<?xml version="1.0"?><Regulation lims:pit-date="2025-01-01" hasPreviousVersion="true" lims:lastAmendedDate="2025-01-01" lims:current-date="2025-01-22" lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500109" lims:id="1500109" gazette-part="II" regulation-type="SOR" xml:lang="en" xmlns:lims="http://justice.gc.ca/lims"><Identification lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500110" lims:id="1500110"><InstrumentNumber>SOR/2024-263</InstrumentNumber><RegistrationDate><Date><YYYY>2024</YYYY><MM>12</MM><DD>13</DD></Date></RegistrationDate><ConsolidationDate><Date><YYYY>2025</YYYY><MM>1</MM><DD>23</DD></Date></ConsolidationDate><EnablingAuthority lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500111" lims:id="1500111"><XRefExternal reference-type="act" link="C-15.31">CANADIAN ENVIRONMENTAL PROTECTION ACT, 1999</XRefExternal></EnablingAuthority><LongTitle lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500112" lims:id="1500112">Clean Electricity Regulations</LongTitle><RegulationMakerOrder><RegulationMaker>P.C.</RegulationMaker><OrderNumber>2024-1317</OrderNumber><Date><YYYY>2024</YYYY><MM>12</MM><DD>13</DD></Date></RegulationMakerOrder></Identification><Order lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500113" lims:id="1500113"><Provision lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500114" lims:id="1500114" format-ref="indent-0-0" language-align="yes" list-item="no"><Text>Whereas, under subsection 332(1)<FootnoteRef idref="fn_81000-2-4931_hq_1661974979">a</FootnoteRef> of the <XRefExternal reference-type="act" link="C-15.31">Canadian Environmental Protection Act, 1999</XRefExternal><FootnoteRef idref="fn_81000-2-4931_hq_1661974989">b</FootnoteRef>, the Minister of the Environment published in the <XRefExternal reference-type="other" link="gazette">Canada Gazette</XRefExternal>, Part I, on August 19, 2023, a copy of the proposed <XRefExternal reference-type="regulation" link="SOR-2024-263">Clean Electricity Regulations</XRefExternal>, and persons were given an opportunity to file comments with respect to the proposed Regulations or to file a notice of objection requesting that a board of review be established and stating the reasons for the objection;</Text><Footnote id="fn_81000-2-4931_hq_1661974979" placement="page" status="official"><Label>a</Label><Text>S.C. 2023, c. 12, s. 55</Text></Footnote><Footnote id="fn_81000-2-4931_hq_1661974989" placement="page" status="official"><Label>b</Label><Text>S.C. 1999, c. 33</Text></Footnote></Provision><Provision lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500115" lims:id="1500115" format-ref="indent-0-0" language-align="yes" list-item="no"><Text>Whereas, under subsection 93(3) of that Act, the National Advisory Committee has been given an opportunity to provide its advice under section 6<FootnoteRef idref="fn_81000-2-4931_hq_1661975012">c</FootnoteRef> of that Act;</Text><Footnote id="fn_81000-2-4931_hq_1661975012" placement="page" status="official"><Label>c</Label><Text>S.C. 2015, c. 3, par. 172(d)</Text></Footnote></Provision><Provision lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500116" lims:id="1500116" format-ref="indent-0-0" language-align="yes" list-item="no"><Text>And whereas, in the opinion of the Governor in Council, under subsection 93(4) of that Act, the proposed Regulations do not regulate an aspect of a substance that is regulated by or under any other Act of Parliament in a manner that provides, in the opinion of the Governor in Council, sufficient protection to the environment and human health;</Text></Provision><Provision lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500117" lims:id="1500117" format-ref="indent-0-0" language-align="yes" list-item="no"><Text>Therefore, Her Excellency the Governor General in Council, on the recommendation of the Minister of the Environment and the Minister of Health, makes the annexed <XRefExternal reference-type="regulation" link="SOR-2024-263">Clean Electricity Regulations</XRefExternal> under subsection 93(1)<FootnoteRef idref="fn_81000-2-4931_hq_1700838423">d</FootnoteRef>, sections 286.1<FootnoteRef idref="fn_81000-2-4931_hq_1681564597">e</FootnoteRef> and 326<FootnoteRef idref="fn_81000-2-4931_hq_1729011039">f</FootnoteRef> and subsection 330(3.2)<FootnoteRef idref="fn_81000-2-4931_hq_1729011054">g</FootnoteRef> of the <XRefExternal reference-type="act" link="C-15.31">Canadian Environmental Protection Act, 1999</XRefExternal><FootnoteRef idref="fn_81000-2-4931_hq_1661974989">b</FootnoteRef>.</Text><Footnote id="fn_81000-2-4931_hq_1700838423" placement="page" status="official"><Label>d</Label><Text>S.C. 2023, c. 12, ss. 33(1) to (6)</Text></Footnote><Footnote id="fn_81000-2-4931_hq_1681564597" placement="page" status="official"><Label>e</Label><Text>S.C. 2009, c. 14, s. 80</Text></Footnote><Footnote id="fn_81000-2-4931_hq_1729011039" placement="page" status="official"><Label>f</Label><Text>S.C. 2023, c. 26, s. 620</Text></Footnote><Footnote id="fn_81000-2-4931_hq_1729011054" placement="page" status="official"><Label>g</Label><Text>S.C. 2008, c. 31, s. 5</Text></Footnote></Provision></Order><Body lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500118" lims:id="1500118"><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500119" lims:id="1500119" level="1"><TitleText>Purpose</TitleText></Heading><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500120" lims:id="1500120"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500121" lims:id="1500121">Purpose</MarginalNote><Label>1</Label><Text>The purpose of these Regulations is to protect the environment and human health from the threat of climate change by establishing a regime that prohibits excessive carbon dioxide (CO<Sub>2</Sub>) emissions from the use of fossil fuel to generate electricity.</Text></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500122" lims:id="1500122" level="1"><TitleText>Interpretation</TitleText></Heading><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500123" lims:id="1500123"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500124" lims:id="1500124">Definitions</MarginalNote><Label>2</Label><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500125" lims:id="1500125"><Label>(1)</Label><Text>The following definitions apply in these Regulations.</Text><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500126" lims:id="1500126"><Text><DefinedTermEn>ASTM</DefinedTermEn> means ASTM International. (<DefinedTermFr>ASTM</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500127" lims:id="1500127"><Text><DefinedTermEn>auditor</DefinedTermEn> means an individual who</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500128" lims:id="1500128"><Label>(a)</Label><Text>is independent of the responsible person that is to be audited; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500129" lims:id="1500129"><Label>(b)</Label><Text>has knowledge of and experience with respect to</Text><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500130" lims:id="1500130"><Label>(i)</Label><Text>the certification, operation and relative accuracy test audit of continuous emission monitoring systems, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500131" lims:id="1500131"><Label>(ii)</Label><Text>quality assurance and quality control procedures in relation to those systems. (<DefinedTermFr>vérificateur</DefinedTermFr>)</Text></Subparagraph></Paragraph></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500132" lims:id="1500132"><Text><DefinedTermEn>authorized official</DefinedTermEn> means</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500133" lims:id="1500133"><Label>(a)</Label><Text>in respect of a responsible person who is an individual, that individual or an individual who is authorized to act on that individual’s behalf;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500134" lims:id="1500134"><Label>(b)</Label><Text>in respect of a responsible person that is a corporation, an officer of the corporation that is authorized to act on its behalf; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500135" lims:id="1500135"><Label>(c)</Label><Text>in respect of a responsible person that is another entity, an individual who is authorized to act on its behalf. (<DefinedTermFr>agent autorisé</DefinedTermFr>)</Text></Paragraph></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500136" lims:id="1500136"><Text><DefinedTermEn>biogas</DefinedTermEn> means a gaseous mixture — including landfill gas and sludge digestion gas — that consists primarily of methane and CO<Sub>2</Sub> that is recovered from the anaerobic decomposition of biomass and that contains other constituents that prevent it from meeting the standard for injection into the nearest natural gas pipeline. (<DefinedTermFr>biogaz</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500137" lims:id="1500137"><Text><DefinedTermEn>biomass</DefinedTermEn> means material that originates from plants or animals, including animal waste, or any product derived from any of these, and includes wood, wood products, agricultural residues, biologically derived organic matter in municipal or industrial wastes, biogas, renewable natural gas, bio-alcohols, pulping liquor and other fuels that consist only of non-fossilized, biodegradable organic material that originates from plants or animals but does not originate from a geological formation. (<DefinedTermFr>biomasse</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500138" lims:id="1500138"><Text><DefinedTermEn>Canadian offset credit</DefinedTermEn> means</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500139" lims:id="1500139"><Label>(a)</Label><Text>an offset credit issued under subsection 29(1) of the <XRefExternal reference-type="regulation" link="SOR-2022-111">Canadian Greenhouse Gas Offset Credit System Regulations</XRefExternal>; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500140" lims:id="1500140"><Label>(b)</Label><Text>a unit or credit that is recognized under subsection 78(1) of the <XRefExternal reference-type="regulation">Output-Based Pricing System Regulations</XRefExternal> and meets the conditions set out in paragraphs 78(4)(a) to (d) of those Regulations. (<DefinedTermFr>crédit compensatoire canadien</DefinedTermFr>)</Text></Paragraph></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500141" lims:id="1500141"><Text><DefinedTermEn>CEMS Protocol</DefinedTermEn> means the document entitled <XRefExternal reference-type="other">Protocols and performance specifications for continuous monitoring of gaseous emissions from thermal power generation and other sources</XRefExternal>, published by the Department of the Environment in 2023. (<DefinedTermFr>Protocole SMECE</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500142" lims:id="1500142"><Text><DefinedTermEn>coal</DefinedTermEn> includes petroleum coke and synthetic gas that is derived from coal or petroleum coke. (<DefinedTermFr>charbon</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500143" lims:id="1500143"><Text><DefinedTermEn>combustion engine</DefinedTermEn> means an engine, other than an engine that is self-propelled or designed to be propelled while performing its function, that</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500144" lims:id="1500144"><Label>(a)</Label><Text>operates according to the Brayton thermodynamic cycle and combusts fossil fuel to produce a net amount of motive power; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500145" lims:id="1500145"><Label>(b)</Label><Text>combusts fossil fuel and uses reciprocating motion to convert thermal energy into mechanical work. (<DefinedTermFr>moteur à combustion</DefinedTermFr>)</Text></Paragraph></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500146" lims:id="1500146"><Text><DefinedTermEn>commissioning date</DefinedTermEn>, in respect of a unit, means the day on which the oldest boiler or combustion engine in the unit starts operating. (<DefinedTermFr>date de mise en service</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500147" lims:id="1500147"><Text><DefinedTermEn>continuous emission monitoring system</DefinedTermEn> or <DefinedTermEn>CEMS</DefinedTermEn> means equipment for the sampling, conditioning and analyzing of emissions from a given source and the recording of data related to those emissions. (<DefinedTermFr>système de mesure et d’enregistrement en continu des émissions</DefinedTermFr> ou <DefinedTermFr>SMECE</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500148" lims:id="1500148"><Text><DefinedTermEn>deduction period</DefinedTermEn> means the period for which the beginning and end is determined in accordance with subsection <XRefInternal>25</XRefInternal>(2). (<DefinedTermFr>période de déduction</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500149" lims:id="1500149"><Text><DefinedTermEn>electricity generation capacity</DefinedTermEn> means the capacity of a unit, expressed in MW and determined in accordance with section <XRefInternal>6</XRefInternal>. (<DefinedTermFr>capacité de production d’électricité</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500150" lims:id="1500150"><Text><DefinedTermEn>electricity system</DefinedTermEn> means an electricity system that is subject to the standards of the North American Electric Reliability Corporation. (<DefinedTermFr>réseau électrique</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500151" lims:id="1500151"><Text><DefinedTermEn>electricity system operator</DefinedTermEn>, in respect of a unit, means the person that operates the electricity system within a province and to which the unit is required to report in order to transmit electricity to the electricity system. (<DefinedTermFr>exploitant de réseau électrique</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500152" lims:id="1500152"><Text><DefinedTermEn>facility</DefinedTermEn> means the units, buildings, other structures and stationary equipment — including equipment used for hydrogen or ammonia production and equipment used for fuel production from coal gasification — that have in common at least one owner or person who has the charge, management or control of each of them and that are located on a single site, or on contiguous or adjacent sites that function as a single integrated site, where an industrial activity is carried out. (<DefinedTermFr>installation</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500153" lims:id="1500153"><Text><DefinedTermEn>fossil fuel</DefinedTermEn> means a fuel, other than biomass, that releases CO<Sub>2</Sub> when combusted or that is produced using a process that results in CO<Sub>2</Sub> emissions. (<DefinedTermFr>combustible fossile</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500154" lims:id="1500154"><Text><DefinedTermEn>GHGRP</DefinedTermEn> means the document entitled <XRefExternal reference-type="other">Canada’s Greenhouse Gas Quantification Requirements, Greenhouse Gas Reporting Program</XRefExternal>, Version 5.0, published by the Department of the Environment in December 2021. (<DefinedTermFr>PDGES</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500155" lims:id="1500155"><Text><DefinedTermEn>maximum continuous rating</DefinedTermEn> means the maximum net power that a unit can continuously sustain, expressed in MW, as reported to the electricity system operator for the unit. (<DefinedTermFr>puissance maximale continue</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500156" lims:id="1500156"><Text><DefinedTermEn>net supply</DefinedTermEn> means the quantity of electricity supplied to an electricity system during a calendar year, expressed in GWh and determined in accordance with subsection <XRefInternal>13</XRefInternal>(2). (<DefinedTermFr>solde de fourniture</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500157" lims:id="1500157"><Text><DefinedTermEn>planned unit</DefinedTermEn> means a unit referred to in section <XRefInternal>3</XRefInternal>. (<DefinedTermFr>groupe prévu</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500158" lims:id="1500158"><Text><DefinedTermEn>renewable natural gas</DefinedTermEn> means natural gas that meets the standard for injection into the nearest natural gas pipeline and that is either gas derived from the processing of biogas or synthetic natural gas derived from biomass. (<DefinedTermFr>gaz naturel renouvelable</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500159" lims:id="1500159"><Text><DefinedTermEn>responsible person</DefinedTermEn> means an owner or a person that has the charge, management or control of a unit. (<DefinedTermFr>personne responsable</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500160" lims:id="1500160"><Text><DefinedTermEn>standard conditions</DefinedTermEn> means a temperature of 15˚C and a pressure of 101.325 kPa. (<DefinedTermFr>conditions normales</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500161" lims:id="1500161"><Text><DefinedTermEn>unit</DefinedTermEn> means an assembly consisting of equipment that is physically connected and that operates together to generate electricity, including at least one boiler or combustion engine along with any other equipment, such as duct burners or other combustion devices, heat recovery systems, steam turbines, generators, emission control devices and carbon capture and storage systems. (<DefinedTermFr>groupe</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500162" lims:id="1500162"><Text><DefinedTermEn>useful thermal energy</DefinedTermEn> means energy in the form of steam or hot water that is destined for a use, other than the generation of electricity, that would have required the consumption of energy in the form of fuel or electricity had that steam or hot water not been used. (<DefinedTermFr>énergie thermique utile</DefinedTermFr>)</Text></Definition></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500163" lims:id="1500163"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500164" lims:id="1500164">Carbon capture and storage</MarginalNote><Label>(2)</Label><Text>For the purposes of the definition <DefinitionRef>unit</DefinitionRef> in subsection (1), equipment that is connected only by a carbon capture and storage system is not considered to be physically connected. However, that carbon capture and storage system is considered to be part of each unit to which it is connected.</Text></Subsection></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500165" lims:id="1500165"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500166" lims:id="1500166">Planned unit</MarginalNote><Label>3</Label><Text>A unit is planned if its commissioning date is within the period that begins on January 1, 2025 and ends on December 31, 2034 and if the Minister is satisfied that the unit is substantially the same on its commissioning date as the unit in relation to which the following criteria were met:</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500167" lims:id="1500167"><Label>(a)</Label><Text>on or before December 31, 2025,</Text><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500168" lims:id="1500168"><Label>(i)</Label><Text>all information required to initiate any impact assessment or environmental assessment required in relation to the unit under a federal or provincial law has been submitted to the relevant authority,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500169" lims:id="1500169"><Label>(ii)</Label><Text>the proponent responsible for the development of the unit owns or has a lease for the land on which the unit is located,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500170" lims:id="1500170"><Label>(iii)</Label><Text>all information required to initiate the process to obtain any permit required to begin construction at the site where the unit is located has been submitted to the relevant authority, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500171" lims:id="1500171"><Label>(iv)</Label><Text>contracts with a value of at least $10 million have been entered into for the purchase of any equipment referred to in the definition <DefinitionRef>unit</DefinitionRef> in subsection <XRefInternal>2</XRefInternal>(1) for use in the unit; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500172" lims:id="1500172"><Label>(b)</Label><Text>on or before December 31, 2027, construction has begun at the site where the unit is located.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500173" lims:id="1500173"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500174" lims:id="1500174">Incorporation by reference</MarginalNote><Label>4</Label><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500175" lims:id="1500175"><Label>(1)</Label><Text>A reference to any document incorporated by reference into these Regulations, other than the GHGRP and the CEMS Protocol, is a reference to the most recently published version of the document.</Text></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500176" lims:id="1500176"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500177" lims:id="1500177">Interpretation of documents incorporated by reference</MarginalNote><Label>(2)</Label><Text>For the purposes of interpreting any document that is incorporated by reference into these Regulations, “should” is to be read as “must” and any recommendation or suggestion is to be read as an obligation.