preserved when changes to it are planned or implemented;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442853" lims:id="1442853"><Label>(i)</Label><Text>it must include processes for internal and external reporting on its performance; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442854" lims:id="1442854"><Label>(j)</Label><Text>it must identify the resources that are necessary to ensure that the requirements under this section are being met.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442855" lims:id="1442855"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442856" lims:id="1442856">Implementation</MarginalNote><Label>(2)</Label><Text>The operator must ensure that each phase of the life cycle of the installation, from its design up to and including its decommissioning and abandonment, is carried out in accordance with the program and that any activity relating to the installation that is carried out under the control of a third party is also carried out in accordance with a quality assurance program.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442857" lims:id="1442857"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442858" lims:id="1442858">Accessibility</MarginalNote><Label>(3)</Label><Text>The operator must ensure that the processes and policies that are included in the program referred to in subsection (1) are readily accessible for consultation and examination.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442859" lims:id="1442859"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442860" lims:id="1442860">Organization</MarginalNote><Label>(4)</Label><Text>The operator must ensure that the documentation relating to the program referred to in subsection (1) is organized and set out in a logical fashion to allow for ease of understanding and efficient implementation.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442861" lims:id="1442861"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442862" lims:id="1442862">Processes and procedures</MarginalNote><Label>(5)</Label><Text>In this section, a reference to a process includes any procedures that are necessary to implement the process.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442863" lims:id="1442863" level="3"><TitleText>Work Permits</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442864" lims:id="1442864"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442865" lims:id="1442865">Requirements</MarginalNote><Label>101</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442866" lims:id="1442866"><Label>(1)</Label><Text>An operator must ensure that a work permit that is required under this Part is issued in either paper or electronic form, is approved by a person other than the one who issued it and sets out the following information:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442867" lims:id="1442867"><Label>(a)</Label><Text>the name of the person who issued it and the person who approved it;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442868" lims:id="1442868"><Label>(b)</Label><Text>the name of each person to whom it is issued;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442869" lims:id="1442869"><Label>(c)</Label><Text>the periods during which it is valid;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442870" lims:id="1442870"><Label>(d)</Label><Text>the work or activity to which it relates, the location at which the work or activity is to be carried out and any conditions to which the carrying out of the work or activity is subject; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442871" lims:id="1442871"><Label>(e)</Label><Text>any circumstances under which the work or activity is to be carried out that may have an effect on the safety and environmental risks associated with it, including</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442872" lims:id="1442872"><Label>(i)</Label><Text>physical and environmental conditions,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442873" lims:id="1442873"><Label>(ii)</Label><Text>any impediments to the proper use of any system or equipment, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442874" lims:id="1442874"><Label>(iii)</Label><Text>any other activities being carried out in the area, with reference to the permit or certificate associated with those activities, if applicable.</Text></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442875" lims:id="1442875"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442876" lims:id="1442876">Signatures</MarginalNote><Label>(2)</Label><Text>The work permit must bear the signatures of the person who issued it, the person who approved it and every person involved in the work or activity to which it relates, certifying that they have read and understood its contents.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442877" lims:id="1442877"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442878" lims:id="1442878">Operator obligations</MarginalNote><Label>102</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442879" lims:id="1442879"><Label>(1)</Label><Text>An operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442880" lims:id="1442880"><Label>(a)</Label><Text>any work or activity that requires a work permit is done in accordance with the permit; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442881" lims:id="1442881"><Label>(b)</Label><Text>any work permit that is issued is made readily accessible for the duration of the work or activity to which it relates.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442882" lims:id="1442882"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442883" lims:id="1442883">Retention of copy</MarginalNote><Label>(2)</Label><Text>The operator must retain a copy of each work permit for at least three years after the day on which the work or activity to which it relates is completed.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1442884" lims:id="1442884" level="3"><TitleText>Requirements</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442885" lims:id="1442885"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442886" lims:id="1442886">Innovations</MarginalNote><Label>103</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442887" lims:id="1442887"><Label>(1)</Label><Text>An operator must ensure that any technology, including any technology that is used in relation to materials, design methods, joining techniques or construction techniques, that has not been previously used in comparable situations is not used in relation to an installation unless</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442888" lims:id="1442888"><Label>(a)</Label><Text>engineering studies, prototypes or model tests demonstrate that the technology is safe and fit for the purposes for which it is to be used; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442889" lims:id="1442889"><Label>(b)</Label><Text>the technology is verified by a competent third party, in accordance with industry standards and best practices for technology qualification.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442890" lims:id="1442890"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442891" lims:id="1442891">Technology qualification program</MarginalNote><Label>(2)</Label><Text>The operator must develop a technology qualification program that sets out the performance monitoring and inspection measures that are necessary to determine the effectiveness of any technology referred to in subsection (1) that it intends to use.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442892" lims:id="1442892"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442893" lims:id="1442893">Program implementation and update</MarginalNote><Label>(3)</Label><Text>The operator must ensure that the program is implemented and periodically updated.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442894" lims:id="1442894"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442895" lims:id="1442895">Physical and environmental conditions</MarginalNote><Label>104</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442896" lims:id="1442896"><Label>(1)</Label><Text>An operator must ensure that an installation is designed to withstand or avoid all foreseeable site-specific physical and environmental conditions, or any foreseeable combination of those conditions, without compromising its structural integrity or that of any of its systems or equipment that are critical to safety or to the protection of the environment.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442897" lims:id="1442897"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442898" lims:id="1442898">Criteria</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the design of an installation is based on criteria that are determined using evidence-based regional and site-specific data, statistical analysis and modelling of physical and environmental conditions, including</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442899" lims:id="1442899"><Label>(a)</Label><Text>oceanographic conditions, including any completely or partially submerged potential navigational hazards;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442900" lims:id="1442900"><Label>(b)</Label><Text>meteorological conditions, including the number of daylight hours;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442901" lims:id="1442901"><Label>(c)</Label><Text>geotechnical conditions and geohazards;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442902" lims:id="1442902"><Label>(d)</Label><Text>ice conditions and any other conditions associated with cold regions; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442903" lims:id="1442903"><Label>(e)</Label><Text>any other physical and environmental conditions or naturally occurring phenomena that may adversely affect the installation.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442904" lims:id="1442904"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442905" lims:id="1442905">Ice conditions</MarginalNote><Label>(3)</Label><Text>The operator must ensure that an installation that is to be operated where ice conditions may exist is designed and operated to</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442906" lims:id="1442906"><Label>(a)</Label><Text>minimize or avoid environmental loads associated with ice or ice and snow accumulation on the installation, including on its structural components;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442907" lims:id="1442907"><Label>(b)</Label><Text>ensure that the ice conditions will not adversely affect the functionality of any systems or equipment that are critical to safety or to the protection of the environment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442908" lims:id="1442908"><Label>(c)</Label><Text>protect risers, offloading systems and other subsea systems from the ice conditions; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442909" lims:id="1442909"><Label>(d)</Label><Text>in the case of a mobile offshore platform or vessel,</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442910" lims:id="1442910"><Label>(i)</Label><Text>prevent damage to propulsion or positioning systems from the ice conditions, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442911" lims:id="1442911"><Label>(ii)</Label><Text>ensure safe transit through ice-infested waters.</Text></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442912" lims:id="1442912"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442913" lims:id="1442913">Redundancy</MarginalNote><Label>(4)</Label><Text>The operator must ensure that there is redundancy included in any measures implemented for the purpose of paragraph (3)(a) in relation to ice and snow accumulation and removal.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442914" lims:id="1442914"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442915" lims:id="1442915">Cold climate — safety plan and environmental protection plan</MarginalNote><Label>(5)</Label><Text>The operator must ensure that an installation that is to be operated in a cold climate is designed, winterized and operated in accordance with the measures referred to in clauses <XRefInternal>9</XRefInternal>(2)(b)(v)(B) and <XRefInternal>10</XRefInternal>(2)(b)(v)(B) that are described in the operator’s safety plan and environmental protection plan, respectively.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442916" lims:id="1442916"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442917" lims:id="1442917">Cold climate — design</MarginalNote><Label>(6)</Label><Text>An installation that is to be operated in a cold climate must be designed to</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442918" lims:id="1442918"><Label>(a)</Label><Text>ensure the functionality in that climate of the installation and all of its systems and equipment that are critical to safety or to the protection of the environment, including in the case of property changes in fluids; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442919" lims:id="1442919"><Label>(b)</Label><Text>prevent any impact or damage to electrical cabling in open or unheated spaces and ensure that the cabling maintains its properties under cold-climate conditions.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442920" lims:id="1442920"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442921" lims:id="1442921">Design for intended use and location</MarginalNote><Label>105</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442922" lims:id="1442922"><Label>(1)</Label><Text>An operator must ensure that the structural components of an installation and any of its ancillary structures, including skids and modules, are designed for their intended use and location, taking into account</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442923" lims:id="1442923"><Label>(a)</Label><Text>the nature of the works and activities to be undertaken on and around the installation and the hazards associated with those works and activities;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442924" lims:id="1442924"><Label>(b)</Label><Text>material properties and dimensions of the installation that may vary over time;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442925" lims:id="1442925"><Label>(c)</Label><Text>failure modes; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442926" lims:id="1442926"><Label>(d)</Label><Text>applicable safety factors.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442927" lims:id="1442927"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442928" lims:id="1442928">Analyses, tests, modelling and investigations</MarginalNote><Label>(2)</Label><Text>The design of the structural components of an installation and any of its ancillary structures, including skids and modules, must be based on any analyses, model tests, numerical modelling and site investigations that are necessary to determine the behaviour of the installation and of the soils that support it or its mooring systems under all foreseeable operating, construction, transportation and installation conditions — including those involving geohazards — and under all foreseeable loads during the design service life of the installation.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442929" lims:id="1442929"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442930" lims:id="1442930">Design criteria</MarginalNote><Label>(3)</Label><Text>The structural components of an installation and any of its ancillary structures, including skids and modules, must be designed to</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442931" lims:id="1442931"><Label>(a)</Label><Text>withstand extreme loads that may occur during their construction and anticipated use;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442932" lims:id="1442932"><Label>(b)</Label><Text>perform as intended during their operation under all anticipated normal loads;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442933" lims:id="1442933"><Label>(c)</Label><Text>not fail under repeated loads;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442934" lims:id="1442934"><Label>(d)</Label><Text>prevent damage that is disproportionate to the cause;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442935" lims:id="1442935"><Label>(e)</Label><Text>prevent localized damage from leading to progressive or complete loss of integrity of the structure;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442936" lims:id="1442936"><Label>(f)</Label><Text>maintain structural integrity for the time necessary to safely evacuate all persons from the installation in the event of major damage caused by foreseeable hazards;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442937" lims:id="1442937"><Label>(g)</Label><Text>in the case of a floating platform,</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442938" lims:id="1442938"><Label>(i)</Label><Text>have sufficient stability and buoyancy reserve in the case of damage to ensure that credible scenarios of unintended flooding, if realized, do not result in the loss of the structure, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442939" lims:id="1442939"><Label>(ii)</Label><Text>incorporate sufficient redundancy in station-keeping systems to ensure that the structure can withstand the loss of a station-keeping component; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442940" lims:id="1442940"><Label>(h)</Label><Text>in the case of a self-elevating mobile offshore platform, withstand all loads to which the platform may be subjected in each mode of operation, including in the elevated position and during its removal.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442941" lims:id="1442941"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442942" lims:id="1442942">Accidental loads</MarginalNote><Label>(4)</Label><Text>For the purposes of paragraphs (3)(d) to (f) and (h), the design must take into account all credible accidental load scenarios, including collisions between the installation and a vessel or aircraft.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442943" lims:id="1442943"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442944" lims:id="1442944">Conditions for safe operation and survival</MarginalNote><Label>106</Label><Text>Based on the results of any analyses, tests, modelling or investigations undertaken under subsection <XRefInternal>105</XRefInternal>(2), the operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442945" lims:id="1442945"><Label>(a)</Label><Text>all physical and environmental conditions that could pose a hazard to the installation are documented and communicated to all affected personnel;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442946" lims:id="1442946"><Label>(b)</Label><Text>the environmental limits for the safe operation of the installation are defined, included in operating procedures and communicated to all affected personnel; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442947" lims:id="1442947"><Label>(c)</Label><Text>measures to detect, avoid, prevent, manage and reduce the effects of the hazards posed by the physical and environmental conditions are developed and implemented in operations and incorporated into the design of the installation where required.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442948" lims:id="1442948"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442949" lims:id="1442949">Risk assessment — fire, explosion and hazardous gas</MarginalNote><Label>107</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442950" lims:id="1442950"><Label>(1)</Label><Text>An operator must ensure that an assessment of fire and explosion risks and of risks associated with hazardous gas and its containment is conducted in respect of an installation and that the assessment identifies</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442951" lims:id="1442951"><Label>(a)</Label><Text>the types of fires, explosions and hazardous gas releases that could occur, their potential sources and unmitigated consequences, the likelihood of their occurrence and, if applicable, their potential fire or blast loads;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442952" lims:id="1442952"><Label>(b)</Label><Text>measures to be incorporated into the design of the installation, if practicable, to eliminate the hazards identified under paragraph (a); and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442953" lims:id="1442953"><Label>(c)</Label><Text>if it is not practicable to eliminate those hazards through design measures, all necessary control measures to reduce the risks associated with the hazards to a level that is as low as reasonably practicable.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442954" lims:id="1442954"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442955" lims:id="1442955">Elements for consideration</MarginalNote><Label>(2)</Label><Text>For the purposes of paragraphs (1)(b) and (c), the assessment must take into account the following elements:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442956" lims:id="1442956"><Label>(a)</Label><Text>the general layout of the installation;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442957" lims:id="1442957"><Label>(b)</Label><Text>the production and process activities to be carried out, including well operations;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442958" lims:id="1442958"><Label>(c)</Label><Text>operating limits of the installation;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442959" lims:id="1442959"><Label>(d)</Label><Text>the types of fires, explosions and hazardous gas releases identified under paragraph (1)(a) and their duration;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442960" lims:id="1442960"><Label>(e)</Label><Text>the need for a means of detecting, from the potential sources identified under paragraph (1)(a),</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442961" lims:id="1442961"><Label>(i)</Label><Text>hazardous gas releases, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442962" lims:id="1442962"><Label>(ii)</Label><Text>outbreaks of fire;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442963" lims:id="1442963"><Label>(f)</Label><Text>the need for a means of isolating and safely storing hazardous substances, including fuel, explosives and chemicals;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442964" lims:id="1442964"><Label>(g)</Label><Text>the need for a safe means of escape, evacuation and rescue in the event of a fire, explosion or hazardous gas release; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442965" lims:id="1442965"><Label>(h)</Label><Text>the need for a means to ensure levels of emergency shutdown of the installation, systems and equipment in the event of the detection of a hazardous gas release or an outbreak of fire.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442966" lims:id="1442966"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442967" lims:id="1442967">Reliability and availability</MarginalNote><Label>108</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442968" lims:id="1442968"><Label>(1)</Label><Text>An operator must demonstrate, through a risk and reliability analysis conducted using internationally recognized techniques, the reliability and availability of any system in an installation whose failure could cause or contribute to a major accidental event or whose purpose is to prevent or mitigate the effects of a major accidental event.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442969" lims:id="1442969"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442970" lims:id="1442970">Redundancies and measures</MarginalNote><Label>(2)</Label><Text>The risk and reliability analysis must determine the redundancies and measures that are required to protect a system referred to in subsection (1) from failure, including any redundancies and measures required under this Part for that system.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442971" lims:id="1442971"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442972" lims:id="1442972">Results of analysis</MarginalNote><Label>(3)</Label><Text>The operator must ensure that the results of the risk and reliability analysis are reflected in the design of the installation, its systems and equipment and in any associated operating and maintenance manuals, including the operations manual referred to in section <XRefInternal>157</XRefInternal>.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442973" lims:id="1442973"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442974" lims:id="1442974">Monitoring program for physical and environmental conditions</MarginalNote><Label>109</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442975" lims:id="1442975"><Label>(1)</Label><Text>An operator must develop a monitoring program that involves the collection of data on physical and environmental conditions in sufficient quantities and at sufficient frequencies, and the retention of that data for sufficient periods, to</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442976" lims:id="1442976"><Label>(a)</Label><Text>support, during all works and activities, the identification of hazards and the assessment of the safety and environmental risks related to those hazards; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442977" lims:id="1442977"><Label>(b)</Label><Text>allow for the timely implementation of control measures to address the identified risks and, if necessary, of the contingency plan referred to in section <XRefInternal>11</XRefInternal>.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442978" lims:id="1442978"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442979" lims:id="1442979">Equipment</MarginalNote><Label>(2)</Label><Text>For the purposes of subsection (1), the operator must ensure that the installation is equipped to observe, measure and forecast physical and environmental conditions, to record data on those conditions and to obtain from external sources any additional data on those conditions.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442980" lims:id="1442980"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442981" lims:id="1442981">Program implementation and update</MarginalNote><Label>(3)</Label><Text>The operator must ensure that the monitoring program is implemented and periodically updated.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442982" lims:id="1442982"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442983" lims:id="1442983">Availability of data</MarginalNote><Label>(4)</Label><Text>The operator must ensure that the data referred to in subsection (1) that may have an impact on safety and the protection of the environment is documented and provided to all persons that request it.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442984" lims:id="1442984"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442985" lims:id="1442985">Inspection, monitoring, testing and maintenance</MarginalNote><Label>110</Label><Text>An operator must, for the purpose of facilitating the inspection, monitoring, testing and maintenance of an installation, ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442986" lims:id="1442986"><Label>(a)</Label><Text>relevant areas are clearly marked and identified;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442987" lims:id="1442987"><Label>(b)</Label><Text>there is safe access to those areas;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442988" lims:id="1442988"><Label>(c)</Label><Text>in the case of an installation that is not intended to be periodically drydocked, there are means for carrying out an on-location inspection of the hull and underwater components;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442989" lims:id="1442989"><Label>(d)</Label><Text>there is safe access to subsea equipment; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442990" lims:id="1442990"><Label>(e)</Label><Text>the installation is otherwise designed and equipped to permit those activities to be carried out.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442991" lims:id="1442991"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442992" lims:id="1442992">Materials for installations</MarginalNote><Label>111</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442993" lims:id="1442993"><Label>(1)</Label><Text>An operator must ensure that the materials used in an installation are</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442994" lims:id="1442994"><Label>(a)</Label><Text>fit for the purposes for which they are to be used and suitable for the conditions to which they may be subjected, including any foreseeable emergency situation;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442995" lims:id="1442995"><Label>(b)</Label><Text>non-combustible, unless essential properties are available only in materials that are combustible or the use of combustible material will not increase the risk to safety; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442996" lims:id="1442996"><Label>(c)</Label><Text>selected to ensure that, in the case of fire or explosion, their use will not increase the risk to safety in the area of the fire or explosion or in adjacent areas, including by exposing persons to toxic fumes or smoke.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442997" lims:id="1442997"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1442998" lims:id="1442998">Definition of <DefinitionRef>non-combustible</DefinitionRef></MarginalNote><Label>(2)</Label><Text>In this section, <DefinedTermEn>non-combustible</DefinedTermEn> means, in respect of material, material that does not burn or give off flammable gases or vapours in sufficient quantity for self-ignition when heated to 750°C.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1442999" lims:id="1442999"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443000" lims:id="1443000">Passive fire and blast protection</MarginalNote><Label>112</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443001" lims:id="1443001"><Label>(1)</Label><Text>An operator must ensure that an installation is designed and constructed with passive fire and blast protection.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443002" lims:id="1443002"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443003" lims:id="1443003">Design of passive fire protection</MarginalNote><Label>(2)</Label><Text>The design of the passive fire protection must</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443004" lims:id="1443004"><Label>(a)</Label><Text>not take into account the cooling effect from active firefighting equipment; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443005" lims:id="1443005"><Label>(b)</Label><Text>take into account the need to inspect and maintain the passive fire protection components and the structures, divisions and equipment they are intended to protect.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443006" lims:id="1443006"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443007" lims:id="1443007">Divisions</MarginalNote><Label>(3)</Label><Text>The operator must ensure that the installation is divided such that spacing and barriers protect against accidental events and loads identified in the risk assessment conducted under subsection <XRefInternal>107</XRefInternal>(1) or mitigate their effects.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443008" lims:id="1443008"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443009" lims:id="1443009">Barriers — safety plan and environmental protection plan</MarginalNote><Label>(4)</Label><Text>The operator must ensure that barriers are designed, arranged, installed and maintained in accordance with the measures referred to in clauses <XRefInternal>9</XRefInternal>(2)(b)(v)(C) and <XRefInternal>10</XRefInternal>(2)(b)(v)(C) that are described in the operator’s safety plan and environmental protection plan, respectively.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443010" lims:id="1443010"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443011" lims:id="1443011">Barriers — requirements</MarginalNote><Label>(5)</Label><Text>Barriers must be designed, arranged, installed and maintained to</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443012" lims:id="1443012"><Label>(a)</Label><Text>contain fire, smoke, explosions and hazardous gas and prevent their effects from spreading into adjacent areas;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443013" lims:id="1443013"><Label>(b)</Label><Text>protect persons from fire, smoke and explosions for the time necessary to enable them to escape to a temporary safe refuge;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443014" lims:id="1443014"><Label>(c)</Label><Text>maintain for the necessary time, as determined on the basis of the safety studies referred to in section <XRefInternal>116</XRefInternal>, the integrity of temporary safe refuges and of associated facilities that allow for communication, command, monitoring, control and evacuation against the effects of fire or explosion;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443015" lims:id="1443015"><Label>(d)</Label><Text>protect safety-critical elements and equipment that are to remain operational in the event of an emergency from failure or malfunction caused by the effects of fire or explosion; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443016" lims:id="1443016"><Label>(e)</Label><Text>maintain the installation’s structural integrity against the effects of fire or explosion for the time necessary to safely evacuate all persons.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443017" lims:id="1443017"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443018" lims:id="1443018">Barriers — level of protection</MarginalNote><Label>(6)</Label><Text>The level of fire and blast protection that each barrier must provide is to be based on the results of the risk assessment conducted under subsection <XRefInternal>107</XRefInternal>(1).</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443019" lims:id="1443019"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443020" lims:id="1443020">Barriers — penetrations and openings</MarginalNote><Label>(7)</Label><Text>A barrier must not have any penetrations or openings unless</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443021" lims:id="1443021"><Label>(a)</Label><Text>the penetration or opening is necessary for the functionality of the installation;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443022" lims:id="1443022"><Label>(b)</Label><Text>the barrier is equipped to maintain its overall fire and blast integrity despite the penetration or opening; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443023" lims:id="1443023"><Label>(c)</Label><Text>if there is a means of closing the penetration or opening, that means can be activated automatically or from outside the space being protected.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443024" lims:id="1443024"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443025" lims:id="1443025">Barrier components</MarginalNote><Label>(8)</Label><Text>The operator must ensure that barrier components are certified by a competent third party.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443026" lims:id="1443026"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443027" lims:id="1443027">Bulkheads — production installation</MarginalNote><Label>(9)</Label><Text>Unless the other combined features of a production installation can be demonstrated to provide at least the same level of protection, the operator must ensure that the following bulkheads are capable of preventing the passage of smoke and flame and of limiting the temperature rise on the unexposed face of the bulkhead to an average increase of 139°C and a maximum increase of 180°C above the initial temperature following 120 minutes of exposure to a hydrocarbon fire:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443028" lims:id="1443028"><Label>(a)</Label><Text>those external bulkheads of the temporary safe refuges, main control centre, control stations, accommodations areas, embarkation stations and evacuation points, other than aircraft landing areas, that face production areas or wellheads; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443029" lims:id="1443029"><Label>(b)</Label><Text>the bulkheads that segregate the wellhead and processing areas from other areas of the installation.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443030" lims:id="1443030"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443031" lims:id="1443031">Classification society rules</MarginalNote><Label>(10)</Label><Text>The operator must ensure that the passive fire and blast protection for an installation that does not hold a valid certificate of class issued by a classification society is at least equivalent to the protection required under the rules of a classification society for a mobile offshore drilling unit.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443032" lims:id="1443032"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443033" lims:id="1443033">Hazardous and non-hazardous areas</MarginalNote><Label>113</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443034" lims:id="1443034"><Label>(1)</Label><Text>An operator must ensure that the boundaries between all hazardous areas and non-hazardous areas on an installation are delineated.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443035" lims:id="1443035"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443036" lims:id="1443036">Classification of hazardous areas</MarginalNote><Label>(2)</Label><Text>The operator must ensure that, following the conduct of the risk assessment under subsection <XRefInternal>107</XRefInternal>(1), each hazardous area is classified according to an internationally recognized, comprehensive and documented classification system.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443037" lims:id="1443037"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443038" lims:id="1443038">Separation of areas</MarginalNote><Label>(3)</Label><Text>The operator must ensure that hazardous areas of different classifications are separated from one another and from non-hazardous areas.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443039" lims:id="1443039"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443040" lims:id="1443040">Direct access and openings</MarginalNote><Label>(4)</Label><Text>The operator must ensure, if practicable, that there is no direct access or other opening between hazardous areas and non-hazardous areas and between hazardous areas of different classifications or, if that is not practicable, that any direct access or opening between those areas is minimized and is designed to prevent uncontrolled air flow between them.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443041" lims:id="1443041"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443042" lims:id="1443042">Piping systems</MarginalNote><Label>(5)</Label><Text>The operator must ensure that piping systems are designed to ensure that there is no direct conduit between hazardous and non-hazardous areas and between hazardous areas of different classifications.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443043" lims:id="1443043"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443044" lims:id="1443044">Ventilation of enclosed hazardous areas</MarginalNote><Label>114</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443045" lims:id="1443045"><Label>(1)</Label><Text>An operator must ensure that any enclosed hazardous area on an installation is ventilated such that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443046" lims:id="1443046"><Label>(a)</Label><Text>air is replaced at a rate sufficient to prevent hazardous gas accumulations in the enclosed hazardous area;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443047" lims:id="1443047"><Label>(b)</Label><Text>all air entering the enclosed hazardous area is from a non-hazardous area;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443048" lims:id="1443048"><Label>(c)</Label><Text>the air exhausted from the enclosed hazardous area does not increase the hazard level in another enclosed hazardous area or create a hazard in an enclosed non-hazardous area; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443049" lims:id="1443049"><Label>(d)</Label><Text>the ventilation system for the enclosed hazardous area is separate from the ventilation system for any non-hazardous area.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443050" lims:id="1443050"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443051" lims:id="1443051">Mechanical ventilation system</MarginalNote><Label>(2)</Label><Text>If a mechanical ventilation system is used for the purposes of subsection (1), the operator must ensure that the air in the enclosed hazardous area is maintained at a pressure that is lower than the pressure of any adjacent non-hazardous area or any adjacent hazardous area that is classified as less hazardous.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443052" lims:id="1443052"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443053" lims:id="1443053">Air exhaustion from enclosed hazardous area</MarginalNote><Label>(3)</Label><Text>The operator must ensure that all air exhausted from an enclosed hazardous area is vented to an outdoor area that, were it not for the vented air, would be a non-hazardous area or a hazardous area that would be classified as no more hazardous than the enclosed hazardous area.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443054" lims:id="1443054"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443055" lims:id="1443055">Ventilation pressure differential and functionality</MarginalNote><Label>(4)</Label><Text>The operator must ensure that measuring devices are installed that will monitor any loss of ventilation pressure differential and any loss of functionality of each ventilation system for a hazardous area and that will, no more than 30 seconds after such a loss occurs, activate audible and visual alarms at the control points from which the system is monitored.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443056" lims:id="1443056"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443057" lims:id="1443057">Positive overpressure relative to atmospheric pressure</MarginalNote><Label>(5)</Label><Text>The operator must, in respect of the main control centre and all accommodations areas on an installation, ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443058" lims:id="1443058"><Label>(a)</Label><Text>they are maintained at a positive overpressure relative to atmospheric pressure;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443059" lims:id="1443059"><Label>(b)</Label><Text>all of their external doors that provide a primary means of access to them are equipped with airlocks; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443060" lims:id="1443060"><Label>(c)</Label><Text>all of their other external doors are equipped with airlocks or other means of maintaining and monitoring positive overpressure relative to atmospheric pressure.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443061" lims:id="1443061"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443062" lims:id="1443062">Power shut-off for mechanical ventilation system</MarginalNote><Label>(6)</Label><Text>The operator must ensure that the power source for a mechanical ventilation system that serves a hazardous area, a work area in a non-hazardous area or an accommodations area is capable of being shut off from the control station and from a position that is outside the area being ventilated and that will remain accessible during any fire that may occur within that area.