</Text></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500178" lims:id="1500178"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500179" lims:id="1500179">Adaptation of GHGRP</MarginalNote><Label>(3)</Label><Text>For the purposes of these Regulations, any reference in the GHGRP to the document entitled <XRefExternal reference-type="other">Reference Method for Source Testing: Quantification of Carbon Dioxide Releases by Continuous Emission Monitoring Systems from Thermal Power Generation</XRefExternal> is to be read as a reference to the CEMS Protocol.</Text></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500180" lims:id="1500180"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500181" lims:id="1500181">Adaptation of CEMS Protocol</MarginalNote><Label>(4)</Label><Text>For the purposes of these Regulations, the CEMS Protocol is to be read as follows:</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500182" lims:id="1500182"><Label>(a)</Label><Text>the references to “appropriate regulatory authority”, “applicable regulating authority”, “appropriate regulatory agency” and “corresponding regulating authority” are to be read as references to the Minister, except in section 5.3.1, where “the appropriate regulatory authority” is to be read as “subsection <XRefInternal>46</XRefInternal>(1) of the <XRefExternal reference-type="regulation" link="SOR-2024-263">Clean Electricity Regulations</XRefExternal>”; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500183" lims:id="1500183"><Label>(b)</Label><Text>the reference to “the most recent version of the ECCC Canada’s Greenhouse Gas Quantification Requirements” in section 7.1 is to be read as a reference to “section <XRefInternal>16</XRefInternal> of the <XRefExternal reference-type="regulation" link="SOR-2024-263">Clean Electricity Regulations</XRefExternal>”.</Text></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500184" lims:id="1500184" level="1"><TitleText>Application</TitleText></Heading><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500185" lims:id="1500185"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500186" lims:id="1500186">Criteria</MarginalNote><Label>5</Label><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500187" lims:id="1500187"><Label>(1)</Label><Text>These Regulations begin to apply in respect of a unit on the day on which the unit meets the following criteria and, subject to subsection <XRefInternal>43</XRefInternal>(2), continue to apply until the responsible person for the unit submits the notice of permanent cessation of electricity generation in accordance with subsection <XRefInternal>43</XRefInternal>(1):</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500188" lims:id="1500188"><Label>(a)</Label><Text>the unit has an electricity generation capacity of at least 25 MW;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500189" lims:id="1500189"><Label>(b)</Label><Text>the unit generates electricity using fossil fuel; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500190" lims:id="1500190"><Label>(c)</Label><Text>the unit is connected, directly or indirectly, to an electricity system.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500191" lims:id="1500191"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500192" lims:id="1500192">Sum of electricity generation capacity</MarginalNote><Label>(2)</Label><Text>Subject to subsection (3), a unit that has an electricity generation capacity of less than 25 MW is deemed to meet the criterion set out in paragraph (1)(a) if</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500193" lims:id="1500193"><Label>(a)</Label><Text>the unit’s commissioning date is on or after January 1, 2025; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500194" lims:id="1500194"><Label>(b)</Label><Text>the sum of the electricity generation capacity of all units, other than planned units, that are located at the facility where the unit is located and that have commissioning dates on or after January 1, 2025 is at least 25 MW.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500195" lims:id="1500195"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500196" lims:id="1500196">Non-application — planned units</MarginalNote><Label>(3)</Label><Text>These Regulations do not apply in respect of a planned unit that has an electricity generation capacity of less than 25 MW.</Text></Subsection></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500197" lims:id="1500197"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500198" lims:id="1500198">Electricity generation capacity</MarginalNote><Label>6</Label><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500199" lims:id="1500199"><Label>(1)</Label><Text>Subject to subsection (6), a unit’s electricity generation capacity is</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500200" lims:id="1500200"><Label>(a)</Label><Text>the unit’s maximum gross power, measured at the electrical terminals of the unit’s generators and determined in accordance with subsections (2) to (4); or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500201" lims:id="1500201"><Label>(b)</Label><Text>if the responsible person has not determined the unit’s maximum gross power, the unit’s most recent maximum continuous rating.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500202" lims:id="1500202"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500203" lims:id="1500203">Performance test</MarginalNote><Label>(2)</Label><Text>To determine a unit’s maximum gross power, the responsible person must conduct, in the presence of the performance test verifier referred to in subsection (3), a performance test that	</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500204" lims:id="1500204"><Label>(a)</Label><Text>is conducted on or after January 1, 2025;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500205" lims:id="1500205"><Label>(b)</Label><Text>is a continuous test that lasts at least two hours;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500206" lims:id="1500206"><Label>(c)</Label><Text>does not compromise the continued operation of the unit by exceeding the operating specifications for temperature, pressure or electrical conductivity recommended by the manufacturer of the equipment that is part of the unit;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500207" lims:id="1500207"><Label>(d)</Label><Text>does not require that the planned maintenance schedule of the unit be altered; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500208" lims:id="1500208"><Label>(e)</Label><Text>has results that are adjusted to standard conditions.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500209" lims:id="1500209"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500210" lims:id="1500210">Performance test verifier</MarginalNote><Label>(3)</Label><Text>The performance test verifier is an individual who</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500211" lims:id="1500211"><Label>(a)</Label><Text>is independent of the responsible person; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500212" lims:id="1500212"><Label>(b)</Label><Text>has demonstrated knowledge of the performance testing of units that generate electricity using fossil fuel and at least five years’ experience with respect to such testing.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500213" lims:id="1500213"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500214" lims:id="1500214">Performance test report</MarginalNote><Label>(4)</Label><Text>A responsible person that conducts a performance test must submit to the Minister a performance test report prepared by the performance test verifier that contains the information set out in Schedule 1.</Text></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500215" lims:id="1500215"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500216" lims:id="1500216">Report submitted after registration</MarginalNote><Label>(5)</Label><Text>A responsible person that submits a performance test report for a unit after the registration report for the unit is submitted under subsection <XRefInternal>7</XRefInternal>(1), paragraph <XRefInternal>7</XRefInternal>(2)(a) or subsection <XRefInternal>8</XRefInternal>(2) must submit to the Minister, no later than 60 days after the day on which the test is conducted, the performance test report along with the updated registration report referred to in subsection <XRefInternal>7</XRefInternal>(4).</Text></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500217" lims:id="1500217"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500218" lims:id="1500218">Change of electricity generation capacity</MarginalNote><Label>(6)</Label><Text>If, during a calendar year in which a unit is subject to an emission limit under subsection <XRefInternal>9</XRefInternal>(1), the maximum gross power or maximum continuous rating of the unit changes, the unit’s electricity generation capacity for that calendar year is determined by the formula</Text><FormulaGroup lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500219" lims:id="1500219"><Formula lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500220" lims:id="1500220"><ImageGroup lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500221" lims:id="1500221" bilingual="no" position="center" spanlanguages="no" spanmarginalnotecol="no" width="8pc"><AlternateText>The sum of the products of Ci and Di divided by N for each period “i” of a calendar year.</AlternateText><Image source="SOR-2024-263img/SOR-2024-263_ef001.JPG" /></ImageGroup></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500222" lims:id="1500222"><FormulaTerm>i</FormulaTerm><Text>is the i<Sup>th</Sup> period of the calendar year, where “i” goes from 1 to <Emphasis style="italic">n</Emphasis> and where <Emphasis style="italic">n</Emphasis> is the number of periods in the calendar year during which the unit’s electricity generation capacity differs from the preceding or subsequent period;</Text></FormulaDefinition><FormulaDefinition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500223" lims:id="1500223"><FormulaTerm>C<Sub>i</Sub></FormulaTerm><Text>is the electricity generation capacity of the unit during the i<Sup>th</Sup> period of the calendar year;</Text></FormulaDefinition><FormulaDefinition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500224" lims:id="1500224"><FormulaTerm>D<Sub>i</Sub></FormulaTerm><Text>is the length of the i<Sup>th</Sup> period of the calendar year, expressed in days; and</Text></FormulaDefinition><FormulaDefinition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500225" lims:id="1500225"><FormulaTerm>N</FormulaTerm><Text>is the number of days during the calendar year that the unit’s electricity generation capacity is greater than zero.</Text></FormulaDefinition></FormulaGroup></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500226" lims:id="1500226"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500227" lims:id="1500227">Rounding</MarginalNote><Label>(7)</Label><Text>The electricity generation capacity determined under subsection (2) or (6) is to be rounded to the nearest whole number or, if equidistant between two consecutive whole numbers, to the higher number.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500228" lims:id="1500228" level="1"><TitleText>Registration</TitleText></Heading><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500229" lims:id="1500229"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500230" lims:id="1500230">Registration report</MarginalNote><Label>7</Label><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500231" lims:id="1500231"><Label>(1)</Label><Text>Subject to section <XRefInternal>8</XRefInternal>, the responsible person for a unit that meets the criteria set out in section <XRefInternal>5</XRefInternal> must submit to the Minister a registration report for the unit that contains the information set out in Schedule 2 by the later of</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500232" lims:id="1500232"><Label>(a)</Label><Text>December 31, 2025, and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500233" lims:id="1500233"><Label>(b)</Label><Text>the 60th day after the day on which the unit meets the criteria set out in section <XRefInternal>5</XRefInternal>.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500234" lims:id="1500234"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500235" lims:id="1500235">Modification of a unit</MarginalNote><Label>(2)</Label><Text>If a unit for which a registration report has been submitted under subsection (1) is modified, such as by adding or removing a piece of equipment or changing how equipment is physically connected, and that modification results in the creation of one or more units that meet the criteria set out in section <XRefInternal>5</XRefInternal>, the responsible person must submit to the Minister</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500236" lims:id="1500236"><Label>(a)</Label><Text>a registration report for each unit that was created that contains the information set out in Schedule 2 within 60 days after the day on which the unit was created; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500237" lims:id="1500237"><Label>(b)</Label><Text>the notice of permanent cessation of electricity generation referred to in subsection <XRefInternal>43</XRefInternal>(1) for the original unit or the updated registration report referred to in subsection (4) for that unit.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500238" lims:id="1500238"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500239" lims:id="1500239">Registration number</MarginalNote><Label>(3)</Label><Text>On receipt of the registration report referred to in subsection (1), paragraph (2)(a) or subsection <XRefInternal>8</XRefInternal>(2), the Minister must assign a registration number to the unit and inform the responsible person of that registration number.</Text></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500240" lims:id="1500240"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500241" lims:id="1500241">Updated registration report</MarginalNote><Label>(4)</Label><Text>If there is a change to any information submitted under this section or subsection <XRefInternal>8</XRefInternal>(2), the responsible person must submit to the Minister, no later than 60 days after the day on which the change occurs, an updated registration report for the unit that contains the information set out in Schedule 2.</Text></Subsection></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500242" lims:id="1500242"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500243" lims:id="1500243">Subunits</MarginalNote><Label>8</Label><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500244" lims:id="1500244"><Label>(1)</Label><Text>A responsible person may register a unit as multiple subunits if</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500245" lims:id="1500245"><Label>(a)</Label><Text>each subunit would be a <DefinitionRef>unit</DefinitionRef> as defined in subsection <XRefInternal>2</XRefInternal>(1) if it were not physically connected to any of the other subunits;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500246" lims:id="1500246"><Label>(b)</Label><Text>each subunit has a maximum continuous rating;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500247" lims:id="1500247"><Label>(c)</Label><Text>each subunit produces useful thermal energy;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500248" lims:id="1500248"><Label>(d)</Label><Text>each boiler and combustion engine, as well as any other equipment that is part of the unit, is accounted for in one of the subunits; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500249" lims:id="1500249"><Label>(e)</Label><Text>either each boiler and combustion engine in the unit started operating on or before December 31, 2024 or each boiler and combustion engine was part of a planned unit on the unit’s commissioning date.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500250" lims:id="1500250"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500251" lims:id="1500251">Registration report</MarginalNote><Label>(2)</Label><Text>To register a unit as multiple subunits, the responsible person must</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500252" lims:id="1500252"><Label>(a)</Label><Text>in the case of a unit for which a registration report has not been submitted under section <XRefInternal>7</XRefInternal>, submit to the Minister a registration report for each subunit that contains the information set out in Schedule 2 by the later of</Text><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500253" lims:id="1500253"><Label>(i)</Label><Text>December 31, 2025, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500254" lims:id="1500254"><Label>(ii)</Label><Text>the 60th day after the day on which the unit meets the criteria set out in section <XRefInternal>5</XRefInternal>; or</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500255" lims:id="1500255"><Label>(b)</Label><Text>in the case of a unit for which a registration report has been submitted under section <XRefInternal>7</XRefInternal>, submit to the Minister the following reports no later than the day before the day on which any of the subunits would, if registered, be subject to an emission limit under subsection <XRefInternal>9</XRefInternal>(1):</Text><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500256" lims:id="1500256"><Label>(i)</Label><Text>an updated registration report for the unit that contains the information set out in Schedule 2 in respect of one of the subunits, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500257" lims:id="1500257"><Label>(ii)</Label><Text>a registration report for each of the other subunits that contains the information set out in Schedule 2.</Text></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500258" lims:id="1500258"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500259" lims:id="1500259">Consequences of registration</MarginalNote><Label>(3)</Label><Text>If a unit is registered as multiple subunits in accordance with subsection (2),</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500260" lims:id="1500260"><Label>(a)</Label><Text>each subunit is deemed to be a unit to which these Regulations apply; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500261" lims:id="1500261"><Label>(b)</Label><Text>these Regulations, other than this section, cease to apply in respect of the unit that is registered as multiple subunits.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500262" lims:id="1500262"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500263" lims:id="1500263">Permanent cessation</MarginalNote><Label>(4)</Label><Text>A registered subunit is no longer deemed to be a unit, other than for the purposes of subsection <XRefInternal>43</XRefInternal>(2), beginning on the day on which the responsible person for the subunit submits the notice of permanent cessation of electricity generation referred to in subsection <XRefInternal>43</XRefInternal>(1).</Text></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500264" lims:id="1500264"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500265" lims:id="1500265">Notice — maximum continuous rating</MarginalNote><Label>(5)</Label><Text>The responsible person for a unit that has been registered as multiple subunits must notify the Minister, no later than 60 days after the day on which the change occurs, if the sum of the maximum continuous rating for each of the subunits increases by 15% or more from the sum of the maximum continuous ratings reported in the registration reports submitted for the subunits under subsection (2).</Text></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500266" lims:id="1500266"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500267" lims:id="1500267">Application of emission limit</MarginalNote><Label>(6)</Label><Text>If, on the day on which the increase referred to in subsection (5) occurs, one or more of the subunits has not reached the end of its prescribed life, as determined in accordance with subsection <XRefInternal>10</XRefInternal>(3) or section <XRefInternal>11</XRefInternal>, subsection <XRefInternal>9</XRefInternal>(1) begins to apply in respect of each of those subunits on the later of</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500268" lims:id="1500268"><Label>(a)</Label><Text>January 1, 2035, and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500269" lims:id="1500269"><Label>(b)</Label><Text>January 1 of the calendar year following the year in which the increased maximum continuous rating was reported to the electricity system operator.</Text></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500270" lims:id="1500270" level="1"><TitleText>Prohibition</TitleText></Heading><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500271" lims:id="1500271"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500272" lims:id="1500272">Emission limit</MarginalNote><Label>9</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500273" lims:id="1500273"><Label>(1)</Label><Text>The responsible person for a unit must not emit from the unit in a calendar year a quantity of CO<Sub>2</Sub>, determined in accordance with section <XRefInternal>12</XRefInternal>, that exceeds the limit, expressed in tonnes, determined by the formula</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500274" lims:id="1500274"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500275" lims:id="1500275"><FormulaText>C × I<Sub>el</Sub> × 8760 × 0.001</FormulaText></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500276" lims:id="1500276"><FormulaTerm>C</FormulaTerm><Text>is the unit’s electricity generation capacity for the calendar year; and</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500277" lims:id="1500277"><FormulaTerm>I<Sub>el</Sub></FormulaTerm><Text>is the emissions intensity applicable to the calendar year and is</Text><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500278" lims:id="1500278"><Label>(a)</Label><Text>65 tonnes of CO<Sub>2</Sub> emissions per GWh for the 2035 to 2049 calendar years, and</Text></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500279" lims:id="1500279"><Label>(b)</Label><Text>0 tonnes of CO<Sub>2</Sub> emissions per GWh for the 2050 and subsequent calendar years.</Text></FormulaParagraph></FormulaDefinition></FormulaGroup></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500280" lims:id="1500280"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500281" lims:id="1500281">Rounding</MarginalNote><Label>(2)</Label><Text>The emission limit determined under subsection (1) is to be rounded to the nearest whole number or, if equidistant between two consecutive whole numbers, to the higher number.</Text></Subsection></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500282" lims:id="1500282"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500283" lims:id="1500283">Non-application — end of prescribed life</MarginalNote><Label>10</Label><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500284" lims:id="1500284"><Label>(1)</Label><Text>Subject to subsection (2), subsections <XRefInternal>9</XRefInternal>(1), <XRefInternal>12</XRefInternal>(1) and <XRefInternal>13</XRefInternal>(1) do not apply in respect of a unit, other than one that combusts coal, until January 1 of the calendar year following the unit’s end of prescribed life if it</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500285" lims:id="1500285"><Label>(a)</Label><Text>has a commissioning date after December 31, 2009 but before January 1, 2025;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500286" lims:id="1500286"><Label>(b)</Label><Text>is a planned unit; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500287" lims:id="1500287"><Label>(c)</Label><Text>is a boiler unit referred to in subsection 3(4) of the <XRefExternal reference-type="regulation">Regulations Limiting Carbon Dioxide Emissions from Natural Gas-fired Generation of Electricity</XRefExternal> that has an end of prescribed life after December 31, 2034.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500288" lims:id="1500288"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500289" lims:id="1500289">Increase in maximum continuous rating</MarginalNote><Label>(2)</Label><Text>Subsections <XRefInternal>9</XRefInternal>(1), <XRefInternal>12</XRefInternal>(1) and <XRefInternal>13</XRefInternal>(1) begin to apply in respect of a unit referred to in subsection (1) on the later of the following dates if the maximum continuous rating for the unit increases by 15% or more from the maximum continuous rating reported in the registration report submitted for the unit under subsection <XRefInternal>7</XRefInternal>(1), paragraph <XRefInternal>7</XRefInternal>(2)(a) or subsection <XRefInternal>8</XRefInternal>(2):</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500290" lims:id="1500290"><Label>(a)</Label><Text>January 1, 2035, and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500291" lims:id="1500291"><Label>(b)</Label><Text>January 1 of the calendar year following the year in which the increased maximum continuous rating was reported to the electricity system operator.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500292" lims:id="1500292"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500293" lims:id="1500293">Date of end of prescribed life</MarginalNote><Label>(3)</Label><Text>For the purposes of subsection (1) but subject to section <XRefInternal>11</XRefInternal>, a unit’s end of prescribed life is on</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500294" lims:id="1500294"><Label>(a)</Label><Text>December 31 of the calendar year that is 25 years after the unit’s commissioning date, in the case of a unit referred to in paragraph (1)(a);</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500295" lims:id="1500295"><Label>(b)</Label><Text>December 31, 2049, in the case of a planned unit; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500296" lims:id="1500296"><Label>(c)</Label><Text>December 31 of the calendar year before the prohibition set out in subsection 4(2) of the <XRefExternal reference-type="regulation">Regulations Limiting Carbon Dioxide Emissions from Natural Gas-fired Generation of Electricity</XRefExternal> would have applied to the unit, as determined under that subsection, in the case of a unit referred to in paragraph (1)(c).</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500297" lims:id="1500297"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500298" lims:id="1500298">Election</MarginalNote><Label>11</Label><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500299" lims:id="1500299"><Label>(1)</Label><Text>For the purposes of subsection <XRefInternal>10</XRefInternal>(1), the responsible person for a unit may elect to end the unit’s prescribed life on a date that is before the date set out for the unit in subsection <XRefInternal>10</XRefInternal>(3) and that is no earlier than December 31, 2034.</Text></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500300" lims:id="1500300"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500301" lims:id="1500301">Information</MarginalNote><Label>(2)</Label><Text>The responsible person must, in order to make the election, submit the following information to the Minister on or before the date that is elected to be the unit’s end of prescribed life:</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500302" lims:id="1500302"><Label>(a)</Label><Text>the registration number assigned to the unit by the Minister under subsection <XRefInternal>7</XRefInternal>(3); and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500303" lims:id="1500303"><Label>(b)</Label><Text>the date that is elected as the unit’s end of prescribed life.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500304" lims:id="1500304"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500305" lims:id="1500305">Election permanent</MarginalNote><Label>(3)</Label><Text>An election made under this section may not be changed or revoked.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500306" lims:id="1500306" level="1"><TitleText>Obligations</TitleText></Heading><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500307" lims:id="1500307"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500308" lims:id="1500308">CO<Sub>2</Sub> emissions from unit</MarginalNote><Label>12</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500309" lims:id="1500309"><Label>(1)</Label><Text>The responsible person for a unit must determine the quantity of CO<Sub>2</Sub>, expressed in tonnes, emitted from the unit in each calendar year in accordance with the formula</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500310" lims:id="1500310"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500311" lims:id="1500311"><FormulaText>E − C<Sub>off</Sub> − C<Sub>c</Sub></FormulaText></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500312" lims:id="1500312"><FormulaTerm>E</FormulaTerm><Text>is the quantity of CO<Sub>2</Sub> emissions attributed to the unit for the calendar year, expressed in tonnes and determined by the formula</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500313" lims:id="1500313"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500314" lims:id="1500314"><FormulaText>E<Sub>u</Sub> − E<Sub>th</Sub> − E<Sub>int</Sub> − E<Sub>ccs</Sub> + E<Sub>ext</Sub> − E<Sub>ec</Sub></FormulaText></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500315" lims:id="1500315"><FormulaTerm>E<Sub>u</Sub></FormulaTerm><Text>is the quantity of CO<Sub>2</Sub> emissions from the combustion of fossil fuel in the unit during the calendar year, determined in accordance with subsection (3),</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500316" lims:id="1500316"><FormulaTerm>E<Sub>th</Sub></FormulaTerm><Text>is the quantity of CO<Sub>2</Sub> emissions attributed to the production of useful thermal energy by the unit during the calendar year, determined in accordance with section <XRefInternal>21</XRefInternal>,</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500317" lims:id="1500317"><FormulaTerm>E<Sub>int</Sub></FormulaTerm><Text>is the quantity of CO<Sub>2</Sub> emissions attributed to electricity generated by the unit that is used internally, during the calendar year, at the facility where the unit is located and is</Text><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500318" lims:id="1500318"><Label>(a)</Label><Text>equal to zero, in the case of</Text><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500319" lims:id="1500319"><Label>(i)</Label><Text>any calendar year in which the unit does not produce useful thermal energy,</Text></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500320" lims:id="1500320"><Label>(ii)</Label><Text>any unit, other than a planned unit, that has a commissioning date after December 31, 2024, and</Text></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500321" lims:id="1500321"><Label>(iii)</Label><Text>every calendar year after 2049, and</Text></FormulaParagraph></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500322" lims:id="1500322"><Label>(b)</Label><Text>determined in accordance with section <XRefInternal>22</XRefInternal>, in any other case,</Text></FormulaParagraph></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500323" lims:id="1500323"><FormulaTerm>E<Sub>ccs</Sub></FormulaTerm><Text>is the quantity of CO<Sub>2</Sub> captured from the unit during the calendar year and stored in a storage project, determined in accordance with section <XRefInternal>23</XRefInternal>,</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500324" lims:id="1500324"><FormulaTerm>E<Sub>ext</Sub></FormulaTerm><Text>is the quantity of CO<Sub>2</Sub> emissions from the production of the hydrogen, ammonia and purchased or transferred steam used by the unit to generate electricity during the calendar year, determined in accordance with section <XRefInternal>24</XRefInternal>, and</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500325" lims:id="1500325"><FormulaTerm>E<Sub>ec</Sub></FormulaTerm><Text>is the quantity of CO<Sub>2</Sub> emissions attributed to the unit for any deduction period during the calendar year, determined in accordance with section <XRefInternal>27</XRefInternal>;</Text></FormulaDefinition></FormulaGroup></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500326" lims:id="1500326"><FormulaTerm>C<Sub>off</Sub></FormulaTerm><Text>is the quantity of CO<Sub>2</Sub>, expressed in tonnes, that corresponds to the number of Canadian offset credits remitted for the unit for the calendar year in accordance with section <XRefInternal>28</XRefInternal>; and</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500327" lims:id="1500327"><FormulaTerm>C<Sub>c</Sub></FormulaTerm><Text>is the quantity of CO<Sub>2</Sub>, expressed in tonnes, that corresponds to the number of compliance credits remitted for the unit for the calendar year in accordance with section <XRefInternal>33</XRefInternal>.</Text></FormulaDefinition></FormulaGroup></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500328" lims:id="1500328"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500329" lims:id="1500329">Rounding</MarginalNote><Label>(2)</Label><Text>The quantity determined for E under subsection (1) is to be rounded to the nearest whole number or, if equidistant between two consecutive whole numbers, to the higher number.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500330" lims:id="1500330"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500331" lims:id="1500331">Combustion of fossil fuel (E<Sub>u</Sub>)</MarginalNote><Label>(3)</Label><Text>The quantity referred to in the description of E<Sub>u</Sub> in subsections (1) and <XRefInternal>27</XRefInternal>(1) must be determined in accordance with</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500332" lims:id="1500332"><Label>(a)</Label><Text>section <XRefInternal>15</XRefInternal>, in the case of a unit that combusted fossil fuel from a coal gasification system during the calendar year;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500333" lims:id="1500333"><Label>(b)</Label><Text>section <XRefInternal>16</XRefInternal>, in the case of a unit that combusted biomass and combusted fossil fuel from a coal gasification system during the calendar year;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500334" lims:id="1500334"><Label>(c)</Label><Text>section <XRefInternal>19</XRefInternal>, in the case of a unit that combusted biomass but did not combust fossil fuel from a coal gasification system during the calendar year; and</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500335" lims:id="1500335"><Label>(d)</Label><Text>section <XRefInternal>15</XRefInternal> or <XRefInternal>19</XRefInternal>, in any other case.</Text></Paragraph></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500336" lims:id="1500336"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500337" lims:id="1500337">Default value</MarginalNote><Label>(4)</Label><Text>Despite subsection (1), the responsible person for a unit may elect to assign a value of zero to any of E<Sub>th</Sub>, E<Sub>int</Sub>, E<Sub>ccs</Sub> and E<Sub>ec</Sub> when determining, for the unit, the quantity referred to in the description of E in that subsection.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500338" lims:id="1500338"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500339" lims:id="1500339">Definition of <DefinitionRef>coal gasification system</DefinitionRef></MarginalNote><Label>(5)</Label><Text>For the purposes of subsection (3), <DefinedTermEn>coal gasification system</DefinedTermEn> includes a coal gasification system that is in part located underground.</Text></Subsection></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500340" lims:id="1500340"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500341" lims:id="1500341">Net supply</MarginalNote><Label>13</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500342" lims:id="1500342"><Label>(1)</Label><Text>The responsible person for a unit must, for each calendar year, determine the net supply from the facility where the unit is located.</Text></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500343" lims:id="1500343"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500344" lims:id="1500344">Determination</MarginalNote><Label>(2)</Label><Text>The net supply from a facility is determined by the formula</Text><FormulaGroup lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500345" lims:id="1500345"><Formula lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500346" lims:id="1500346"><FormulaText>Q<Sub>t</Sub> − Q<Sub>r</Sub> − Q<Sub>a</Sub> − Q<Sub>na</Sub> − Q<Sub>ec</Sub></FormulaText></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500347" lims:id="1500347"><FormulaTerm>Q<Sub>t</Sub></FormulaTerm><Text>is the quantity of electricity transmitted from the facility to an electricity system during the calendar year;</Text></FormulaDefinition><FormulaDefinition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500348" lims:id="1500348"><FormulaTerm>Q<Sub>r</Sub></FormulaTerm><Text>is the quantity of electricity transmitted to the facility from an electricity system during the calendar year;</Text></FormulaDefinition><FormulaDefinition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500349" lims:id="1500349"><FormulaTerm>Q<Sub>a</Sub></FormulaTerm><Text>is the quantity of electricity allocated to the facility for the calendar year in accordance with subsection (4);</Text></FormulaDefinition><FormulaDefinition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500350" lims:id="1500350"><FormulaTerm>Q<Sub>na</Sub></FormulaTerm><Text>is the sum of the quantities of electricity generated at the facility during the calendar year by</Text><FormulaParagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500351" lims:id="1500351"><Label>(a)</Label><Text>any unit that has not reached the end of its prescribed life as determined in accordance with subsection <XRefInternal>10</XRefInternal>(3) or section <XRefInternal>11</XRefInternal>,</Text></FormulaParagraph><FormulaParagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500352" lims:id="1500352"><Label>(b)</Label><Text>any unit to which these Regulations do not apply, other than a unit that has been registered as multiple subunits in accordance with section <XRefInternal>8</XRefInternal>, and</Text></FormulaParagraph><FormulaParagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500353" lims:id="1500353"><Label>(c)</Label><Text>any source of electricity generation at the facility that is not a unit; and</Text></FormulaParagraph></FormulaDefinition><FormulaDefinition lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500354" lims:id="1500354"><FormulaTerm>Q<Sub>ec</Sub></FormulaTerm><Text>is the sum of the quantities of electricity generated by any unit located at the facility, other than a unit referred to in the description of Q<Sub>na</Sub>, during any deduction period during the calendar year.</Text></FormulaDefinition></FormulaGroup></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500355" lims:id="1500355"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500356" lims:id="1500356">Measurement</MarginalNote><Label>(3)</Label><Text>The quantities of electricity referred to in subsection (2) must be expressed in GWh and must be measured</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500357" lims:id="1500357"><Label>(a)</Label><Text>in the case of the quantities referred to in the descriptions of Q<Sub>t</Sub>, Q<Sub>r</Sub> and Q<Sub>a</Sub>, using meters that measure the transfer of electricity; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500358" lims:id="1500358"><Label>(b)</Label><Text>in the case of the quantities referred to in the descriptions of Q<Sub>na</Sub> and Q<Sub>ec</Sub>, at the electrical terminals of the generators of the unit or, in the case of a source of electricity generation that is not a unit, at the electrical terminals of the source.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500359" lims:id="1500359"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500360" lims:id="1500360">Electricity allocated to facility (Q<Sub>a</Sub>)</MarginalNote><Label>(4)</Label><Text>A quantity must not be assigned to Q<Sub>a</Sub> in subsection (2) unless, during the calendar year for which the quantity is assigned, the facility transmits electricity to an electricity system and supplies useful thermal energy to a recipient facility and the following conditions are met:</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500361" lims:id="1500361"><Label>(a)</Label><Text>the recipient facility is not a facility where a unit to which these Regulations apply is located;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500362" lims:id="1500362"><Label>(b)</Label><Text>the quantity assigned to Q<Sub>a</Sub> does not exceed the quantity of electricity transmitted to the recipient facility from the electricity system during that calendar year; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500363" lims:id="1500363"><Label>(c)</Label><Text>the responsible person obtains from the recipient facility documentation that</Text><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500364" lims:id="1500364"><Label>(i)</Label><Text>indicates the quantity of electricity transmitted to the recipient facility from the electricity system during the calendar year, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500365" lims:id="1500365"><Label>(ii)</Label><Text>demonstrates that the quantity of electricity was measured using an electricity meter that is installed, maintained and calibrated in accordance with subsections <XRefInternal>36</XRefInternal>(1) and (2) and that enables measurements to be made in accordance with subsection <XRefInternal>36</XRefInternal>(3).</Text></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500366" lims:id="1500366"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500367" lims:id="1500367">Overlapping deduction periods</MarginalNote><Label>(5)</Label><Text>A quantity of electricity generated by a unit must not be included in more than one deduction period for the purposes of determining the quantity for Q<Sub>ec</Sub> in subsection (2).