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443063" lims:id="1443063"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443064" lims:id="1443064">Inlets and outlets of ventilation systems</MarginalNote><Label>(7)</Label><Text>The operator must ensure that the main inlets and outlets of all ventilation systems are capable of being closed from a position that is outside the area being ventilated and that will remain accessible during any fire that may occur within that area.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443065" lims:id="1443065"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443066" lims:id="1443066">Ventilation system in non-hazardous area</MarginalNote><Label>(8)</Label><Text>The operator must ensure that any ventilation system that serves a non-hazardous area is equipped with emergency devices in the event of a mechanical ventilation failure or the detection of hazardous gas, including</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443067" lims:id="1443067"><Label>(a)</Label><Text>measuring devices to monitor any loss of ventilation pressure differential;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443068" lims:id="1443068"><Label>(b)</Label><Text>audible and visual alarms;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443069" lims:id="1443069"><Label>(c)</Label><Text>an automated isolation device to prevent hazardous gas from entering the non-hazardous area; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443070" lims:id="1443070"><Label>(d)</Label><Text>a device to remotely seal the non-hazardous area — including inlets and outlets of all ventilation systems — from the control station and from a position outside the non-hazardous ventilated area that will remain accessible during any fire that may occur within the area.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443071" lims:id="1443071"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443072" lims:id="1443072">Ignition prevention</MarginalNote><Label>115</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443073" lims:id="1443073"><Label>(1)</Label><Text>In order to prevent the ignition of flammable, combustible or explosive substances on an installation, an operator must ensure that measures are implemented to prevent the uncontrolled release or accumulation of those substances, including by ensuring that materials and equipment are properly arranged.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443074" lims:id="1443074"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443075" lims:id="1443075">Design — systems and equipment</MarginalNote><Label>(2)</Label><Text>The operator must ensure that any system or equipment that is to be used in a hazardous area is designed to control ignition sources and to prevent fire and explosions in that area, taking into account the area’s classification under subsection <XRefInternal>113</XRefInternal>(2).</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443076" lims:id="1443076"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443077" lims:id="1443077">Risk assessment</MarginalNote><Label>(3)</Label><Text>For the purposes of meeting the requirements under subsections (1) and (2), the operator must ensure that any control measures identified in the risk assessment conducted under subsection <XRefInternal>107</XRefInternal>(1) are implemented.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443078" lims:id="1443078"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443079" lims:id="1443079">Other requirements — equipment</MarginalNote><Label>(4)</Label><Text>The operator must ensure that any equipment located in a hazardous area is rated for use in that area and is installed, ventilated and maintained to ensure safe operation.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443080" lims:id="1443080"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443081" lims:id="1443081">Safe distance operation</MarginalNote><Label>(5)</Label><Text>The operator must ensure that any equipment that is operated in a non-hazardous area is operated at a safe distance from any flammable, combustible or explosive substances and is, unless it is rated for use in a hazardous area, equipped with an automatic and manual means of deactivation in the event of fire or hazardous gas detection.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443082" lims:id="1443082"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443083" lims:id="1443083">Equipment in event of emergency</MarginalNote><Label>(6)</Label><Text>The operator must ensure that any equipment that is located in a non-hazardous area and that is to remain in service in the event of an emergency associated with a gas release is rated for use in a hazardous area and is installed, ventilated and maintained to ensure safe operation.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443084" lims:id="1443084"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443085" lims:id="1443085">Cargo tank</MarginalNote><Label>(7)</Label><Text>The operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443086" lims:id="1443086"><Label>(a)</Label><Text>the gas mixture inside a cargo tank is maintained outside the explosive limits; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443087" lims:id="1443087"><Label>(b)</Label><Text>the systems associated with the cargo tank are designed to</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443088" lims:id="1443088"><Label>(i)</Label><Text>prevent fire, gas or explosion hazards during all operating modes through the use of sufficient control measures, including alarms, and through redundancies in those measures, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443089" lims:id="1443089"><Label>(ii)</Label><Text>ensure that affected persons are made aware when the systems become impaired.</Text></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443090" lims:id="1443090"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443091" lims:id="1443091">Work permit</MarginalNote><Label>(8)</Label><Text>A work permit is required for all hot work carried out on an installation.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443092" lims:id="1443092"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443093" lims:id="1443093">Safe distances</MarginalNote><Label>(9)</Label><Text>The work permit for hot work must set out safe distances to be maintained between the hot work and any well or any flammable, combustible or explosive substance.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443094" lims:id="1443094"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443095" lims:id="1443095">Means of escape, evacuation and rescue</MarginalNote><Label>116</Label><Text>An operator must ensure that an installation is equipped with a safe means of escape, evacuation and rescue, taking into account the results of the risk assessment conducted under subsection <XRefInternal>107</XRefInternal>(1) and comprehensive and documented safety studies.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443096" lims:id="1443096"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443097" lims:id="1443097">Temporary safe refuge</MarginalNote><Label>117</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443098" lims:id="1443098"><Label>(1)</Label><Text>The operator must ensure that the installation is equipped with a temporary safe refuge that will, in the case of an emergency, including an accidental event,</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443099" lims:id="1443099"><Label>(a)</Label><Text>provide sufficient space to accommodate all persons who may need to use the refuge until they have been evacuated, the accidental event has been brought under control or the emergency otherwise ends;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443100" lims:id="1443100"><Label>(b)</Label><Text>protect the persons referred to in paragraph (a) from fire, gas release and explosion hazards for as long as they are in the refuge;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443101" lims:id="1443101"><Label>(c)</Label><Text>provide the means for communication and command and, if applicable, for the monitoring and control of the accidental event for as long as persons are in the refuge; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443102" lims:id="1443102"><Label>(d)</Label><Text>provide signage and lighting to enable safe evacuation from the refuge.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443103" lims:id="1443103"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443104" lims:id="1443104">Areas required to remain safe</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the accommodations area, main control centre and any other area of an installation that is required to remain safe for persons to occupy during an emergency, including the temporary safe refuge, are</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443105" lims:id="1443105"><Label>(a)</Label><Text>designed to prevent ingress of hazardous substances; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443106" lims:id="1443106"><Label>(b)</Label><Text>designed and located to enable occupation for the time required to implement emergency and evacuation procedures.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443107" lims:id="1443107"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443108" lims:id="1443108">Periodic verification</MarginalNote><Label>(3)</Label><Text>The operator must verify on a periodic basis that the temporary safe refuge meets the requirements set out in subsections (1) and (2) and must record the findings resulting from the verification.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443109" lims:id="1443109"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443110" lims:id="1443110">Exits, access and escape routes</MarginalNote><Label>118</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443111" lims:id="1443111"><Label>(1)</Label><Text>An operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443112" lims:id="1443112"><Label>(a)</Label><Text>in any area where persons are normally present on an installation, there are at least two exits, each connected to an escape route that provides safe, direct and unobstructed access to temporary safe refuges, muster areas, embarkation stations and evacuation points; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443113" lims:id="1443113"><Label>(b)</Label><Text>there are means for persons to descend to the water.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443114" lims:id="1443114"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443115" lims:id="1443115">Exception</MarginalNote><Label>(2)</Label><Text>Despite paragraph (1)(a), if an area referred to in that paragraph has an area less than 20 m<Sup>2</Sup> or is a passage less than 5 m in length, the operator must ensure that there is at least one exit as described in that paragraph in that area.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443116" lims:id="1443116"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443117" lims:id="1443117">Distancing — exits</MarginalNote><Label>(3)</Label><Text>The operator must ensure that the exits referred to in paragraph (1)(a) are separated as far apart from each other as possible to increase the likelihood that at least one exit and its connected escape route will be passable during an accidental event.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443118" lims:id="1443118"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443119" lims:id="1443119">Location of escape routes</MarginalNote><Label>(4)</Label><Text>The operator must ensure that the installation has escape routes on two of its sides.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443120" lims:id="1443120"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443121" lims:id="1443121">Safe evacuation</MarginalNote><Label>(5)</Label><Text>The operator must ensure that all escape routes from an accommodations area or a temporary safe refuge to a muster area, embarkation station or evacuation point are clearly marked and illuminated and provided with fire protection to allow for the safe evacuation of persons in a time frame determined in the safety studies referred to in section <XRefInternal>116</XRefInternal>.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443122" lims:id="1443122"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443123" lims:id="1443123">Size of escape routes</MarginalNote><Label>(6)</Label><Text>The operator must ensure that each escape route is of sufficient size to enable the efficient movement of the maximum number of persons who may need to use it, as well as unrestricted manoeuvring of firefighting equipment and stretchers, taking into account the maximum number of persons who can be accommodated on the installation.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443124" lims:id="1443124"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443125" lims:id="1443125">Life-saving appliances for installation</MarginalNote><Label>119</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443126" lims:id="1443126"><Label>(1)</Label><Text>An operator must ensure that an installation is equipped with life-saving appliances that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443127" lims:id="1443127"><Label>(a)</Label><Text>are sufficient in number and have the necessary redundancy to ensure their availability in any emergency situation; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443128" lims:id="1443128"><Label>(b)</Label><Text>meet the requirements of the LSA Code and the annex to International Maritime Organization Resolution MSC.81(70), <XRefExternal reference-type="other">Revised Recommendation on Testing of Life-Saving Appliances</XRefExternal>, as if the installation were a vessel to which the Code and the Resolution apply.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443129" lims:id="1443129"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443130" lims:id="1443130">Loads</MarginalNote><Label>(2)</Label><Text>The operator must ensure that life-saving appliances can withstand all loads to which they may be subjected when they are in use.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443131" lims:id="1443131"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443132" lims:id="1443132">Space requirements and weight</MarginalNote><Label>(3)</Label><Text>The operator must ensure that, in determining the number of persons any lifeboat, life raft or marine evacuation system can accommodate, the persons’ space requirements and weight while wearing immersion suits are taken into account.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443133" lims:id="1443133"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443134" lims:id="1443134">Arrangement and selection</MarginalNote><Label>(4)</Label><Text>The operator must ensure that the arrangement and selection of life-saving appliances are based on</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443135" lims:id="1443135"><Label>(a)</Label><Text>the safety studies referred to in section <XRefInternal>116</XRefInternal>, in particular any escape and evacuation analysis that takes into account any major accidental events; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443136" lims:id="1443136"><Label>(b)</Label><Text>the results of the risk assessment conducted under subsection <XRefInternal>107</XRefInternal>(1).</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443137" lims:id="1443137"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443138" lims:id="1443138">Position</MarginalNote><Label>(5)</Label><Text>The operator must ensure that copies of a plan showing the position of all life-saving appliances are posted at the installation, including in the main control centre and in every accommodations area and work area.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443139" lims:id="1443139"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443140" lims:id="1443140">Lifeboats — availability</MarginalNote><Label>(6)</Label><Text>For the purpose of subsections (1) and (2), the operator must ensure, with respect to the lifeboats on an installation, that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443141" lims:id="1443141"><Label>(a)</Label><Text>they are kept in at least two separate locations, one of which is adjacent to a temporary safe refuge;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443142" lims:id="1443142"><Label>(b)</Label><Text>they have a combined capacity to accommodate the total number of persons on board the installation — and those kept in each location have a combined capacity to accommodate the total number of persons assigned to that location — even in the event that any one lifeboat is lost or rendered unusable; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443143" lims:id="1443143"><Label>(c)</Label><Text>if the installation is a floating platform, those lifeboats that are able to be launched under any credible scenario of angle of heel have a combined capacity to accommodate the total number of persons on board the installation.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443144" lims:id="1443144"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443145" lims:id="1443145">Lifeboats — specifications</MarginalNote><Label>(7)</Label><Text>The operator must ensure that the lifeboats are totally enclosed and are fire-protected.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443146" lims:id="1443146"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443147" lims:id="1443147">Lifeboats — continuous communication</MarginalNote><Label>(8)</Label><Text>The operator must ensure that each lifeboat is capable of being in continuous communication with each other lifeboat and with other vessels in the area.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443148" lims:id="1443148"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443149" lims:id="1443149">Lifeboats — towing devices</MarginalNote><Label>(9)</Label><Text>The operator must ensure that each lifeboat is equipped with towing devices.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443150" lims:id="1443150"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443151" lims:id="1443151">Life rafts</MarginalNote><Label>(10)</Label><Text>For the purpose of subsections (1) and (2), the operator must ensure that the life rafts on an installation have a combined capacity to accommodate the total number of persons on board the installation.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443152" lims:id="1443152"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443153" lims:id="1443153">Continuous verification</MarginalNote><Label>(11)</Label><Text>The operator must verify on a continual basis that the lifeboats, life rafts and other life-saving appliances are available and in a condition to perform as intended and must record the findings resulting from each verification.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443154" lims:id="1443154"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443155" lims:id="1443155">Installation designed for removal</MarginalNote><Label>120</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443156" lims:id="1443156"><Label>(1)</Label><Text>An operator must ensure that an installation is designed to facilitate its removal from the offshore area at the end of its design service life and to reduce any risks to safety, adverse effects on the marine environment and interference with navigation and other uses of the sea that may occur during and after its removal.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443157" lims:id="1443157"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443158" lims:id="1443158">Exception</MarginalNote><Label>(2)</Label><Text>Subsection (1) does not apply if the Board has approved, in the development plan, the abandonment or an alternative use of the installation.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443159" lims:id="1443159"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443160" lims:id="1443160">Transportation and positioning</MarginalNote><Label>121</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443161" lims:id="1443161"><Label>(1)</Label><Text>An operator must ensure that an installation, or any part of it, is transported and positioned</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443162" lims:id="1443162"><Label>(a)</Label><Text>in a manner that does not compromise safety or the protection of the environment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443163" lims:id="1443163"><Label>(b)</Label><Text>in a manner that minimizes interference with and hazards to other activities in proximity to that installation;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443164" lims:id="1443164"><Label>(c)</Label><Text>under the supervision of a competent third party;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443165" lims:id="1443165"><Label>(d)</Label><Text>in the case of a self-elevating mobile offshore platform, with the legs of the platform secured in accordance with the rules of the classification society that issued the certificate of class required under section <XRefInternal>140</XRefInternal>; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443166" lims:id="1443166"><Label>(e)</Label><Text>with the support of vessels that are classified in accordance with section <XRefInternal>177</XRefInternal>.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443167" lims:id="1443167"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443168" lims:id="1443168">Risk assessment</MarginalNote><Label>(2)</Label><Text>Before an installation, or any part of it, is transported and positioned, the operator must ensure that the following requirements are met:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443169" lims:id="1443169"><Label>(a)</Label><Text>a risk assessment must be conducted that takes into account</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443170" lims:id="1443170"><Label>(i)</Label><Text>personnel requirements,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443171" lims:id="1443171"><Label>(ii)</Label><Text>the towing vessels that will be used, the towing plan, including towing arrangements, and the operating limits of the towing equipment’s components,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443172" lims:id="1443172"><Label>(iii)</Label><Text>the processes and control measures to be implemented to ensure safety and the protection of the environment,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443173" lims:id="1443173"><Label>(iv)</Label><Text>physical and environmental conditions and the ability to reliably forecast those conditions, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443174" lims:id="1443174"><Label>(v)</Label><Text>any contingency measures to be taken in the event of adverse physical and environmental conditions or the occurrence of any other foreseeable adverse event during transportation and positioning; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443175" lims:id="1443175"><Label>(b)</Label><Text>a transportation and positioning plan must be prepared that takes into account any requirements of the competent third party referred to in paragraph (1)(c) and, if the installation is a floating platform, the plan must be prepared in accordance with the rules of the classification society that issued the certificate of class required under section <XRefInternal>140</XRefInternal>.</Text></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1443176" lims:id="1443176" level="3"><TitleText>Systems and Equipment: Design, Installation, Commission and Other Requirements</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443177" lims:id="1443177"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443178" lims:id="1443178">Electrical system</MarginalNote><Label>122</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443179" lims:id="1443179"><Label>(1)</Label><Text>An operator must ensure that any electrical system on an installation is designed to avoid any abnormal conditions and faults that may endanger the installation or, if it is not possible to avoid them, to provide alerts of those conditions and faults and mitigate their effects.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443180" lims:id="1443180"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443181" lims:id="1443181">Safety and reliability</MarginalNote><Label>(2)</Label><Text>The operator must ensure that all electric motors, lighting fixtures, electrical wiring and other electrical equipment on an installation are safe and reliable under all foreseeable operating conditions.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443182" lims:id="1443182"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443183" lims:id="1443183">Device for monitoring insulation level to earth</MarginalNote><Label>(3)</Label><Text>If a primary or secondary distribution system for electrical power, heating or lighting with no connection to earth is used on an installation, the operator must ensure that the system is equipped with a device that continuously monitors the insulation level to earth and produces an audible or visual alarm to indicate abnormally low insulation values.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443184" lims:id="1443184"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443185" lims:id="1443185">Main electrical power supply</MarginalNote><Label>(4)</Label><Text>The operator must ensure that the main electrical power supply on, or to, an installation</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443186" lims:id="1443186"><Label>(a)</Label><Text>ensures continuous availability of power generation and distribution;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443187" lims:id="1443187"><Label>(b)</Label><Text>includes at least two power plants or other power supply sources, not including emergency power plants;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443188" lims:id="1443188"><Label>(c)</Label><Text>is capable of supporting all normal operations without recourse to the emergency electrical power supply required under subsection <XRefInternal>126</XRefInternal>(1); and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443189" lims:id="1443189"><Label>(d)</Label><Text>is capable of supporting all operations, other than drilling and production, if one of the power plants is out of operation.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443190" lims:id="1443190"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443191" lims:id="1443191">Primary circuit shutdown</MarginalNote><Label>(5)</Label><Text>The operator must ensure that the primary circuits from a power plant serving an installation are capable of being shut down from at least two separate locations, one of which must be the site of the power plant.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443192" lims:id="1443192"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443193" lims:id="1443193">Control system</MarginalNote><Label>123</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443194" lims:id="1443194"><Label>(1)</Label><Text>An operator must ensure that a control system is designed in accordance with the measures referred to in clauses <XRefInternal>9</XRefInternal>(2)(b)(v)(D) and <XRefInternal>10</XRefInternal>(2)(b)(v)(D) that are described in the operator’s safety plan and environmental protection plan, respectively.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443195" lims:id="1443195"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443196" lims:id="1443196">Requirements</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the control system is designed to meet the following requirements, taking into account human factors:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443197" lims:id="1443197"><Label>(a)</Label><Text>controlled equipment must not be capable of being inadvertently activated;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443198" lims:id="1443198"><Label>(b)</Label><Text>controlled equipment must not create a safety or environmental hazard in the event of system failure or shutdown;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443199" lims:id="1443199"><Label>(c)</Label><Text>the system must have basic diagnostic capability; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443200" lims:id="1443200"><Label>(d)</Label><Text>the system must be capable of being operated simultaneously from multiple control stations without compromising safety.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443201" lims:id="1443201"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443202" lims:id="1443202">Protection of hardware</MarginalNote><Label>(3)</Label><Text>The operator must ensure that control system hardware is protected from circumstances, including excessive vibration, high electromagnetic field levels, electrical power disturbances and extreme temperatures or humidity levels or other physical and environmental conditions, that could cause mechanical damage to or degradation of the hardware or that could otherwise adversely affect the performance of the system.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443203" lims:id="1443203"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443204" lims:id="1443204">Wireless remote control system</MarginalNote><Label>(4)</Label><Text>The operator must ensure that any wireless remote control system includes</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443205" lims:id="1443205"><Label>(a)</Label><Text>a means for error checking to prevent the controlled equipment from responding to corrupt data; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443206" lims:id="1443206"><Label>(b)</Label><Text>a means for identification coding to prevent a transmitter other than the designated transmitter from operating the equipment.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443207" lims:id="1443207"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443208" lims:id="1443208">Alternative means of control</MarginalNote><Label>(5)</Label><Text>The operator must ensure that all control system functions that are required to ensure safety and are dependent on wireless communication links have an alternative means of control that can be activated without delay and without modification to the control system.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443209" lims:id="1443209"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443210" lims:id="1443210">Inspection and testing</MarginalNote><Label>(6)</Label><Text>Equipment that is to be operated by a new, repaired or modified control system must not be put into operation until the operator ensures that the control system has been inspected and tested to confirm that it functions as intended.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443211" lims:id="1443211"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443212" lims:id="1443212">Documentation</MarginalNote><Label>(7)</Label><Text>The operator must ensure that documentation containing an up-to-date description of the design, installation, operation and maintenance of the control systems is readily accessible for consultation and examination.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443213" lims:id="1443213"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443214" lims:id="1443214">Integrated software-dependent control system</MarginalNote><Label>124</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443215" lims:id="1443215"><Label>(1)</Label><Text>An operator must ensure that an integrated software-dependent control system whose failure or malfunction would cause a hazard to safety or the environment is maintained to ensure its reliability, availability and security.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443216" lims:id="1443216"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443217" lims:id="1443217">Control measures</MarginalNote><Label>(2)</Label><Text>The operator must ensure that control measures are implemented to protect the integrated software-dependent system from any threat, including unauthorized access.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443218" lims:id="1443218"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443219" lims:id="1443219">Safety-critical software</MarginalNote><Label>125</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443220" lims:id="1443220"><Label>(1)</Label><Text>The operator must ensure that any software that is a safety-critical element is</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443221" lims:id="1443221"><Label>(a)</Label><Text>secure, reliable and capable of being updated;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443222" lims:id="1443222"><Label>(b)</Label><Text>designed, commissioned and updated by competent persons; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443223" lims:id="1443223"><Label>(c)</Label><Text>demonstrated to be fit for the purposes for which it is to be used through a testing and validation process that takes into account</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443224" lims:id="1443224"><Label>(i)</Label><Text>all foreseeable operating conditions and emergency situations, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443225" lims:id="1443225"><Label>(ii)</Label><Text>system complexity, dependencies and interactions between systems, software failure modes and the level of risk associated with system failure or malfunction.</Text></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443226" lims:id="1443226"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443227" lims:id="1443227">Modification to features</MarginalNote><Label>(2)</Label><Text>The operator must ensure that no modification to the features of the software is implemented unless</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443228" lims:id="1443228"><Label>(a)</Label><Text>the modified software has undergone the testing and validation process referred to in paragraph (1)(c); and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443229" lims:id="1443229"><Label>(b)</Label><Text>the necessary internal approvals for the modification have been obtained, including the approval of the installation manager.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443230" lims:id="1443230"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443231" lims:id="1443231">Emergency electrical power supply</MarginalNote><Label>126</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443232" lims:id="1443232"><Label>(1)</Label><Text>An operator must ensure that an installation has an emergency electrical power supply that is independent of the main electrical power supply such that the following systems and equipment continue to function in the event of a failure of the main electrical power supply:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443233" lims:id="1443233"><Label>(a)</Label><Text>lights at</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443234" lims:id="1443234"><Label>(i)</Label><Text>all embarkation and debarkation stations and evacuation points,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443235" lims:id="1443235"><Label>(ii)</Label><Text>all escape routes, temporary safe refuges, service corridors, accommodations area corridors, stairways, exits and personnel lift cars,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443236" lims:id="1443236"><Label>(iii)</Label><Text>all control centres, control stations and areas from which the communication system referred to in section <XRefInternal>129</XRefInternal> is controlled,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443237" lims:id="1443237"><Label>(iv)</Label><Text>spaces from which drilling or production equipment, including any equipment that is critical to that equipment’s operation, is controlled,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443238" lims:id="1443238"><Label>(v)</Label><Text>spaces where equipment that is related to the emergency shutdown system referred to in section <XRefInternal>133</XRefInternal> and to the power plants referred to in paragraph <XRefInternal>122</XRefInternal>(4)(b) is located,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443239" lims:id="1443239"><Label>(vi)</Label><Text>areas where emergency response equipment is stored, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443240" lims:id="1443240"><Label>(vii)</Label><Text>aircraft landing areas and the location of any obstacle to take-off and landing;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443241" lims:id="1443241"><Label>(b)</Label><Text>hazard detection systems, including the central monitoring system referred to in section <XRefInternal>169</XRefInternal> and the fire and gas detection system referred to in section <XRefInternal>132</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443242" lims:id="1443242"><Label>(c)</Label><Text>emergency response and life-saving systems, including life-saving appliances that require electrical power;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443243" lims:id="1443243"><Label>(d)</Label><Text>the communication system referred to in section <XRefInternal>129</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443244" lims:id="1443244"><Label>(e)</Label><Text>the emergency shutdown system referred to in section <XRefInternal>133</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443245" lims:id="1443245"><Label>(f)</Label><Text>the lights and sound-signalling appliances referred to in section <XRefInternal>127</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443246" lims:id="1443246"><Label>(g)</Label><Text>in the case of a floating platform, the pumps and powered watertight doors and hatches that are necessary to stabilize the installation, having regard to the failure modes and effects analysis referred to in subsection <XRefInternal>144</XRefInternal>(5);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443247" lims:id="1443247"><Label>(h)</Label><Text>in the case of a column-stabilized mobile offshore platform, the ballast systems referred to in section <XRefInternal>144</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443248" lims:id="1443248"><Label>(i)</Label><Text>the systems and equipment that are necessary to safely suspend at any time drilling or production that is in progress, including</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443249" lims:id="1443249"><Label>(i)</Label><Text>blowout prevention systems, including the blowout preventer referred to in subsection <XRefInternal>68</XRefInternal>(5),</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443250" lims:id="1443250"><Label>(ii)</Label><Text>any disconnectable mooring system referred to in section <XRefInternal>148</XRefInternal>,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443251" lims:id="1443251"><Label>(iii)</Label><Text>any disconnect system referred to in section <XRefInternal>150</XRefInternal>, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443252" lims:id="1443252"><Label>(iv)</Label><Text>pumping systems; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443253" lims:id="1443253"><Label>(j)</Label><Text>any other system or equipment that requires electrical power and that is referred to in the operator’s safety plan referred to in section <XRefInternal>9</XRefInternal> or its contingency plan referred to in section <XRefInternal>11</XRefInternal>.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443254" lims:id="1443254"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443255" lims:id="1443255">Mechanically driven generator</MarginalNote><Label>(2)</Label><Text>If the emergency electrical power supply is a mechanically driven generator, the operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443256" lims:id="1443256"><Label>(a)</Label><Text>the installation is equipped with a transitional source of electrical power, unless the generator will automatically start and supply the necessary power in less than 45 seconds from the time the main electrical power supply fails;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443257" lims:id="1443257"><Label>(b)</Label><Text>the installation is equipped with a self-contained battery system that is designed, on failure or shutdown of both the main electrical power supply and the emergency electrical power supply, to automatically supply sufficient power to operate</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443258" lims:id="1443258"><Label>(i)</Label><Text>for a period of at least one hour, the lights that are located in any emergency exit route, any escape route, any space where equipment incorporating an internal combustion engine, gas turbine, electric motor, generator, pump or compressor is found, any control centre and any emergency assembly room and at every launching station of life-saving appliances,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443259" lims:id="1443259"><Label>(ii)</Label><Text>for a period of at least one hour, the communication system referred to in section <XRefInternal>129</XRefInternal> and the general alarm system referred to in section <XRefInternal>130</XRefInternal>, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443260" lims:id="1443260"><Label>(iii)</Label><Text>for a period of at least four days, the lights and sound-signalling appliances referred to in section <XRefInternal>127</XRefInternal>; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443261" lims:id="1443261"><Label>(c)</Label><Text>the mechanically driven generator has redundancy in its starting capabilities and a dedicated fuel source.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443262" lims:id="1443262"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443263" lims:id="1443263">Design and maintenance</MarginalNote><Label>(3)</Label><Text>The operator must ensure that the emergency electrical power supply together with any transitional source of electrical power and self-contained battery system with which the installation may be equipped are designed and maintained such that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443264" lims:id="1443264"><Label>(a)</Label><Text>they are able to provide the systems and equipment referred to in subsection (1) with an emergency power supply of sufficient capacity, taking into account starting currents and the transitory nature of electrical loads, and sufficient duration to ensure that the systems and equipment can function as intended and to allow for effective management of the installation during an emergency, including</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443265" lims:id="1443265"><Label>(i)</Label><Text>to allow for the complete shutdown and evacuation of the installation,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443266" lims:id="1443266"><Label>(ii)</Label><Text>to facilitate emergency response and the safe escape, refuge and evacuation of persons or to maintain the integrity of the installation,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443267" lims:id="1443267"><Label>(iii)</Label><Text>to ensure sufficient power so that systems that must operate simultaneously can do so,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443268" lims:id="1443268"><Label>(iv)</Label><Text>in the case of a floating platform, to maintain the flotation and stability of the platform, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443269" lims:id="1443269"><Label>(v)</Label><Text>to bring a well to a safe state and to maintain it in that state;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443270" lims:id="1443270"><Label>(b)</Label><Text>their capacity to provide power to essential systems is not compromised during their maintenance;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443271" lims:id="1443271"><Label>(c)</Label><Text>they have sufficient redundancy to ensure their reliability and, as far as is practicable, to ensure their functional and physical independence from other essential systems or, if that is not practicable, they are arranged so as not to adversely affect or be adversely affected by the operation of those systems; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443272" lims:id="1443272"><Label>(d)</Label><Text>they are readily accessible.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443273" lims:id="1443273"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443274" lims:id="1443274">Protection from damage</MarginalNote><Label>(4)</Label><Text>The operator must ensure that the emergency electrical power supply, transitional source of electrical power and self-contained battery system referred to in subsection (3) are arranged — or are otherwise protected from mechanical damage and damage caused by fire, explosion and physical and environmental conditions to which they may be exposed — so that they remain capable of fulfilling their intended functions under all foreseeable operating conditions, including, in the case of a floating platform, under the static and dynamic angles of inclination referred to in subsection <XRefInternal>136</XRefInternal>(7).</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443275" lims:id="1443275"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443276" lims:id="1443276">Alert</MarginalNote><Label>(5)</Label><Text>The operator must ensure that, in the event of a failure of the main electrical power supply, all control centres are alerted by means of an audible and visual signal that the installation is being powered by the emergency electrical power supply.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443277" lims:id="1443277"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443278" lims:id="1443278">Lights and sound-signalling appliances</MarginalNote><Label>127</Label><Text>An operator must ensure that an installation is equipped with the lights and sound-signalling appliances that are required by the <XRefExternal reference-type="regulation" link="C.R.C.,_c._1416">Collision Regulations</XRefExternal> as if that installation were a Canadian vessel to which those Regulations apply, unless compliance with the height and distance requirements of those Regulations is not possible, in which case the lights and appliances must be installed to maximize their audible and visual alerting capabilities for collision avoidance.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443279" lims:id="1443279"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443280" lims:id="1443280">Radar</MarginalNote><Label>128</Label><Text>An operator must ensure that an installation other than an unattended installation is equipped with radar for identifying hazards in proximity to the installation and that the radar is continuously monitored.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443281" lims:id="1443281"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443282" lims:id="1443282">Communication system</MarginalNote><Label>129</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443283" lims:id="1443283"><Label>(1)</Label><Text>An operator must ensure that an installation is equipped with a communication system that has built-in redundancy and is capable of communicating continuously, including in an emergency, with</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443284" lims:id="1443284"><Label>(a)</Label><Text>external emergency response teams;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443285" lims:id="1443285"><Label>(b)</Label><Text>all persons, individually or collectively, at an operations site;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443286" lims:id="1443286"><Label>(c)</Label><Text>all persons who are in transit to or from an operations site;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443287" lims:id="1443287"><Label>(d)</Label><Text>all support craft;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443288" lims:id="1443288"><Label>(e)</Label><Text>all onshore support centres;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443289" lims:id="1443289"><Label>(f)</Label><Text>nearby vessels and aircraft; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443290" lims:id="1443290"><Label>(g)</Label><Text>nearby installations.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443291" lims:id="1443291"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443292" lims:id="1443292">Radiocommunication system</MarginalNote><Label>(2)</Label><Text>An operator must ensure that an installation other than an unattended installation is equipped with a radiocommunication system in respect of which the following requirements are met:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443293" lims:id="1443293"><Label>(a)</Label><Text>the system must comply with Part 2 of the <XRefExternal reference-type="regulation" link="SOR-2020-216">Navigation Safety Regulations, 2020</XRefExternal> as if the installation were a Canadian vessel to which those Regulations apply;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443294" lims:id="1443294"><Label>(b)</Label><Text>a technical acceptance certificate must have been issued in respect of the system under the <XRefExternal reference-type="act" link="R-2">Radiocommunication Act</XRefExternal>; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443295" lims:id="1443295"><Label>(c)</Label><Text>a continuous listening watch and radio log must be maintained.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443296" lims:id="1443296"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443297" lims:id="1443297">Radiocommunication system — unattended installation</MarginalNote><Label>(3)</Label><Text>An operator must ensure that any radiocommunication system on an unattended installation meets the requirements referred to in paragraphs (2)(a) and (b).</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443298" lims:id="1443298"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443299" lims:id="1443299">General alarm system</MarginalNote><Label>130</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443300" lims:id="1443300"><Label>(1)</Label><Text>An operator must ensure that an installation is equipped with a general alarm system that is capable of alerting persons on the installation of any hazards to safety or the environment other than fire or gas.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443301" lims:id="1443301"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443302" lims:id="1443302">Additional requirements</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the general alarm system is</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443303" lims:id="1443303"><Label>(a)</Label><Text>operational at all times other than when the system is being inspected, maintained or repaired;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443304" lims:id="1443304"><Label>(b)</Label><Text>flagged as being subject to inspection, maintenance or repair, as required; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443305" lims:id="1443305"><Label>(c)</Label><Text>designed to prevent tampering.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443306" lims:id="1443306"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443307" lims:id="1443307">Alternative means of alert</MarginalNote><Label>(3)</Label><Text>If a general alarm system is being inspected, maintained or repaired, the operator must ensure that there is an alternative means of alerting persons of the hazards referred to in subsection (1).</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443308" lims:id="1443308"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443309" lims:id="1443309">Gas release system</MarginalNote><Label>131</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443310" lims:id="1443310"><Label>(1)</Label><Text>An operator must ensure that an installation that includes process tanks, process vessels and piping is equipped with a gas release system that has a flaring system, a pressure relief system, a depressurizing system or a cold vent system.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443311" lims:id="1443311"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443312" lims:id="1443312">Risk assessment — design</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the design of the gas release system is based on the results of the risk assessment conducted under subsection <XRefInternal>107</XRefInternal>(1).</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443313" lims:id="1443313"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443314" lims:id="1443314">Design</MarginalNote><Label>(3)</Label><Text>The operator must ensure that the gas release system is designed to</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443315" lims:id="1443315"><Label>(a)</Label><Text>release gas and combustible liquid from an installation in a controlled manner without creating a hazard to safety;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443316" lims:id="1443316"><Label>(b)</Label><Text>reduce pressure in the entire process system as quickly as possible while ensuring a safe and controlled release of pressure;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443317" lims:id="1443317"><Label>(c)</Label><Text>minimize the effect on the environment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443318" lims:id="1443318"><Label>(d)</Label><Text>be activated from the main control centre and from control stations that meet the requirements set out in subsection (5); and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443319" lims:id="1443319"><Label>(e)</Label><Text>ensure that oxygen cannot enter the system during normal operations.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443320" lims:id="1443320"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443321" lims:id="1443321">Location — system</MarginalNote><Label>(4)</Label><Text>The operator must ensure that the gas release system is designed and located taking into account factors, including physical and environmental conditions, that affect the safe and normal flaring or emergency release of combustible liquid, gases or vapours so that when the system is in operation it does not damage the installation — or any other installation, vessel or support craft in proximity to it — or injure any person.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443322" lims:id="1443322"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443323" lims:id="1443323">Control stations</MarginalNote><Label>(5)</Label><Text>The operator must ensure that the control stations from which the gas release system is activated are located and spaced so that they remain protected and accessible for safe operation of the system.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443324" lims:id="1443324"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443325" lims:id="1443325">Flaring systems</MarginalNote><Label>(6)</Label><Text>The operator must, in respect of any flaring system, ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443326" lims:id="1443326"><Label>(a)</Label><Text>if an unlit release of gas could produce toxic gas concentrations or gas concentrations of more than 50% of the lower explosive limit of the released gas,</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443327" lims:id="1443327"><Label>(i)</Label><Text>the system has an automatic igniter system that has redundancy in its ignition capabilities, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443328" lims:id="1443328"><Label>(ii)</Label><Text>in the case of an open flare system, the system and any associated equipment are designed to ensure a continuous flame; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443329" lims:id="1443329"><Label>(b)</Label><Text>the system and any associated equipment are designed to</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443330" lims:id="1443330"><Label>(i)</Label><Text>withstand the radiated heat at the maximum flaring rate,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443331" lims:id="1443331"><Label>(ii)</Label><Text>prevent flashback, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443332" lims:id="1443332"><Label>(iii)</Label><Text>withstand all loads to which they may be subjected.</Text></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443333" lims:id="1443333"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443334" lims:id="1443334">Risk minimization — vents</MarginalNote><Label>(7)</Label><Text>The operator must ensure that any vent that is used to release gas into the atmosphere without combustion is designed and located in accordance with the measures referred to in clause <XRefInternal>9</XRefInternal>(2)(b)(vi)(A) and subparagraph <XRefInternal>10</XRefInternal>(2)(b)(vi) that are described in the operator’s safety plan and environmental protection plan, respectively.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443335" lims:id="1443335"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443336" lims:id="1443336">Liquid removal</MarginalNote><Label>(8)</Label><Text>The operator must ensure that any liquid, other than water, that cannot be safely and reliably burned at the flare tip of a gas release system is removed from the gas before it enters the flare.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443337" lims:id="1443337"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443338" lims:id="1443338">Fire and gas detection system</MarginalNote><Label>132</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443339" lims:id="1443339"><Label>(1)</Label><Text>An operator must ensure that an installation is equipped with a fire and gas detection system.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443340" lims:id="1443340"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443341" lims:id="1443341">Requirements</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the fire and gas detection system</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443342" lims:id="1443342"><Label>(a)</Label><Text>provides continuous, reliable and automatic monitoring functions to allow persons to be alerted to the presence and location of fire and hazardous gas, as well as the concentration and composition of that gas;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443343" lims:id="1443343"><Label>(b)</Label><Text>as far as is practicable, is functionally and physically independent of other essential systems or, if that is not practicable, is arranged so as not to adversely affect or be adversely affected by the operation of those systems;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443344" lims:id="1443344"><Label>(c)</Label><Text>includes an alarm system with audible and visual alarms that are distinct from other types of alarms, that can be heard or seen at the main control centre and in other areas where persons are normally present, that are, on detection of fire or gas hazards, automatically activated and that can also be manually activated; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443345" lims:id="1443345"><Label>(d)</Label><Text>allows control measures, including those that are designed to be initiated automatically, to be initiated manually to prevent abnormal conditions from escalating and causing major accidental events.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443346" lims:id="1443346"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443347" lims:id="1443347">Risk assessment — design</MarginalNote><Label>(3)</Label><Text>The operator must ensure that the design of the fire and gas detection system is based on the results of the risk assessment conducted under subsection <XRefInternal>107</XRefInternal>(1).</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443348" lims:id="1443348"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443349" lims:id="1443349">Design</MarginalNote><Label>(4)</Label><Text>The operator must ensure that the fire and gas detection system is designed</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443350" lims:id="1443350"><Label>(a)</Label><Text>to detect the types of fire and hazardous gas releases identified in the risk assessment conducted under subsection <XRefInternal>107</XRefInternal>(1);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443351" lims:id="1443351"><Label>(b)</Label><Text>to detect hazardous gas and smoke in the air intakes of any mechanically ventilated non-hazardous areas; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443352" lims:id="1443352"><Label>(c)</Label><Text>such that the means to manually initiate fire and gas alarms are available at or near the office of the installation manager, at the main control centre, at every control station and at any other locations identified in the risk assessment conducted under subsection <XRefInternal>107</XRefInternal>(1).</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443353" lims:id="1443353"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443354" lims:id="1443354">Requirements</MarginalNote><Label>(5)</Label><Text>The operator must ensure that the fire and gas detection system meets the following requirements:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443355" lims:id="1443355"><Label>(a)</Label><Text>its detection components must</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443356" lims:id="1443356"><Label>(i)</Label><Text>be capable of detecting the types of fire and hazardous gas releases identified in the risk assessment conducted under subsection <XRefInternal>107</XRefInternal>(1) in the areas in which they are located,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443357" lims:id="1443357"><Label>(ii)</Label><Text>ensure reliable and early detection, taking into account their response characteristics, redundancy and performance under foreseeable conditions in which detection may be required,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443358" lims:id="1443358"><Label>(iii)</Label><Text>be rated and maintained for use in the areas in which they are located, as those areas are classified in accordance with the classification system referred to in subsection <XRefInternal>113</XRefInternal>(2), and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443359" lims:id="1443359"><Label>(iv)</Label><Text>include failure and malfunction indicators;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443360" lims:id="1443360"><Label>(b)</Label><Text>the system and its components must be protected from mechanical damage and damage caused by fire, explosion and physical and environmental conditions to which they may be exposed so that they remain capable of fulfilling their intended functions under all foreseeable operating conditions;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443361" lims:id="1443361"><Label>(c)</Label><Text>the system must allow for all necessary information to be continuously provided to the main control centre and other strategic locations to permit the management of emergency situations; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443362" lims:id="1443362"><Label>(d)</Label><Text>the system must be capable of being reset only if the cause of its activation has been resolved.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443363" lims:id="1443363"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443364" lims:id="1443364">Testing and maintenance</MarginalNote><Label>(6)</Label><Text>The operator must ensure, in relation to the testing and maintenance of the fire and gas detection system, that the following requirements are met:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443365" lims:id="1443365"><Label>(a)</Label><Text>the system must be capable of being overridden for the purposes of testing and maintenance activities;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443366" lims:id="1443366"><Label>(b)</Label><Text>override commands and functions must be applied for the shortest amount of time possible and with as few as possible being applied simultaneously; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443367" lims:id="1443367"><Label>(c)</Label><Text>the testing and maintenance activities must not impair the system beyond what is necessary to undertake those activities and must not impede its functioning.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443368" lims:id="1443368"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443369" lims:id="1443369">Work permit</MarginalNote><Label>(7)</Label><Text>A work permit is required for the testing and maintenance of the fire and gas detection system.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443370" lims:id="1443370"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443371" lims:id="1443371">Management of override effects</MarginalNote><Label>(8)</Label><Text>The work permit must set out measures to be taken to manage the effects of overriding the fire and gas detection system.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443372" lims:id="1443372"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443373" lims:id="1443373">Leak repair</MarginalNote><Label>(9)</Label><Text>The operator must ensure that any leak of gas that is detected by the fire and gas detection system or by means of an auditory, olfactory or visual method — including the observation of the dripping of hydrocarbon liquids from an equipment component — is repaired</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443374" lims:id="1443374"><Label>(a)</Label><Text>immediately, if the repair is necessary for the purposes of safety or the conservation of petroleum resources; or</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443375" lims:id="1443375"><Label>(b)</Label><Text>as soon as the circumstances permit, in any other case.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443376" lims:id="1443376"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443377" lims:id="1443377">Emergency shutdown system</MarginalNote><Label>133</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443378" lims:id="1443378"><Label>(1)</Label><Text>An operator must ensure that an installation has an emergency shutdown system that is capable of</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443379" lims:id="1443379"><Label>(a)</Label><Text>shutting down all potential ignition sources and potential sources of flammable liquids or gases, including by isolating those sources;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443380" lims:id="1443380"><Label>(b)</Label><Text>depressurizing all potential sources of flammable liquids or gases other than reservoirs;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443381" lims:id="1443381"><Label>(c)</Label><Text>preventing abnormal conditions from escalating and causing major accidental events; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443382" lims:id="1443382"><Label>(d)</Label><Text>limiting the extent and duration of any major accidental event.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443383" lims:id="1443383"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443384" lims:id="1443384">Studies and assessments — design</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the design of the emergency shutdown system is based on studies, analyses and assessments that identify potential hazards and must assess the risks associated with those hazards, including the risk assessment conducted under subsection <XRefInternal>107</XRefInternal>(1) and the risk and reliability analysis referred to in section <XRefInternal>108</XRefInternal>.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443385" lims:id="1443385"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443386" lims:id="1443386">Design</MarginalNote><Label>(3)</Label><Text>The operator must ensure that the emergency shutdown system is designed to</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443387" lims:id="1443387"><Label>(a)</Label><Text>allow for automated and manual activation to ensure effective shutdown;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443388" lims:id="1443388"><Label>(b)</Label><Text>allow for the shutdown of any system or equipment to bring it to a safe state, unless the system or equipment has been rated to remain operational in the area in which it is located, as that area is classified in accordance with the classification system referred to in subsection <XRefInternal>113</XRefInternal>(2);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443389" lims:id="1443389"><Label>(c)</Label><Text>allow for the selective shutdown of ventilation systems, other than fans that are necessary for supplying combustion air to engines that are required to operate during emergency situations unless gas has been detected in the intake to those engines;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443390" lims:id="1443390"><Label>(d)</Label><Text>allow for the isolation of petroleum and flammable fluid inventories, including reservoirs, wells, production systems and pipelines, from ignition sources;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443391" lims:id="1443391"><Label>(e)</Label><Text>take into account the size and segregation of petroleum and flammable fluid inventories to limit the quantity of substances released on loss of containment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443392" lims:id="1443392"><Label>(f)</Label><Text>allow for the depressurization and the disposal of hydrocarbon inventories in a safe manner and to a safe location without cold venting;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443393" lims:id="1443393"><Label>(g)</Label><Text>allow for the closure of the installation’s subsea and subsurface safety valves and of pipeline safety valves;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443394" lims:id="1443394"><Label>(h)</Label><Text>take into account, in relation to all essential systems, the necessary timelines to support the safe escape, refuge and evacuation of persons and to maintain the integrity of the installation; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443395" lims:id="1443395"><Label>(i)</Label><Text>take into account the activation of the fixed fire suppression systems required under paragraph <XRefInternal>134</XRefInternal>(4)(a).</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443396" lims:id="1443396"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443397" lims:id="1443397">Shutdown logic</MarginalNote><Label>(4)</Label><Text>The operator must ensure that the logic for the emergency shutdown system includes a hierarchy of shutdown levels, action sequences and timelines that are appropriate for the degree of risk posed by the hazards identified in the studies, analyses and assessments referred to in subsection (2).</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443398" lims:id="1443398"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443399" lims:id="1443399">Additional requirements</MarginalNote><Label>(5)</Label><Text>The operator must ensure, in relation to the emergency shutdown system, that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443400" lims:id="1443400"><Label>(a)</Label><Text>the system is reliable and, as far as is practicable, it is functionally and physically independent of other essential systems or, if that is not practicable, it is arranged so as not to adversely affect or be adversely affected by the operation of those systems;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443401" lims:id="1443401"><Label>(b)</Label><Text>the system includes an alarm system, with audible and visual alarms that are distinct from other types of alarms, that will automatically activate in the main control centre and at other strategic locations so that all affected persons, having regard to the hierarchy of shutdown levels referred to in subsection (4), are alerted to the emergency shutdown;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443402" lims:id="1443402"><Label>(c)</Label><Text>there is continuous monitoring from the main control centre of the system’s status, including, if the system or part of the system is overridden, the extent and duration of the override;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443403" lims:id="1443403"><Label>(d)</Label><Text>the system and its components are protected from mechanical damage and damage caused by fire, explosion and physical and environmental conditions to which they may be exposed so that they remain capable of fulfilling their intended functions under all foreseeable operating conditions;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443404" lims:id="1443404"><Label>(e)</Label><Text>the system allows for all information that is necessary to permit the management of emergency situations to be continuously provided to the main control centre and other strategic locations, including information regarding</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443405" lims:id="1443405"><Label>(i)</Label><Text>the shutdown level and the source of activation of the system,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443406" lims:id="1443406"><Label>(ii)</Label><Text>any shutdown effects that failed to execute on activation of the system, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443407" lims:id="1443407"><Label>(iii)</Label><Text>the status, including failure, of the system’s components;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443408" lims:id="1443408"><Label>(f)</Label><Text>the system is capable of being activated from multiple manual activation points that are</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443409" lims:id="1443409"><Label>(i)</Label><Text>clearly marked,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443410" lims:id="1443410"><Label>(ii)</Label><Text>protected against unintentional activation, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443411" lims:id="1443411"><Label>(iii)</Label><Text>located at</Text><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443412" lims:id="1443412"><Label>(A)</Label><Text>in the case of manual activation points for the highest level of shutdown, the main control centre and other strategic locations, including aircraft landing areas and other embarkation stations, and</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443413" lims:id="1443413"><Label>(B)</Label><Text>in the case of all other manual activation points, strategic positions, at least one of which must not be in a hazardous area;</Text></Clause></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443414" lims:id="1443414"><Label>(g)</Label><Text>the activation of the system from a manual activation point triggers the general alarm system referred to in section <XRefInternal>130</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443415" lims:id="1443415"><Label>(h)</Label><Text>if any part of the system is operated using a hydraulic or pneumatic accumulator,</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443416" lims:id="1443416"><Label>(i)</Label><Text>the accumulator</Text><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443417" lims:id="1443417"><Label>(A)</Label><Text>is located as close as is practicable to the part that it is intended to operate, except if that part is part of a subsea production system, and</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443418" lims:id="1443418"><Label>(B)</Label><Text>has the capacity for a sufficient number of activations to ensure that shutdown can be achieved, and</Text></Clause></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443419" lims:id="1443419"><Label>(ii)</Label><Text>the shutdown valves revert to a fail-safe mode in the event of a failure of the accumulator;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443420" lims:id="1443420"><Label>(i)</Label><Text>the system is capable of testing both its input and output signal devices and its internal functions to ensure its functioning;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443421" lims:id="1443421"><Label>(j)</Label><Text>in the event of a failure of the main electrical power supply referred to in subsection <XRefInternal>122</XRefInternal>(4), the system has the capacity to function continuously until the main electrical power supply is restored or all shutdown operations have been concluded;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443422" lims:id="1443422"><Label>(k)</Label><Text>in the event that an impairment of the system or any of its components increases the risk to safety or the environment, any other systems that support the emergency shutdown system reverts to a fail-safe mode;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443423" lims:id="1443423"><Label>(l)</Label><Text>if two or more installations are connected or if there is temporary equipment that has an emergency shutdown system on an installation,</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443424" lims:id="1443424"><Label>(i)</Label><Text>the emergency shutdown systems of the connected installations are linked so that emergency shutdown signals are transmitted between those systems,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443425" lims:id="1443425"><Label>(ii)</Label><Text>the emergency shutdown systems of the temporary equipment are linked to the installation’s emergency shutdown system so that emergency shutdown signals are transmitted between those systems, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443426" lims:id="1443426"><Label>(iii)</Label><Text>the logic for the emergency shutdown system of each of the connected installations and of the temporary equipment is re-evaluated and modified, if necessary, to take into account the fact that the emergency shutdown systems are linked, with the logic of the installation’s emergency shutdown system being given priority over that of any temporary equipment;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443427" lims:id="1443427"><Label>(m)</Label><Text>the system is capable of being overridden or reset only if the cause of its activation has been resolved and there has been local confirmation that the equipment that gave rise to the system shutdown can be safely used; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443428" lims:id="1443428"><Label>(n)</Label><Text>override commands and functions are not capable of being unintentionally activated.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443429" lims:id="1443429"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443430" lims:id="1443430">Testing and maintenance</MarginalNote><Label>(6)</Label><Text>If the emergency shutdown system is capable of being overridden for the purposes of testing and maintenance activities, the operator must ensure that the following requirements are met:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443431" lims:id="1443431"><Label>(a)</Label><Text>override commands and functions must be applied for the shortest amount of time possible and with as few as possible being applied simultaneously; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443432" lims:id="1443432"><Label>(b)</Label><Text>the testing and maintenance activities must not impair the system beyond what is necessary to undertake those activities and must not impede the system’s functioning.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443433" lims:id="1443433"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443434" lims:id="1443434">Work permit</MarginalNote><Label>(7)</Label><Text>A work permit is required for the testing and maintenance of the emergency shutdown system.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443435" lims:id="1443435"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443436" lims:id="1443436">Management of override effects</MarginalNote><Label>(8)</Label><Text>The work permit must set out the measures to be taken to manage the effects of overriding the emergency shutdown system.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443437" lims:id="1443437"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443438" lims:id="1443438">Closure — subsurface safety valve</MarginalNote><Label>(9)</Label><Text>In the case of a production installation, the operator must ensure that, if the emergency shutdown system is activated, any subsurface safety valve closes not later than two minutes after the tree safety valve has closed unless a longer delay is justified by the mechanical or production characteristics of the well.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443439" lims:id="1443439"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443440" lims:id="1443440">Fire protection systems and equipment</MarginalNote><Label>134</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443441" lims:id="1443441"><Label>(1)</Label><Text>An operator must ensure that an installation is equipped with fire protection systems and equipment to control and extinguish fires.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443442" lims:id="1443442"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443443" lims:id="1443443">Safety plan</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the fire protection systems and equipment are designed, selected, operated, inspected, tested and maintained in accordance with the measures referred to in clause <XRefInternal>9</XRefInternal>(2)(b)(vi)(B) that are described in the operator’s safety plan.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443444" lims:id="1443444"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443445" lims:id="1443445">Design and selection</MarginalNote><Label>(3)</Label><Text>The design and selection of fire protection systems and equipment, including suppression agents, must take into account their intended use and the results of the risk assessment conducted under subsection <XRefInternal>107</XRefInternal>(1).</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443446" lims:id="1443446"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443447" lims:id="1443447">Further requirements</MarginalNote><Label>(4)</Label><Text>The operator must ensure that the fire protection systems and equipment include</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443448" lims:id="1443448"><Label>(a)</Label><Text>automated fixed fire suppression systems that are capable of being manually activated from outside the space that is being protected;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443449" lims:id="1443449"><Label>(b)</Label><Text>fixed monitors, deluge systems and foam systems;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443450" lims:id="1443450"><Label>(c)</Label><Text>manual firefighting systems and equipment; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443451" lims:id="1443451"><Label>(d)</Label><Text>any redundancies that are necessary to ensure that the systems function in the case of a failure of one of their components.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443452" lims:id="1443452"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443453" lims:id="1443453">Protection from damage</MarginalNote><Label>(5)</Label><Text>The operator must ensure that the fire protection systems and equipment are protected from mechanical damage and damage caused by fire, explosion and physical and environmental conditions to which they may be exposed so that they remain capable of fulfilling their intended functions under all foreseeable operating conditions.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443454" lims:id="1443454"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443455" lims:id="1443455">Fixed fire suppression system</MarginalNote><Label>(6)</Label><Text>The operator must ensure that an automated fixed fire suppression system is installed in every accommodations area and hazardous area and in any other area that requires such a system based on the results of the risk assessment conducted under subsection <XRefInternal>107</XRefInternal>(1).</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443456" lims:id="1443456"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443457" lims:id="1443457">Fire pumps</MarginalNote><Label>(7)</Label><Text>The operator must ensure that at least two dedicated, segregated and independently driven fire pumps supply a dedicated firewater ring main and that each of those fire pumps is</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443458" lims:id="1443458"><Label>(a)</Label><Text>equipped with at least two independent starting devices; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443459" lims:id="1443459"><Label>(b)</Label><Text>designed to allow for both local and remote control.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443460" lims:id="1443460"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443461" lims:id="1443461">Location</MarginalNote><Label>(8)</Label><Text>The operator must ensure that the fire pumps are located as far as possible from equipment used for storing and processing petroleum, taking into account the results of the risk assessment conducted under subsection <XRefInternal>107</XRefInternal>(1).</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443462" lims:id="1443462"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443463" lims:id="1443463">Supply of firewater</MarginalNote><Label>(9)</Label><Text>The operator must ensure that the fire pumps and piping and their valves are capable of providing a sufficient supply of firewater to any area on the installation, including if a segment of the firewater ring main is damaged.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443464" lims:id="1443464"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443465" lims:id="1443465">Firewater system</MarginalNote><Label>(10)</Label><Text>The operator must ensure that the firewater system is capable of operating continuously for a minimum of 18 hours.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443466" lims:id="1443466"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443467" lims:id="1443467">Fire hydrants and hose reels</MarginalNote><Label>(11)</Label><Text>The operator must ensure that the number and location of fire hydrants and fire hose reels are such that at least two jets of water, not emanating from the same location, can reach any part of the installation where a fire may occur.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443468" lims:id="1443468"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443469" lims:id="1443469">Portable fire-extinguishing equipment</MarginalNote><Label>(12)</Label><Text>In areas where it is not practical to use fire hydrants and fire hose reels, the operator must ensure that portable fire-extinguishing equipment is readily available and accessible.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443470" lims:id="1443470"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443471" lims:id="1443471">Alarms at main control centre</MarginalNote><Label>(13)</Label><Text>The operator must ensure that audible and visual alarms will activate at the main control centre on the initiation of any of the automated fixed fire suppression systems or on the loss of any firewater pressure.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443472" lims:id="1443472"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443473" lims:id="1443473">Additional alarms</MarginalNote><Label>(14)</Label><Text>If the automated fixed fire suppression system creates a hazard to persons, the operator must ensure that audible and visual alarms automatically activate inside and outside the space that is being protected.