</Text></Subsection></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500368" lims:id="1500368" level="1"><TitleText>Exemptions</TitleText></Heading><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500369" lims:id="1500369"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500370" lims:id="1500370">Net supply ≤ 0</MarginalNote><Label>14</Label><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500371" lims:id="1500371"><Label>(1)</Label><Text>The responsible person for a unit is exempt from the application of subsection <XRefInternal>9</XRefInternal>(1) and sections <XRefInternal>39</XRefInternal> and <XRefInternal>41</XRefInternal> with respect to the unit for any calendar year in which the net supply from the facility where the unit is located is zero or less.</Text></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500372" lims:id="1500372"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500373" lims:id="1500373">Declaration of net supply</MarginalNote><Label>(2)</Label><Text>The responsible person for a unit is exempt from the application of sections <XRefInternal>12</XRefInternal> and <XRefInternal>15</XRefInternal> to <XRefInternal>24</XRefInternal> with respect to the unit if</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500374" lims:id="1500374"><Label>(a)</Label><Text>the net supply from the facility where the unit is located is zero or less for each calendar year in which subsection <XRefInternal>13</XRefInternal>(1) applies in respect of the unit; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500375" lims:id="1500375"><Label>(b)</Label><Text>the responsible person submits to the Minister a declaration of net supply in accordance with subsections (3) and (4).</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500376" lims:id="1500376"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500377" lims:id="1500377">Contents</MarginalNote><Label>(3)</Label><Text>The declaration must contain</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500378" lims:id="1500378"><Label>(a)</Label><Text>the registration number assigned to each unit located at the facility by the Minister under subsection <XRefInternal>7</XRefInternal>(3);</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500379" lims:id="1500379"><Label>(b)</Label><Text>a statement that the facility operates in such a manner that it is reasonable to conclude that the net supply from the facility will be zero or less for each calendar year in which subsection <XRefInternal>13</XRefInternal>(1) applies in respect of the unit; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500380" lims:id="1500380"><Label>(c)</Label><Text>an attestation, dated and signed by the responsible person or its authorized official, that the declaration is accurate and complete.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500381" lims:id="1500381"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500382" lims:id="1500382">Submission date</MarginalNote><Label>(4)</Label><Text>The declaration must be submitted within the 12 months before any unit at the facility would have been subject to an emission limit under subsection <XRefInternal>9</XRefInternal>(1) had the unit not been subject to an exemption, under subsection (1), from the application of that subsection.</Text></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500383" lims:id="1500383"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500384" lims:id="1500384">End of exemption</MarginalNote><Label>(5)</Label><Text>The exemption referred to in subsection (2) ends on December 31 of the calendar year before any calendar year in which the net supply from the facility is greater than zero.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500385" lims:id="1500385" level="1"><TitleText>Quantification</TitleText></Heading><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500386" lims:id="1500386" level="2"><TitleText>Combustion of Fossil Fuel</TitleText></Heading><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500387" lims:id="1500387" level="3"><TitleText>Continuous Emission Monitoring Systems</TitleText></Heading><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500388" lims:id="1500388"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500389" lims:id="1500389">Quantification with CEMS</MarginalNote><Label>15</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500390" lims:id="1500390"><Label>(1)</Label><Text>For the purposes of paragraphs <XRefInternal>12</XRefInternal>(3)(a) and (d), the quantity of CO<Sub>2</Sub> emissions from the combustion of fossil fuel in a unit during a calendar year must be measured using a CEMS and is determined, subject to section <XRefInternal>17</XRefInternal>, in accordance with sections 7.1 to 7.5 of the CEMS Protocol.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500391" lims:id="1500391"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500392" lims:id="1500392">Multiple CEMS</MarginalNote><Label>(2)</Label><Text>The quantity of CO<Sub>2</Sub> emissions from a unit equipped with multiple CEMS is determined by adding together the quantity of CO<Sub>2</Sub> emissions measured by each CEMS.</Text></Subsection></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500393" lims:id="1500393"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500394" lims:id="1500394">Combustion of biomass</MarginalNote><Label>16</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500395" lims:id="1500395"><Label>(1)</Label><Text>For the purposes of paragraph <XRefInternal>12</XRefInternal>(3)(b), the quantity of CO<Sub>2</Sub> emissions from the combustion of fossil fuel in a unit during a calendar year must be measured using a CEMS and is determined by the formula</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500396" lims:id="1500396"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500397" lims:id="1500397"><FormulaText>E<Sub>comb</Sub> × (V<Sub>ff</Sub> ÷ V<Sub>T</Sub>) − E<Sub>s</Sub></FormulaText></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500398" lims:id="1500398"><FormulaTerm>E<Sub>comb</Sub></FormulaTerm><Text>is the quantity of CO<Sub>2</Sub> emissions from the unit, expressed in tonnes, from the combustion of fossil fuel and biomass during the calendar year, determined in accordance with section <XRefInternal>15</XRefInternal> or <XRefInternal>17</XRefInternal>, as applicable;</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500399" lims:id="1500399"><FormulaTerm>V<Sub>ff</Sub></FormulaTerm><Text>is the volume of CO<Sub>2</Sub> emissions from the combustion of fossil fuel in the unit during the calendar year, expressed in m<Sup>3</Sup> at standard conditions and determined by the formula</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500400" lims:id="1500400"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500401" lims:id="1500401"><ImageGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500402" lims:id="1500402" bilingual="no" position="center" spanlanguages="no" spanmarginalnotecol="no" width="11pc"><AlternateText>The sum of the products resulting from the multiplication of Qi, Fc,i and HHVi for each fossil fuel type “i”.</AlternateText><Image source="SOR-2024-263img/SOR-2024-263_ef002.JPG" /></ImageGroup></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500403" lims:id="1500403"><FormulaTerm>i</FormulaTerm><Text>is the i<Sup>th</Sup> fossil fuel type combusted in the unit during the calendar year, where “i” goes from 1 to <Emphasis style="italic">n</Emphasis> and where <Emphasis style="italic">n</Emphasis> is the number of fossil fuel types combusted,</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500404" lims:id="1500404"><FormulaTerm>Q<Sub>i</Sub></FormulaTerm><Text>is the quantity of fossil fuel type “i” combusted in the unit during the calendar year, determined</Text><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500405" lims:id="1500405"><Label>(a)</Label><Text>for a gaseous fuel, in the same manner used in the determination of V<Sub>f</Sub> in paragraph <XRefInternal>20</XRefInternal>(1)(a) and expressed in m<Sup>3</Sup> at standard conditions,</Text></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500406" lims:id="1500406"><Label>(b)</Label><Text>for a liquid fuel, in the same manner used in the determination of V<Sub>f</Sub> in paragraph <XRefInternal>20</XRefInternal>(1)(b) and expressed in kL, and</Text></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500407" lims:id="1500407"><Label>(c)</Label><Text>for a solid fuel, in the same manner used in the determination of M<Sub>f</Sub> in paragraph <XRefInternal>20</XRefInternal>(1)(c) and expressed in tonnes,</Text></FormulaParagraph></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500408" lims:id="1500408"><FormulaTerm>F<Sub>c,i</Sub></FormulaTerm><Text>is the fuel-specific carbon-based F-factor for each fossil fuel type “i” — being either the F-factor set out in Appendix A of the CEMS Protocol or, for fuels not listed in that Appendix, the F-factor determined in accordance with that Appendix — corrected to be expressed in m<Sup>3</Sup> of CO<Sub>2</Sub>/GJ at standard conditions, and</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500409" lims:id="1500409"><FormulaTerm>HHV<Sub>i</Sub></FormulaTerm><Text>is the higher heating value for each fossil fuel type “i” that is measured in accordance with subsection (2) or the default higher heating value set out in column 2 of Schedule 3 for the fuel type set out in column 1;</Text></FormulaDefinition></FormulaGroup></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500410" lims:id="1500410"><FormulaTerm>V<Sub>T</Sub></FormulaTerm><Text>is the volume of CO<Sub>2</Sub> emissions resulting from combustion of fossil fuel and biomass in the unit during the calendar year, expressed in m<Sup>3</Sup> at standard conditions and determined by the formula</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500411" lims:id="1500411"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500412" lims:id="1500412"><ImageGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500413" lims:id="1500413" bilingual="no" position="center" spanlanguages="no" spanmarginalnotecol="no" width="12pc"><AlternateText>The sum of the products of 0.01, CO2w,t and Qw,t for each hour “t”.</AlternateText><Image source="SOR-2024-263img/SOR-2024-263_e003.JPG" /></ImageGroup></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500414" lims:id="1500414"><FormulaTerm>t</FormulaTerm><Text>is the t<Sup>th</Sup> hour, where “t” goes from 1 to <Emphasis style="italic">n</Emphasis> and where <Emphasis style="italic">n</Emphasis> is the total number of hours during which the unit generated electricity in the calendar year,</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500415" lims:id="1500415"><FormulaTerm>CO<Sub>2w,t</Sub></FormulaTerm><Text>is the average concentration of CO<Sub>2</Sub> in relation to all gases in the stack emitted from the combustion of fuel in the unit during each hour “t” — or, if applicable, a calculation made in accordance with section 7.4 of the CEMS Protocol of that average concentration of CO<Sub>2</Sub> based on a measurement of the concentration of oxygen (O<Sub>2</Sub>) in those gases in the stack — expressed as a percentage on a wet basis, and</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500416" lims:id="1500416"><FormulaTerm>Q<Sub>w,t</Sub></FormulaTerm><Text>is the average volumetric flow during that hour, measured on a wet basis by a stack gas volumetric flow monitor and expressed in m<Sup>3</Sup> at standard conditions; and</Text></FormulaDefinition></FormulaGroup></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500417" lims:id="1500417"><FormulaTerm>E<Sub>s</Sub></FormulaTerm><Text>is the quantity of CO<Sub>2</Sub> emissions, expressed in tonnes, that is released from the use of sorbent to control the emission of sulphur dioxide from the unit during the calendar year, as determined by the formula</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500418" lims:id="1500418"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500419" lims:id="1500419"><FormulaText>S × R × (44 ÷ MM<Sub>s</Sub>)</FormulaText></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500420" lims:id="1500420"><FormulaTerm>S</FormulaTerm><Text>is the quantity of sorbent, such as calcium carbonate (Ca‍CO<Sub>3</Sub>), expressed in tonnes,</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500421" lims:id="1500421"><FormulaTerm>R</FormulaTerm><Text>is the stoichiometric ratio, on a mole fraction basis, of CO<Sub>2</Sub> released on usage of one mole of sorbent, which is equal to 1 if the sorbent is Ca‍CO<Sub>3</Sub>, and</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500422" lims:id="1500422"><FormulaTerm>MM<Sub>s</Sub></FormulaTerm><Text>is the molecular mass of the sorbent, which is equal to 100 if the sorbent is Ca‍CO<Sub>3</Sub>.</Text></FormulaDefinition></FormulaGroup></FormulaDefinition></FormulaGroup></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500423" lims:id="1500423"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500424" lims:id="1500424">Higher heating value (HHV<Sub>i</Sub>)</MarginalNote><Label>(2)</Label><Text>The higher heating value of a fossil fuel must be measured</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500425" lims:id="1500425"><Label>(a)</Label><Text>in the case of a gaseous fuel,</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500426" lims:id="1500426"><Label>(i)</Label><Text>in accordance with one of the following standards, as applicable:</Text><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500427" lims:id="1500427"><Label>(A)</Label><Text>ASTM D1826, entitled <XRefExternal reference-type="standard">Standard Test Method for Calorific (Heating) Value of Gases in Natural Gas Range by Continuous Recording Calorimeter</XRefExternal>,</Text></Clause><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500428" lims:id="1500428"><Label>(B)</Label><Text>ASTM D3588, entitled <XRefExternal reference-type="standard">Standard Practice for Calculating Heat Value, Compressibility Factor, and Relative Density of Gaseous Fuels</XRefExternal>,</Text></Clause><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500429" lims:id="1500429"><Label>(C)</Label><Text>ASTM D4891, entitled <XRefExternal reference-type="standard">Standard Test Method for Heating Value of Gases in Natural Gas and Flare Gases Range by Stoichiometric Combustion</XRefExternal>,</Text></Clause><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500430" lims:id="1500430"><Label>(D)</Label><Text>Gas Processors Association Standard 2172, entitled <XRefExternal reference-type="standard">Calculation of Gross Heating Value, Relative Density, Compressibility and Theoretical Hydrocarbon Liquid Content for Natural Gas Mixtures for Custody Transfer</XRefExternal>, or</Text></Clause><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500431" lims:id="1500431"><Label>(E)</Label><Text>Gas Processors Association Standard 2261, entitled <XRefExternal reference-type="standard">Analysis for Natural Gas and Similar Gaseous Mixtures by Gas Chromatography</XRefExternal>, or</Text></Clause></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500432" lims:id="1500432"><Label>(ii)</Label><Text>by means of a direct measuring device, except that if the measuring device provides only lower heating values, those lower heating values must be converted to higher heating values;</Text></Subparagraph></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500433" lims:id="1500433"><Label>(b)</Label><Text>in the case of a liquid fuel that is</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500434" lims:id="1500434"><Label>(i)</Label><Text>an oil or a liquid fuel derived from waste, in accordance with one of the following standards, as applicable:</Text><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500435" lims:id="1500435"><Label>(A)</Label><Text>ASTM D240, entitled <XRefExternal reference-type="standard">Standard Test Method for Heat of Combustion of Liquid Hydrocarbon Fuels by Bomb Calorimeter</XRefExternal>, or</Text></Clause><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500436" lims:id="1500436"><Label>(B)</Label><Text>ASTM D4809, entitled <XRefExternal reference-type="standard">Standard Test Method for Heat of Combustion of Liquid Hydrocarbon Fuels by Bomb Calorimeter (Precision Method)</XRefExternal>, and</Text></Clause></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500437" lims:id="1500437"><Label>(ii)</Label><Text>any other liquid fuel type, in accordance with an applicable ASTM standard for the measurement of the higher heating value of the fuel type or, if there is no such ASTM standard, in accordance with an applicable internationally recognized method; and</Text></Subparagraph></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500438" lims:id="1500438"><Label>(c)</Label><Text>in the case of a solid fuel that is</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500439" lims:id="1500439"><Label>(i)</Label><Text>coal, in accordance with ASTM D5865, entitled <XRefExternal reference-type="standard">Standard Test Method for Gross Calorific Value of Coal and Coke</XRefExternal>, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500440" lims:id="1500440"><Label>(ii)</Label><Text>any other solid fuel type, in accordance with an applicable ASTM standard for the measurement of the higher heating value of the fuel type or, if there is no such ASTM standard, in accordance with an applicable internationally recognized method.</Text></Subparagraph></Paragraph></Subsection></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500441" lims:id="1500441"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500442" lims:id="1500442">Units sharing CEMS</MarginalNote><Label>17</Label><Text>If a unit is located at a facility where there are one or more other units and a CEMS measures emissions from that unit and at least one other unit at a common stack rather than at the exhaust duct of each unit that shares the common stack, the quantity of CO<Sub>2</Sub> emissions attributed to that unit is determined, based on the ratio of the heat input of that unit to the total heat input of all the units sharing the common stack, by the formula</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500443" lims:id="1500443"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500444" lims:id="1500444"><ImageGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500445" lims:id="1500445" bilingual="no" position="center" spanlanguages="no" spanmarginalnotecol="no" width="13pc"><AlternateText>The product of the multiplication of E and the quotient of the following two sums: the sum of the product resulting from the multiplication of Quj and HHVuj for each fuel type “j” combusted in that unit “u” during the calendar year and the sum, for each unit “i” that shares a common stack, of the sum of the product resulting from the multiplication of Qij and HHVij for each fuel type “j” combusted during the calendar year.</AlternateText><Image source="SOR-2024-263img/SOR-2024-263_e004.JPG" /></ImageGroup></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500446" lims:id="1500446"><FormulaTerm>j</FormulaTerm><Text>is the j<Sup>th</Sup> fuel type combusted during the calendar year in a unit where “j” goes from 1 to <Emphasis style="italic">y</Emphasis> and where <Emphasis style="italic">y</Emphasis> is the number of fuel types combusted;</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500447" lims:id="1500447"><FormulaTerm>Q<Sub>u,j</Sub></FormulaTerm><Text>is the quantity of fuel type “j” combusted in the unit “u” during the calendar year, determined</Text><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500448" lims:id="1500448"><Label>(a)</Label><Text>for a gaseous fuel, in the same manner used in the determination of V<Sub>f</Sub> in paragraph <XRefInternal>20</XRefInternal>(1)(a) and expressed in m<Sup>3</Sup> at standard conditions,</Text></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500449" lims:id="1500449"><Label>(b)</Label><Text>for a liquid fuel, in the same manner used in the determination of V<Sub>f</Sub> in paragraph <XRefInternal>20</XRefInternal>(1)(b) and expressed in kL, and</Text></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500450" lims:id="1500450"><Label>(c)</Label><Text>for a solid fuel, in the same manner used in the determination of M<Sub>f</Sub> in paragraph <XRefInternal>20</XRefInternal>(1)(c) and expressed in tonnes;</Text></FormulaParagraph></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500451" lims:id="1500451"><FormulaTerm>HHV<Sub>u,j</Sub></FormulaTerm><Text>is the higher heating value for each fuel type “j” combusted in the unit “u” that is measured in accordance with subsection <XRefInternal>16</XRefInternal>(2) or the default higher heating value set out in column 2 of Schedule 3 for the fuel type set out in column 1;</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500452" lims:id="1500452"><FormulaTerm>i</FormulaTerm><Text>is the i<Sup>th</Sup> unit, where “i” goes from 1 to <Emphasis style="italic">x</Emphasis> and where <Emphasis style="italic">x</Emphasis> is the number of units that share the common stack;</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500453" lims:id="1500453"><FormulaTerm>Q<Sub>i,j</Sub></FormulaTerm><Text>the quantity of fuel type “j” combusted in each unit “i” during the calendar year, determined for a gaseous fuel, a liquid fuel and a solid fuel, respectively, in the manner set out in the description of Q<Sub>u,j</Sub>;</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500454" lims:id="1500454"><FormulaTerm>HHV<Sub>i,j</Sub></FormulaTerm><Text>is the higher heating value for each fuel type “j” combusted in each unit “i” that is measured in accordance with subsection <XRefInternal>16</XRefInternal>(2) or the default higher heating value set out in column 2 of Schedule 3 for the fuel type set out in column 1; and</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500455" lims:id="1500455"><FormulaTerm>E</FormulaTerm><Text>is the quantity of CO<Sub>2</Sub> emissions, expressed in tonnes, from the combustion of all fuels in all the units that share the common stack during the calendar year, measured using a CEMS at the common stack and determined in accordance with sections 7.1 to 7.5 of the CEMS Protocol.</Text></FormulaDefinition></FormulaGroup></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500456" lims:id="1500456"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500457" lims:id="1500457">Obligation — CEMS Protocol</MarginalNote><Label>18</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500458" lims:id="1500458"><Label>(1)</Label><Text>A responsible person that uses a CEMS to measure CO<Sub>2</Sub> emissions for the purposes of any of sections <XRefInternal>15</XRefInternal> to <XRefInternal>17</XRefInternal> must ensure that the requirements set out in sections 3, 4 and 6 of the CEMS Protocol are met.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500459" lims:id="1500459"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500460" lims:id="1500460">Certification of CEMS</MarginalNote><Label>(2)</Label><Text>The CEMS must be certified in accordance with section 5 of the CEMS Protocol before it is used for the purposes of these Regulations.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500461" lims:id="1500461"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500462" lims:id="1500462">CEMS report</MarginalNote><Label>(3)</Label><Text>For each calendar year during which a CEMS is used to measure CO<Sub>2</Sub> emissions from a unit, the responsible person must</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500463" lims:id="1500463"><Label>(a)</Label><Text>obtain a CEMS report, signed by an auditor, that contains the information set out in Schedule 4 in respect of the CEMS; and</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500464" lims:id="1500464"><Label>(b)</Label><Text>if the emissions report referred to in subsection <XRefInternal>39</XRefInternal>(1) is required for the unit for that calendar year, submit the CEMS report along with the emissions report.</Text></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500465" lims:id="1500465" level="3"><TitleText>Fuel-based Method</TitleText></Heading><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500466" lims:id="1500466"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500467" lims:id="1500467">Quantification</MarginalNote><Label>19</Label><Text>For the purposes of paragraphs <XRefInternal>12</XRefInternal>(3)(c) and (d), the quantity of CO<Sub>2</Sub> emissions from the combustion of fossil fuel in a unit during a calendar year is determined by the formula</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500468" lims:id="1500468"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500469" lims:id="1500469"><ImageGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500470" lims:id="1500470" bilingual="no" position="center" spanlanguages="no" spanmarginalnotecol="no" width="7pc"><AlternateText>Es plus the sum of Ei for each fossil fuel “i” combusted in the unit during the calendar year.</AlternateText><Image source="SOR-2024-263img/SOR-2024-263_ef005.JPG" /></ImageGroup></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500471" lims:id="1500471"><FormulaTerm>i</FormulaTerm><Text>is the i<Sup>th</Sup> fossil fuel type combusted in the unit during the calendar year, where “i” goes from 1 to <Emphasis style="italic">n</Emphasis> and where <Emphasis style="italic">n</Emphasis> is the number of fossil fuel types combusted;</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500472" lims:id="1500472"><FormulaTerm>E<Sub>i</Sub></FormulaTerm><Text>is the quantity of CO<Sub>2</Sub> emissions from the combustion of each fossil fuel type “i” in the unit during the calendar year, expressed in tonnes, as determined for that fossil fuel type in accordance with section <XRefInternal>20</XRefInternal>; and</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500473" lims:id="1500473"><FormulaTerm>E<Sub>s</Sub></FormulaTerm><Text>is the quantity of CO<Sub>2</Sub> emissions that is released from the sorbent used to control the emission of sulphur dioxide from the unit during the calendar year, expressed in tonnes and determined by the formula</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500474" lims:id="1500474"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500475" lims:id="1500475"><FormulaText>S × R × (44 ÷ MM<Sub>s</Sub>)</FormulaText></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500476" lims:id="1500476"><FormulaTerm>S</FormulaTerm><Text>is the quantity of sorbent, such as Ca‍CO<Sub>3</Sub>, expressed in tonnes,</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500477" lims:id="1500477"><FormulaTerm>R</FormulaTerm><Text>is the stoichiometric ratio, on a mole fraction basis, of CO<Sub>2</Sub> released on usage of one mole of sorbent, which is equal to 1 if the sorbent is Ca‍CO<Sub>3</Sub>, and</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500478" lims:id="1500478"><FormulaTerm>MM<Sub>s</Sub></FormulaTerm><Text>is the molecular mass of the sorbent, which is equal to 100 if the sorbent is Ca‍CO<Sub>3</Sub>.</Text></FormulaDefinition></FormulaGroup></FormulaDefinition></FormulaGroup></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500479" lims:id="1500479"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500480" lims:id="1500480">Measured carbon content</MarginalNote><Label>20</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500481" lims:id="1500481"><Label>(1)</Label><Text>The quantity assigned to E<Sub>i</Sub> in section <XRefInternal>19</XRefInternal> is, for each type of fossil fuel combusted in the unit during a calendar year, determined by one of the following formulas, as applicable:</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500482" lims:id="1500482"><Label>(a)</Label><Text>in the case of a gaseous fuel,</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500483" lims:id="1500483"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500484" lims:id="1500484"><FormulaText>V<Sub>f</Sub> × CC<Sub>A</Sub> × (MM<Sub>A</Sub> ÷ MV<Sub>cf</Sub>) × 3.664 × 0.001</FormulaText></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500485" lims:id="1500485"><FormulaTerm>V<Sub>f</Sub></FormulaTerm><Text>is the volume of the fossil fuel combusted during the calendar year, determined using flow meters and expressed in m<Sup>3</Sup> at standard conditions,</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500486" lims:id="1500486"><FormulaTerm>CC<Sub>A</Sub></FormulaTerm><Text>is the weighted average of the carbon content of the fossil fuel, determined in accordance with subsection (4) and expressed in kg of carbon per kg of the fossil fuel,</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500487" lims:id="1500487"><FormulaTerm>MM<Sub>A</Sub></FormulaTerm><Text>is the average molecular mass of the fossil fuel, determined based on fuel samples taken in accordance with section <XRefInternal>34</XRefInternal> and expressed in kg per kg-mole of the fossil fuel, and</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500488" lims:id="1500488"><FormulaTerm>MV<Sub>cf</Sub></FormulaTerm><Text>is the molar volume conversion factor of 23.645 m<Sup>3</Sup> at standard conditions, per kg-mole of the fossil fuel at standard conditions;</Text></FormulaDefinition></FormulaGroup></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500489" lims:id="1500489"><Label>(b)</Label><Text>in the case of a liquid fuel,</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500490" lims:id="1500490"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500491" lims:id="1500491"><FormulaText>V<Sub>f</Sub> × CC<Sub>A</Sub> × 3.664</FormulaText></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500492" lims:id="1500492"><FormulaTerm>V<Sub>f</Sub></FormulaTerm><Text>is the volume of the fossil fuel combusted during the calendar year, determined using flow meters and expressed in kL, and</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500493" lims:id="1500493"><FormulaTerm>CC<Sub>A</Sub></FormulaTerm><Text>is the weighted average of the carbon content of the fossil fuel, determined in accordance with subsection (4) at the same temperature as that used in the determination of V<Sub>f</Sub> and expressed in tonnes of carbon per kL of the fossil fuel; and</Text></FormulaDefinition></FormulaGroup></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500494" lims:id="1500494"><Label>(c)</Label><Text>in the case of a solid fuel,</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500495" lims:id="1500495"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500496" lims:id="1500496"><FormulaText>M<Sub>f</Sub> × CC<Sub>A</Sub> × 3.664</FormulaText></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500497" lims:id="1500497"><FormulaTerm>M<Sub>f</Sub></FormulaTerm><Text>is the mass of the fossil fuel combusted during the calendar year, determined, as the case may be, on a wet or dry basis using a measuring device and expressed in tonnes, and</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500498" lims:id="1500498"><FormulaTerm>CC<Sub>A</Sub></FormulaTerm><Text>is the weighted average of the carbon content of the fossil fuel, determined in accordance with subsection (4) on the same wet or dry basis as that used in the determination of M<Sub>f</Sub> and expressed in kg of carbon per kg of the fossil fuel.</Text></FormulaDefinition></FormulaGroup></Paragraph></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500499" lims:id="1500499"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500500" lims:id="1500500">Renewable natural gas</MarginalNote><Label>(2)</Label><Text>If a unit that combusts natural gas is supplied by a pipeline network into which renewable natural gas is injected, the volume of natural gas to be used in determining the value for V<Sub>f</Sub> in paragraph (1)(a) is determined by the formula</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500501" lims:id="1500501"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500502" lims:id="1500502"><FormulaText>V<Sub>total</Sub> − V<Sub>RNG</Sub></FormulaText></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500503" lims:id="1500503"><FormulaTerm>V<Sub>total</Sub></FormulaTerm><Text>is the total volume of natural gas and renewable natural gas supplied to the unit that is combusted during the calendar year, determined using flow meters and expressed in m<Sup>3</Sup> at standard conditions; and</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500504" lims:id="1500504"><FormulaTerm>V<Sub>RNG</Sub></FormulaTerm><Text>is the volume of renewable natural gas that may be claimed by the unit during the calendar year, determined in accordance with subsection (3) and expressed in m<Sup>3</Sup> at standard conditions.</Text></FormulaDefinition></FormulaGroup></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500505" lims:id="1500505"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500506" lims:id="1500506">V<Sub>RNG</Sub> — conditions</MarginalNote><Label>(3)</Label><Text>For the purposes of determining the value for V<Sub>RNG</Sub> in subsection (2), a volume of renewable natural gas may be claimed for a calendar year only if</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500507" lims:id="1500507"><Label>(a)</Label><Text>a contractual agreement specifies that the volume is supplied to the unit for the calendar year;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500508" lims:id="1500508"><Label>(b)</Label><Text>the volume is kept physically separated from any other substance and is clearly identifiable as renewable natural gas from the time it is produced until the time it is injected into a pipeline network to which the unit is connected;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500509" lims:id="1500509"><Label>(c)</Label><Text>the responsible person for the unit is able to identify each producer of the renewable natural gas supplied to the unit under the contractual agreement referred to in paragraph (a) and the volume supplied by each producer;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500510" lims:id="1500510"><Label>(d)</Label><Text>the volume supplied by each producer does not exceed the volume of renewable natural gas produced by that producer that is injected during the calendar year into a pipeline network to which the unit is connected;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500511" lims:id="1500511"><Label>(e)</Label><Text>the volume is not being used to create credits in a jurisdiction outside Canada or to comply with a requirement relating to greenhouse gas emissions that is set by a jurisdiction outside Canada;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500512" lims:id="1500512"><Label>(f)</Label><Text>the volume is not being used by an end user, other than the responsible person, to create credits in Canada or to comply with a requirement relating to greenhouse gas emissions set out in a federal or provincial law; and</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500513" lims:id="1500513"><Label>(g)</Label><Text>the responsible person for the unit submits to the Minister, in the emissions report submitted under section <XRefInternal>39</XRefInternal> for the calendar year, the information set out in section 8 of Schedule 5 in respect of the volume.</Text></Paragraph></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500514" lims:id="1500514"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500515" lims:id="1500515">Weighted average (CC<Sub>A</Sub>)</MarginalNote><Label>(4)</Label><Text>The weighted average CC<Sub>A</Sub> referred to in paragraphs (1)(a) to (c) is determined by the formula</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500516" lims:id="1500516"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500517" lims:id="1500517"><ImageGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500518" lims:id="1500518" bilingual="no" position="center" spanlanguages="no" spanmarginalnotecol="no" width="8pc"><AlternateText>The quotient of the following two sums: the sum of the product resulting from the multiplication of Qi and CCi for each sampling period “i” and the sum of Qi for each sampling period “i”.</AlternateText><Image source="SOR-2024-263img/SOR-2024-263_ef006.JPG" /></ImageGroup></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500519" lims:id="1500519"><FormulaTerm>i</FormulaTerm><Text>is the i<Sup>th</Sup> sampling period that is set out for the fuel type in subsection <XRefInternal>34</XRefInternal>(2), where “i” goes from 1 to <Emphasis style="italic">n</Emphasis> and where <Emphasis style="italic">n</Emphasis> is the number of sampling periods;</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500520" lims:id="1500520"><FormulaTerm>CC<Sub>i</Sub></FormulaTerm><Text>is the carbon content of each sample or composite sample, as the case may be, of the fossil fuel for the i<Sup>th</Sup> sampling period — expressed for gaseous fuels, liquid fuels and solid fuels, respectively, in the same unit of measure as that set out in the description of CC<Sub>A</Sub> in paragraph (1)(a), (b) or (c), as applicable — as provided by the supplier of the fossil fuel to the responsible person or, if not so provided, as determined in the following manner:</Text><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500521" lims:id="1500521"><Label>(a)</Label><Text>in the case of a gaseous fuel,</Text><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500522" lims:id="1500522"><Label>(i)</Label><Text>in accordance with one of the following standards, as applicable:</Text><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500523" lims:id="1500523"><Label>(A)</Label><Text>ASTM D1945, entitled <XRefExternal reference-type="standard">Standard Test Method for Analysis of Natural Gas by Gas Chromatography</XRefExternal>,</Text></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500524" lims:id="1500524"><Label>(B)</Label><Text>ASTM UOP539, entitled <XRefExternal reference-type="standard">Refinery Gas Analysis by Gas Chromatography</XRefExternal>,</Text></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500525" lims:id="1500525"><Label>(C)</Label><Text>ASTM D7833, entitled <XRefExternal reference-type="standard">Standard Test Method for Determination of Hydrocarbons and Non-Hydrocarbon Gases in Gaseous Mixtures by Gas Chromatography</XRefExternal>, or</Text></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500526" lims:id="1500526"><Label>(D)</Label><Text>API Technical Report 2572, entitled <XRefExternal reference-type="standard">Carbon Content, Sampling, and Calculation</XRefExternal>, published by the American Petroleum Institute, or</Text></FormulaParagraph></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500527" lims:id="1500527"><Label>(ii)</Label><Text>by means of a direct measuring device,</Text></FormulaParagraph></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500528" lims:id="1500528"><Label>(b)</Label><Text>in the case of a liquid fuel, in accordance with one of the following standards or methods, as applicable:</Text><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500529" lims:id="1500529"><Label>(i)</Label><Text>API Technical Report 2572, entitled <XRefExternal reference-type="standard">Carbon Content, Sampling, and Calculation</XRefExternal>, published by the American Petroleum Institute,</Text></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500530" lims:id="1500530"><Label>(ii)</Label><Text>ASTM D5291, entitled <XRefExternal reference-type="standard">Standard Test Methods for Instrumental Determination of Carbon, Hydrogen, and Nitrogen in Petroleum Products and Lubricants</XRefExternal>, or</Text></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500531" lims:id="1500531"><Label>(iii)</Label><Text>the ASTM standard that applies to the fossil fuel type, or if there is no such ASTM standard, an applicable internationally recognized method, and</Text></FormulaParagraph></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500532" lims:id="1500532"><Label>(c)</Label><Text>in the case of a solid fuel, on the same wet or dry basis as that used in the determination of CC<Sub>A</Sub>, in accordance with</Text><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500533" lims:id="1500533"><Label>(i)</Label><Text>for a solid fuel derived from waste, ASTM E777, entitled <XRefExternal reference-type="standard">Standard Test Method for Carbon and Hydrogen in the Analysis Sample of Refuse-Derived Fuel</XRefExternal>, and</Text></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500534" lims:id="1500534"><Label>(ii)</Label><Text>for any other solid fuel type, in accordance with an ASTM standard for the measurement of the carbon content of the fuel type or, if there is no such ASTM standard, in accordance with an applicable internationally recognized method; and</Text></FormulaParagraph></FormulaParagraph></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500535" lims:id="1500535"><FormulaTerm>Q<Sub>i</Sub></FormulaTerm><Text>is the volume or mass, as the case may be, of the fossil fuel combusted during the i<Sup>th</Sup> sampling period, determined</Text><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500536" lims:id="1500536"><Label>(a)</Label><Text>using flow meters and expressed in m<Sup>3</Sup> at standard conditions, in the case of a gaseous fuel,</Text></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500537" lims:id="1500537"><Label>(b)</Label><Text>using flow meters and expressed in kL, in the case of a liquid fuel, and</Text></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500538" lims:id="1500538"><Label>(c)</Label><Text>using a measuring device and expressed in tonnes, on the same wet or dry basis as that used in the determination of CC<Sub>A</Sub>, in the case of a solid fuel.