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443474" lims:id="1443474"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443475" lims:id="1443475">Unattended installations</MarginalNote><Label>(15)</Label><Text>Paragraphs (4)(a) and (b) and subsections (6) to (11) do not apply in respect of unattended installations.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443476" lims:id="1443476"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443477" lims:id="1443477">Boilers and pressure systems</MarginalNote><Label>135</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443478" lims:id="1443478"><Label>(1)</Label><Text>An operator must ensure that boilers and pressure systems are designed in accordance with the measures referred to in clause <XRefInternal>9</XRefInternal>(2)(b)(vi)(C) that are described in the operator’s safety plan.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443479" lims:id="1443479"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443480" lims:id="1443480">Design requirements</MarginalNote><Label>(2)</Label><Text>The boilers and pressure systems must be designed to</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443481" lims:id="1443481"><Label>(a)</Label><Text>prevent the occurrence of an abnormal condition that could cause an undesirable event;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443482" lims:id="1443482"><Label>(b)</Label><Text>prevent an undesirable event from causing a release of liquids, gases or vapours;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443483" lims:id="1443483"><Label>(c)</Label><Text>prevent the ignition of any flammable liquids, gases or vapours that are released;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443484" lims:id="1443484"><Label>(d)</Label><Text>safely disperse or dispose of any liquids, gases or vapours that are released;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443485" lims:id="1443485"><Label>(e)</Label><Text>prevent the formation of explosive mixtures;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443486" lims:id="1443486"><Label>(f)</Label><Text>limit persons’ exposure to fire hazards;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443487" lims:id="1443487"><Label>(g)</Label><Text>monitor safe limits of pressure, temperature and fluid levels and reliably protect against exceeding those limits;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443488" lims:id="1443488"><Label>(h)</Label><Text>permit the examination of components critical to the pressure system to ensure their continued integrity;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443489" lims:id="1443489"><Label>(i)</Label><Text>allow for draining and venting at all stages of operation to</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443490" lims:id="1443490"><Label>(i)</Label><Text>permit cleaning, inspection and maintenance activities to be carried out safely, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443491" lims:id="1443491"><Label>(ii)</Label><Text>avoid harmful effects, including water hammer, vacuum collapse, corrosion and uncontrolled chemical reactions;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443492" lims:id="1443492"><Label>(j)</Label><Text>prevent the escalation in relation to the boilers and pressure systems of accidental events occurring outside of them; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443493" lims:id="1443493"><Label>(k)</Label><Text>limit and mitigate the effects of any loss of containment of the contents of the boilers and pressure systems.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443494" lims:id="1443494"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443495" lims:id="1443495">Additional requirements</MarginalNote><Label>(3)</Label><Text>The design of boilers and pressure systems must</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443496" lims:id="1443496"><Label>(a)</Label><Text>be based on standards that incorporate safety margins, that conform to good engineering practice and that involve the carrying out of analyses and numerical modelling as necessary to determine the behaviour and failure modes of the boilers and pressure systems under all foreseeable operating conditions, taking into account</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443497" lims:id="1443497"><Label>(i)</Label><Text>the internal and external pressures to which the boilers and pressure systems are subjected,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443498" lims:id="1443498"><Label>(ii)</Label><Text>ambient and operating temperatures,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443499" lims:id="1443499"><Label>(iii)</Label><Text>static pressure and the mass of the contents of the boilers and pressure systems when tested or operated,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443500" lims:id="1443500"><Label>(iv)</Label><Text>foreseeable dynamic loads and reaction forces and moments resulting from, among other things, piping and its supports and other accessories,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443501" lims:id="1443501"><Label>(v)</Label><Text>structural and mechanical integrity threats, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443502" lims:id="1443502"><Label>(vi)</Label><Text>reactions caused by changes in fluids and other substances contained in the boilers and pressure systems over time, including reactions caused by the products of the decomposition of unstable fluids or substances;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443503" lims:id="1443503"><Label>(b)</Label><Text>if hazards cannot be eliminated, incorporate safety measures that take into account</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443504" lims:id="1443504"><Label>(i)</Label><Text>the need for closing and opening devices and devices to indicate their status and to prevent their opening or physical access to them while pressure differential exists,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443505" lims:id="1443505"><Label>(ii)</Label><Text>the need to contain hazardous substances and to mitigate the effects of any hazard related to their release,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443506" lims:id="1443506"><Label>(iii)</Label><Text>the surface temperature of the boilers and pressure systems, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443507" lims:id="1443507"><Label>(iv)</Label><Text>the decomposition of unstable fluids; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443508" lims:id="1443508"><Label>(c)</Label><Text>be approved by an authorized inspector.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443509" lims:id="1443509"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443510" lims:id="1443510">Loads and other factors</MarginalNote><Label>(4)</Label><Text>The operator must ensure that boilers and pressure systems can withstand all combinations of loads, pressures, temperatures, fluids and substances to which they may be subjected during their design service life.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443511" lims:id="1443511"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443512" lims:id="1443512">Materials used</MarginalNote><Label>(5)</Label><Text>The operator must ensure that the materials used for the manufacture of boilers and pressure systems are compatible with their operating environment and are chemically resistant to the fluids they contain during their design service life.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443513" lims:id="1443513"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443514" lims:id="1443514">Manufacturer’s documents and records</MarginalNote><Label>(6)</Label><Text>The operator must ensure that the following documents and records are obtained from the manufacturer of the boilers and pressure systems:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443515" lims:id="1443515"><Label>(a)</Label><Text>documents demonstrating that manufacturing, testing and installation have been carried out in accordance with the design specifications provided for in a quality assurance program that is approved by an authorized inspector;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443516" lims:id="1443516"><Label>(b)</Label><Text>records of the procedures that were followed in the welding, brazing and non-destructive examination of the boilers and pressure systems, including the results of the welder qualification tests specific to the welding and brazing procedures;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443517" lims:id="1443517"><Label>(c)</Label><Text>documents evidencing the qualifications of persons involved in manufacturing, inspection and testing, including welders; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443518" lims:id="1443518"><Label>(d)</Label><Text>traceability records for the components of the boilers and pressure systems.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443519" lims:id="1443519"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443520" lims:id="1443520">Construction, installation, commissioning, inspection and testing</MarginalNote><Label>(7)</Label><Text>The operator must ensure, before a boiler or pressure system is put into operation, that it has been</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443521" lims:id="1443521"><Label>(a)</Label><Text>constructed, installed and commissioned by persons with the necessary experience, training, qualifications and competence to do so safely and in a manner that protects the environment; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443522" lims:id="1443522"><Label>(b)</Label><Text>subjected to any inspections by an authorized inspector and tests by or under the direction of an authorized inspector, including non-destructive examination and proof tests, that are necessary to ensure its integrity and compliance with design specifications.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443523" lims:id="1443523"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443524" lims:id="1443524">Authorized inspector</MarginalNote><Label>(8)</Label><Text>The operator must ensure that a boiler or pressure system is inspected by an authorized inspector and tested by or under the direction of an authorized inspector</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443525" lims:id="1443525"><Label>(a)</Label><Text>before the boiler or pressure system is put into operation following its installation;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443526" lims:id="1443526"><Label>(b)</Label><Text>before the boiler or pressure system is put into operation following any modification or repair to it, including welding; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443527" lims:id="1443527"><Label>(c)</Label><Text>at any other interval as required by the standards on which the design of the boiler or pressure system is based.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443528" lims:id="1443528"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443529" lims:id="1443529">Operating procedures</MarginalNote><Label>(9)</Label><Text>The operator must ensure that operating procedures are developed for the boilers and pressure systems that inform users of operating hazards and indicate any special measures to be taken to reduce risks when the boilers and pressure systems are being used, maintained or repaired.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443530" lims:id="1443530"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443531" lims:id="1443531">Conformity with procedures</MarginalNote><Label>(10)</Label><Text>The operator must ensure that any boiler or pressure system is used, maintained and repaired in accordance with the operating procedures referred to in subsection (9).</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443532" lims:id="1443532"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443533" lims:id="1443533">Alteration of fitting</MarginalNote><Label>(11)</Label><Text>It is prohibited for any person to alter, interfere with or render inoperative any boiler or pressure system fitting, except for the purpose of adjusting or testing the fitting.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443534" lims:id="1443534"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443535" lims:id="1443535">Register</MarginalNote><Label>(12)</Label><Text>The operator must keep a register of all boilers and pressure systems that includes the following documents and information in respect of each:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443536" lims:id="1443536"><Label>(a)</Label><Text>accurate design calculations, technical drawings and design specifications, including evidence of the design approval by an authorized inspector;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443537" lims:id="1443537"><Label>(b)</Label><Text>a list of the standards on which the design of the boiler or pressure system is based;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443538" lims:id="1443538"><Label>(c)</Label><Text>the boiler or pressure system’s operating limits, including its pressure and temperature ratings;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443539" lims:id="1443539"><Label>(d)</Label><Text>all documents and records required from the manufacturer under subsection (6);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443540" lims:id="1443540"><Label>(e)</Label><Text>in respect of each inspection and test referred to in subsection (7) or (8), a record created and signed by the authorized inspector who conducted the inspection that includes</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443541" lims:id="1443541"><Label>(i)</Label><Text>the date of the inspection or test,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443542" lims:id="1443542"><Label>(ii)</Label><Text>information that identifies the boiler or pressure system that was inspected or tested, as well as its location,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443543" lims:id="1443543"><Label>(iii)</Label><Text>the range of safe pressure and temperature at which the boiler or pressure system may be operated,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443544" lims:id="1443544"><Label>(iv)</Label><Text>a declaration by the authorized inspector who conducted the inspection or who conducted or directed the test as to whether the boiler or pressure system meets the standards that were applied in its design and manufacture,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443545" lims:id="1443545"><Label>(v)</Label><Text>a declaration by the authorized inspector who conducted the inspection or who conducted or directed the test stating that the boiler or pressure system is fit for the purposes for which it is to be used,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443546" lims:id="1443546"><Label>(vi)</Label><Text>any recommendations regarding the need for modifications to the maintenance program established under section <XRefInternal>159</XRefInternal>, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443547" lims:id="1443547"><Label>(vii)</Label><Text>any other observation relevant to safety; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443548" lims:id="1443548"><Label>(f)</Label><Text>a description of each repair or modification made to the boiler or pressure system.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443549" lims:id="1443549"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443550" lims:id="1443550">Marking</MarginalNote><Label>(13)</Label><Text>The operator must ensure that a boiler or pressure system is marked with any information that is necessary for its safe installation and operation, including an identifier that permits reference to the documents and records referred to in subsection (6) and the information referred to in paragraphs (12)(e) and (f).</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443551" lims:id="1443551"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443552" lims:id="1443552">Verification</MarginalNote><Label>(14)</Label><Text>The operator must ensure that all operating procedures developed in accordance with subsection (9) and the register referred to in subsection (12) are periodically verified by the certifying authority.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443553" lims:id="1443553"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443554" lims:id="1443554">Non-application</MarginalNote><Label>(15)</Label><Text>This section does not apply to any of the following:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443555" lims:id="1443555"><Label>(a)</Label><Text>a heating boiler that has a heating surface of 3 m<Sup>2</Sup> or less;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443556" lims:id="1443556"><Label>(b)</Label><Text>a pressure system that is installed for use at a pressure of one atmosphere of pressure or less;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443557" lims:id="1443557"><Label>(c)</Label><Text>a pressure vessel that</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443558" lims:id="1443558"><Label>(i)</Label><Text>has a capacity of 40 L or less, or</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443559" lims:id="1443559"><Label>(ii)</Label><Text>has an internal diameter of</Text><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443560" lims:id="1443560"><Label>(A)</Label><Text>152 mm or less, or</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443561" lims:id="1443561"><Label>(B)</Label><Text>more than 152 mm but not more than 610 mm if the pressure vessel is used for the storage of hot water or is connected to a water pumping system containing compressed air that serves as a cushion;</Text></Clause></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443562" lims:id="1443562"><Label>(d)</Label><Text>a refrigeration plant that has a refrigeration capacity of 18 kW or less; or</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443563" lims:id="1443563"><Label>(e)</Label><Text>a domestic water and plumbing system.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443564" lims:id="1443564"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443565" lims:id="1443565">Mechanical equipment</MarginalNote><Label>136</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443566" lims:id="1443566"><Label>(1)</Label><Text>An operator must ensure that any mechanical equipment on an installation</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443567" lims:id="1443567"><Label>(a)</Label><Text>is designed, selected, located, installed, commissioned, protected, operated, inspected and maintained in accordance with the measures referred to in clauses <XRefInternal>9</XRefInternal>(2)(b)(v)(E) and <XRefInternal>10</XRefInternal>(2)(b)(v)(E) that are described in the operator’s safety plan and environmental protection plan, respectively; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443568" lims:id="1443568"><Label>(b)</Label><Text>can operate safely and reliably under all foreseeable operating conditions, taking into account the manufacturer’s instructions.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443569" lims:id="1443569"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443570" lims:id="1443570">Design</MarginalNote><Label>(2)</Label><Text>Mechanical equipment must be designed to eliminate hazards to safety or the environment in the following scenarios or, if that is not possible, to mitigate the risks posed by those hazards:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443571" lims:id="1443571"><Label>(a)</Label><Text>loss of containment of hazardous substances;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443572" lims:id="1443572"><Label>(b)</Label><Text>overspeeding and loss of restraint of machinery components with high kinetic energy;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443573" lims:id="1443573"><Label>(c)</Label><Text>extreme surface temperatures of the mechanical equipment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443574" lims:id="1443574"><Label>(d)</Label><Text>movement of mobile components of the mechanical equipment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443575" lims:id="1443575"><Label>(e)</Label><Text>loss of control and integrity of the mechanical equipment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443576" lims:id="1443576"><Label>(f)</Label><Text>ignition of potentially explosive atmospheres in hazardous areas from sparks, flames or excessive heat; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443577" lims:id="1443577"><Label>(g)</Label><Text>escalation of accidental events.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443578" lims:id="1443578"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443579" lims:id="1443579">Controls and manual shut-off devices</MarginalNote><Label>(3)</Label><Text>The operator must ensure that controls and manual shut-off devices for mechanical equipment are in a protected and readily accessible location that permits safe operation when an accidental event occurs that renders the equipment inaccessible.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443580" lims:id="1443580"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443581" lims:id="1443581">Internal combustion engine — operating instructions</MarginalNote><Label>(4)</Label><Text>The operator must ensure that the basic operating instructions for an internal combustion engine provide details of stop, start and emergency procedures and are permanently attached to the engine.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443582" lims:id="1443582"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443583" lims:id="1443583">Turbines and internal combustion engines</MarginalNote><Label>(5)</Label><Text>The operator must ensure that turbines and internal combustion engines are</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443584" lims:id="1443584"><Label>(a)</Label><Text>equipped to prevent unintended ignition;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443585" lims:id="1443585"><Label>(b)</Label><Text>installed so that</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443586" lims:id="1443586"><Label>(i)</Label><Text>their supply of combustion air is from a non-hazardous area, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443587" lims:id="1443587"><Label>(ii)</Label><Text>their exhaust is discharged to a non-hazardous area; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443588" lims:id="1443588"><Label>(c)</Label><Text>equipped with safety devices — including manual fuel shut-off devices and, unless it would increase safety or environmental risks, automatic fuel shut-off devices — to prevent major damage from overspeeding, high exhaust temperature, high cooling water temperature, low lubricating oil pressure or other foreseeable hazards that could impair the safety of operations.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443589" lims:id="1443589"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443590" lims:id="1443590">Exception</MarginalNote><Label>(6)</Label><Text>Despite paragraph (5)(c), turbines and internal combustion engines that are critical to emergency response, including emergency generators and fire pumps, need only be equipped with safety devices to prevent major damage from overspeeding.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443591" lims:id="1443591"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443592" lims:id="1443592">Operation of critical mechanical equipment</MarginalNote><Label>(7)</Label><Text>The operator must ensure that mechanical equipment that is critical to the safety or propulsion of a floating platform will continue to operate safely and reliably at its full rated power under the static and dynamic angles of inclination that are specified in the rules of the classification society that issued the certificate of class required under section <XRefInternal>140</XRefInternal>.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443593" lims:id="1443593"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443594" lims:id="1443594">Materials handling equipment</MarginalNote><Label>137</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443595" lims:id="1443595"><Label>(1)</Label><Text>An operator must ensure that all materials handling equipment is</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443596" lims:id="1443596"><Label>(a)</Label><Text>to the extent feasible, designed and constructed to prevent the failure of any of its parts, taking into account the conditions under which it is to be operated;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443597" lims:id="1443597"><Label>(b)</Label><Text>to the extent feasible, equipped with safety devices that will ensure that any failure of any of its parts does not result in a loss of control of the equipment or of its load or result in any other hazardous situation; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443598" lims:id="1443598"><Label>(c)</Label><Text>operated taking into account the manufacturer’s instructions and industry standards and best practices.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443599" lims:id="1443599"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443600" lims:id="1443600">Marking</MarginalNote><Label>(2)</Label><Text>The operator must ensure that all materials handling equipment is marked with its rated capacity and in a manner that identifies its manufacturer and model and that permits reference to any information that is necessary to its safe operation, including information regarding its design, construction, inspection, testing, maintenance and repair.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443601" lims:id="1443601"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443602" lims:id="1443602">Inspection and proof test</MarginalNote><Label>(3)</Label><Text>The operator must ensure that materials handling equipment that is to be used on an installation is inspected and proof-tested by a competent third party in the following situations to determine the equipment’s rated capacity:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443603" lims:id="1443603"><Label>(a)</Label><Text>the equipment is to be used on the installation for the first time;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443604" lims:id="1443604"><Label>(b)</Label><Text>repairs or modifications have been made to the equipment’s load-bearing components;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443605" lims:id="1443605"><Label>(c)</Label><Text>the equipment has been in contact with an electric arc or current; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443606" lims:id="1443606"><Label>(d)</Label><Text>there is any other reason to doubt that the rated capacity of the equipment that was most recently certified under subsection (5) or the limitations that were most recently indicated under that subsection continue to be accurate, including as a result of damage sustained by the equipment or modifications made to it.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443607" lims:id="1443607"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443608" lims:id="1443608">Criteria for inspection and testing</MarginalNote><Label>(4)</Label><Text>The operator must ensure that the inspection and proof-testing is done in accordance with criteria established by the manufacturer or applicable industry design and safety standards, including with respect to the frequency at which the equipment must be inspected and proof-tested to ensure its continued safe operation.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443609" lims:id="1443609"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443610" lims:id="1443610">Rated capacity</MarginalNote><Label>(5)</Label><Text>Following the inspection and proof test, the competent third party must certify in writing the rated capacity of the materials handling equipment and must indicate in writing any limitations that must be imposed on its use having regard to physical and environmental conditions.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443611" lims:id="1443611"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443612" lims:id="1443612">Emergency slewing and lowering</MarginalNote><Label>(6)</Label><Text>The operator must ensure that a crane with slewing capability is capable of retaining its slewing and lowering capability in emergency situations.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443613" lims:id="1443613"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443614" lims:id="1443614">Pedestal crane</MarginalNote><Label>(7)</Label><Text>The operator must ensure that a pedestal crane meets the following requirements:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443615" lims:id="1443615"><Label>(a)</Label><Text>it must be equipped with</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443616" lims:id="1443616"><Label>(i)</Label><Text>appropriate travel-limiting devices for its boom, hoist, blocks and slewing mechanism,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443617" lims:id="1443617"><Label>(ii)</Label><Text>a load-measuring device that has been calibrated in accordance with the manufacturer’s specifications or any calibration standard that is at least as rigorous as those specifications,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443618" lims:id="1443618"><Label>(iii)</Label><Text>a device to indicate its boom extension or load radius, if its rated capacity is affected by the extension or radius,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443619" lims:id="1443619"><Label>(iv)</Label><Text>a device to indicate its boom angle, if its rated capacity is affected by that angle,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443620" lims:id="1443620"><Label>(v)</Label><Text>a device for accessing anemometer readings, if the load that it is able to safely handle or support is susceptible to being reduced by wind,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443621" lims:id="1443621"><Label>(vi)</Label><Text>a gross overload protection system, if it is used to move persons or things to or from a floating platform or vessel, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443622" lims:id="1443622"><Label>(vii)</Label><Text>a safe load indicator system that is programmed for different operating modes and includes load and moment measuring devices; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443623" lims:id="1443623"><Label>(b)</Label><Text>a load chart that specifies the boom angle and the safe working load for each block and for each operating mode, as well as any limitations indicated under subsection (5), must be posted inside its control cab.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443624" lims:id="1443624"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443625" lims:id="1443625">Crane hooks</MarginalNote><Label>(8)</Label><Text>The operator must ensure that all crane hooks are equipped with spring-loaded latches or other equally effective means of preventing the load from falling off the hook under any operating conditions.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443626" lims:id="1443626"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443627" lims:id="1443627">Landing or take-off</MarginalNote><Label>(9)</Label><Text>When an aircraft is landing on or taking off from a landing area, it is prohibited to move a crane in the vicinity of the landing area and, if feasible, the person operating the crane must ensure that the crane’s boom is stowed.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443628" lims:id="1443628"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443629" lims:id="1443629">Lifting device certification</MarginalNote><Label>(10)</Label><Text>The operator must ensure that any materials handling equipment that lifts over 10 tonnes is certified by the certifying authority.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443630" lims:id="1443630"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443631" lims:id="1443631">Subsea production system</MarginalNote><Label>138</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443632" lims:id="1443632"><Label>(1)</Label><Text>An operator must ensure that a subsea production system is designed, constructed, installed, commissioned, operated, inspected, monitored, tested and maintained in accordance with the measures referred to in clauses <XRefInternal>9</XRefInternal>(2)(b)(v)(F) and <XRefInternal>10</XRefInternal>(2)(b)(v)(F) that are described in the operator’s safety plan and environmental protection plan, respectively.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443633" lims:id="1443633"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443634" lims:id="1443634">Design</MarginalNote><Label>(2)</Label><Text>A subsea production system must be designed so that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443635" lims:id="1443635"><Label>(a)</Label><Text>the system can avoid foreseeable hazards or revert to a safe state when hazards are imminent;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443636" lims:id="1443636"><Label>(b)</Label><Text>the system supports and seals connections to the well, pipelines, other subsea production systems or other installations;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443637" lims:id="1443637"><Label>(c)</Label><Text>in the event of a loss of control or communication, the system will revert to a safe state;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443638" lims:id="1443638"><Label>(d)</Label><Text>the failure of a single component of the system cannot cause or contribute to a major accidental event;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443639" lims:id="1443639"><Label>(e)</Label><Text>barrier elements in each conduit that carries fluids are reliable, have the necessary redundancy and are arranged to</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443640" lims:id="1443640"><Label>(i)</Label><Text>prevent uncontrolled flow of well fluids,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443641" lims:id="1443641"><Label>(ii)</Label><Text>minimize the quantity of fluids released from the conduit in the event of unintended release, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443642" lims:id="1443642"><Label>(iii)</Label><Text>permit testing of the integrity of the barrier elements without increasing safety or environmental risks;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443643" lims:id="1443643"><Label>(f)</Label><Text>subsea equipment can withstand or is protected from any load to which it may be subjected that would result in mechanical damage;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443644" lims:id="1443644"><Label>(g)</Label><Text>production risers can withstand or are protected from all hazards and environmental loads to which they may be subjected, other than icebergs; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443645" lims:id="1443645"><Label>(h)</Label><Text>the blowout preventer is supported by the system during drilling and the tree and any workover or intervention pressure control equipment are supported by the system after completion.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443646" lims:id="1443646"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443647" lims:id="1443647">Disconnectable riser</MarginalNote><Label>(3)</Label><Text>The operator must ensure that a riser that is connected to a floating platform that has a disconnectable mooring system or dynamic positioning system is designed to be capable of safely detaching in any foreseeable physical and environmental conditions.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443648" lims:id="1443648"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443649" lims:id="1443649">Riser disconnect</MarginalNote><Label>(4)</Label><Text>The operator must ensure that, if risers are designed to disconnect in order to avoid foreseeable hazards, riser fluids may be safely displaced by water or isolated.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443650" lims:id="1443650"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443651" lims:id="1443651">Riser integrity</MarginalNote><Label>(5)</Label><Text>The operator must ensure that, if a riser is disconnected, its integrity is demonstrated through testing once it is reconnected and before it is brought back into service.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443652" lims:id="1443652"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443653" lims:id="1443653">Control of subsea production system</MarginalNote><Label>(6)</Label><Text>The operator must ensure that a subsea production system is controlled from only one location at any given time.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443654" lims:id="1443654"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443655" lims:id="1443655">Failure modes and effects analysis</MarginalNote><Label>(7)</Label><Text>The operator must ensure that any subsea production system is assessed through a failure modes and effects analysis.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443656" lims:id="1443656"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443657" lims:id="1443657">Temporary or portable equipment</MarginalNote><Label>139</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443658" lims:id="1443658"><Label>(1)</Label><Text>An operator must ensure that any temporary or portable equipment used on an installation is fit for the purposes for which it is to be used.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443659" lims:id="1443659"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443660" lims:id="1443660">Assessment of temporary or portable equipment</MarginalNote><Label>(2)</Label><Text>Before any temporary or portable equipment is installed or brought into service on an installation, the operator must ensure that the equipment and its integration with other equipment and systems are assessed to determine their impact on safety-critical elements and on the risk assessment referred to in subsection <XRefInternal>24</XRefInternal>(3).</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443661" lims:id="1443661"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443662" lims:id="1443662">Measures</MarginalNote><Label>(3)</Label><Text>The operator must ensure that temporary or portable equipment is managed in accordance with the measures referred to in clauses <XRefInternal>9</XRefInternal>(2)(b)(v)(G) and <XRefInternal>10</XRefInternal>(2)(b)(v)(G) that are described in the operator’s safety plan and environmental protection plan, respectively, and in a manner that does not compromise the target levels of safety set out in those plans.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443663" lims:id="1443663"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443664" lims:id="1443664">Verification by certifying authority</MarginalNote><Label>(4)</Label><Text>The operator must ensure that temporary or portable equipment that is a safety-critical element is, before being put into operation, verified by the certifying authority to confirm its suitability and safe placement and hook-up.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1443665" lims:id="1443665" level="3"><TitleText>Additional Requirements for Platforms</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443666" lims:id="1443666"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443667" lims:id="1443667">Classification</MarginalNote><Label>140</Label><Text>An operator must ensure that a floating platform holds a valid certificate of class issued by a classification society that corresponds to the authorized work or activity to be carried out from the floating platform.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443668" lims:id="1443668"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443669" lims:id="1443669">Air gap</MarginalNote><Label>141</Label><Text>An operator must ensure that a platform that is either founded on the seabed or column-stabilized has a sufficient air gap to operate safely under the maximum environmental load conditions to which it may be subjected.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443670" lims:id="1443670"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443671" lims:id="1443671">Stability</MarginalNote><Label>142</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443672" lims:id="1443672"><Label>(1)</Label><Text>An operator must ensure that a floating platform, whether intact or in a damaged condition, is stable and can be operated safely, having regard to all motions and loads to which it may be subjected, including by</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443673" lims:id="1443673"><Label>(a)</Label><Text>determining the stability and motion response characteristics of the platform using analysis or model testing;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443674" lims:id="1443674"><Label>(b)</Label><Text>determining the critical maximum loads and motions that the platform can withstand;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443675" lims:id="1443675"><Label>(c)</Label><Text>ensuring that all equipment is fastened to prevent unintended movement; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443676" lims:id="1443676"><Label>(d)</Label><Text>monitoring and recording all loads that could affect the motions, stability or inclination of the platform.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443677" lims:id="1443677"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443678" lims:id="1443678">Freeboard</MarginalNote><Label>(2)</Label><Text>The operator must ensure that a floating platform has sufficient freeboard to operate safely under the maximum environmental load conditions to which it may be subjected.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443679" lims:id="1443679"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443680" lims:id="1443680">Requirement — Codes</MarginalNote><Label>(3)</Label><Text>The operator must comply with the applicable provisions of the MODU Code and Part B of the IS Code concerning the stability and motion response of a floating platform, which are to be read as mandatory.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443681" lims:id="1443681"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443682" lims:id="1443682">Deadweight survey</MarginalNote><Label>(4)</Label><Text>If the weight of a floating platform or a self-elevating mobile offshore platform changes by more than 1% of the lightship weight, the operator must ensure that a deadweight survey is carried out at the earliest opportunity and an up-to-date value of the lightship centre of gravity is calculated.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443683" lims:id="1443683"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443684" lims:id="1443684">Self-elevating mobile offshore platform</MarginalNote><Label>143</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443685" lims:id="1443685"><Label>(1)</Label><Text>An operator must, in relation to a self-elevating mobile offshore platform, ensure that a site-specific assessment is conducted of the condition of the seabed, including seabed restraint, to ensure that the platform is stable and can be operated safely.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443686" lims:id="1443686"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443687" lims:id="1443687">Requirements</MarginalNote><Label>(2)</Label><Text>The operator must ensure that a self-elevating mobile offshore platform meets the following requirements:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443688" lims:id="1443688"><Label>(a)</Label><Text>it must be equipped with systems to actively monitor</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443689" lims:id="1443689"><Label>(i)</Label><Text>hull inclination,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443690" lims:id="1443690"><Label>(ii)</Label><Text>leg penetration into the seabed,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443691" lims:id="1443691"><Label>(iii)</Label><Text>loads on each of the platform’s legs, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443692" lims:id="1443692"><Label>(iv)</Label><Text>rack phase differential, if applicable; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443693" lims:id="1443693"><Label>(b)</Label><Text>its jacking mechanisms must be designed so that the failure of a single component does not cause an uncontrolled descent of the platform.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443694" lims:id="1443694"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443695" lims:id="1443695">Suspension of operations and well shut-in</MarginalNote><Label>(3)</Label><Text>The operator must ensure that the works and activities on a self-elevating mobile offshore platform are suspended and that all wells associated with the platform are brought to a safe shut-in condition if</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443696" lims:id="1443696"><Label>(a)</Label><Text>hull inclination or the rack phase differential exceeds the allowable limits set out in the operations manual in accordance with paragraph <XRefInternal>157</XRefInternal>(3)(b);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443697" lims:id="1443697"><Label>(b)</Label><Text>unexplained changes occur in the loads on any of the platform’s legs;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443698" lims:id="1443698"><Label>(c)</Label><Text>leg penetration into the seabed increases; or</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443699" lims:id="1443699"><Label>(d)</Label><Text>any other event threatens the stability of the platform.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443700" lims:id="1443700"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443701" lims:id="1443701">Corrective measures</MarginalNote><Label>(4)</Label><Text>In the case of any of the situations referred to in subsection (3), the operator must ensure that the works and activities on the self-elevating mobile offshore platform remain suspended and that all wells associated with the platform remain in a safe shut-in condition until the cause of the situation has been investigated and corrective measures have been taken.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443702" lims:id="1443702"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443703" lims:id="1443703">Ballast and bilge systems</MarginalNote><Label>144</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443704" lims:id="1443704"><Label>(1)</Label><Text>An operator must ensure that a floating platform is equipped with reliable ballast and bilge systems with the necessary redundancy in their components to</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443705" lims:id="1443705"><Label>(a)</Label><Text>maintain necessary draught, stability and hull strength under all foreseeable operating conditions;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443706" lims:id="1443706"><Label>(b)</Label><Text>return the floating platform to a safe condition from an unintended draught, trim or heel;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443707" lims:id="1443707"><Label>(c)</Label><Text>prevent unintended transfer of fluid within the system;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443708" lims:id="1443708"><Label>(d)</Label><Text>empty and fill all tanks that are a part of the system; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443709" lims:id="1443709"><Label>(e)</Label><Text>completely and rapidly empty watertight spaces.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443710" lims:id="1443710"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443711" lims:id="1443711">Requirement — Code</MarginalNote><Label>(2)</Label><Text>The operator must comply with the applicable provisions of the MODU Code concerning ballast and bilge systems, which are to be read as mandatory.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443712" lims:id="1443712"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443713" lims:id="1443713">Secondary ballast control station</MarginalNote><Label>(3)</Label><Text>In the case of a column-stabilized mobile offshore platform, the operator must ensure that it is equipped with a secondary ballast control station that is equipped with</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443714" lims:id="1443714"><Label>(a)</Label><Text>an effective means of communication with other spaces that contain equipment relating to the operation of the ballast system;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443715" lims:id="1443715"><Label>(b)</Label><Text>a ballast pump control and status system;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443716" lims:id="1443716"><Label>(c)</Label><Text>a ballast valve control and status system;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443717" lims:id="1443717"><Label>(d)</Label><Text>a tank level indicating system;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443718" lims:id="1443718"><Label>(e)</Label><Text>a permanently mounted ballast schematic diagram;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443719" lims:id="1443719"><Label>(f)</Label><Text>heel and trim indicators;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443720" lims:id="1443720"><Label>(g)</Label><Text>a draught-indicating system;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443721" lims:id="1443721"><Label>(h)</Label><Text>a system to indicate the available power from the main and emergency electrical power supplies; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443723" lims:id="1443723"><Label>(i)</Label><Text>a ballast system hydraulic or pneumatic pressure-indicating system.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443726" lims:id="1443726"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443727" lims:id="1443727">Location — secondary ballast control station</MarginalNote><Label>(4)</Label><Text>The operator must ensure that a secondary ballast control station is located above the waterline in the final condition of equilibrium after flooding if the floating platform is in a damaged condition.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443728" lims:id="1443728"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443729" lims:id="1443729">Failure modes and effects analysis</MarginalNote><Label>(5)</Label><Text>The operator must ensure that the ballast and bilge systems are assessed through a failure modes and effects analysis before any authorized work or activity is carried out from the floating platform.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443733" lims:id="1443733"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443735" lims:id="1443735">Watertight and weathertight integrity and freeboard</MarginalNote><Label>145</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443738" lims:id="1443738"><Label>(1)</Label><Text>The operator must comply with the applicable provisions of the MODU Code and Part B of the IS Code concerning watertight and weathertight integrity and freeboard, which are to be read as mandatory.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443740" lims:id="1443740"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443742" lims:id="1443742">Watertight subdivision</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the floating platform is designed with sufficient watertight subdivision to ensure the preservation of reserve buoyancy and damage stability under all foreseeable conditions.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443746" lims:id="1443746"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443748" lims:id="1443748">Load line certificate</MarginalNote><Label>(3)</Label><Text>The operator must ensure that a floating platform</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443749" lims:id="1443749"><Label>(a)</Label><Text>holds an International Load Line Certificate or an International Load Line Exemption Certificate issued by the government of the state whose flag the platform is entitled to fly, as required under Article 16 of the International Convention on Load Lines, 1966; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443751" lims:id="1443751"><Label>(b)</Label><Text>is marked in accordance with the certificate.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443754" lims:id="1443754"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443756" lims:id="1443756">Watertight and weathertight appliances</MarginalNote><Label>(4)</Label><Text>The operator must ensure that the arrangement and specification of watertight and weathertight appliances complies with the measures referred to in clause <XRefInternal>9</XRefInternal>(2)(b)(v)(H) that are described in the operator’s safety plan.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443759" lims:id="1443759"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443760" lims:id="1443760">Water ingress</MarginalNote><Label>(5)</Label><Text>The operator must ensure that a floating platform is designed with systems and equipment that provide for the operation, monitoring and indication — both locally and at the ballast control stations — of the opening and closing of watertight doors and hatches and for the detection and provision of alerts of any water ingress into watertight spaces that are not designed to accumulate liquid.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443762" lims:id="1443762"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443764" lims:id="1443764">Port lights</MarginalNote><Label>(6)</Label><Text>The operator must ensure that the columns of a column-stabilized mobile offshore platform do not have port lights or similar openings.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443767" lims:id="1443767"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443769" lims:id="1443769">Station-keeping</MarginalNote><Label>146</Label><Text>An operator must ensure that a floating platform is equipped with a mooring system or a dynamic positioning system to ensure station-keeping of the platform within its operating limits.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443771" lims:id="1443771"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443772" lims:id="1443772">Mooring system</MarginalNote><Label>147</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443773" lims:id="1443773"><Label>(1)</Label><Text>An operator must ensure that a mooring system with which a floating platform is equipped is designed, on the basis of analysis and model testing, to ensure</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443774" lims:id="1443774"><Label>(a)</Label><Text>safety and the protection of the environment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443775" lims:id="1443775"><Label>(b)</Label><Text>the stability and serviceability of the floating platform;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443776" lims:id="1443776"><Label>(c)</Label><Text>the integrity and serviceability of the mooring system components, including any related topside equipment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443777" lims:id="1443777"><Label>(d)</Label><Text>the integrity and serviceability of drilling risers, production risers, export risers or any other type of riser;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443778" lims:id="1443778"><Label>(e)</Label><Text>the necessary redundancy of the mooring system components to enable the floating platform to maintain its position with the loss of a single component or, for a thruster-assisted mooring system, the loss of the most effective thruster or a single failure in the power or control system;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443779" lims:id="1443779"><Label>(f)</Label><Text>for a thruster-assisted mooring system, the ability of the floating platform to withstand extreme meteorological conditions in the event of a power failure;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443780" lims:id="1443780"><Label>(g)</Label><Text>the ability of the floating platform to move from its position to avoid accidental events that it is not designed to withstand; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443781" lims:id="1443781"><Label>(h)</Label><Text>safe access and safe clearances with respect to subsea and surface components of the installation, any nearby installations, support vessels and evacuation systems.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443783" lims:id="1443783"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443785" lims:id="1443785">Excursion limits</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the excursion limits of a floating platform that is equipped with a mooring system are established on the basis of the analysis and model testing referred to in subsection (1).</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443787" lims:id="1443787"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443788" lims:id="1443788">Loss of station-keeping or failure</MarginalNote><Label>(3)</Label><Text>The operator must ensure that the floating platform has systems and processes to continuously detect loss of station-keeping or the failure of any mooring system component.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443789" lims:id="1443789"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443790" lims:id="1443790">Monitoring</MarginalNote><Label>(4)</Label><Text>The operator must ensure that mooring line tensions or other indicators of the integrity of the mooring system are monitored and kept within the mooring system’s operating limits.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443791" lims:id="1443791"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443792" lims:id="1443792">Measures</MarginalNote><Label>(5)</Label><Text>The operator must ensure that measures to ensure that the mooring system continues to perform in accordance with its design specifications are implemented, including</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443793" lims:id="1443793"><Label>(a)</Label><Text>the assessment of the system’s condition, periodically and if it is damaged or if damage to it is suspected; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443794" lims:id="1443794"><Label>(b)</Label><Text>the making of arrangements for timely repair or replacement in the event of damage or deterioration.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443795" lims:id="1443795"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443796" lims:id="1443796">Disconnectable mooring system</MarginalNote><Label>148</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443797" lims:id="1443797"><Label>(1)</Label><Text>If the mooring system with which a floating platform is equipped is disconnectable, the operator must ensure that the system is designed to ensure that disconnection can be accomplished in a controlled manner without creating a risk of drift-off.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443798" lims:id="1443798"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443799" lims:id="1443799">Safety plan</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the disconnectable mooring system is designed and maintained in accordance with the measures referred to in clause <XRefInternal>9</XRefInternal>(2)(b)(vi)(D) that are described in the operator’s safety plan.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443800" lims:id="1443800"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443801" lims:id="1443801">Primary and backup systems</MarginalNote><Label>(3)</Label><Text>The operator must ensure that the disconnectable mooring system includes a primary system and a backup system for disconnection, both of which can be operated locally or from a remote location.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443802" lims:id="1443802"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443803" lims:id="1443803">Floating platform capability</MarginalNote><Label>(4)</Label><Text>The operator must ensure that a floating platform that is equipped with a disconnectable mooring system is capable of</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443804" lims:id="1443804"><Label>(a)</Label><Text>safely manoeuvering away under its own power; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443805" lims:id="1443805"><Label>(b)</Label><Text>maintaining a safe position and heading while disconnected.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443806" lims:id="1443806"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443807" lims:id="1443807">Criteria and procedures for disconnection</MarginalNote><Label>(5)</Label><Text>The operator must ensure that criteria and procedures for disconnection are developed for all credible disconnection scenarios, including procedures for monitoring environmental conditions and providing alerts for worsening conditions that may require disconnection.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443808" lims:id="1443808"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443809" lims:id="1443809">Disconnection and reconnection</MarginalNote><Label>(6)</Label><Text>The operator must ensure that the disconnectable mooring system</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443810" lims:id="1443810"><Label>(a)</Label><Text>is capable of carrying out a planned disconnection after allowing time for the depressurization and flushing of subsea flowlines;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443811" lims:id="1443811"><Label>(b)</Label><Text>is capable of carrying out an emergency disconnection after allowing time to safely shut in wells and subsea equipment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443812" lims:id="1443812"><Label>(c)</Label><Text>allows for the reconnection to the floating platform of the system and flowlines in an orderly sequence, in the physical and environmental conditions described in the operations manual under paragraph <XRefInternal>157</XRefInternal>(2)(c); and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443813" lims:id="1443813"><Label>(d)</Label><Text>allows for the resumption of production after the system and flowlines have been reconnected to the floating platform following a planned disconnection;</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443814" lims:id="1443814"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443815" lims:id="1443815">Periodic verification of disconnection capability</MarginalNote><Label>(7)</Label><Text>The operator must periodically verify the disconnect capability of the disconnectable mooring system and must record the findings resulting from the verification.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443816" lims:id="1443816"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443817" lims:id="1443817">Excursion limits exceeded</MarginalNote><Label>(8)</Label><Text>The operator must ensure that the emergency disconnection referred to in paragraph (6)(b) is initiated if the floating platform exceeds the excursion limits established under subsection <XRefInternal>147</XRefInternal>(2).</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443818" lims:id="1443818"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443819" lims:id="1443819">Dynamic positioning system</MarginalNote><Label>149</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443820" lims:id="1443820"><Label>(1)</Label><Text>An operator must ensure that the design of a dynamic positioning system with which a floating platform is equipped</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443821" lims:id="1443821"><Label>(a)</Label><Text>is based on numerical analysis and model testing to ensure that the floating platform’s position reference and directional control can be maintained within specified tolerances that satisfy design operational requirements in relation to all functional and environmental loads to which the system may be subjected at the floating platform’s intended location;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443822" lims:id="1443822"><Label>(b)</Label><Text>is based on a failure modes and effects analysis to ensure the segregation and redundancy of safety-critical systems and their components as necessary to maintain the platform’s position in the event that credible scenarios of equipment failure are realized;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443823" lims:id="1443823"><Label>(c)</Label><Text>allows the dynamic positioning system to withstand the loss from fire or flooding of all of its components situated in any one watertight compartment or fire subdivision of the floating platform; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443824" lims:id="1443824"><Label>(d)</Label><Text>includes systems to monitor the parameters of operability and integrity of the critical systems of the dynamic positioning system and to provide alerts for critical system faults.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443825" lims:id="1443825"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443826" lims:id="1443826">Excursion limits</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the excursion limits of a floating platform that is equipped with a dynamic positioning system are established based on the numerical analysis and model testing referred to in paragraph (1)(a).</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443827" lims:id="1443827"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443828" lims:id="1443828">Disconnect system</MarginalNote><Label>150</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443829" lims:id="1443829"><Label>(1)</Label><Text>An operator must ensure that a floating platform that is equipped with a dynamic positioning system has a disconnect system that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443830" lims:id="1443830"><Label>(a)</Label><Text>is capable of carrying out a planned disconnection of the floating platform from the seabed after allowing time to prepare the risers and subsea flowlines for the disconnection;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443831" lims:id="1443831"><Label>(b)</Label><Text>is capable of carrying out an emergency disconnection after allowing time to safely shut in wells and subsea equipment; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443832" lims:id="1443832"><Label>(c)</Label><Text>allows for reconnection in an orderly sequence, in the physical and environmental conditions described in the operations manual under paragraph <XRefInternal>157</XRefInternal>(2)(c).</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443833" lims:id="1443833"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443834" lims:id="1443834">Demonstration</MarginalNote><Label>(2)</Label><Text>The operator must periodically demonstrate by means of a trial or performance test that the disconnect system meets the requirements under subsection (1).</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443835" lims:id="1443835"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443836" lims:id="1443836">Excursion limits exceeded</MarginalNote><Label>(3)</Label><Text>The operator must ensure that the emergency disconnection referred to in paragraph (1)(b) is initiated if the floating platform exceeds the excursion limits established under subsection <XRefInternal>149</XRefInternal>(2).</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443837" lims:id="1443837"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443838" lims:id="1443838">Decisions and exemptions</MarginalNote><Label>151</Label><Text>For any floating platform that is registered outside Canada, the operator must</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443839" lims:id="1443839"><Label>(a)</Label><Text>establish a list of all flag State administration decisions and exemptions that apply to the floating platform in relation to any standards adopted by the International Maritime Organization;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443840" lims:id="1443840"><Label>(b)</Label><Text>conduct a risk assessment to identify measures to reduce the safety and environmental risks in relation to those decisions and exemptions to a level that is as low as reasonably practicable; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443841" lims:id="1443841"><Label>(c)</Label><Text>establish an action plan to implement the measures referred to in paragraph (b).</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443842" lims:id="1443842"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443843" lims:id="1443843">Gap analysis</MarginalNote><Label>152</Label><Text>The operator must, every time the MODU Code is updated,</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443844" lims:id="1443844"><Label>(a)</Label><Text>undertake a gap analysis between the criteria in the updated version and the version that applies to the floating platform based on its date of construction;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443845" lims:id="1443845"><Label>(b)</Label><Text>conduct a risk assessment in relation to any gaps identified; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443846" lims:id="1443846"><Label>(c)</Label><Text>ensure that mitigation measures are implemented, as necessary.</Text></Paragraph></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1443847" lims:id="1443847" level="3"><TitleText>Asset Integrity</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443848" lims:id="1443848"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443849" lims:id="1443849">Requirements</MarginalNote><Label>153</Label><Text>An operator must ensure that all installations, including their systems and equipment, are inspected, monitored, tested, maintained and operated to</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443850" lims:id="1443850"><Label>(a)</Label><Text>ensure safety, the protection of the environment and the prevention of waste; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443851" lims:id="1443851"><Label>(b)</Label><Text>ensure that they continue to perform in accordance with their design specifications under the operating conditions and maximum loads to which they may be subjected.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443852" lims:id="1443852"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443853" lims:id="1443853">Non-destructive examination</MarginalNote><Label>154</Label><Text>An operator must ensure that a non-destructive examination of the critical joints and structural parts of an installation is conducted at least once every five years or more often as required to ensure the continued safe operation of the installation.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443854" lims:id="1443854"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443855" lims:id="1443855">Corrosion management</MarginalNote><Label>155</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443856" lims:id="1443856"><Label>(1)</Label><Text>An operator must ensure that if a safety or environmental hazard would result from the failure due to corrosion — including corrosion from exposure to a sour environment — of any equipment, including process vessels, or of any piping, valves, fittings and structural elements that are part of an installation, that corrosion is prevented and managed throughout the life cycle of the installation.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443857" lims:id="1443857"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443858" lims:id="1443858">Corrosion management program</MarginalNote><Label>(2)</Label><Text>The operator must develop a corrosion management program that sets out the measures that are necessary to prevent critical failures resulting from corrosion-related degradation and to ensure the continued integrity of safety-critical elements.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443859" lims:id="1443859"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443860" lims:id="1443860">Program requirements</MarginalNote><Label>(3)</Label><Text>The program must</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443861" lims:id="1443861"><Label>(a)</Label><Text>identify all safety-critical elements that are susceptible to degradation by corrosion;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443862" lims:id="1443862"><Label>(b)</Label><Text>provide for the analysis that is necessary to determine corrosion degradation mechanisms and the limits and failure modes of the safety-critical elements referred to in paragraph (a), taking into account the physical and environmental conditions and chemicals to which it is foreseeable that the safety-critical elements may be exposed;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443863" lims:id="1443863"><Label>(c)</Label><Text>include measures to prevent corrosion, as far as is practicable, and to mitigate or protect against the effects of corrosion;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443864" lims:id="1443864"><Label>(d)</Label><Text>provide for the inspection and monitoring of corrosion and of any corrosion protection and prevention systems;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443865" lims:id="1443865"><Label>(e)</Label><Text>provide for the collection and analysis of baseline and continuous data to monitor corrosion;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443866" lims:id="1443866"><Label>(f)</Label><Text>provide for the continuous assessment, based on the data and analysis referred to in paragraph (e), of the maintenance activities and schedules referred to in paragraph <XRefInternal>159</XRefInternal>(2)(f) to determine whether those activities and schedules are adequate to ensure corrosion management of safety-critical elements and provide for the modification of those activities and schedules, if necessary;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443867" lims:id="1443867"><Label>(g)</Label><Text>provide for timely preventive maintenance of any corrosion protection and prevention systems; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443868" lims:id="1443868"><Label>(h)</Label><Text>provide for the timely inspection, monitoring and maintenance of safety-critical elements in accordance with the requirements of the maintenance program referred to in paragraphs <XRefInternal>159</XRefInternal>(2)(e) and (f) and for any necessary repair before the limits established in paragraph (b) are reached.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443869" lims:id="1443869"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443870" lims:id="1443870">Program implementation and update</MarginalNote><Label>(4)</Label><Text>The operator must ensure that the program is implemented and periodically updated, taking into account the data and analysis referred to in paragraph (3)(e).</Text></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1443871" lims:id="1443871" level="3"><TitleText>Operation and Maintenance</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443872" lims:id="1443872"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443873" lims:id="1443873">Limits and requirements</MarginalNote><Label>156</Label><Text>An operator must operate an installation, including its systems and equipment, in accordance with any limitations that are set out in the certificate of fitness under subsection <XRefInternal>28</XRefInternal>(3), with any requirements under this Part and with the operations manual referred to in section <XRefInternal>157</XRefInternal>.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443874" lims:id="1443874"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443875" lims:id="1443875">Operations manual</MarginalNote><Label>157</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443876" lims:id="1443876"><Label>(1)</Label><Text>An operator must develop an operations manual in respect of each installation that sets out or incorporates by reference the following documents and information:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443877" lims:id="1443877"><Label>(a)</Label><Text>a general description of the installation, including its particular characteristics;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443878" lims:id="1443878"><Label>(b)</Label><Text>the chain of command and the roles, responsibilities and authorities of persons during normal operations of the installation and in emergency situations;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443879" lims:id="1443879"><Label>(c)</Label><Text>a brief description of the systems and equipment on the installation, including flow sheets and instructions for the assembly, use and maintenance of the systems and equipment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443880" lims:id="1443880"><Label>(d)</Label><Text>the operating limits of the installation, including those of its systems and equipment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443881" lims:id="1443881"><Label>(e)</Label><Text>the physical and environmental conditions under which the installation and any pipeline can operate without compromising safety or the protection of the environment and the physical and environmental conditions that the installation and pipeline can withstand, taking into account the results of any analyses, tests, numerical modelling or investigations undertaken under subsection <XRefInternal>105</XRefInternal>(2);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443882" lims:id="1443882"><Label>(f)</Label><Text>the results of the risk and reliability analysis conducted for the purpose of subsection <XRefInternal>108</XRefInternal>(1);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443883" lims:id="1443883"><Label>(g)</Label><Text>a list of the procedures necessary to ensure the safe operation of the installation, including its systems and equipment, within the limits described in paragraph (d);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443884" lims:id="1443884"><Label>(h)</Label><Text>a list of the accidental events that would require implementing the contingency plan referred to in section <XRefInternal>11</XRefInternal>, any possible triggers for such events and the measures to be implemented to avoid their occurrence;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443885" lims:id="1443885"><Label>(i)</Label><Text>a list of the procedures, practices, resources and monitoring measures set out in the contingency plan referred to in section <XRefInternal>11</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443886" lims:id="1443886"><Label>(j)</Label><Text>the criteria for each platform’s minimum penetration into the seabed or for the maximum scour of the platform’s foundation and an indication of the arrangement of the platform’s anchoring system;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443887" lims:id="1443887"><Label>(k)</Label><Text>a description of the characteristics of each platform’s foundation and its penetration into the seabed or an indication of the arrangement of the platform’s anchoring system, as well as a description of the measures to be implemented to monitor the integrity of the foundation or that of the mooring and anchoring systems;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443888" lims:id="1443888"><Label>(l)</Label><Text>the criteria to identify meteorological and oceanographic conditions and phenomena that require subsea components and pipelines to be inspected;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443889" lims:id="1443889"><Label>(m)</Label><Text>plans that show the arrangement of watertight and weathertight subdivisions;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443890" lims:id="1443890"><Label>(n)</Label><Text>details of openings in watertight and weathertight subdivisions, including the location of vents, air pipes and all other means of water penetration, and the means of closure of the compartments, as well as the location of downflooding points;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443891" lims:id="1443891"><Label>(o)</Label><Text>a plan that contains information concerning permissible deck loads, variable loading limits and preloading;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443892" lims:id="1443892"><Label>(p)</Label><Text>details of all audible and visual signals and alarms used in the communication system referred to in section <XRefInternal>129</XRefInternal>, the general alarm system referred to in section <XRefInternal>130</XRefInternal>, the fire and gas detection system referred to in section <XRefInternal>132</XRefInternal> and the emergency shutdown system referred to in section <XRefInternal>133</XRefInternal>, as well as details of any colour-coding systems used for the safety of persons on the installation;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443893" lims:id="1443893"><Label>(q)</Label><Text>information on any corrosion protection and prevention systems, including their type and location, and any requirements for the safety and maintenance of those systems;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443894" lims:id="1443894"><Label>(r)</Label><Text>technical drawings that show</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443895" lims:id="1443895"><Label>(i)</Label><Text>the arrangement of any deck structure and of the equipment located on it, of all accommodations areas and temporary safe refuges and of any aircraft landing area, including its obstacle-free approach zone,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443896" lims:id="1443896"><Label>(ii)</Label><Text>sufficient details to permit verification and management, if applicable, of the integrity of hulls, mooring components, primary and critical structures, foundation elements, jacking mechanisms, risers and conductors,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443897" lims:id="1443897"><Label>(iii)</Label><Text>the arrangement of hazardous areas and of any equipment located in those areas, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443898" lims:id="1443898"><Label>(iv)</Label><Text>a fire control and evacuation plan, including</Text><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443899" lims:id="1443899"><Label>(A)</Label><Text>the location of escape routes, fixed fire suppression systems and life-saving appliances, and</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443900" lims:id="1443900"><Label>(B)</Label><Text>the arrangement of barriers that provide passive fire and blast protection and associated equipment, along with a description of those barriers and equipment;</Text></Clause></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443901" lims:id="1443901"><Label>(s)</Label><Text>the operating and maintenance requirements for all the life-saving appliances referred to in section <XRefInternal>119</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443902" lims:id="1443902"><Label>(t)</Label><Text>information identifying the aircraft that were used for the design of any aircraft landing area on the installation and the maximum weight, size and wheel centres of those aircraft;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443903" lims:id="1443903"><Label>(u)</Label><Text>any special arrangements in place to facilitate the inspection and maintenance of the installation, including its systems and equipment, and the storage of any crude oil on the installation;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443904" lims:id="1443904"><Label>(v)</Label><Text>special precautions to be taken or instructions to be followed when repairs or alterations to the installation, including its systems or equipment, are to be carried out;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443905" lims:id="1443905"><Label>(w)</Label><Text>any special operational or emergency requirements and procedures with respect to any systems and equipment that are critical to safety, including the emergency shutdown system referred to in section <XRefInternal>133</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443906" lims:id="1443906"><Label>(x)</Label><Text>a description of the air gap or freeboard and of the means of ensuring that the requirements under section <XRefInternal>141</XRefInternal> and subsections <XRefInternal>142</XRefInternal>(2) and <XRefInternal>145</XRefInternal>(1) and (3), as the case may be, are met;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443907" lims:id="1443907"><Label>(y)</Label><Text>the number of persons who can be accommodated on the installation during normal operations;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443908" lims:id="1443908"><Label>(z)</Label><Text>a description of the main electrical power supply referred to in subsection <XRefInternal>122</XRefInternal>(4) and the emergency electrical power supply referred to in section <XRefInternal>126</XRefInternal> and any limitations on their operation;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443909" lims:id="1443909"><Label>(z.1)</Label><Text>the procedure for periodically documenting the results of all inspections, monitoring, testing and maintenance of the installation’s integrity, including the format and presentation of that documentation; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443910" lims:id="1443910"><Label>(z.2)</Label><Text>the procedure for notifying the Chief Safety Officer and the certifying authority under subsections <XRefInternal>162</XRefInternal>(1) and <XRefInternal>170</XRefInternal>(1) and (2).