</Text></FormulaParagraph></FormulaDefinition></FormulaGroup></Subsection></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500539" lims:id="1500539" level="2"><TitleText>Useful Thermal Energy</TitleText></Heading><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500540" lims:id="1500540"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500541" lims:id="1500541">Attributed emissions (E<Sub>th</Sub>)</MarginalNote><Label>21</Label><Text>The quantity of CO<Sub>2</Sub> emissions attributed to the production of useful thermal energy by a unit during a calendar year is determined by the formula</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500542" lims:id="1500542"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500543" lims:id="1500543"><FormulaText>H<Sub>pnet</Sub> × b<Sub>EI</Sub></FormulaText></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500544" lims:id="1500544"><FormulaTerm>H<Sub>pnet</Sub></FormulaTerm><Text>is the net quantity of useful thermal energy, expressed in GJ, determined by the formula</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500545" lims:id="1500545"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500546" lims:id="1500546"><ImageGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500547" lims:id="1500547" bilingual="no" position="center" spanlanguages="no" spanmarginalnotecol="no" width="19pc"><AlternateText>The sum of the products of houti and Mouti for each heat stream “i” minus the sum of the products of hinj and Minj for each heat stream “j”, summed for all time periods.</AlternateText><Image source="SOR-2024-263img/SOR-2024-263_e007.JPG" /></ImageGroup></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500548" lims:id="1500548"><FormulaTerm>t</FormulaTerm><Text>is the t<Sup>th</Sup> period, where “t” goes from 1 to <Emphasis style="italic">x</Emphasis> and where <Emphasis style="italic">x</Emphasis> is the total number of periods during which the unit produced useful thermal energy during the calendar year,</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500549" lims:id="1500549"><FormulaTerm>i</FormulaTerm><Text>is the i<Sup>th</Sup> heat stream exiting the unit, where “i” goes from 1 to <Emphasis style="italic">n</Emphasis> and where <Emphasis style="italic">n</Emphasis> is the total number of heat streams exiting the unit,</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500550" lims:id="1500550"><FormulaTerm>h<Sub>out<Emphasis><Sub>i</Sub></Emphasis></Sub></FormulaTerm><Text>is the average specific enthalpy of the i<Sup>th</Sup> heat stream exiting the unit during period “t”, expressed in GJ/tonne and determined based on the measurement, using a continuous measuring device, of the temperature and pressure of that heat stream,</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500551" lims:id="1500551"><FormulaTerm>M<Sub>out<Emphasis><Sub>i</Sub></Emphasis></Sub></FormulaTerm><Text>is the mass flow of the i<Sup>th</Sup> heat stream exiting the unit during period “t”, expressed in tonnes and determined using a continuous measuring device,</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500552" lims:id="1500552"><FormulaTerm>j</FormulaTerm><Text>is the j<Sup>th</Sup> heat stream, other than condensate return, entering the unit, where “j” goes from 1 to <Emphasis style="italic">m</Emphasis> and where <Emphasis style="italic">m</Emphasis> is the total number of heat streams entering the unit,</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500553" lims:id="1500553"><FormulaTerm>h<Sub>in<Emphasis><Sub>j</Sub></Emphasis></Sub></FormulaTerm><Text>is the average specific enthalpy of the j<Sup>th</Sup> heat stream, other than condensate return, entering the unit during period “t”, expressed in GJ/tonne and determined based on the measurement, using a continuous measuring device, of the temperature and pressure of that heat stream, and</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500554" lims:id="1500554"><FormulaTerm>M<Sub>in<Emphasis><Sub>j</Sub></Emphasis></Sub></FormulaTerm><Text>is the mass flow of the j<Sup>th</Sup> heat stream, other than condensate return, entering the unit during period “t”, expressed in tonnes and determined using a continuous measuring device; and</Text></FormulaDefinition></FormulaGroup></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500555" lims:id="1500555"><FormulaTerm>b<Sub>EI</Sub></FormulaTerm><Text>is the emission intensity of a reference boiler, set to 0.0556 tonnes of CO<Sub>2</Sub> emissions per GJ.</Text></FormulaDefinition></FormulaGroup></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500556" lims:id="1500556" level="2"><TitleText>Electricity Used at Facility</TitleText></Heading><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500557" lims:id="1500557"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500558" lims:id="1500558">Attributed emissions (E<Sub>int</Sub>)</MarginalNote><Label>22</Label><Text>The quantity of CO<Sub>2</Sub> emissions attributed to electricity generated by a unit that is used internally, during a calendar year, at the facility where the unit is located is determined by the formula</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500559" lims:id="1500559"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500560" lims:id="1500560"><FormulaText>G<Sub>int</Sub> × C<Sub>EI</Sub></FormulaText></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500561" lims:id="1500561"><FormulaTerm>G<Sub>int</Sub></FormulaTerm><Text>is the quantity of electricity generated by the unit that is used internally, during the calendar year, at the facility where the unit is located, expressed in GWh and determined by the formula</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500562" lims:id="1500562"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500563" lims:id="1500563"><FormulaText>(G<Sub>F</Sub> − Q<Sub>ns</Sub>) × (G<Sub>U</Sub> ÷ G<Sub>F</Sub>)</FormulaText></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500564" lims:id="1500564"><FormulaTerm>G<Sub>F</Sub></FormulaTerm><Text>is the sum of the total gross electricity generated by each unit at the facility that is subject to an emission limit under subsection <XRefInternal>9</XRefInternal>(1) during the calendar year, expressed in GWh and measured for each unit at the electrical terminals of the unit’s generators,</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500565" lims:id="1500565"><FormulaTerm>Q<Sub>ns</Sub></FormulaTerm><Text>is the net supply from the facility for the calendar year, and</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500566" lims:id="1500566"><FormulaTerm>G<Sub>U</Sub></FormulaTerm><Text>is the total gross electricity generated by the unit during the calendar year, expressed in GWh and measured at the electrical terminals of the unit’s generators; and</Text></FormulaDefinition></FormulaGroup></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500567" lims:id="1500567"><FormulaTerm>C<Sub>EI</Sub></FormulaTerm><Text>is the emission intensity of a reference unit that produces useful thermal energy, set to 250 tonnes of CO<Sub>2</Sub> emissions per GWh.</Text></FormulaDefinition></FormulaGroup></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500568" lims:id="1500568" level="2"><TitleText>Carbon Capture and Storage</TitleText></Heading><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500569" lims:id="1500569"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500570" lims:id="1500570">CO<Sub>2</Sub> captured and stored (E<Sub>ccs</Sub>)</MarginalNote><Label>23</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500571" lims:id="1500571"><Label>(1)</Label><Text>The quantity of CO<Sub>2</Sub> from a unit that is captured during a calendar year and stored in a storage project is determined by the formula</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500572" lims:id="1500572"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500573" lims:id="1500573"><FormulaText>E<Sub>u</Sub> × (E<Sub>cap</Sub> ÷ E<Sub>in</Sub>)</FormulaText></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500574" lims:id="1500574"><FormulaTerm>E<Sub>u</Sub></FormulaTerm><Text>is the value determined for E<Sub>u</Sub> in subsection <XRefInternal>12</XRefInternal>(1) or, if applicable, subsection <XRefInternal>27</XRefInternal>(1);</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500575" lims:id="1500575"><FormulaTerm>E<Sub>cap</Sub></FormulaTerm><Text>is the quantity of CO<Sub>2</Sub> that is the portion of E<Sub>in</Sub> that has been captured and subsequently stored, during the calendar year, in a storage project that meets the conditions set out in subsection (2), expressed in tonnes and determined by means of a direct measuring device that measures the flow and concentration of CO<Sub>2</Sub>; and</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500576" lims:id="1500576"><FormulaTerm>E<Sub>in</Sub></FormulaTerm><Text>is the quantity of CO<Sub>2</Sub>, expressed in tonnes, entering the carbon capture and storage system during the calendar year, determined, in accordance with sections 7.1 to 7.5 of the CEMS Protocol, using a CEMS that is located upstream of the carbon capture and storage system and that measures all CO<Sub>2</Sub> entering the carbon capture and storage system.</Text></FormulaDefinition></FormulaGroup></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500577" lims:id="1500577"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500578" lims:id="1500578">Conditions</MarginalNote><Label>(2)</Label><Text>For the purposes of determining the value for E<Sub>ccs</Sub> in subsections <XRefInternal>12</XRefInternal>(1) and <XRefInternal>27</XRefInternal>(1), a quantity of CO<Sub>2</Sub> may only be claimed if it has been permanently stored in a storage project that meets the following conditions:</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500579" lims:id="1500579"><Label>(a)</Label><Text>the geological site into which the CO<Sub>2</Sub> is injected is</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500580" lims:id="1500580"><Label>(i)</Label><Text>a deep saline aquifer into which the CO<Sub>2</Sub> is injected for the sole purpose of storing it, or</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500581" lims:id="1500581"><Label>(ii)</Label><Text>a depleted oil reservoir into which the CO<Sub>2</Sub> is injected for the purpose of enhanced oil recovery; and</Text></Subparagraph></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500582" lims:id="1500582"><Label>(b)</Label><Text>the CO<Sub>2</Sub> stored for the purposes of the project is captured, transported and stored in accordance with the laws of Canada or a province or the laws of the United States or one of its states.</Text></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500583" lims:id="1500583" level="2"><TitleText>Energy carriers</TitleText></Heading><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500584" lims:id="1500584"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500585" lims:id="1500585">Emissions — hydrogen, ammonia or steam (E<Sub>ext</Sub>)</MarginalNote><Label>24</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500586" lims:id="1500586"><Label>(1)</Label><Text>The quantity of CO<Sub>2</Sub> emissions from the production of the hydrogen, ammonia or steam used by a unit to generate electricity during a calendar year is determined by the formula</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500587" lims:id="1500587"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500588" lims:id="1500588"><ImageGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500589" lims:id="1500589" bilingual="no" position="center" spanlanguages="no" spanmarginalnotecol="no" width="8pc"><AlternateText>The sum of the multiplication of Qk by the quotient of Ek and Pk, summed for each stream “k” of hydrogen, ammonia and steam.</AlternateText><Image source="SOR-2024-263img/SOR-2024-263_ef008.JPG" /></ImageGroup></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500590" lims:id="1500590"><FormulaTerm>k</FormulaTerm><Text>is the k<Sup>th</Sup> stream of hydrogen, ammonia or steam, where “k” goes from 1 to <Emphasis style="italic">n</Emphasis> and where <Emphasis style="italic">n</Emphasis> is the number of streams of hydrogen, ammonia or steam that are used by the unit during the calendar year;</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500591" lims:id="1500591"><FormulaTerm>E<Sub>k</Sub></FormulaTerm><Text>is the total annual CO<Sub>2</Sub> emissions, expressed in tonnes, from the total annual production of the k<Sup>th</Sup> stream of hydrogen, ammonia or steam used by the unit during the calendar year;</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500592" lims:id="1500592"><FormulaTerm>P<Sub>k</Sub></FormulaTerm><Text>is the total annual production of the k<Sup>th</Sup> stream of hydrogen, ammonia or steam during the calendar year, determined using a continuous measuring device and expressed</Text><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500593" lims:id="1500593"><Label>(a)</Label><Text>in m<Sup>3</Sup> at standard conditions, in the case of hydrogen and ammonia, and</Text></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500594" lims:id="1500594"><Label>(b)</Label><Text>in GJ, in the case of steam; and</Text></FormulaParagraph></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500595" lims:id="1500595"><FormulaTerm>Q<Sub>k</Sub></FormulaTerm><Text>is the quantity of hydrogen or ammonia, expressed in m<Sup>3</Sup> at standard conditions, or the quantity of purchased or transferred steam, expressed in GJ, in the k<Sup>th</Sup> stream used by the unit to generate electricity during the calendar year, determined using a continuous measuring device.</Text></FormulaDefinition></FormulaGroup></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500596" lims:id="1500596"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500597" lims:id="1500597">Quantification of E<Sub>k</Sub> and P<Sub>k</Sub></MarginalNote><Label>(2)</Label><Text>Subject to subsection (4), the responsible person must obtain the values of E<Sub>k</Sub> and P<Sub>k</Sub> from the supplier of the hydrogen, ammonia or steam, if any, used by the unit, determined in accordance with</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500598" lims:id="1500598"><Label>(a)</Label><Text>section 10 of the GHGRP, in the case of hydrogen production;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500599" lims:id="1500599"><Label>(b)</Label><Text>section 8 of the GHGRP, in the case of ammonia production; and</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500600" lims:id="1500600"><Label>(c)</Label><Text>section 7 of the GHGRP, in the case of steam production.</Text></Paragraph></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500601" lims:id="1500601"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500602" lims:id="1500602">Adaptation of GHGRP</MarginalNote><Label>(3)</Label><Text>For the purposes of paragraph (2)(a), the description of R<Sub>CO2</Sub> in Equation 10-2 of the GHGRP is to be read as “CO<Sub>2</Sub> captured and permanently stored in a storage project that meets the conditions set out in subsection <XRefInternal>23</XRefInternal>(2) of the <XRefExternal reference-type="regulation" link="SOR-2024-263">Clean Electricity Regulations</XRefExternal>”.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500603" lims:id="1500603"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500604" lims:id="1500604">Default values</MarginalNote><Label>(4)</Label><Text>If the hydrogen or ammonia used by a unit is not produced at the facility at which the unit is located or the steam used by a unit is purchased or transferred to that facility and the responsible person for the unit is not able to obtain from the supplier the information required under subsection (2), the responsible person must replace the ratio E<Sub>k</Sub> ÷ P<Sub>k</Sub> in subsection (1) with the following values:</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500605" lims:id="1500605"><Label>(a)</Label><Text>9.8312 × 10<Sup>-4</Sup> tonnes of CO<Sub>2</Sub>/m<Sup>3</Sup>, in the case of hydrogen;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500606" lims:id="1500606"><Label>(b)</Label><Text>1.4635 × 10<Sup>-3</Sup> tonnes of CO<Sub>2</Sub>/m<Sup>3</Sup>, in the case of ammonia; and</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500607" lims:id="1500607"><Label>(c)</Label><Text>0.08 tonnes of CO<Sub>2</Sub>/GJ, in the case of steam.</Text></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500608" lims:id="1500608" level="2"><TitleText>Emergency Circumstances</TitleText></Heading><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500609" lims:id="1500609"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500610" lims:id="1500610">Deduction</MarginalNote><Label>25</Label><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500611" lims:id="1500611"><Label>(1)</Label><Text>The responsible person for a unit may, for the purposes of subsection <XRefInternal>12</XRefInternal>(1), deduct the quantity of CO<Sub>2</Sub> emissions attributed to the unit during a deduction period and may, for the purposes of subsection <XRefInternal>13</XRefInternal>(2), deduct the quantity of electricity generated by the unit during a deduction period if the following conditions are met:</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500612" lims:id="1500612"><Label>(a)</Label><Text>the electricity system operator has determined that there is an irresistible emergency event, whether natural or arising from human action, or the Minister has determined that there is a risk to human health and safety;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500613" lims:id="1500613"><Label>(b)</Label><Text>in the case of an irresistible emergency event, the event is outside the control of the electricity system operator and the responsible person;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500614" lims:id="1500614"><Label>(c)</Label><Text>the electricity system operator has determined that the event or risk referred to in paragraph (a) has triggered a disruption or significant risk of disruption to the electricity supply in the province in which the unit is located or in a contiguous province or state;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500615" lims:id="1500615"><Label>(d)</Label><Text>the electricity system operator directs the unit to generate electricity due to the event or risk referred to in paragraph (a) in order to alleviate or materially help alleviate a disruption or significant risk of disruption to the electricity supply in the province in which the unit is located or in a contiguous province or state;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500616" lims:id="1500616"><Label>(e)</Label><Text>the generation of electricity by the unit will alleviate or materially help alleviate a disruption or significant risk of disruption to the electricity supply in the province in which the unit is located or in a contiguous province or state; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500617" lims:id="1500617"><Label>(f)</Label><Text>within seven days after the day on which the direction to generate electricity referred to in paragraph (d) is received, the responsible person notifies the Minister of that direction.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500618" lims:id="1500618"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500619" lims:id="1500619">Deduction period</MarginalNote><Label>(2)</Label><Text>The period for which the quantities of CO<Sub>2</Sub> emissions and electricity generated may be deducted begins in the hour in which a unit operates in response to the direction to generate electricity referred to in paragraph (1)(d) and ends as follows:</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500620" lims:id="1500620"><Label>(a)</Label><Text>if an application for an extension of the deduction period is not submitted to the Minister in accordance with subsection <XRefInternal>26</XRefInternal>(1), the period ends on the earlier of</Text><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500621" lims:id="1500621"><Label>(i)</Label><Text>the day that is the 30th day after the day on which the direction to generate electricity was given, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500622" lims:id="1500622"><Label>(ii)</Label><Text>the hour that is 24 hours after the electricity system operator notifies the responsible person for the unit that the direction to generate electricity no longer applies; or</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500623" lims:id="1500623"><Label>(b)</Label><Text>if an application for an extension of the deduction period is submitted to the Minister in accordance with subsection <XRefInternal>26</XRefInternal>(1), the period ends</Text><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500624" lims:id="1500624"><Label>(i)</Label><Text>in the case of an application that is not granted, on the earlier of</Text><Clause lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500625" lims:id="1500625"><Label>(A)</Label><Text>the hour that is 24 hours after the electricity system operator notifies the responsible person for the unit that the direction to generate electricity no longer applies, and</Text></Clause><Clause lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500626" lims:id="1500626"><Label>(B)</Label><Text>the day that is the 45th day after the day on which the direction to generate electricity was given, and</Text></Clause></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500627" lims:id="1500627"><Label>(ii)</Label><Text>in any other case, on the earlier of</Text><Clause lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500628" lims:id="1500628"><Label>(A)</Label><Text>the hour that is 24 hours after the electricity system operator notifies the responsible person for the unit that the direction to generate electricity no longer applies, and</Text></Clause><Clause lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500629" lims:id="1500629"><Label>(B)</Label><Text>the hour that is 24 hours after the Minister notifies the responsible person for the unit that the deduction period has ended.