</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443911" lims:id="1443911"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443912" lims:id="1443912">Additional information — floating platform</MarginalNote><Label>(2)</Label><Text>In the case of a floating platform, the operations manual must also contain</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443913" lims:id="1443913"><Label>(a)</Label><Text>a description of the platform’s station-keeping system and its capabilities, taking into account the platform’s operating limits;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443914" lims:id="1443914"><Label>(b)</Label><Text>all procedures for addressing the failure of any component of the station-keeping system that is critical to safety;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443915" lims:id="1443915"><Label>(c)</Label><Text>if the station-keeping system is a mooring system, descriptions of the environmental loads that the moorings can sustain to keep the platform moored in place, the estimated holding power and capacity of the anchors in relation to the soil at the drill site or production site and the physical and environmental conditions in which reconnection of the platform is permitted;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443916" lims:id="1443916"><Label>(d)</Label><Text>the procedures for addressing an excursion outside of the limits established in the context of the analysis and model testing under subsections <XRefInternal>147</XRefInternal>(2) and <XRefInternal>149</XRefInternal>(2);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443917" lims:id="1443917"><Label>(e)</Label><Text>a description and the limitations of any onboard computer or computer-based control systems used in operations such as ballasting and dynamic positioning and in the platform’s trim and stability calculations;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443918" lims:id="1443918"><Label>(f)</Label><Text>instructions on how to assess the loading and ballast conditions of the platform to determine its stability and how to manage those conditions to maintain the platform’s stability in accordance with the provisions referred to in subsection <XRefInternal>142</XRefInternal>(3);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443919" lims:id="1443919"><Label>(g)</Label><Text>data on the location, type and weights of permanent ballast installed on the platform;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443920" lims:id="1443920"><Label>(h)</Label><Text>hydrostatic curves or equivalent data;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443921" lims:id="1443921"><Label>(i)</Label><Text>a plan that shows the capacities and the centres of gravity of tanks and bulk material stowage compartments;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443922" lims:id="1443922"><Label>(j)</Label><Text>tank-sounding tables or curves that show the capacities and the centres of gravity in graduated intervals and the free surface data for each tank;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443923" lims:id="1443923"><Label>(k)</Label><Text>stability data that take into account the maximum height of the centre of gravity above the keel in relation to the draught curve and other parameters relevant to the stability of the platform;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443924" lims:id="1443924"><Label>(l)</Label><Text>the results of any inclining test, or of any lightweight survey together with the inclining test results, and the updated location of the platform centre of gravity following a deadweight survey;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443925" lims:id="1443925"><Label>(m)</Label><Text>examples of loading conditions for each mode of operation, together with the means to evaluate any other loading conditions;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443926" lims:id="1443926"><Label>(n)</Label><Text>technical drawings that</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443927" lims:id="1443927"><Label>(i)</Label><Text>show the arrangement and location of all openings that could affect the stability of the platform and their means of closure,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443928" lims:id="1443928"><Label>(ii)</Label><Text>show the arrangement and operation of the ballast and bilge systems,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443929" lims:id="1443929"><Label>(iii)</Label><Text>are accompanied by the operating instructions for the ballast and bilge systems, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443930" lims:id="1443930"><Label>(iv)</Label><Text>are sufficient in their scope and detail to ensure, in combination with the instructions referred to in subparagraph (iii), that</Text><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443931" lims:id="1443931"><Label>(A)</Label><Text>the necessary draught, stability and hull strength can be maintained under all foreseeable operating conditions, and</Text></Clause><Clause lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443932" lims:id="1443932"><Label>(B)</Label><Text>the floating platform can be returned to a safe condition from an unintended draught, trim or heel; and</Text></Clause></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443933" lims:id="1443933"><Label>(o)</Label><Text>a towing arrangement plan, if necessary, and the operating limits of the towing equipment’s components.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443934" lims:id="1443934"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443935" lims:id="1443935">Additional information — mobile offshore platform</MarginalNote><Label>(3)</Label><Text>In the case of a self-elevating mobile offshore platform, the operations manual must also contain</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443936" lims:id="1443936"><Label>(a)</Label><Text>a description of any equipment for elevating and lowering the installation and details of any special types of joints and their purpose, including any operating or maintenance instructions for the equipment and joints; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443937" lims:id="1443937"><Label>(b)</Label><Text>the allowable limits for hull inclination and rack phase differential.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443938" lims:id="1443938"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443939" lims:id="1443939">Up-to-date</MarginalNote><Label>(4)</Label><Text>The operator must ensure that the operations manual is kept up-to-date.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443940" lims:id="1443940"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443941" lims:id="1443941">Programs</MarginalNote><Label>158</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443942" lims:id="1443942"><Label>(1)</Label><Text>An operator must develop the following programs to ensure the continued integrity of an installation, including its systems and equipment, from the time the installation is commissioned until it is abandoned or removed from the offshore area:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443943" lims:id="1443943"><Label>(a)</Label><Text>the maintenance program referred to in section <XRefInternal>159</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443944" lims:id="1443944"><Label>(b)</Label><Text>the preservation program referred to in section <XRefInternal>160</XRefInternal>; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443945" lims:id="1443945"><Label>(c)</Label><Text>the weight control program referred to in section <XRefInternal>161</XRefInternal>.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443946" lims:id="1443946"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443947" lims:id="1443947">Program implementation and update</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the programs are implemented and periodically updated.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443948" lims:id="1443948"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443949" lims:id="1443949">Maintenance program</MarginalNote><Label>159</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443950" lims:id="1443950"><Label>(1)</Label><Text>The maintenance program must set out the inspection, monitoring, testing and maintenance policies and procedures for the installation, including its systems and equipment, that are necessary to ensure safety, protect the environment and prevent waste.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443951" lims:id="1443951"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443952" lims:id="1443952">Requirements</MarginalNote><Label>(2)</Label><Text>The maintenance program must</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443953" lims:id="1443953"><Label>(a)</Label><Text>include the measures to ensure that the installation, including its systems and equipment, continues to perform in accordance with its design specifications;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443954" lims:id="1443954"><Label>(b)</Label><Text>include the measures to ensure compliance with any inspection, monitoring, testing or maintenance requirements under this Part;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443955" lims:id="1443955"><Label>(c)</Label><Text>include the performance standards developed by the operator for the installation, including for its systems and equipment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443956" lims:id="1443956"><Label>(d)</Label><Text>take into account the failure modes and mechanisms of safety-critical elements and the causes of their failure;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443957" lims:id="1443957"><Label>(e)</Label><Text>include inspection and monitoring activities that occur at a frequency and in a manner to prevent, if practicable, the failures referred to in paragraph (d), or to mitigate the effects of those failures, and to ensure that safety-critical elements are repaired, replaced or modified without delay and in accordance with section <XRefInternal>162</XRefInternal>; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443958" lims:id="1443958"><Label>(f)</Label><Text>include predictive and preventive maintenance activities and schedules for each safety-critical element that</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443959" lims:id="1443959"><Label>(i)</Label><Text>are based on the performance standards referred to in paragraph (c),</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443960" lims:id="1443960"><Label>(ii)</Label><Text>take into account the manufacturer’s recommendations and industry standards and best practices,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443961" lims:id="1443961"><Label>(iii)</Label><Text>specify a minimum frequency for the comprehensive inspection of each safety-critical element, taking into account its condition and the conditions under which it is used,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443962" lims:id="1443962"><Label>(iv)</Label><Text>for rotating equipment, provide for partial or complete dismantling and inspection at a frequency necessary to maintain the equipment in good condition and to ensure that the equipment’s functionality, availability, reliability and performance are in accordance with its design specifications,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443963" lims:id="1443963"><Label>(v)</Label><Text>provide for a periodic maintenance regime for any low running-hour equipment, such as emergency generators, essential generators and fire pumps, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443964" lims:id="1443964"><Label>(vi)</Label><Text>provide for the management of spare parts so that critical spare parts are available on the installation to ensure the continued functionality, availability, reliability and performance of each safety-critical element in accordance with its design specifications.</Text></Subparagraph></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443965" lims:id="1443965"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443966" lims:id="1443966">Preservation program</MarginalNote><Label>160</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443967" lims:id="1443967"><Label>(1)</Label><Text>The preservation program must set out the measures that are necessary to ensure the integrity of equipment that is taken out of service and stored for future use.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443968" lims:id="1443968"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443969" lims:id="1443969">Periodic inspection</MarginalNote><Label>(2)</Label><Text>The program must provide for the periodic inspection of the stored equipment to verify its integrity and ensure that it is fit for the purposes for which it is to be used if it is brought into service.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443970" lims:id="1443970"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443971" lims:id="1443971">Weight control program</MarginalNote><Label>161</Label><Text>The weight control program must set out the measures that are necessary to ensure that the weight and centre of gravity of each installation are kept safely within the installation’s operating limits.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443972" lims:id="1443972"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443973" lims:id="1443973">Safety-critical element — repair, replacement or modification</MarginalNote><Label>162</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443974" lims:id="1443974"><Label>(1)</Label><Text>The holder of a certificate of fitness must ensure that the certifying authority and the Chief Safety Officer are notified before a safety-critical element is repaired, replaced or modified and before any equipment that would change the design, performance or integrity of a safety-critical element is brought on board the installation.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443975" lims:id="1443975"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443976" lims:id="1443976">Approval before repair or modification</MarginalNote><Label>(2)</Label><Text>The holder of a certificate of fitness must ensure that the approval of the certifying authority is obtained before a safety-critical element is repaired or modified.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443977" lims:id="1443977"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443978" lims:id="1443978">Verification</MarginalNote><Label>(3)</Label><Text>The holder of a certificate of fitness must ensure that a safety-critical element that has been repaired or modified is not put into operation until the certifying authority has verified it and</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443979" lims:id="1443979"><Label>(a)</Label><Text>confirmed that it is fit for the purposes for which it is to be used, can be operated safely without posing a threat to persons or the environment and meets the requirements of these Regulations; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443980" lims:id="1443980"><Label>(b)</Label><Text>imposed any limitation on the operation of the installation that is necessary to ensure that the installation meets the requirements referred to in paragraph <XRefInternal>28</XRefInternal>(1)(b).</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443981" lims:id="1443981"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443982" lims:id="1443982">Emergency repair or modification</MarginalNote><Label>(4)</Label><Text>In an emergency, subsections (2) and (3) do not apply if the installation manager considers that the delay required to comply with the requirements under those subsections endangers persons on the installation or the environment.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443983" lims:id="1443983"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443984" lims:id="1443984">Verification after emergency</MarginalNote><Label>(5)</Label><Text>A safety-critical element that is repaired or modified in an emergency must be verified by the certifying authority in accordance with subsection (3) as soon as the circumstances permit.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443985" lims:id="1443985"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443986" lims:id="1443986">Non-application</MarginalNote><Label>(6)</Label><Text>This section does not apply in the case of an adjustment made to or the testing of a boiler or pressure system fitting.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1443987" lims:id="1443987" level="2"><TitleText>Wells</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443988" lims:id="1443988"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443989" lims:id="1443989">Drilling fluid systems</MarginalNote><Label>163</Label><Text>An operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443990" lims:id="1443990"><Label>(a)</Label><Text>the drilling fluid system and associated monitoring equipment provide an effective barrier against formation pressure, ensure safe well operations, prevent pollution and allow for well evaluation;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443991" lims:id="1443991"><Label>(b)</Label><Text>the indicators and alarms associated with the monitoring equipment are strategically located on the drilling rig to alert persons on it; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443992" lims:id="1443992"><Label>(c)</Label><Text>dedicated personnel provide continuous monitoring, using independent monitoring systems, of parameters that are critical to safe well operations or to the detection of a gain or loss of drilling fluid while the installation is connected to the well and is taking fluid returns.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1443993" lims:id="1443993"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443994" lims:id="1443994">Drilling riser</MarginalNote><Label>164</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443995" lims:id="1443995"><Label>(1)</Label><Text>An operator must ensure that every drilling riser is, throughout the duration of a well operation, capable of</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443996" lims:id="1443996"><Label>(a)</Label><Text>providing access to the well;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443997" lims:id="1443997"><Label>(b)</Label><Text>isolating the well-bore from the sea;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443998" lims:id="1443998"><Label>(c)</Label><Text>withstanding the differential pressure of the drilling fluid relative to the sea;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1443999" lims:id="1443999"><Label>(d)</Label><Text>withstanding the maximum loads to which it may be subjected; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444000" lims:id="1444000"><Label>(e)</Label><Text>permitting the drilling fluid to be returned to the installation.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444001" lims:id="1444001"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444002" lims:id="1444002">Drilling riser support</MarginalNote><Label>(2)</Label><Text>The operator must ensure that every drilling riser is supported in a manner that effectively compensates for any loads caused by the motion of the installation, the drilling fluid or the water column.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444003" lims:id="1444003"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444004" lims:id="1444004">Drilling riser analysis</MarginalNote><Label>(3)</Label><Text>The operator must ensure that a drilling riser analysis and, in the case of a floating platform that uses a dynamic positioning system, a weak-point analysis of the drilling riser are conducted and that the certifying authority in relation to the installation approves those analyses.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444005" lims:id="1444005"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444006" lims:id="1444006">Fail-safe subsurface safety valves</MarginalNote><Label>165</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444007" lims:id="1444007"><Label>(1)</Label><Text>An operator must ensure that a completed development well is equipped with a fail-safe subsurface safety valve that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444008" lims:id="1444008"><Label>(a)</Label><Text>can be operated from the surface; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444009" lims:id="1444009"><Label>(b)</Label><Text>if the well is located where permafrost is present in unconsolidated sediments, is installed in the production tubing below the base of the permafrost.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444010" lims:id="1444010"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444011" lims:id="1444011">Additional valve</MarginalNote><Label>(2)</Label><Text>The operator must ensure that a completed development well on a fixed platform that has gas-lift, injection or production capabilities in the A-annulus is equipped with an additional fail-safe safety valve on the A-annulus.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444012" lims:id="1444012"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444013" lims:id="1444013">Requirements</MarginalNote><Label>(3)</Label><Text>The operator must ensure that all fail-safe safety valves are designed, installed, tested, maintained and operated to prevent uncontrolled well flow when they are activated.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444014" lims:id="1444014"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444015" lims:id="1444015">Well tubulars, trees and wellheads</MarginalNote><Label>166</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444016" lims:id="1444016"><Label>(1)</Label><Text>An operator must ensure that well tubulars, trees and wellheads are operated in accordance with good engineering practices.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444017" lims:id="1444017"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444018" lims:id="1444018">Sour environment</MarginalNote><Label>(2)</Label><Text>The operator must ensure that any well tubulars, trees or wellheads that may be exposed to a sour environment are capable of operating safely in that environment.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444019" lims:id="1444019"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444020" lims:id="1444020">Safe and efficient operation</MarginalNote><Label>(3)</Label><Text>The operator must ensure that the wellhead and tree equipment, including any valves, are designed and maintained to operate safely and efficiently throughout the life cycle of the well under all loads to which the well may be subjected.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444021" lims:id="1444021"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444022" lims:id="1444022">Formation flow test equipment</MarginalNote><Label>167</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444023" lims:id="1444023"><Label>(1)</Label><Text>An operator must ensure that the equipment used in a formation flow test is designed to safely control well pressure, evaluate the formation and prevent pollution.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444024" lims:id="1444024"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444025" lims:id="1444025">Rated working pressure</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the rated working pressure of formation flow test equipment at and upstream of the well testing manifold exceeds the maximum anticipated shut-in pressure.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444026" lims:id="1444026"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444027" lims:id="1444027">Overpressure</MarginalNote><Label>(3)</Label><Text>The operator must ensure that all equipment downstream of the well testing manifold is protected against overpressure.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444028" lims:id="1444028"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444029" lims:id="1444029">Downhole safety valve — development well</MarginalNote><Label>(4)</Label><Text>The operator must ensure, in the case of a development well, that the formation flow test equipment includes a downhole safety valve that permits closure of the test string above the packer.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444030" lims:id="1444030"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444031" lims:id="1444031">Downhole safety valve — exploratory or delineation well</MarginalNote><Label>(5)</Label><Text>The operator must ensure, in the case of an exploratory well or a delineation well drilled on a geological feature, that a downhole safety valve is installed before a formation flow test is conducted unless</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444032" lims:id="1444032"><Label>(a)</Label><Text>it has been demonstrated as part of the formation flow test program referred to in paragraph <XRefInternal>63</XRefInternal>(3)(a) that the level of risk of the proposed alternative arrangement in that program is equivalent to or lower than that of using a downhole safety valve; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444033" lims:id="1444033"><Label>(b)</Label><Text>the Board has approved the test under subsection <XRefInternal>63</XRefInternal>(5).</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444034" lims:id="1444034"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444035" lims:id="1444035">Subsea test tree</MarginalNote><Label>(6)</Label><Text>The operator must ensure that any formation flow test equipment used in testing a well that is drilled with a floating drilling unit has a subsea test tree that is equipped with</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444036" lims:id="1444036"><Label>(a)</Label><Text>a valve that can be operated from the surface and automatically closes when required to prevent uncontrolled well flow; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444037" lims:id="1444037"><Label>(b)</Label><Text>a release system that permits the test string to be hydraulically or mechanically disconnected within or below the blowout preventers.</Text></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1444038" lims:id="1444038" level="2"><TitleText>Pipelines</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444039" lims:id="1444039"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444040" lims:id="1444040">Pipeline integrity — standard</MarginalNote><Label>168</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444041" lims:id="1444041"><Label>(1)</Label><Text>An operator must ensure that a pipeline is designed, constructed, installed, operated and maintained in accordance with CSA Group standard Z662, <XRefExternal reference-type="standard">Oil and gas pipeline systems</XRefExternal>, as it relates to offshore pipelines.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444042" lims:id="1444042"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444043" lims:id="1444043">Integrity management program</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the pipeline system integrity management program required by that standard is implemented and periodically updated.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1444044" lims:id="1444044" level="2"><TitleText>Monitoring of Installations, Wells and Pipelines</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444045" lims:id="1444045"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444046" lims:id="1444046">Monitoring of systems</MarginalNote><Label>169</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444047" lims:id="1444047"><Label>(1)</Label><Text>An operator must ensure that an installation is equipped with a central monitoring system in the main control centre to monitor all systems whose failure could cause or contribute to an accidental event or waste.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444048" lims:id="1444048"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444049" lims:id="1444049">Management of associated systems</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the alarm, safety, monitoring, warning and control functions associated with the systems that are monitored under subsection (1) are managed to prevent reportable incidents and waste.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444050" lims:id="1444050"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444051" lims:id="1444051">Suspension of related system</MarginalNote><Label>(3)</Label><Text>When a function referred to in subsection (2) is suspended or found to be impaired, the operator must ensure that the use of any related system is also suspended until</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444052" lims:id="1444052"><Label>(a)</Label><Text>in the case of a function that is suspended, that function is returned to service; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444053" lims:id="1444053"><Label>(b)</Label><Text>in the case of a function that was found to be impaired, measures are implemented to offset the risk of a reportable incident or waste.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444054" lims:id="1444054"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444055" lims:id="1444055">Affected persons informed</MarginalNote><Label>(4)</Label><Text>The operator must ensure that all affected persons are informed when a function referred to in subsection (2) is suspended and when it is returned to service.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444056" lims:id="1444056"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444057" lims:id="1444057">Deterioration</MarginalNote><Label>170</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444058" lims:id="1444058"><Label>(1)</Label><Text>An operator must, without delay, notify the Chief Safety Officer of any deterioration of an installation, including its systems or equipment, or of a pipeline, well, vessel or support craft if that deterioration could adversely affect safety or the environment.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444059" lims:id="1444059"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444060" lims:id="1444060">Notice to certifying authority</MarginalNote><Label>(2)</Label><Text>If an installation, system, equipment, pipeline or part of a well referred to in subsection (1) is within the scope of work referred to in section <XRefInternal>31</XRefInternal>, the operator must also, without delay, notify the certifying authority of the deterioration.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444061" lims:id="1444061"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444062" lims:id="1444062">Impairment rectification</MarginalNote><Label>(3)</Label><Text>The operator must ensure that any impairment of an installation, including its systems or equipment, or of a pipeline, well, vessel or support craft is rectified without delay if the impairment could adversely affect safety or the environment.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444063" lims:id="1444063"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444064" lims:id="1444064">Mitigation measures</MarginalNote><Label>(4)</Label><Text>If it is not possible to rectify the impairment without delay, the operator must</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444065" lims:id="1444065"><Label>(a)</Label><Text>conduct a risk assessment to identify risk mitigation measures;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444066" lims:id="1444066"><Label>(b)</Label><Text>implement those mitigation measures; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444067" lims:id="1444067"><Label>(c)</Label><Text>ensure that the impairment is rectified as soon as the circumstances permit.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444068" lims:id="1444068"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444069" lims:id="1444069">Non-application</MarginalNote><Label>(5)</Label><Text>Subsections (3) and (4) do not apply in respect of safety-critical elements.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1444070" lims:id="1444070" level="1"><Label>PART 11</Label><TitleText>Support Operations</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444071" lims:id="1444071"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444072" lims:id="1444072">Support craft</MarginalNote><Label>171</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444073" lims:id="1444073"><Label>(1)</Label><Text>An operator must, in respect of an installation on which persons are normally present, ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444074" lims:id="1444074"><Label>(a)</Label><Text>a support craft that is at a distance from the installation not greater than that required for a return time of 20 minutes is available at all times for emergency response; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444075" lims:id="1444075"><Label>(b)</Label><Text>whenever an aircraft is landing or taking off, or personnel are working over the side or otherwise exposed to the risk of falling in the water, a support craft is available in the immediate vicinity of the installation and ready to undertake rescue and recovery operations.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444076" lims:id="1444076"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444077" lims:id="1444077">Requirements</MarginalNote><Label>(2)</Label><Text>The support craft referred to in subsection (1) must be</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444078" lims:id="1444078"><Label>(a)</Label><Text>capable of safely providing necessary support functions in the foreseeable physical and environmental conditions prevailing in the area in which it operates;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444079" lims:id="1444079"><Label>(b)</Label><Text>equipped to supply emergency services, including rescue and first aid treatment, for all personnel on the installation in the event of an emergency; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444080" lims:id="1444080"><Label>(c)</Label><Text>equipped with a self-righting fast rescue boat that</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444081" lims:id="1444081"><Label>(i)</Label><Text>meets the requirements under chapter V of the LSA Code,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444082" lims:id="1444082"><Label>(ii)</Label><Text>is capable of being launched and retrieved when it is loaded with a full complement of persons and equipment, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444083" lims:id="1444083"><Label>(iii)</Label><Text>is ready for deployment in the event of an emergency.</Text></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444084" lims:id="1444084"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444085" lims:id="1444085">Required distance exceeded</MarginalNote><Label>(3)</Label><Text>If the support craft is located at a distance that exceeds the distance referred to in paragraph (1)(a), both the installation manager and the person in charge of the support craft must log that fact and the reason why the distance or time was exceeded.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444086" lims:id="1444086"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444087" lims:id="1444087">Vessel master</MarginalNote><Label>(4)</Label><Text>During any activity or situation referred to in paragraph (1)(b), or any other activity or situation that presents an increased level of risk to the safety of the installation, the vessel master must, under the direction of the installation manager, keep the craft in close proximity to the installation, maintain open communication channels with the installation and be prepared to conduct rescue operations.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444088" lims:id="1444088"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444089" lims:id="1444089">Rescue boat — vessel</MarginalNote><Label>172</Label><Text>An operator must, in respect of any vessel that is used in a geoscientific program, geotechnical program, environmental program, diving project or construction activity, ensure that a rescue boat is available and ready for use in the event of an emergency.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444090" lims:id="1444090"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444091" lims:id="1444091">Safety zone</MarginalNote><Label>173</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444092" lims:id="1444092"><Label>(1)</Label><Text>A support craft must not enter the safety zone around an installation or around a vessel that is engaged in a geoscientific program, geotechnical program, environmental program or diving project without the consent of the installation manager or the person in charge of the operations site.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444093" lims:id="1444093"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444094" lims:id="1444094">Notice to approaching aircraft or vessel</MarginalNote><Label>(2)</Label><Text>The operator must ensure that persons who are in charge of an aircraft or vessel that is approaching the safety zone are notified of the safety zone boundaries and of any hazards within that zone that relate to the operator’s installation or vessel.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444095" lims:id="1444095"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444096" lims:id="1444096">Boundaries — installation</MarginalNote><Label>(3)</Label><Text>The safety zone around an installation consists of the area within a line that encloses the installation and is drawn at a distance of 500 m from the outer edge of the installation or, if any component of the installation extends beyond that edge, from the outer limit of the component that extends furthest from that edge.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444097" lims:id="1444097"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444098" lims:id="1444098">Boundaries — vessel</MarginalNote><Label>(4)</Label><Text>The safety zone around a vessel referred to in subsection (1) consists of the area within a line that encloses the vessel and any of its attached equipment and is drawn at a distance that minimizes risks to safety, the environment and property located nearby, including fishing gear or fishing vessels.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444099" lims:id="1444099"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444100" lims:id="1444100">Landing area</MarginalNote><Label>174</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444101" lims:id="1444101"><Label>(1)</Label><Text>An operator must ensure that the aircraft landing area on an installation or vessel and the equipment that is used in that area or that otherwise supports the take-off or landing of aircraft are designed to ensure safety and the protection of the environment and to prevent incidents or damage resulting from the use of aircraft.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444102" lims:id="1444102"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444103" lims:id="1444103">Requirements</MarginalNote><Label>(2)</Label><Text>The operator must ensure that the landing area</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444104" lims:id="1444104"><Label>(a)</Label><Text>has an obstacle-free take-off and approach area and is oriented relative to prevailing winds;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444105" lims:id="1444105"><Label>(b)</Label><Text>can withstand all functional loads imposed by aircraft;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444106" lims:id="1444106"><Label>(c)</Label><Text>can accommodate aircraft of expected sizes;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444107" lims:id="1444107"><Label>(d)</Label><Text>has emergency response and firefighting equipment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444108" lims:id="1444108"><Label>(e)</Label><Text>has conspicuous markings and signage;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444109" lims:id="1444109"><Label>(f)</Label><Text>has adequate lighting, including in reduced visibility conditions;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444110" lims:id="1444110"><Label>(g)</Label><Text>has monitoring and status light systems and communication and meteorological equipment;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444111" lims:id="1444111"><Label>(h)</Label><Text>is readily and safely accessible, including from the accommodations areas and from any temporary safe refuge; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444112" lims:id="1444112"><Label>(i)</Label><Text>in the case of a landing area on an installation, is equipped with fuel storage tanks.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444113" lims:id="1444113"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444114" lims:id="1444114">Fuel storage tanks</MarginalNote><Label>(3)</Label><Text>The operator must ensure that any fuel storage tanks that are in proximity to a landing area are stored safely and protected from damage, impact and fire.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444115" lims:id="1444115"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444116" lims:id="1444116">Procedures</MarginalNote><Label>175</Label><Text>The operator must ensure the establishment of procedures associated with the support of aircraft operations, including procedures for emergency response, and of a training program for personnel for those purposes.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444117" lims:id="1444117"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444118" lims:id="1444118">Aircraft service provider</MarginalNote><Label>176</Label><Text>An operator must ensure that, before the start of any operations that require the use of an aircraft, the aircraft service provider has accepted in writing all conditions with respect to the use of the equipment in any landing area, the procedures associated with the support of aircraft operations, including the procedures for emergency response, and the training program for personnel in respect of those matters.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444119" lims:id="1444119"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444120" lims:id="1444120">Classification</MarginalNote><Label>177</Label><Text>An operator must ensure that any support or construction vessel to be used in conjunction with an installation holds a valid certificate of class issued by a classification society according to the work or activity to be carried out by it.</Text></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1444121" lims:id="1444121" level="1"><Label>PART 12</Label><TitleText>Notice, Records, Reports and Other Information for Authorized Works and Activities</TitleText></Heading><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1444122" lims:id="1444122" level="2"><TitleText>General</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444123" lims:id="1444123"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444124" lims:id="1444124">Definition of <DefinitionRef>shotpoint</DefinitionRef></MarginalNote><Label>178</Label><Text>In this Part, <DefinedTermEn>shotpoint</DefinedTermEn> means the surface location of a seismic energy source.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444125" lims:id="1444125"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444126" lims:id="1444126">Reportable incidents</MarginalNote><Label>179</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444127" lims:id="1444127"><Label>(1)</Label><Text>An operator must notify the Board of a reportable incident as soon as the circumstances permit, but not later than 24 hours after becoming aware of the incident.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444128" lims:id="1444128"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444129" lims:id="1444129">Investigation</MarginalNote><Label>(2)</Label><Text>The operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444130" lims:id="1444130"><Label>(a)</Label><Text>any reportable incident is investigated;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444131" lims:id="1444131"><Label>(b)</Label><Text>the person who conducts the investigation includes in their investigation report the root causes of the reportable incident, the contributing factors, measures to be implemented to prevent its recurrence and any other relevant information; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444132" lims:id="1444132"><Label>(c)</Label><Text>the investigation report is submitted to the Board not later than 14 days after the day on which the reportable incident occurred.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444133" lims:id="1444133"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444134" lims:id="1444134">Accessibility of records</MarginalNote><Label>180</Label><Text>An operator must ensure that any records that are necessary to support operational requirements and the requirements of these Regulations are readily accessible to the Board for examination.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444135" lims:id="1444135"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444136" lims:id="1444136">Critical information</MarginalNote><Label>181</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444137" lims:id="1444137"><Label>(1)</Label><Text>An operator must ensure that records are kept of all information — including the following — that is critical to safety, the protection of the environment or the prevention of waste:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444138" lims:id="1444138"><Label>(a)</Label><Text>information on the location and movement of support craft;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444139" lims:id="1444139"><Label>(b)</Label><Text>information on reportable incidents;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444140" lims:id="1444140"><Label>(c)</Label><Text>information on emergency drills and exercises;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444141" lims:id="1444141"><Label>(d)</Label><Text>information on the quantities of consumable substances at any operations site;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444142" lims:id="1444142"><Label>(e)</Label><Text>data resulting from any required observation of wildlife;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444143" lims:id="1444143"><Label>(f)</Label><Text>information on verification, inspection, monitoring, testing, maintenance and operating activities;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444144" lims:id="1444144"><Label>(g)</Label><Text>information on the status of all systems and equipment identified in the safety plan as being critical to safety or in the environmental protection plan as being critical to the protection of the environment, including any test result indicating that the systems or equipment are not functioning as intended and information on any equipment failure that has led to an impairment of any of those systems; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444145" lims:id="1444145"><Label>(h)</Label><Text>information on the physical and environmental conditions observed and forecasted under section <XRefInternal>42</XRefInternal>.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444146" lims:id="1444146"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444147" lims:id="1444147">Retention periods</MarginalNote><Label>(2)</Label><Text>The operator must retain the records referred to in subsection (1) for the following periods:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444148" lims:id="1444148"><Label>(a)</Label><Text>in the case of the records referred to in paragraphs (1)(a) and (e) to (g) and those referred to in paragraph (1)(h) regarding forecasted conditions, five years after the day on which the record is created;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444149" lims:id="1444149"><Label>(b)</Label><Text>in the case of the records referred to in paragraphs (1)(b) and (c),</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444150" lims:id="1444150"><Label>(i)</Label><Text>five years after the day on which the drill or exercise is carried out, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444151" lims:id="1444151"><Label>(ii)</Label><Text>10 years after the day on which the reportable incident is reported;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444152" lims:id="1444152"><Label>(c)</Label><Text>in the case of the records referred to in paragraph (1)(d), for as long as the consumable substance is at the operations site; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444153" lims:id="1444153"><Label>(d)</Label><Text>in the case of the records referred to in paragraph (1)(h) regarding conditions observed, for the duration of the authorized work or activity.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444154" lims:id="1444154"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444155" lims:id="1444155">Safety report</MarginalNote><Label>182</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444156" lims:id="1444156"><Label>(1)</Label><Text>An operator must ensure that a safety report that relates to an authorized work or activity conducted in a given calendar year is submitted to the Board within 90 days after the day on which the work or activity is concluded or suspended or, in the case of a work or activity that will continue into the following calendar year, that a safety report that relates to the work or activity conducted in the preceding calendar year is submitted to the Board not later than March 31 of that following calendar year.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444157" lims:id="1444157"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444158" lims:id="1444158">Requirements</MarginalNote><Label>(2)</Label><Text>The safety report must contain</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444159" lims:id="1444159"><Label>(a)</Label><Text>a description and analysis of the efforts undertaken to improve safety;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444160" lims:id="1444160"><Label>(b)</Label><Text>a summary of the operator’s safety performance during the applicable calendar year, including with respect to the objective of reducing safety risks;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444161" lims:id="1444161"><Label>(c)</Label><Text>a summary of the safety measures and actions taken to mitigate the effects of any reportable incident, as well as of their effectiveness and any adjustments made for their continued improvement; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444162" lims:id="1444162"><Label>(d)</Label><Text>a summary of any emergency response drills and exercises relating to safety that were completed.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444163" lims:id="1444163"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444164" lims:id="1444164">Annual reports</MarginalNote><Label>183</Label><Text>An operator must ensure that the Board is made aware, at least once a year, of any report containing relevant information regarding applied research work or studies that the operator has participated in, funded or commissioned concerning the operator’s authorized works and activities in relation to safety, the protection of the environment or resource management and must ensure that a copy of the report is submitted to the Board on request.</Text></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1444165" lims:id="1444165" level="2"><TitleText>Geoscientific, Geotechnical and Environmental Programs</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444166" lims:id="1444166"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444167" lims:id="1444167">Notice — key dates</MarginalNote><Label>184</Label><Text>When any geoscientific program, geotechnical program or environmental program is commenced, concluded, suspended or cancelled by an operator, the operator must, without delay, notify the Board in writing of the date of the commencement, conclusion, suspension or cancellation of the program.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444168" lims:id="1444168"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444169" lims:id="1444169">Weekly status reports</MarginalNote><Label>185</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444170" lims:id="1444170"><Label>(1)</Label><Text>An operator must ensure that weekly reports are submitted to the Board on the status of field work carried out in relation to any geoscientific program, geotechnical program or environmental program from the commencement of the program until its conclusion, suspension or cancellation.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444171" lims:id="1444171"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444172" lims:id="1444172">Content of reports</MarginalNote><Label>(2)</Label><Text>The weekly status reports must contain the following documents and information:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444173" lims:id="1444173"><Label>(a)</Label><Text>the program number assigned by the Board;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444174" lims:id="1444174"><Label>(b)</Label><Text>information identifying, and indicating the current location and status of, all operations sites and support craft used in the program;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444175" lims:id="1444175"><Label>(c)</Label><Text>key dates of the works and activities under the program, in particular their commencement, suspension and completion dates,</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444176" lims:id="1444176"><Label>(d)</Label><Text>a description of the works and activities carried out during the preceding week, including</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444177" lims:id="1444177"><Label>(i)</Label><Text>the quantity of data collected, broken down by data acquisition technique,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444178" lims:id="1444178"><Label>(ii)</Label><Text>information identifying and indicating the location of data collection points, lines or areas,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444179" lims:id="1444179"><Label>(iii)</Label><Text>a schedule indicating each type of work or activity carried out under the program, as well as any period in which data acquisition was delayed or interrupted, along with a summary of the causes of that delay or interruption, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444180" lims:id="1444180"><Label>(iv)</Label><Text>a description of any failure to comply with a condition of the authorization;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444181" lims:id="1444181"><Label>(e)</Label><Text>maps illustrating, in relation to the proposed data acquisition plan referred to in subparagraph <XRefInternal>8</XRefInternal>(i)(iii), the portion of the data acquisition that has been completed, the portion that was completed in the preceding week and the portion that remains to be carried out;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444182" lims:id="1444182"><Label>(f)</Label><Text>an indication of the total number of persons involved in the program who, during the preceding week, were at, or transferred to or from, the operations sites and, if applicable, the means by which they were transferred;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444183" lims:id="1444183"><Label>(g)</Label><Text>a summary of any communications or interactions that occurred during the preceding week concerning program activities between persons associated with the program and persons associated with fishing activities;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444184" lims:id="1444184"><Label>(h)</Label><Text>a summary of emergency drills and exercises that were completed and reportable incidents that occurred during the preceding week;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444185" lims:id="1444185"><Label>(i)</Label><Text>an indication of the quantities of consumable substances that are critical to safety that are currently at each operations site;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444186" lims:id="1444186"><Label>(j)</Label><Text>all wildlife observation data from the preceding week that were required to be recorded under paragraph <XRefInternal>181</XRefInternal>(1)(e);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444187" lims:id="1444187"><Label>(k)</Label><Text>a summary of the verification, inspection, monitoring, testing, maintenance and operating activities that are critical to safety that were carried out during the preceding week; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444188" lims:id="1444188"><Label>(l)</Label><Text>a description of any measures taken during the preceding week to avoid disturbing wildlife or interfering with fishing activities or any other uses of the sea.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444189" lims:id="1444189"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444190" lims:id="1444190">Environmental report — programs</MarginalNote><Label>186</Label><Text>An operator must ensure that an environmental report that contains the following documents and information is submitted to the Board within 90 days after the day on which a geoscientific program, geotechnical program or environmental program is concluded or suspended:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444191" lims:id="1444191"><Label>(a)</Label><Text>a description of the general physical and environmental conditions under which the program was conducted and, if applicable, a description of ice management activities and non-productive time caused by meteorological or ice conditions;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444192" lims:id="1444192"><Label>(b)</Label><Text>a summary of program performance in relation to the environment, including with respect to the objective of reducing environmental risks;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444193" lims:id="1444193"><Label>(c)</Label><Text>a summary of environmental protection measures and actions that were taken to mitigate the effects of any reportable incident, as well as of their effectiveness and any adjustments made for their continued improvement;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444194" lims:id="1444194"><Label>(d)</Label><Text>a summary of any emergency response drills and exercises for the protection of the environment that were completed; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444195" lims:id="1444195"><Label>(e)</Label><Text>all wildlife observation data that were required to be recorded under paragraph <XRefInternal>181</XRefInternal>(1)(e).</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444196" lims:id="1444196"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444197" lims:id="1444197">Final reports</MarginalNote><Label>187</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444198" lims:id="1444198"><Label>(1)</Label><Text>An operator must ensure that a final operations report, final data processing report and final interpretation report are submitted to the Board with the acquired data referred to in subsection (5), as applicable, within 12 months after the day on which any geoscientific program, geotechnical program or environmental program is concluded, unless a longer period has been agreed to in writing by the Board.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444199" lims:id="1444199"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444200" lims:id="1444200">Content of final operations report</MarginalNote><Label>(2)</Label><Text>The final operations report must contain the following documents and information:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444201" lims:id="1444201"><Label>(a)</Label><Text>the program number assigned by the Board;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444202" lims:id="1444202"><Label>(b)</Label><Text>the title, author and date of the report;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444203" lims:id="1444203"><Label>(c)</Label><Text>an executive summary and table of contents;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444204" lims:id="1444204"><Label>(d)</Label><Text>the names of the operator, contractors and any <DefinitionRef>interest owner</DefinitionRef>, as defined in section 47 of the Act;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444205" lims:id="1444205"><Label>(e)</Label><Text>a description of all operation sites and any support craft used for the program;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444206" lims:id="1444206"><Label>(f)</Label><Text>a description of the program, including</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444207" lims:id="1444207"><Label>(i)</Label><Text>key dates, in particular its commencement, suspension and completion dates,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444208" lims:id="1444208"><Label>(ii)</Label><Text>the equipment used,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444209" lims:id="1444209"><Label>(iii)</Label><Text>the operational methods employed,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444210" lims:id="1444210"><Label>(iv)</Label><Text>the number of persons who were involved in the program, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444211" lims:id="1444211"><Label>(v)</Label><Text>the quantity of data collected, broken down by data acquisition technique;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444212" lims:id="1444212"><Label>(g)</Label><Text>location maps illustrating details of the data acquisition activities carried out under the program, including the identification and location of data collection points, lines or areas and the type of data acquired;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444213" lims:id="1444213"><Label>(h)</Label><Text>location maps illustrating the boundaries of each area covered by the program and any portion of those areas that is subject to an <DefinitionRef>interest</DefinitionRef>, as defined in section 47 of the Act, as well as the identification number of each such interest;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444214" lims:id="1444214"><Label>(i)</Label><Text>a schedule that specifies the type and duration of all program activities and includes any period in which data acquisition was delayed or interrupted;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444215" lims:id="1444215"><Label>(j)</Label><Text>an indication as to the accuracy of the navigation system and of the positioning and survey systems, as well as the parameters and configuration of both the energy source and recording system; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444216" lims:id="1444216"><Label>(k)</Label><Text>shotpoint maps, track plots, flight lines with numbered fiducial points, gravity station maps, location maps for any samples or core holes, copies of any photographs and a list of any videos.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444217" lims:id="1444217"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444218" lims:id="1444218">Content of final data processing report</MarginalNote><Label>(3)</Label><Text>The final data processing report must contain the following documents and information:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444219" lims:id="1444219"><Label>(a)</Label><Text>the documents and information referred to in paragraphs (2)(a) to (d), (g) and (k);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444220" lims:id="1444220"><Label>(b)</Label><Text>a description of the program, including the quantity of data collected, broken down by data acquisition technique; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444221" lims:id="1444221"><Label>(c)</Label><Text>a description of the geoscientific data acquired, including the data processing sequence and parameters.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444222" lims:id="1444222"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444223" lims:id="1444223">Content of final interpretation report</MarginalNote><Label>(4)</Label><Text>The final interpretation report must contain the following documents and information, as applicable:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444224" lims:id="1444224"><Label>(a)</Label><Text>the documents and information referred to in paragraphs (2)(a) to (e);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444225" lims:id="1444225"><Label>(b)</Label><Text>bathymetric or topographic maps compiled from the data collected;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444226" lims:id="1444226"><Label>(c)</Label><Text>a description and interpretive maps of the acquired data, including</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444227" lims:id="1444227"><Label>(i)</Label><Text>time and depth structure and isopach maps, velocity and residual velocity maps and seismic attribute maps,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444228" lims:id="1444228"><Label>(ii)</Label><Text>final Bouguer gravity maps and any residual or other processed gravity maps,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444229" lims:id="1444229"><Label>(iii)</Label><Text>final total magnetic intensity contour maps and any residual, gradient or other processed magnetic maps,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444230" lims:id="1444230"><Label>(iv)</Label><Text>final controlled-source electromagnetic resistivity maps,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444231" lims:id="1444231"><Label>(v)</Label><Text>surficial maps generated from any seabed, geohazard or pipeline route survey, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444232" lims:id="1444232"><Label>(vi)</Label><Text>any geological maps;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444233" lims:id="1444233"><Label>(d)</Label><Text>a description and analysis of the interpretation of the data with respect to</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444234" lims:id="1444234"><Label>(i)</Label><Text>geological and geophysical correlations,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444235" lims:id="1444235"><Label>(ii)</Label><Text>correlations between gravity, magnetic, seismic and controlled-source electromagnetic data, including correlations to any data acquired during previous surveys,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444236" lims:id="1444236"><Label>(iii)</Label><Text>in the case of seabed surveys, the geophysical correlation between shallow seismic data and data from cores and geotechnical boreholes,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444237" lims:id="1444237"><Label>(iv)</Label><Text>corrections or adjustments that were applied to the data during processing or compilation,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444238" lims:id="1444238"><Label>(v)</Label><Text>the velocity information that the operator used in a time-to-depth conversion,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444239" lims:id="1444239"><Label>(vi)</Label><Text>cores and samples,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444240" lims:id="1444240"><Label>(vii)</Label><Text>other geoscientific and geotechnical analyses, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444241" lims:id="1444241"><Label>(viii)</Label><Text>geohazards; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444242" lims:id="1444242"><Label>(e)</Label><Text>a description of</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444243" lims:id="1444243"><Label>(i)</Label><Text>synthetic seismograms,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444244" lims:id="1444244"><Label>(ii)</Label><Text>seismic modelling studies that use synthetic seismograms,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444245" lims:id="1444245"><Label>(iii)</Label><Text>vertical seismic profiles at wells that were used in the interpretation of the data,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444246" lims:id="1444246"><Label>(iv)</Label><Text>amplitude versus offset studies,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444247" lims:id="1444247"><Label>(v)</Label><Text>seismic inversion studies, if any, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444248" lims:id="1444248"><Label>(vi)</Label><Text>any other seismic studies related to the program.</Text></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444249" lims:id="1444249"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444250" lims:id="1444250">Acquired data</MarginalNote><Label>(5)</Label><Text>The following acquired data must accompany the final reports, as applicable:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444251" lims:id="1444251"><Label>(a)</Label><Text>time-stamped track plot, shotpoint and sample location data;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444252" lims:id="1444252"><Label>(b)</Label><Text>bathymetric data;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444253" lims:id="1444253"><Label>(c)</Label><Text>all final processed seismic data for each 2-D seismic line in time and depth;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444254" lims:id="1444254"><Label>(d)</Label><Text>all final processed 3-D volumes and each line generated from that volume in time and depth;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444255" lims:id="1444255"><Label>(e)</Label><Text>any vertical seismic profiles, synthetic seismograms, amplitude versus offset data and seismic inversion data;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444256" lims:id="1444256"><Label>(f)</Label><Text>in the case of any seabed, geohazard or pipeline route survey,</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444257" lims:id="1444257"><Label>(i)</Label><Text>processed high-resolution data for each line,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444258" lims:id="1444258"><Label>(ii)</Label><Text>digital location maps for any samples,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444259" lims:id="1444259"><Label>(iii)</Label><Text>any photographs and videos, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444260" lims:id="1444260"><Label>(iv)</Label><Text>sub-bottom profiler and side-scan sonar data;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444261" lims:id="1444261"><Label>(g)</Label><Text>in the case of an environmental program, any photograph, video or other graphic information that is relevant and contributes to the interpretation of the final data and the drafting of the final report;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444262" lims:id="1444262"><Label>(h)</Label><Text>in the case of a gravity or magnetic survey, a series of gravity and magnetic profiles across all gravity and magnetic surveys; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444263" lims:id="1444263"><Label>(i)</Label><Text>in the case of controlled-source electromagnetic data, final processed cross-sections on all receiver lines, curves from all receivers and all 2-D and 3-D final models generated.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444264" lims:id="1444264"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444265" lims:id="1444265">Incorporation of previous data</MarginalNote><Label>(6)</Label><Text>The operator must incorporate into any map referred to in paragraph (4)(b) that is included in a final interpretation report any data previously collected by the operator that are related to the area covered by the map and that are of a type similar to the data from which the map was produced.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444266" lims:id="1444266"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444267" lims:id="1444267">Exception — data made available to public</MarginalNote><Label>188</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444268" lims:id="1444268"><Label>(1)</Label><Text>An operator that has conducted a geoscientific program, a geotechnical program or an environmental program need not submit a final interpretation report if the data acquired from the program are made available to the public for purchase or for use under licence.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444269" lims:id="1444269"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444270" lims:id="1444270">Data no longer available</MarginalNote><Label>(2)</Label><Text>If the operator ceases to make data available for purchase or use under licence, the operator must ensure that, within 12 months after the day on which the operator ceased to make the data available, the final interpretation report is submitted to the Board.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444271" lims:id="1444271"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444272" lims:id="1444272">Data purchases</MarginalNote><Label>189</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444273" lims:id="1444273"><Label>(1)</Label><Text>A purchaser of data referred to in subsection <XRefInternal>188</XRefInternal>(1) that were acquired in an area that is subject to an <DefinitionRef>interest</DefinitionRef>, as defined in section 47 of the Act, must submit to the Board a final interpretation report that contains the documents and information referred to in subsection <XRefInternal>187</XRefInternal>(4), as applicable, if the costs of the purchase of the data are to be credited against a deposit or other costs in relation to the interest.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444274" lims:id="1444274"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444275" lims:id="1444275">Reports from data purchaser</MarginalNote><Label>(2)</Label><Text>If the purchaser has reprocessed or reinterpreted the data, and if the costs of the reprocessing or reinterpretation are to be credited against a deposit or other costs of the interest, the purchaser must submit to the Board, with the acquired data referred to in subsection <XRefInternal>187</XRefInternal>(5), as applicable, a final data processing report that contains the documents and information referred to in subsection <XRefInternal>187</XRefInternal>(3) and a final interpretation report that contains the documents and information referred to in subsection <XRefInternal>187</XRefInternal>(4), as applicable.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444276" lims:id="1444276"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444277" lims:id="1444277">Timing of submissions</MarginalNote><Label>(3)</Label><Text>The reports and data required under subsections (1) and (2) must be submitted by the purchaser to the Board before the costs referred to in those subsections are credited.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444278" lims:id="1444278"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444279" lims:id="1444279">Notice to Chief Conservation Officer</MarginalNote><Label>(4)</Label><Text>A person who has submitted a report referred to in this section must, in respect of data that pertain to shotpoints or the location of stations, notify the Chief Conservation Officer, without delay, of any errors or omissions identified in or corrections made to the data after the report is submitted.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1444280" lims:id="1444280" level="2"><TitleText>Drilling and Production</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444281" lims:id="1444281"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444282" lims:id="1444282">Reference</MarginalNote><Label>190</Label><Text>When submitting any information to the Board about a well, pool, zone or field under these Regulations, an operator must refer to each by the name given to it under section <XRefInternal>59</XRefInternal> or paragraph <XRefInternal>60</XRefInternal>(b), as the case may be.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444283" lims:id="1444283"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444284" lims:id="1444284">Results, data, analyses and schematics</MarginalNote><Label>191</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444285" lims:id="1444285"><Label>(1)</Label><Text>An operator must ensure that a copy of the final results, data, analyses and schematics obtained from any well operation, including those obtained as a result of the following activities, is submitted to the Board:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444286" lims:id="1444286"><Label>(a)</Label><Text>the testing, sampling and pressure measurements that are conducted as part of the field data acquisition program referred to in section <XRefInternal>13</XRefInternal> and the well data acquisition program referred to in section <XRefInternal>18</XRefInternal>, as well as any evaluation, testing and sampling of formations that is conducted under section <XRefInternal>62</XRefInternal>; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444287" lims:id="1444287"><Label>(b)</Label><Text>any verification conducted under paragraph <XRefInternal>71</XRefInternal>(2)(a) and any segregation test conducted under paragraph <XRefInternal>71</XRefInternal>(2)(b).</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444288" lims:id="1444288"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444289" lims:id="1444289">Period for submission</MarginalNote><Label>(2)</Label><Text>Unless otherwise agreed to in writing by the Board, the operator must ensure that the copy is submitted within 60 days after the day on which the activity that gave rise to the results, data, analyses or schematics is concluded.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444290" lims:id="1444290"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444291" lims:id="1444291">Survey</MarginalNote><Label>192</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444292" lims:id="1444292"><Label>(1)</Label><Text>An operator must ensure that a survey, certified by a person licensed under the <XRefExternal reference-type="act" link="L-5.8">Canada Lands Surveyors Act</XRefExternal>, is conducted to confirm the location of any well and production installation.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444293" lims:id="1444293"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444294" lims:id="1444294">Copy of survey plan</MarginalNote><Label>(2)</Label><Text>The operator must ensure that a copy of the survey plan is</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444295" lims:id="1444295"><Label>(a)</Label><Text>filed with the Canada Lands Survey Records; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444296" lims:id="1444296"><Label>(b)</Label><Text>submitted to the Board.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444297" lims:id="1444297"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444298" lims:id="1444298">Critical information</MarginalNote><Label>193</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444299" lims:id="1444299"><Label>(1)</Label><Text>The records that must be kept under section <XRefInternal>181</XRefInternal> include, in the case of an operation involving drilling or production, records containing the following information and documents:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444300" lims:id="1444300"><Label>(a)</Label><Text>in respect of any assessment of the efficacy of a spill-treating agent under paragraph <XRefInternal>11</XRefInternal>(4)(a),</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444301" lims:id="1444301"><Label>(i)</Label><Text>a description of the assessment, including any oil samples used, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444302" lims:id="1444302"><Label>(ii)</Label><Text>a description of any tests conducted for the assessment and their results;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444303" lims:id="1444303"><Label>(b)</Label><Text>information concerning the inspection of any installation and its equipment or a pipeline for corrosion and erosion and any resulting maintenance activities carried out;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444304" lims:id="1444304"><Label>(c)</Label><Text>the pressure, temperature and flow rate data obtained from compressors and from systems and equipment used for treatment and processing;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444305" lims:id="1444305"><Label>(d)</Label><Text>information concerning the calibration of meters and other instruments on an installation;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444306" lims:id="1444306"><Label>(e)</Label><Text>information concerning the testing of subsea, surface and subsurface safety valves;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444307" lims:id="1444307"><Label>(f)</Label><Text>information concerning the status of each well and the status of well operations;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444308" lims:id="1444308"><Label>(g)</Label><Text>in the case of a floating platform, information concerning all loads that could affect the motions, stability or inclination of the platform, including</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444309" lims:id="1444309"><Label>(i)</Label><Text>data, observations, measurements and calculations related to its stability and station-keeping capability, including records of all of its movements,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444310" lims:id="1444310"><Label>(ii)</Label><Text>the results of all tests and analyses conducted to assess its stability and station-keeping capability,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444311" lims:id="1444311"><Label>(iii)</Label><Text>a description of every change in relation to its weight, its centre of gravity or the weight or distribution of temporary or portable equipment on it that may affect its stability, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444312" lims:id="1444312"><Label>(iv)</Label><Text>a description of the verification of the disconnect capability of any disconnectable mooring system;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444313" lims:id="1444313"><Label>(h)</Label><Text>in respect of boilers and pressure systems, the documents and information referred to in paragraphs <XRefInternal>135</XRefInternal>(12)(d) to (f);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444314" lims:id="1444314"><Label>(i)</Label><Text>information concerning each formation leak-off test and formation integrity test conducted under section <XRefInternal>70</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444315" lims:id="1444315"><Label>(j)</Label><Text>the findings resulting from the verifications of temporary safe refuges required under subsection <XRefInternal>117</XRefInternal>(3); and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444316" lims:id="1444316"><Label>(k)</Label><Text>the findings resulting from the verifications of the availability and condition of life-saving appliances required under subsection <XRefInternal>119</XRefInternal>(11).</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444317" lims:id="1444317"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444318" lims:id="1444318">Retention periods</MarginalNote><Label>(2)</Label><Text>The operator must retain the records referred to in subsection (1) for the following periods:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444319" lims:id="1444319"><Label>(a)</Label><Text>in the case of the records referred to in paragraph (1)(a), for as long as the spill-treating agent is approved for use;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444320" lims:id="1444320"><Label>(b)</Label><Text>in the case of the records referred to in paragraphs (1)(b) to (f), subparagraph (1)(g)(iv) and paragraphs (1)(i) to (k), five years after the day on which the record is created;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444321" lims:id="1444321"><Label>(c)</Label><Text>in the case of the records referred to in subparagraphs (1)(g)(i) to (iii), for the life of the floating platform; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444322" lims:id="1444322"><Label>(d)</Label><Text>in the case of the records referred to in paragraph (1)(h), five years after the day on which the boiler or pressure system is taken out of service.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444323" lims:id="1444323"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444324" lims:id="1444324">Daily production record</MarginalNote><Label>194</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444325" lims:id="1444325"><Label>(1)</Label><Text>An operator must ensure that a daily production record is kept in respect of a field in which a pool or well is located until the field is abandoned and, at that time, must offer to submit the record to the Board before destroying it.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444326" lims:id="1444326"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444327" lims:id="1444327">Contents</MarginalNote><Label>(2)</Label><Text>The daily production record must contain, with respect to each day, the following information and documents:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444328" lims:id="1444328"><Label>(a)</Label><Text>information concerning the calibration of meters and other instruments referred to in paragraph <XRefInternal>193</XRefInternal>(1)(d);</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444329" lims:id="1444329"><Label>(b)</Label><Text>any measurements obtained under section <XRefInternal>74</XRefInternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444330" lims:id="1444330"><Label>(c)</Label><Text>a description of the manner in which any fluids were disposed of, including through venting, burning or flaring, or transported for processing, whether through offloading or a pipeline; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444331" lims:id="1444331"><Label>(d)</Label><Text>any other information relating to the production of petroleum and other fluids from each pool or well.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444332" lims:id="1444332"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444333" lims:id="1444333">Formation flow test records and report</MarginalNote><Label>195</Label><Text>An operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444334" lims:id="1444334"><Label>(a)</Label><Text>in respect of exploratory wells and delineation wells, a record of formation flow test results is submitted to the Board on a daily basis; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444335" lims:id="1444335"><Label>(b)</Label><Text>in respect of all wells, a formation flow test report is submitted to the Board as soon as the circumstances permit after each formation flow test.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444336" lims:id="1444336"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444337" lims:id="1444337">Pilot scheme</MarginalNote><Label>196</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444338" lims:id="1444338"><Label>(1)</Label><Text>An operator must ensure that interim evaluations of a pilot scheme referred to in section <XRefInternal>81</XRefInternal> are reported to the Board in writing at the intervals referred to in paragraph <XRefInternal>81</XRefInternal>(2)(b).</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444339" lims:id="1444339"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444340" lims:id="1444340">Report on completion</MarginalNote><Label>(2)</Label><Text>On completion of the pilot scheme, the operator must ensure that a report is submitted to the Board that contains</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444341" lims:id="1444341"><Label>(a)</Label><Text>the results of the scheme and supporting data and analyses; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444342" lims:id="1444342"><Label>(b)</Label><Text>the operator’s conclusions as to the potential of the scheme for application to full-scale production.