</Text></Clause></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500630" lims:id="1500630"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500631" lims:id="1500631">Notice to Minister</MarginalNote><Label>(3)</Label><Text>The responsible person must, within seven days after the day on which the electricity system operator notifies the responsible person that the direction to generate electricity referred to in paragraph (1)(d) no longer applies, notify the Minister that the direction no longer applies.</Text></Subsection></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500632" lims:id="1500632"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500633" lims:id="1500633">Application for extension of deduction period</MarginalNote><Label>26</Label><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500634" lims:id="1500634"><Label>(1)</Label><Text>If the conditions set out in subsection <XRefInternal>25</XRefInternal>(1) will continue to be met for more than 30 days after the day on which the unit receives the direction to generate electricity referred to in paragraph <XRefInternal>25</XRefInternal>(1)(d), the responsible person may, within 30 days after the day on which the direction is received, apply to the Minister for an extension of the deduction period.</Text></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500635" lims:id="1500635"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500636" lims:id="1500636">Contents of application</MarginalNote><Label>(2)</Label><Text>The application must include</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500637" lims:id="1500637"><Label>(a)</Label><Text>the registration number assigned to the unit by the Minister under subsection <XRefInternal>7</XRefInternal>(3), if any;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500638" lims:id="1500638"><Label>(b)</Label><Text>the date on which and hour at which the deduction period began;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500639" lims:id="1500639"><Label>(c)</Label><Text>a description of the irresistible emergency event or risk to human health and safety that caused the electricity system operator to direct the unit to generate electricity, including</Text><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500640" lims:id="1500640"><Label>(i)</Label><Text>the date on which and hour at which the event or risk began and, if applicable, the date on which and hour at which it ended,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500641" lims:id="1500641"><Label>(ii)</Label><Text>the province or state in which the event or risk occurred,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500642" lims:id="1500642"><Label>(iii)</Label><Text>the province or state in which the disruption or significant risk of disruption to the electricity supply occurred, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500643" lims:id="1500643"><Label>(iv)</Label><Text>information demonstrating that the unit received the direction to generate electricity to alleviate or materially help alleviate a disruption or significant risk of disruption to the electricity supply; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500644" lims:id="1500644"><Label>(d)</Label><Text>if the direction to generate electricity is due to the electricity system operator determining that there is an irresistible emergency event, information, along with supporting documents, demonstrating that</Text><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500645" lims:id="1500645"><Label>(i)</Label><Text>the electricity system operator determined that an irresistible emergency event occurred,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500646" lims:id="1500646"><Label>(ii)</Label><Text>the event was outside the control of the electricity system operator and the responsible person for the unit,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500647" lims:id="1500647"><Label>(iii)</Label><Text>the irresistible emergency event caused the disruption or significant risk of disruption to the electricity supply that the direction to generate electricity is intended to alleviate or materially help alleviate, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500648" lims:id="1500648"><Label>(iv)</Label><Text>the disruption or significant risk of disruption to the electricity supply arising from the event will continue for more than 30 days after the day on which the deduction period began.</Text></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500649" lims:id="1500649"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500650" lims:id="1500650">Minister’s decision</MarginalNote><Label>(3)</Label><Text>If the Minister is satisfied that the conditions set out in subsection <XRefInternal>25</XRefInternal>(1) will continue to be met, the Minister must, within 10 days after the day on which the application is received, grant an extension of the deduction period.</Text></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500651" lims:id="1500651"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500652" lims:id="1500652">Irresistible emergency event</MarginalNote><Label>(4)</Label><Text>Before granting an extension of a deduction period based on an irresistible emergency event, the Minister must be satisfied that</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500653" lims:id="1500653"><Label>(a)</Label><Text>the event occurred;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500654" lims:id="1500654"><Label>(b)</Label><Text>the event is outside the control of the electricity system operator and the responsible person for the unit;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500655" lims:id="1500655"><Label>(c)</Label><Text>the disruption or significant risk of disruption to the electricity supply arising from the event will continue; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500656" lims:id="1500656"><Label>(d)</Label><Text>the generation of electricity by the unit will alleviate or materially help alleviate the disruption or significant risk of disruption to the electricity supply in the province in which the unit is located or in a contiguous province or state.</Text></Paragraph></Subsection></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500657" lims:id="1500657"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500658" lims:id="1500658">Emissions during deduction period (E<Sub>ec</Sub>)</MarginalNote><Label>27</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500659" lims:id="1500659"><Label>(1)</Label><Text>The quantity referred to in the description of E<Sub>ec</Sub> in subsection <XRefInternal>12</XRefInternal>(1) is determined by the formula</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500660" lims:id="1500660"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500661" lims:id="1500661"><ImageGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500662" lims:id="1500662" bilingual="no" position="center" spanlanguages="no" spanmarginalnotecol="no" width="14pc"><AlternateText>The sum, for each deduction period “i”, of Eu minus Eth, minus Eint, minus Eccs, plus Eext.</AlternateText><Image source="SOR-2024-263img/SOR-2024-263_e009.JPG" /></ImageGroup></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500663" lims:id="1500663"><FormulaTerm>i</FormulaTerm><Text>is the i<Sup>th</Sup> deduction period, where “i” goes from 1 to <Emphasis style="italic">n</Emphasis> and where <Emphasis style="italic">n</Emphasis> is the number of deduction periods in the calendar year;</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500664" lims:id="1500664"><FormulaTerm>E<Sub>u</Sub></FormulaTerm><Text>is the quantity of CO<Sub>2</Sub> emissions, expressed in tonnes, from the combustion of fossil fuel in the unit during the i<Sup>th</Sup> deduction period during the calendar year, determined in accordance with subsection <XRefInternal>12</XRefInternal>(3);</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500665" lims:id="1500665"><FormulaTerm>E<Sub>th</Sub></FormulaTerm><Text>is the quantity of CO<Sub>2</Sub> emissions, expressed in tonnes, attributed to the production of useful thermal energy by the unit during the i<Sup>th</Sup> deduction period during the calendar year, determined in accordance with section <XRefInternal>21</XRefInternal>;</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500666" lims:id="1500666"><FormulaTerm>E<Sub>int</Sub></FormulaTerm><Text>is the quantity of CO<Sub>2</Sub> emissions, expressed in tonnes, attributed to electricity generated by the unit, during the i<Sup>th</Sup> deduction period during the calendar year, that is used internally at the facility where the unit is located and is</Text><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500667" lims:id="1500667"><Label>(a)</Label><Text>equal to zero, in the case of</Text><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500668" lims:id="1500668"><Label>(i)</Label><Text>any deduction period in which the unit did not produce useful thermal energy,</Text></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500669" lims:id="1500669"><Label>(ii)</Label><Text>any unit, other than a planned unit, that has a commissioning date after December 31, 2024, and</Text></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500670" lims:id="1500670"><Label>(iii)</Label><Text>every deduction period after 2049, and</Text></FormulaParagraph></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500671" lims:id="1500671"><Label>(b)</Label><Text>determined in accordance with section <XRefInternal>22</XRefInternal> in any other case;</Text></FormulaParagraph></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500672" lims:id="1500672"><FormulaTerm>E<Sub>ccs</Sub></FormulaTerm><Text>is the quantity of CO<Sub>2</Sub>, expressed in tonnes, captured from the unit during the i<Sup>th</Sup> deduction period during the calendar year and stored in a storage project, determined in accordance with section <XRefInternal>23</XRefInternal>; and</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500673" lims:id="1500673"><FormulaTerm>E<Sub>ext</Sub></FormulaTerm><Text>is the quantity of CO<Sub>2</Sub> emissions, expressed in tonnes, from the production of the hydrogen, ammonia and the purchased or transferred steam used by the unit to generate electricity during the i<Sup>th</Sup> deduction period during the calendar year, determined in accordance with section <XRefInternal>24</XRefInternal>.</Text></FormulaDefinition></FormulaGroup></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500674" lims:id="1500674"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500675" lims:id="1500675">Adaptation</MarginalNote><Label>(2)</Label><Text>For the purposes of subsection (1), any reference to a calendar year in a calculation required under section <XRefInternal>15</XRefInternal> or <XRefInternal>16</XRefInternal> or any of sections <XRefInternal>19</XRefInternal> to <XRefInternal>24</XRefInternal> is to be read as a reference to the applicable deduction period.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500676" lims:id="1500676"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500677" lims:id="1500677">Multiple calendar years</MarginalNote><Label>(3)</Label><Text>If a deduction period begins in one calendar year and ends in another calendar year, the deduction period for the purposes of subsection (1) is the portion of that deduction period that occurred during the calendar year for which CO<Sub>2</Sub> emissions are being determined.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500678" lims:id="1500678"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500679" lims:id="1500679">Overlapping deduction periods</MarginalNote><Label>(4)</Label><Text>A quantity of CO<Sub>2</Sub> emissions must not be included in more than one deduction period for the purposes of subsection (1).</Text></Subsection></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500680" lims:id="1500680" level="2"><TitleText>Canadian Offset Credits</TitleText></Heading><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500681" lims:id="1500681"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500682" lims:id="1500682">Remittance — December 15</MarginalNote><Label>28</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500683" lims:id="1500683"><Label>(1)</Label><Text>The quantity of CO<Sub>2</Sub> assigned to C<Sub>off</Sub> in subsection <XRefInternal>12</XRefInternal>(1) corresponds to the number of Canadian offset credits that the responsible person remits to the Minister for the unit on or before the December 15 that follows the calendar year for which the remittance is made.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500684" lims:id="1500684"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500685" lims:id="1500685">Maximum</MarginalNote><Label>(2)</Label><Text>The maximum number of Canadian offset credits that may be remitted for a unit for a calendar year corresponds to the quantity of CO<Sub>2</Sub>, expressed in tonnes, determined by the formula</Text><FormulaGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500686" lims:id="1500686"><Formula in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500687" lims:id="1500687"><FormulaText>C × I<Sub>off</Sub> × 8760 × 0.001</FormulaText></Formula><FormulaConnector>where</FormulaConnector><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500688" lims:id="1500688"><FormulaTerm>C</FormulaTerm><Text>is the unit’s electricity generation capacity for the calendar year; and</Text></FormulaDefinition><FormulaDefinition in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500689" lims:id="1500689"><FormulaTerm>I<Sub>off</Sub></FormulaTerm><Text>is the emission intensity applicable to the calendar year and is</Text><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500690" lims:id="1500690"><Label>(a)</Label><Text>35 tonnes of CO<Sub>2</Sub> emissions per GWh for the 2035 to 2049 calendar years, and</Text></FormulaParagraph><FormulaParagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500691" lims:id="1500691"><Label>(b)</Label><Text>42 tonnes of CO<Sub>2</Sub> emissions per GWh for the 2050 and subsequent calendar years.</Text></FormulaParagraph></FormulaDefinition></FormulaGroup></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500692" lims:id="1500692"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500693" lims:id="1500693">Rounding</MarginalNote><Label>(3)</Label><Text>The quantity determined under subsection (2) is to be rounded to the nearest whole number or, if equidistant between two consecutive whole numbers, to the higher number.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500694" lims:id="1500694"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500695" lims:id="1500695">Condition</MarginalNote><Label>(4)</Label><Text>Any Canadian offset credit remitted for a calendar year must have been issued for greenhouse gas reductions or removals that occurred no more than eight calendar years before the calendar year in which the Canadian offset credit is remitted.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500696" lims:id="1500696"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500697" lims:id="1500697">Cross-recognition</MarginalNote><Label>(5)</Label><Text>A responsible person may remit the same Canadian offset credit for the purposes of both subsection <XRefInternal>12</XRefInternal>(1) and an eligible system referred to in subsection (6) if, under that eligible system, the Canadian offset credit is remitted</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500698" lims:id="1500698"><Label>(a)</Label><Text>for the same calendar year as the year for which the Canadian offset credit is remitted under this section;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500699" lims:id="1500699"><Label>(b)</Label><Text>in relation to the same unit for which the Canadian offset credit is remitted under this section; and</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500700" lims:id="1500700"><Label>(c)</Label><Text>in fulfillment of a remittance requirement other than a requirement that relates to an extraordinary situation, such as to replace a cancelled credit or as compensation for non-compliance with a requirement.</Text></Paragraph></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500701" lims:id="1500701"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500702" lims:id="1500702">Eligible systems</MarginalNote><Label>(6)</Label><Text>The eligible systems are</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500703" lims:id="1500703"><Label>(a)</Label><Text>a system for pricing greenhouse gas emissions established under Division 1 of Part 2 of the <XRefExternal reference-type="act" link="G-11.55">Greenhouse Gas Pollution Pricing Act</XRefExternal>; and</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500704" lims:id="1500704"><Label>(b)</Label><Text>a provincial carbon pricing system that is subject to an agreement between the Minister and a province regarding the cross-recognition of Canadian offset credits and that is on the list published on the Department of the Environment’s website for the purposes of this section.</Text></Paragraph></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500705" lims:id="1500705"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500706" lims:id="1500706">Timing of remittance</MarginalNote><Label>(7)</Label><Text>A Canadian offset credit is considered to be remitted on the day on which a reconciliation report that contains all of the information set out in sections 1 and 2 of Schedule 6 in respect of the Canadian offset credit is submitted to the Minister in accordance with section <XRefInternal>41</XRefInternal>.</Text></Subsection></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500707" lims:id="1500707"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500708" lims:id="1500708">Cancelled Canadian offset credit</MarginalNote><Label>29</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500709" lims:id="1500709"><Label>(1)</Label><Text>If, within five years after the day on which a responsible person remits to the Minister one or more Canadian offset credits referred to in paragraph (b) of the definition <DefinitionRef>Canadian offset credit</DefinitionRef> in subsection <XRefInternal>2</XRefInternal>(1), the issuing province cancels and does not provide a mechanism to replace the credits, the Minister must notify the responsible person of the number of Canadian offset credits that were cancelled by the province and the number of Canadian offset credits that the responsible person must remit to the Minister.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500710" lims:id="1500710"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500711" lims:id="1500711">Cross-recognition conditions not met</MarginalNote><Label>(2)</Label><Text>If the Minister determines that one or more Canadian offset credits referred to in subsection <XRefInternal>28</XRefInternal>(5) were remitted that did not meet the conditions set out in that subsection, the Minister must notify the responsible person of the number of Canadian offset credits remitted that did not meet those conditions and the number of Canadian offset credits that the responsible person must remit to the Minister.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500712" lims:id="1500712"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500713" lims:id="1500713">Request by Minister</MarginalNote><Label>(3)</Label><Text>The responsible person must provide to the Minister, within the time limit specified by the Minister, any information requested by the Minister to determine whether a Canadian offset credit meets the conditions set out in subsection <XRefInternal>28</XRefInternal>(5).</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500714" lims:id="1500714"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500715" lims:id="1500715">Remittance obligation</MarginalNote><Label>(4)</Label><Text>The responsible person must remit the number of Canadian offset credits set out in a notice referred to in subsection (1) or (2) by submitting to the Minister, no later than December 15 of the calendar year that follows the calendar year in which the Minister provides the notice, a reconciliation report that contains the information set out in sections 1 and 4 of Schedule 6 in respect of the credits.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500716" lims:id="1500716"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500717" lims:id="1500717">Eligible Canadian offset credits</MarginalNote><Label>(5)</Label><Text>The Canadian offset credits that are remitted under subsection (4) must have been issued for greenhouse gas reductions or removals that occurred no more than eight calendar years before the time limit set out in that subsection.