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444343" lims:id="1444343"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444344" lims:id="1444344">Daily reports</MarginalNote><Label>197</Label><Text>An operator must ensure that the following reports are submitted to the Board on a daily basis:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444345" lims:id="1444345"><Label>(a)</Label><Text>a daily operations report that contains</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444346" lims:id="1444346"><Label>(i)</Label><Text>a description of the works and activities that were carried out on the installation on the previous day and the current status of those works and activities,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444347" lims:id="1444347"><Label>(ii)</Label><Text>a description of the works and activities that are expected to be carried out on the installation on the day on which the report is submitted,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444348" lims:id="1444348"><Label>(iii)</Label><Text>a summary of the verification, inspection, monitoring, testing, maintenance and operating activities critical to safety that were carried out on the previous day,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444349" lims:id="1444349"><Label>(iv)</Label><Text>a summary of the physical and environmental conditions that were observed under section <XRefInternal>42</XRefInternal> on the previous day,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444350" lims:id="1444350"><Label>(v)</Label><Text>a summary of the information referred to in paragraph <XRefInternal>193</XRefInternal>(1)(g) that was obtained on the previous day, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444351" lims:id="1444351"><Label>(vi)</Label><Text>any other information that is necessary to indicate the status of operations on the installation;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444352" lims:id="1444352"><Label>(b)</Label><Text>a daily drilling report that contains</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444353" lims:id="1444353"><Label>(i)</Label><Text>the daily and cumulative costs of operating the installation,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444354" lims:id="1444354"><Label>(ii)</Label><Text>all well and casing data obtained on the previous day,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444355" lims:id="1444355"><Label>(iii)</Label><Text>a description of the properties of the drilling fluid and all drilling fluid gas readings from the previous day,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444356" lims:id="1444356"><Label>(iv)</Label><Text>a summary of any directional and deviation surveys carried out the previous day,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444357" lims:id="1444357"><Label>(v)</Label><Text>a description of the formations encountered on the previous day,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444358" lims:id="1444358"><Label>(vi)</Label><Text>the results of any blowout preventer test carried out on the previous day and the date of the most recent test, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444359" lims:id="1444359"><Label>(vii)</Label><Text>the results of any formation leak-off tests or formation integrity tests referred to in section <XRefInternal>70</XRefInternal> that were carried out the previous day;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444360" lims:id="1444360"><Label>(c)</Label><Text>a daily geological report, consisting of well and field data acquired the previous day through the programs referred to in sections <XRefInternal>13</XRefInternal> and <XRefInternal>18</XRefInternal> , geological assessments made the previous day and any other information that is relevant to those assessments; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444361" lims:id="1444361"><Label>(d)</Label><Text>in the case of a production installation, a daily production report that contains a summary of the information referred to in paragraphs <XRefInternal>193</XRefInternal>(1)(a) to (c) in relation to the previous day and a summary of the daily production record referred to in section <XRefInternal>194</XRefInternal>.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444362" lims:id="1444362"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444363" lims:id="1444363">Monthly production report</MarginalNote><Label>198</Label><Text>An operator must ensure that a report summarizing the production data collected during a given month is submitted to the Board not later than the 15th day of the subsequent month.</Text></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444364" lims:id="1444364"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444365" lims:id="1444365">Well records and reports</MarginalNote><Label>199</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444366" lims:id="1444366"><Label>(1)</Label><Text>An operator must ensure that</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444367" lims:id="1444367"><Label>(a)</Label><Text>a well termination record is submitted to the Board in respect of a well within 21 days after</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444368" lims:id="1444368"><Label>(i)</Label><Text>the day on which the well is abandoned,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444369" lims:id="1444369"><Label>(ii)</Label><Text>the day on which the well is suspended if the suspension is planned to be for a period that is longer than 21 days, or</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444370" lims:id="1444370"><Label>(iii)</Label><Text>the day on which the well is completed or recompleted;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444371" lims:id="1444371"><Label>(b)</Label><Text>a well operation report is submitted to the Board in respect of a well that requires a workover or intervention within 30 days after the day on which the workover or intervention is completed;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444372" lims:id="1444372"><Label>(c)</Label><Text>a well history report is submitted to the Board in respect of a development well within 45 days after the day referred to in subparagraph (a)(i), (ii) or (iii), as the case may be;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444373" lims:id="1444373"><Label>(d)</Label><Text>a well history report is submitted to the Board in respect of an exploration or delineation well within 90 days after the day referred to in subparagraph (a)(i), (ii) or (iii), as the case may be; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444374" lims:id="1444374"><Label>(e)</Label><Text>the actual cost breakdown of all well operations is submitted to the Board within 90 days after the day on which a well is abandoned, suspended or completed.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444375" lims:id="1444375"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444376" lims:id="1444376">Well termination record — contents</MarginalNote><Label>(2)</Label><Text>The record required under paragraph (1)(a) must describe the manner in which the well has been abandoned, suspended, completed or recompleted and must include a schematic of the well illustrating the nature and location of the plugs used to abandon or suspend the well or the equipment used to complete or recomplete the well.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444377" lims:id="1444377"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444378" lims:id="1444378">Reports — contents</MarginalNote><Label>(3)</Label><Text>The reports required under paragraphs (1)(b) to (d) must contain a record of all operational, engineering, petrophysical, geophysical and geological information that is relevant to the well operation, including any problems encountered during the well operation and the results of any formation leak-off test or formation integrity test conducted under section <XRefInternal>70</XRefInternal>.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444379" lims:id="1444379"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444380" lims:id="1444380">Impact description</MarginalNote><Label>(4)</Label><Text>The report required under paragraph (1)(b) must describe any impact of the workover or intervention on the performance of the well, including any effect on productivity, injectivity and the recovery of petroleum.</Text></Subsection></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444381" lims:id="1444381"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444382" lims:id="1444382">Environmental report — drilling</MarginalNote><Label>200</Label><Text>An operator must ensure, in relation to a drilling program that involves an exploratory well or a delineation well, that an environmental report that contains the following documents and information is submitted to the Board within 90 days after the day referred to in subparagraph <XRefInternal>199</XRefInternal>(1)(a)(i), (ii) or (iii), as the case may be:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444383" lims:id="1444383"><Label>(a)</Label><Text>a summary of the physical and environmental conditions under which the drilling program was conducted and, if applicable, a description of ice management activities and non-productive time caused by meteorological or ice conditions;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444384" lims:id="1444384"><Label>(b)</Label><Text>a summary of the environmental protection measures in place during the drilling program, the measures taken to mitigate the effects of any reportable incident, the effectiveness of those measures and any adjustments made for their continued improvement;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444385" lims:id="1444385"><Label>(c)</Label><Text>a summary of the performance of the drilling program in relation to the environment, including in relation to the objective of reducing environmental risks;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444386" lims:id="1444386"><Label>(d)</Label><Text>a summary of any emergency response drills and exercises for the protection of the environment that were completed; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444387" lims:id="1444387"><Label>(e)</Label><Text>all wildlife observation data that was required to be recorded under paragraph <XRefInternal>181</XRefInternal>(1)(e).</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444388" lims:id="1444388"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444389" lims:id="1444389">Annual environmental report — production and pipeline</MarginalNote><Label>201</Label><Text>An operator must ensure, in relation to a production project or pipeline project, that an environmental report that contains the following documents and information with respect to a given calendar year is submitted to the Board not later than March 31 of the subsequent year:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444390" lims:id="1444390"><Label>(a)</Label><Text>a summary of the general physical and environmental conditions to which each operations site was subjected;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444391" lims:id="1444391"><Label>(b)</Label><Text>a description of any ice management activities carried out;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444392" lims:id="1444392"><Label>(c)</Label><Text>a summary of the environmental protection measures in place, the measures taken to mitigate the effects of any reportable incident, the effectiveness of those measures and any adjustments made for their continued improvement;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444393" lims:id="1444393"><Label>(d)</Label><Text>a summary of the performance of the project in relation to the environment, including in relation to the objective of reducing environmental risks;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444394" lims:id="1444394"><Label>(e)</Label><Text>a summary of any emergency response drills and exercises for the protection of the environment that were completed; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444395" lims:id="1444395"><Label>(f)</Label><Text>all wildlife observation data that were required to be recorded under paragraph <XRefInternal>181</XRefInternal>(1)(e).</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444396" lims:id="1444396"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444397" lims:id="1444397">Annual production report</MarginalNote><Label>202</Label><Text>An operator must ensure that, not later than March 31 of each year, an annual production report for a pool, field or zone is submitted to the Board that contains information on how the operator manages and intends to manage the resource being produced without waste, including</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444398" lims:id="1444398"><Label>(a)</Label><Text>for the preceding calendar year, details on performance, production forecasts, reserve revision, the reasons for deviations in well performance from forecasts in previous annual production reports, gas conservation resources, efforts to maximize the recovery of petroleum and operating and capital expenditures, including the cost of each well operation; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444399" lims:id="1444399"><Label>(b)</Label><Text>for the preceding calendar year, the current calendar year and the next two calendar years, capital costs and fixed operating costs for each well and field in a production project, variable costs, commodity prices and financial commitments in relation to the transportation of the resource, including by pipeline.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444400" lims:id="1444400"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444401" lims:id="1444401">Gas venting records</MarginalNote><Label>203</Label><Text>An operator must ensure that a record is kept of the following information in respect of each gas venting referred to in paragraph <XRefInternal>82</XRefInternal>(c):</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444402" lims:id="1444402"><Label>(a)</Label><Text>a description of the emergency situation that justified the venting;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444403" lims:id="1444403"><Label>(b)</Label><Text>a description of the venting, the date it occurred and its duration; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444404" lims:id="1444404"><Label>(c)</Label><Text>the volume of gas vented.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444405" lims:id="1444405"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444406" lims:id="1444406">Compressor records</MarginalNote><Label>204</Label><Text>An operator must ensure that a record containing the following documents and information is kept in respect of the compressors referred to in subsection <XRefInternal>84</XRefInternal>(1):</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444407" lims:id="1444407"><Label>(a)</Label><Text>information demonstrating, with supporting documents, that the continuous monitoring device referred to in subsection <XRefInternal>84</XRefInternal>(2) has been calibrated in accordance with the manufacturer’s recommendations such that its measurements have a maximum margin of error of ±10%; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444408" lims:id="1444408"><Label>(b)</Label><Text>for each compressor, if its maximum flow rate limit under subsection <XRefInternal>84</XRefInternal>(3) or (4) has been exceeded,</Text><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444409" lims:id="1444409"><Label>(i)</Label><Text>its serial number, make and model,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444410" lims:id="1444410"><Label>(ii)</Label><Text>the date on which the maximum flow rate limit was exceeded,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444411" lims:id="1444411"><Label>(iii)</Label><Text>the flow rate indicated by the continuous monitoring device when the maximum flow rate limit was exceeded, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444412" lims:id="1444412"><Label>(iv)</Label><Text>a description of the corrective measures that were taken and the dates on which they was taken.</Text></Subparagraph></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444413" lims:id="1444413"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444414" lims:id="1444414">Fugitive emission records</MarginalNote><Label>205</Label><Text>An operator must ensure that a record containing the following information is kept in respect of any fugitive emission from an installation that is detected:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444415" lims:id="1444415"><Label>(a)</Label><Text>the date on which the emission was detected;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444416" lims:id="1444416"><Label>(b)</Label><Text>the type of equipment from which the emission was released and its location within the installation or identifier;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444417" lims:id="1444417"><Label>(c)</Label><Text>the means by which the emission was identified; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444418" lims:id="1444418"><Label>(d)</Label><Text>a description of the corrective measures that were taken and the dates on which they were taken.</Text></Paragraph></Section><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444419" lims:id="1444419"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444420" lims:id="1444420">Record retention period</MarginalNote><Label>206</Label><Text>An operator must ensure that a record referred to in any of sections <XRefInternal>203</XRefInternal> to <XRefInternal>205</XRefInternal> is retained for five years after the day on which the record is created.</Text></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1444421" lims:id="1444421" level="2"><TitleText>Diving Projects or Construction Activities</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444422" lims:id="1444422"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444423" lims:id="1444423">Weekly status reports</MarginalNote><Label>207</Label><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444424" lims:id="1444424"><Label>(1)</Label><Text>An operator must ensure that weekly reports are submitted to the Board on the status of any diving project or construction activities.</Text></Subsection><Subsection lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444425" lims:id="1444425"><MarginalNote lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444426" lims:id="1444426">Content of reports</MarginalNote><Label>(2)</Label><Text>The weekly status reports must contain the following documents and information:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444427" lims:id="1444427"><Label>(a)</Label><Text>the project number assigned by the Board;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444428" lims:id="1444428"><Label>(b)</Label><Text>information identifying, and indicating the current location and status of, all operations sites and support craft used in the diving project or construction activities;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444429" lims:id="1444429"><Label>(c)</Label><Text>a description of the works and activities carried out during the preceding week;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444430" lims:id="1444430"><Label>(d)</Label><Text>an indication of the total number of persons involved in the works and activities who, during the week, were at, or transferred to or from, the operations sites and, if applicable, the means by which they were transferred;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444431" lims:id="1444431"><Label>(e)</Label><Text>a summary of emergency drills and exercises that were completed and reportable incidents that occurred during the week;</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444432" lims:id="1444432"><Label>(f)</Label><Text>an indication of the quantities of consumable substances that are critical to safety that are currently at each operations site; and</Text></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444433" lims:id="1444433"><Label>(g)</Label><Text>a summary of the verification, inspection, monitoring, testing, maintenance and operating activities that are critical to safety that were carried out during the preceding week.</Text></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1444434" lims:id="1444434" level="1"><Label>PART 13</Label><TitleText>Repeals and Coming into Force</TitleText></Heading><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1444435" lims:id="1444435" level="2"><TitleText>Repeals</TitleText></Heading><Section lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444436" lims:id="1444436" target="SOR/2009-316" type="repeal"><Label>208</Label><Text>The following Regulations are repealed:</Text><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444437" lims:id="1444437" type="repeal"><Label>(a)</Label><Text>the <XRefExternal reference-type="regulation" link="SOR-88-347">Newfoundland Offshore Area Oil and Gas Operations Regulations</XRefExternal><FootnoteRef idref="fn_81000-2-4108_hq_30622">1</FootnoteRef>;</Text><Footnote id="fn_81000-2-4108_hq_30622" placement="page" status="official"><Label>1</Label><Text>SOR/88-347</Text></Footnote></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444438" lims:id="1444438" type="repeal"><Label>(b)</Label><Text>the <XRefExternal reference-type="regulation" link="SOR-95-100">Newfoundland Offshore Certificate of Fitness Regulations</XRefExternal><FootnoteRef idref="fn_81000-2-4108_hq_30624">2</FootnoteRef>;</Text><Footnote id="fn_81000-2-4108_hq_30624" placement="page" status="official"><Label>2</Label><Text>SOR/95-100</Text></Footnote></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444439" lims:id="1444439" type="repeal"><Label>(c)</Label><Text>the <XRefExternal reference-type="regulation" link="SOR-95-104">Newfoundland Offshore Petroleum Installations Regulations</XRefExternal><FootnoteRef idref="fn_81000-2-4108_hq_30626">3</FootnoteRef>;</Text><Footnote id="fn_81000-2-4108_hq_30626" placement="page" status="official"><Label>3</Label><Text>SOR/95-104</Text></Footnote></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444440" lims:id="1444440" type="repeal"><Label>(d)</Label><Text>the <XRefExternal reference-type="regulation" link="SOR-95-334">Newfoundland Offshore Area Petroleum Geophysical Operations Regulations</XRefExternal><FootnoteRef idref="fn_81000-2-4108_hq_30623">4</FootnoteRef>; and</Text><Footnote id="fn_81000-2-4108_hq_30623" placement="page" status="official"><Label>4</Label><Text>SOR/95-334</Text></Footnote></Paragraph><Paragraph lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444441" lims:id="1444441" type="repeal"><Label>(e)</Label><Text>the <XRefExternal reference-type="regulation" link="SOR-2009-316">Newfoundland Offshore Petroleum Drilling and Production Regulations</XRefExternal><FootnoteRef idref="fn_81000-2-4108_hq_30625">5</FootnoteRef>.</Text><Footnote id="fn_81000-2-4108_hq_30625" placement="page" status="official"><Label>5</Label><Text>SOR/2009-316</Text></Footnote></Paragraph></Section><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1444442" lims:id="1444442" level="2"><TitleText>Coming into Force</TitleText></Heading><Section lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-02-19" lims:fid="1444443" lims:id="1444443" type="CIF"><MarginalNote lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1444444" lims:id="1444444">Eight months after publication</MarginalNote><Label><FootnoteRef idref="fn_SOR-2024-25_e_transform_hq_1709064003">*</FootnoteRef>209</Label><Text>These Regulations come into force on the day that, in the eighth month after the month in which they are published in the <XRefExternal reference-type="other" link="gazette">Canada Gazette</XRefExternal>, Part II, has the same calendar number as the day on which they are published or, if that eighth month has no day with that number, the last day of that eighth month.</Text><Footnote id="fn_SOR-2024-25_e_transform_hq_1709064003" placement="section" status="editorial"><Label>*</Label><Text>[Note: Regulations in force October 28, 2024.]</Text></Footnote></Section></Body><Schedule lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444445" lims:id="1444445" bilingual="no" spanlanguages="no"><ScheduleFormHeading lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444446" lims:id="1444446"><Label>SCHEDULE 1</Label><OriginatingRef>(Clauses <XRefInternal>28</XRefInternal>(1)(b)(ii)(A) and (B) and (iii)(B))</OriginatingRef><TitleText>Certificate of Fitness</TitleText></ScheduleFormHeading><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1444447" lims:id="1444447" level="1"><Label>PART 1</Label><TitleText>Provisions of these Regulations</TitleText></Heading><List lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444448" lims:id="1444448" first-line-indent="0" language-align="no" subsequent-line-indent="2.5"><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444449" lims:id="1444449"><Label>1</Label><Text>Section <XRefInternal>24</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444450" lims:id="1444450"><Label>2</Label><Text>Subsections <XRefInternal>84</XRefInternal>(1) to (4)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444451" lims:id="1444451"><Label>3</Label><Text>Section <XRefInternal>98</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444452" lims:id="1444452"><Label>4</Label><Text>Section <XRefInternal>100</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444453" lims:id="1444453"><Label>5</Label><Text>Subsections <XRefInternal>103</XRefInternal>(1) and (2)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444454" lims:id="1444454"><Label>6</Label><Text>Sections <XRefInternal>104</XRefInternal> to <XRefInternal>108</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444455" lims:id="1444455"><Label>7</Label><Text>Subsection <XRefInternal>109</XRefInternal>(2)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444456" lims:id="1444456"><Label>8</Label><Text>Sections <XRefInternal>110</XRefInternal> to <XRefInternal>114</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444457" lims:id="1444457"><Label>9</Label><Text>Subsections <XRefInternal>115</XRefInternal>(1) to (7)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444458" lims:id="1444458"><Label>10</Label><Text>Section <XRefInternal>116</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444459" lims:id="1444459"><Label>11</Label><Text>Subsections <XRefInternal>117</XRefInternal>(1) and (2)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444460" lims:id="1444460"><Label>12</Label><Text>Section <XRefInternal>118</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444461" lims:id="1444461"><Label>13</Label><Text>Subsections <XRefInternal>119</XRefInternal>(1) to (10)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444462" lims:id="1444462"><Label>14</Label><Text>Section <XRefInternal>120</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444463" lims:id="1444463"><Label>15</Label><Text>Subsection <XRefInternal>121</XRefInternal>(2)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444464" lims:id="1444464"><Label>16</Label><Text>Sections <XRefInternal>122</XRefInternal> and <XRefInternal>123</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444465" lims:id="1444465"><Label>17</Label><Text>Subsection <XRefInternal>124</XRefInternal>(2)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444466" lims:id="1444466"><Label>18</Label><Text>Subsection <XRefInternal>125</XRefInternal>(1)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444467" lims:id="1444467"><Label>19</Label><Text>Paragraph <XRefInternal>125</XRefInternal>(2)(a)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444468" lims:id="1444468"><Label>20</Label><Text>Sections <XRefInternal>126</XRefInternal> to <XRefInternal>131</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444469" lims:id="1444469"><Label>21</Label><Text>Subsections <XRefInternal>132</XRefInternal>(1) to (6)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444470" lims:id="1444470"><Label>22</Label><Text>Subsections <XRefInternal>133</XRefInternal>(1) to (6) and (9)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444471" lims:id="1444471"><Label>23</Label><Text>Section <XRefInternal>134</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444472" lims:id="1444472"><Label>24</Label><Text>Subsections <XRefInternal>135</XRefInternal>(1) to (7) and (11) to (13)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444473" lims:id="1444473"><Label>25</Label><Text>Section <XRefInternal>136</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444474" lims:id="1444474"><Label>26</Label><Text>Paragraph <XRefInternal>137</XRefInternal>(1)(a)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444475" lims:id="1444475"><Label>27</Label><Text>Subsections <XRefInternal>137</XRefInternal>(2) to (8) and (10)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444476" lims:id="1444476"><Label>28</Label><Text>Subsections <XRefInternal>138</XRefInternal>(1) to (4), (6) and (7)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444477" lims:id="1444477"><Label>29</Label><Text>Section <XRefInternal>139</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444478" lims:id="1444478"><Label>30</Label><Text>Section <XRefInternal>141</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444479" lims:id="1444479"><Label>31</Label><Text>Paragraphs <XRefInternal>142</XRefInternal>(1)(a) to (c)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444480" lims:id="1444480"><Label>32</Label><Text>Subsections <XRefInternal>142</XRefInternal>(2) to (4)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444481" lims:id="1444481"><Label>33</Label><Text>Subsections <XRefInternal>143</XRefInternal>(1) and (2)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444482" lims:id="1444482"><Label>34</Label><Text>Sections <XRefInternal>144</XRefInternal> to <XRefInternal>146</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444483" lims:id="1444483"><Label>35</Label><Text>Subsections <XRefInternal>147</XRefInternal>(1) to (3)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444484" lims:id="1444484"><Label>36</Label><Text>Subsections <XRefInternal>148</XRefInternal>(1) to (6). However, subsection (5) applies only with respect to the criteria for disconnection.</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444485" lims:id="1444485"><Label>37</Label><Text>Section <XRefInternal>149</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444486" lims:id="1444486"><Label>38</Label><Text>Subsection <XRefInternal>150</XRefInternal>(1)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444487" lims:id="1444487"><Label>39</Label><Text>Sections <XRefInternal>151</XRefInternal> and <XRefInternal>152</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444488" lims:id="1444488"><Label>40</Label><Text>Section <XRefInternal>154</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444489" lims:id="1444489"><Label>41</Label><Text>Subsections <XRefInternal>155</XRefInternal>(1) to (3)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444490" lims:id="1444490"><Label>42</Label><Text>Section <XRefInternal>174</XRefInternal></Text></Item></List><Heading lims:inforce-start-date="2024-02-19" lims:enacted-date="2024-02-19" lims:fid="1444491" lims:id="1444491" level="1"><Label>PART 2</Label><TitleText>Provisions of the Canada–Newfoundland and Labrador Offshore Area Occupational Health and Safety Regulations</TitleText></Heading><List lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444492" lims:id="1444492" first-line-indent="0" language-align="no" subsequent-line-indent="2.5"><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444493" lims:id="1444493"><Label>1</Label><Text>Section 19</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444494" lims:id="1444494"><Label>2</Label><Text>Paragraphs 21(b) and (c)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444495" lims:id="1444495"><Label>3</Label><Text>Sections 22 to 25</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444496" lims:id="1444496"><Label>4</Label><Text>Subsections 26(1) and (3)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444497" lims:id="1444497"><Label>5</Label><Text>Sections 27 and 28</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444498" lims:id="1444498"><Label>6</Label><Text>Paragraph 29(a)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444499" lims:id="1444499"><Label>7</Label><Text>Subparagraph 30(2)(d)(ii)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444500" lims:id="1444500"><Label>8</Label><Text>Subsection 30(3)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444501" lims:id="1444501"><Label>9</Label><Text>Paragraphs 32(2)(a), (b) and (d)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444502" lims:id="1444502"><Label>10</Label><Text>Subsection 32(3)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444503" lims:id="1444503"><Label>11</Label><Text>Paragraphs 32(4)(a), (c) to (g) and (i). However, paragraph (e) applies only with respect to the requirement that a medical room have surfaces that are easily cleaned and disinfected.</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444504" lims:id="1444504"><Label>12</Label><Text>Paragraphs 46(a) and (b)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444505" lims:id="1444505"><Label>13</Label><Text>Subparagraph 46(m)(i)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444506" lims:id="1444506"><Label>14</Label><Text>Clauses 46(m)(ii)(A), (C) and (D)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444507" lims:id="1444507"><Label>15</Label><Text>Paragraph 47(2)(b)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444508" lims:id="1444508"><Label>16</Label><Text>Subsection 57(1). However, paragraph (e) applies only with respect to the requirement that the accommodations area be maintained in good repair.</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444509" lims:id="1444509"><Label>17</Label><Text>Subsections 58(1) and (2)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444510" lims:id="1444510"><Label>18</Label><Text>Paragraphs 58(3)(a) to (e). However, paragraph (a) applies only with respect to the requirement under paragraph 60(2)(a) concerning handwashing facilities and paragraph (e) applies only with respect to the requirement that washrooms be maintained in good repair.</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444511" lims:id="1444511"><Label>19</Label><Text>Subsection 60(1)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444512" lims:id="1444512"><Label>20</Label><Text>Paragraphs 60(2)(a) and (d). However, paragraph (d) applies only with respect to the requirement that handwashing facilities be maintained in good repair.</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444513" lims:id="1444513"><Label>21</Label><Text>Subsection 61(1)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444514" lims:id="1444514"><Label>22</Label><Text>Paragraphs 61(2)(a) to (c) and (e). However, paragraph (e) applies only with respect to the requirement that showers be maintained in good repair.</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444515" lims:id="1444515"><Label>23</Label><Text>Section 62</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444516" lims:id="1444516"><Label>24</Label><Text>Subparagraphs 63(1)(a)(i) to (v)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444517" lims:id="1444517"><Label>25</Label><Text>Paragraphs 63(1)(b) and (c)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444518" lims:id="1444518"><Label>26</Label><Text>Section 64. However, paragraph (d) applies only with respect to the requirement that the dining area be maintained in good repair.</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444519" lims:id="1444519"><Label>27</Label><Text>Subsections 65(2), (4) and (5)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444520" lims:id="1444520"><Label>28</Label><Text>Paragraphs 66(b) and (c). However, subparagraph (c)(iv) applies only with respect to the requirement that waste receptacles be maintained in good working order.</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444521" lims:id="1444521"><Label>29</Label><Text>Subsection 67(1)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444522" lims:id="1444522"><Label>30</Label><Text>Paragraph 73(b)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444523" lims:id="1444523"><Label>31</Label><Text>Subsection 74(1)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444524" lims:id="1444524"><Label>32</Label><Text>Paragraph 77(1)(a)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444525" lims:id="1444525"><Label>33</Label><Text>Subparagraph 77(1)(c)(i)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444526" lims:id="1444526"><Label>34</Label><Text>Subsection 78(2)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444527" lims:id="1444527"><Label>35</Label><Text>Section 79</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444528" lims:id="1444528"><Label>36</Label><Text>Sections 81 to 85</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444529" lims:id="1444529"><Label>37</Label><Text>Paragraphs 91(1)(a) to (e), (h), (j) and (n) to (p). However, paragraph (j) applies only with respect to the requirement that the equipment, machines and devices in question be rated by their manufacturer as appropriate for use.</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444530" lims:id="1444530"><Label>38</Label><Text>Subsection 93(1)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444531" lims:id="1444531"><Label>39</Label><Text>Paragraph 93(2)(a)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444532" lims:id="1444532"><Label>40</Label><Text>Sections 97 and 98</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444533" lims:id="1444533"><Label>41</Label><Text>Section 100</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444534" lims:id="1444534"><Label>42</Label><Text>Subsection 101(1)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444535" lims:id="1444535"><Label>43</Label><Text>Paragraphs 107(a) to (d)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444536" lims:id="1444536"><Label>44</Label><Text>Subsection 113(2)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444537" lims:id="1444537"><Label>45</Label><Text>Paragraphs 113(3)(a) and (b)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444538" lims:id="1444538"><Label>46</Label><Text>Section 120</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444539" lims:id="1444539"><Label>47</Label><Text>Paragraphs 121(1)(a) to (d), (g) to (v) and (z.2)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444540" lims:id="1444540"><Label>48</Label><Text>Subsection 122(5)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444541" lims:id="1444541"><Label>49</Label><Text>Paragraph 122(6)(a)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444542" lims:id="1444542"><Label>50</Label><Text>Subparagraph 122(6)(b)(i)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444543" lims:id="1444543"><Label>51</Label><Text>Section 123</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444544" lims:id="1444544"><Label>52</Label><Text>Subsections 124(2) and (3)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444545" lims:id="1444545"><Label>53</Label><Text>Paragraphs 125(1)(a) and (b)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444546" lims:id="1444546"><Label>54</Label><Text>Paragraphs 126(1)(f) and (g)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444547" lims:id="1444547"><Label>55</Label><Text>Subsection 126(2)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444548" lims:id="1444548"><Label>56</Label><Text>Paragraph 127(3)(a)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444549" lims:id="1444549"><Label>57</Label><Text>Subsection 130(3)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444550" lims:id="1444550"><Label>58</Label><Text>Paragraphs 144(1)(b), (l), (n), (o), (r) to (u), (w) and (x)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444551" lims:id="1444551"><Label>59</Label><Text>Subsection 147(1)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444552" lims:id="1444552"><Label>60</Label><Text>Paragraph 153(1)(e)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444553" lims:id="1444553"><Label>61</Label><Text>Paragraphs 157(1)(b), (d), (g), (l) and (q). However, subparagraph (q)(iv) applies only with respect to the inspection of a piping system that contains a hazardous substance before it is placed in service.</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444554" lims:id="1444554"><Label>62</Label><Text>Subparagraphs 157(1)(c)(i) and (k)(i)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444555" lims:id="1444555"><Label>63</Label><Text>Subsection 171(3)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444556" lims:id="1444556"><Label>64</Label><Text>Paragraphs 172(1)(a), (g), (j) to (m), (o) and (p), (2)(e) and (3)(c) and (f)</Text></Item></List></Schedule><Schedule lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:lastAmendedDate="2024-10-28" lims:fid="1444557" lims:id="1444557" bilingual="no" spanlanguages="no"><ScheduleFormHeading lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444558" lims:id="1444558"><Label>SCHEDULE 2</Label><OriginatingRef>(Subparagraph <XRefInternal>31</XRefInternal>(3)(b)(iii))</OriginatingRef><TitleText>Verification of Certificate of Fitness Requirements</TitleText></ScheduleFormHeading><List lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444559" lims:id="1444559" first-line-indent="0" language-align="no" subsequent-line-indent="2.5"><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444560" lims:id="1444560"><Label>1</Label><Text>Subparagraph <XRefInternal>4</XRefInternal>(1)(m)(iii)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444561" lims:id="1444561"><Label>2</Label><Text>Paragraphs <XRefInternal>4</XRefInternal>(1)(p) and (v)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444562" lims:id="1444562"><Label>3</Label><Text>Paragraph <XRefInternal>44</XRefInternal>(b)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444563" lims:id="1444563"><Label>4</Label><Text>Section <XRefInternal>45</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444564" lims:id="1444564"><Label>5</Label><Text>Subsections <XRefInternal>68</XRefInternal>(2) and (9)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444565" lims:id="1444565"><Label>6</Label><Text>Section <XRefInternal>73</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444566" lims:id="1444566"><Label>7</Label><Text>Subsection <XRefInternal>77</XRefInternal>(1)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444567" lims:id="1444567"><Label>8</Label><Text>Subsection <XRefInternal>103</XRefInternal>(3)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444568" lims:id="1444568"><Label>9</Label><Text>Subsection <XRefInternal>121</XRefInternal>(1)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444569" lims:id="1444569"><Label>10</Label><Text>Subsection <XRefInternal>124</XRefInternal>(1)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444570" lims:id="1444570"><Label>11</Label><Text>Subsection <XRefInternal>135</XRefInternal>(8)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444571" lims:id="1444571"><Label>12</Label><Text>Subsection <XRefInternal>138</XRefInternal>(5)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444572" lims:id="1444572"><Label>13</Label><Text>Paragraph <XRefInternal>142</XRefInternal>(1)(d)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444573" lims:id="1444573"><Label>14</Label><Text>Subsections <XRefInternal>143</XRefInternal>(3) and (4)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444574" lims:id="1444574"><Label>15</Label><Text>Subsections <XRefInternal>147</XRefInternal>(4) and (5)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444575" lims:id="1444575"><Label>16</Label><Text>Subsection <XRefInternal>148</XRefInternal>(7)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444576" lims:id="1444576"><Label>17</Label><Text>Subsection <XRefInternal>150</XRefInternal>(2)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444577" lims:id="1444577"><Label>18</Label><Text>Section <XRefInternal>153</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444578" lims:id="1444578"><Label>19</Label><Text>Subsection <XRefInternal>155</XRefInternal>(4)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444579" lims:id="1444579"><Label>20</Label><Text>Sections <XRefInternal>163</XRefInternal> to <XRefInternal>165</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444580" lims:id="1444580"><Label>21</Label><Text>Subsections <XRefInternal>166</XRefInternal>(2) and (3)</Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444581" lims:id="1444581"><Label>22</Label><Text>Sections <XRefInternal>167</XRefInternal> and <XRefInternal>168</XRefInternal></Text></Item><Item lims:inforce-start-date="2024-10-28" lims:enacted-date="2024-02-19" lims:fid="1444582" lims:id="1444582"><Label>23</Label><Text>Subsections <XRefInternal>169</XRefInternal>(1) to (3)</Text></Item></List></Schedule></Regulation>