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500718" lims:id="1500718" level="2"><TitleText>Compliance Credits</TitleText></Heading><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500719" lims:id="1500719" level="3"><TitleText>Issuance</TitleText></Heading><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500720" lims:id="1500720"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500721" lims:id="1500721">Number of compliance credits issued</MarginalNote><Label>30</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500722" lims:id="1500722"><Label>(1)</Label><Text>If the Minister is satisfied that, for any of the 2035 to 2049 calendar years, the quantity of CO<Sub>2</Sub> emissions attributed to a unit, as determined in accordance with the formula set out in the description of E in subsection <XRefInternal>12</XRefInternal>(1), is below the emission limit determined for the unit in accordance with subsection <XRefInternal>9</XRefInternal>(1), the Minister must issue to the responsible person for the unit, for that calendar year and for that unit, a number of compliance credits, each with a corresponding value of one tonne of CO<Sub>2</Sub>, that is equal to the difference between that quantity and that limit.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500723" lims:id="1500723"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500724" lims:id="1500724">Exceptions</MarginalNote><Label>(2)</Label><Text>Despite subsection (1), no compliance credits are issued for a unit for a calendar year if</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500725" lims:id="1500725"><Label>(a)</Label><Text>the unit is not subject to an emission limit under subsection <XRefInternal>9</XRefInternal>(1) before July 1 of that calendar year; or</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500726" lims:id="1500726"><Label>(b)</Label><Text>the unit is subject to an exemption, under subsection <XRefInternal>14</XRefInternal>(1), from the application of subsection <XRefInternal>9</XRefInternal>(1) for that calendar year.</Text></Paragraph></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500727" lims:id="1500727"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500728" lims:id="1500728">Request by Minister</MarginalNote><Label>(3)</Label><Text>The responsible person for a unit must provide to the Minister, within the time limit specified by the Minister, any information requested by the Minister that is necessary to determine whether</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500729" lims:id="1500729"><Label>(a)</Label><Text>the quantity of CO<Sub>2</Sub> emissions assigned to E in subsection <XRefInternal>12</XRefInternal>(1) that is reported in the emissions report submitted under section <XRefInternal>39</XRefInternal> for the unit for a calendar year was determined in accordance with that subsection; and</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500730" lims:id="1500730"><Label>(b)</Label><Text>the emission limit that is reported in the emissions report submitted under section <XRefInternal>39</XRefInternal> for the unit for a calendar year was determined in accordance with subsection <XRefInternal>9</XRefInternal>(1).</Text></Paragraph></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500731" lims:id="1500731"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500732" lims:id="1500732">Notice</MarginalNote><Label>(4)</Label><Text>If, after receiving the information requested under subsection (3), the Minister is not satisfied that the quantity of CO<Sub>2</Sub> emissions attributed to a unit, as determined in accordance with the formula set out in the description of E in subsection <XRefInternal>12</XRefInternal>(1), is below the emission limit determined for the unit in accordance with subsection <XRefInternal>9</XRefInternal>(1), the Minister must notify the responsible person that no compliance credits will be issued for the unit for the calendar year.</Text></Subsection></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500733" lims:id="1500733"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500734" lims:id="1500734">Transferable compliance credits</MarginalNote><Label>31</Label><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500735" lims:id="1500735"><Label>(1)</Label><Text>Subject to section <XRefInternal>32</XRefInternal>, the compliance credits issued under subsection <XRefInternal>30</XRefInternal>(1) for a unit for a calendar year are transferable if the unit does not combust coal during the calendar year and is</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500736" lims:id="1500736"><Label>(a)</Label><Text>a unit that has a commissioning date before January 1, 2025 and that does not produce useful thermal energy during the calendar year;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500737" lims:id="1500737"><Label>(b)</Label><Text>a unit, other than a planned unit, that has a commissioning date after December 31, 2024 but before January 1, 2030; or</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500738" lims:id="1500738"><Label>(c)</Label><Text>a planned unit that does not produce useful thermal energy during the calendar year.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500739" lims:id="1500739"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500740" lims:id="1500740">Non-transferable compliance credits</MarginalNote><Label>(2)</Label><Text>Subject to section <XRefInternal>32</XRefInternal>, the compliance credits issued under subsection <XRefInternal>30</XRefInternal>(1) for a unit for a calendar year are non-transferable if the unit is not a unit referred to in subsection (1).</Text></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500741" lims:id="1500741"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500742" lims:id="1500742">Transfer between responsible persons</MarginalNote><Label>(3)</Label><Text>A transferable compliance credit may only be transferred between responsible persons for units to which these Regulations apply.</Text></Subsection></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500743" lims:id="1500743"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500744" lims:id="1500744">Designation of substitute unit</MarginalNote><Label>32</Label><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500745" lims:id="1500745"><Label>(1)</Label><Text>The responsible person for a unit described in any of paragraphs <XRefInternal>31</XRefInternal>(1)(a) to (c) or a unit that has been designated as a substitute unit under this section may, with the agreement of the responsible person for another unit, designate that other unit as a substitute unit if</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500746" lims:id="1500746"><Label>(a)</Label><Text>the electricity generation capacity of the unit being designated as a substitute unit does not exceed the electricity generation capacity of the unit being substituted; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500747" lims:id="1500747"><Label>(b)</Label><Text>both units report to the same electricity system operator.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500748" lims:id="1500748"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500749" lims:id="1500749">Required information</MarginalNote><Label>(2)</Label><Text>To designate a substitute unit, the responsible person that makes the designation and the responsible person for the unit that will be designated as a substitute unit must each submit the following information to the Minister before January 1 of the calendar year in which the substitution will take effect, along with an attestation, dated and signed by the responsible person or its authorized official, that it agrees to the substitution:</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500750" lims:id="1500750"><Label>(a)</Label><Text>the registration number assigned to each unit by the Minister under subsection <XRefInternal>7</XRefInternal>(3);</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500751" lims:id="1500751"><Label>(b)</Label><Text>the electricity generation capacity of each unit; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500752" lims:id="1500752"><Label>(c)</Label><Text>the electricity system operator for each unit.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500753" lims:id="1500753"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500754" lims:id="1500754">Consequences of substitution</MarginalNote><Label>(3)</Label><Text>Beginning with the calendar year in which the designation of a substitute unit takes effect,</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500755" lims:id="1500755"><Label>(a)</Label><Text>any compliance credits issued for the substitute unit for that calendar year — and for any subsequent calendar year in which the unit is a substitute unit — are transferable, unless the substitute unit</Text><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500756" lims:id="1500756"><Label>(i)</Label><Text>combusts coal during that calendar year,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500757" lims:id="1500757"><Label>(ii)</Label><Text>has a commissioning date before January 1, 2025 and produces useful thermal energy during that calendar year, or</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500758" lims:id="1500758"><Label>(iii)</Label><Text>is a planned unit that produces useful thermal energy during that calendar year; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500759" lims:id="1500759"><Label>(b)</Label><Text>any compliance credits issued for the unit that is not the substitute unit for that calendar year — and for any subsequent calendar year in which that unit is not a substitute unit — are non-transferable.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500760" lims:id="1500760"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500761" lims:id="1500761">Ceasing to be a substitute unit</MarginalNote><Label>(4)</Label><Text>A substitute unit ceases to be a substitute unit on January 1 of the calendar year that follows the year in which the responsible person for that unit designates another substitute unit in accordance with this section.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500762" lims:id="1500762" level="3"><TitleText>Remittance</TitleText></Heading><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500763" lims:id="1500763"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500764" lims:id="1500764">Remittance — December 15</MarginalNote><Label>33</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500765" lims:id="1500765"><Label>(1)</Label><Text>The quantity of CO<Sub>2</Sub> assigned to C<Sub>c</Sub> in subsection <XRefInternal>12</XRefInternal>(1) corresponds to the number of compliance credits that the responsible person remits to the Minister for the unit on or before the December 15 that follows the calendar year for which the remittance is made.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500766" lims:id="1500766"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500767" lims:id="1500767">Conditions</MarginalNote><Label>(2)</Label><Text>A responsible person may only remit a compliance credit for the purposes of subsection <XRefInternal>12</XRefInternal>(1) if the following conditions are met:</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500768" lims:id="1500768"><Label>(a)</Label><Text>the remittance is for a calendar year before 2050;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500769" lims:id="1500769"><Label>(b)</Label><Text>the compliance credit was issued for a calendar year that is no more than five calendar years before the calendar year in which it is remitted;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500770" lims:id="1500770"><Label>(c)</Label><Text>in the case of a non-transferable compliance credit, the credit is remitted for the unit for which it was issued; and</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500771" lims:id="1500771"><Label>(d)</Label><Text>in the case of a transferable compliance credit, the credit is remitted</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500772" lims:id="1500772"><Label>(i)</Label><Text>for a unit that</Text><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500773" lims:id="1500773"><Label>(A)</Label><Text>met, during the calendar year for which the remittance is made, the conditions to be issued transferable compliance credits that are set out in subsections <XRefInternal>31</XRefInternal>(1) and <XRefInternal>32</XRefInternal>(3), and</Text></Clause><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500774" lims:id="1500774"><Label>(B)</Label><Text>reports to the same electricity system operator as the unit for which the transferable compliance credit was issued, or</Text></Clause></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500775" lims:id="1500775"><Label>(ii)</Label><Text>for the unit for which it was issued.</Text></Subparagraph></Paragraph></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500776" lims:id="1500776"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500777" lims:id="1500777">Timing of remittance</MarginalNote><Label>(3)</Label><Text>A compliance credit is considered to be remitted on the day on which a reconciliation report that contains all of the information set out in sections 1 to 3 of Schedule 6 in respect of the compliance credit is submitted to the Minister in accordance with section <XRefInternal>41</XRefInternal>.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500778" lims:id="1500778"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500779" lims:id="1500779">Retirement</MarginalNote><Label>(4)</Label><Text>A compliance credit remitted under these Regulations may only be remitted once and, once remitted to the Minister, is retired and must not be used again.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500780" lims:id="1500780" level="2"><TitleText>Sampling and Missing Data</TitleText></Heading><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500781" lims:id="1500781"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500782" lims:id="1500782">Sampling</MarginalNote><Label>34</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500783" lims:id="1500783"><Label>(1)</Label><Text>The value of the variables referred to in the formulas set out in subsection <XRefInternal>20</XRefInternal>(1) and (4) must be determined based on fuel samples taken in accordance with this section.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500784" lims:id="1500784"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500785" lims:id="1500785">Frequency</MarginalNote><Label>(2)</Label><Text>Each fuel sample must be taken at a time and location in the fuel-handling system of the facility that provides the following representative samples of the fuel combusted at the applicable minimum frequency:</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500786" lims:id="1500786"><Label>(a)</Label><Text>for natural gas, during each sampling period consisting of each calendar year that the unit generates electricity or produces useful thermal energy, two samples taken that year, with each of those samples being taken at least four months after any previous sample has been taken, in accordance with one of the following standards:</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500787" lims:id="1500787"><Label>(i)</Label><Text>ASTM D4057, entitled <XRefExternal reference-type="standard">Standard Practice for Manual Sampling of Petroleum and Petroleum Products</XRefExternal>,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500788" lims:id="1500788"><Label>(ii)</Label><Text>ASTM D4177, entitled <XRefExternal reference-type="standard">Standard Practice for Automatic Sampling of Petroleum and Petroleum Products</XRefExternal>, or</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500789" lims:id="1500789"><Label>(iii)</Label><Text>ASTM F307, entitled <XRefExternal reference-type="standard">Standard Practice for Sampling Pressurized Gas for Gas Analysis</XRefExternal>;</Text></Subparagraph></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500790" lims:id="1500790"><Label>(b)</Label><Text>for refinery gas, during each sampling period consisting of each day that the unit generates electricity or produces useful thermal energy, one sample per day that is taken at least six hours after any previous sample has been taken, in accordance with any of the standards referred to in paragraph (a);</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500791" lims:id="1500791"><Label>(c)</Label><Text>for a type of liquid fuel or of a gaseous fuel other than refinery gas and natural gas, during each sampling period consisting of each month that the unit generates electricity or produces useful thermal energy, one sample per month that is taken at least two weeks after any previous sample has been taken, in accordance with any of the standards referred to in paragraph (a); and</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500792" lims:id="1500792"><Label>(d)</Label><Text>for a solid fuel, one composite sample per month that consists of sub-samples, each having the same mass, that are taken</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500793" lims:id="1500793"><Label>(i)</Label><Text>from the fuel that is fed for combustion during each week that begins in that month and during which the unit generates electricity or produces useful thermal energy,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500794" lims:id="1500794"><Label>(ii)</Label><Text>after all fuel treatment operations have been carried out but before any mixing of the fuel with other fuels, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500795" lims:id="1500795"><Label>(iii)</Label><Text>at intervals of at least 72 hours.</Text></Subparagraph></Paragraph></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500796" lims:id="1500796"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500797" lims:id="1500797">Additional samples</MarginalNote><Label>(3)</Label><Text>If the responsible person takes more samples or composite samples, as the case may be, than the number required under subsection (2) and a determination is made on the carbon content of any of those samples or composite samples in the manner set out in the description of CC<Sub>i</Sub> in subsection <XRefInternal>20</XRefInternal>(4) for the fuel type, the results of that determination must be included in the determination of CC<Sub>A</Sub> under subsection <XRefInternal>20</XRefInternal>(4).</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500798" lims:id="1500798"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500799" lims:id="1500799">Carbon content provided by the supplier</MarginalNote><Label>(4)</Label><Text>A responsible person may use the carbon content of a fuel provided by the supplier of the fuel rather than taking fuel samples in accordance with this section if the supplier</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500800" lims:id="1500800"><Label>(a)</Label><Text>determined the carbon content in the manner set out in the description of CC<Sub>i</Sub> in subsection <XRefInternal>20</XRefInternal>(4); and</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500801" lims:id="1500801"><Label>(b)</Label><Text>took the samples during the applicable sampling period and at the applicable minimum sampling frequency set out in subsection (2).</Text></Paragraph></Subsection></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500802" lims:id="1500802"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500803" lims:id="1500803">Missing data</MarginalNote><Label>35</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500804" lims:id="1500804"><Label>(1)</Label><Text>If, for any reason beyond the responsible person’s control, the data required to determine the value of any variable in any formula in these Regulations is missing for a period of a calendar year, replacement data for that period must be used to determine that value.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500805" lims:id="1500805"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500806" lims:id="1500806">Replacement data — CEMS</MarginalNote><Label>(2)</Label><Text>If a CEMS is used to determine the value of a variable in a formula set out in section <XRefInternal>16</XRefInternal> or <XRefInternal>17</XRefInternal> or any of sections 7.1 to 7.5 of the CEMS Protocol, but data is missing for a given period, the replacement data must be obtained in accordance with section 3.4.1 of the CEMS Protocol.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500807" lims:id="1500807"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500808" lims:id="1500808">Replacement data — non-CEMS</MarginalNote><Label>(3)</Label><Text>If data, other than data referred to in subsection (2), that is required to determine the value of any variable in a formula in these Regulations is missing for a given period, the replacement data is to be the average of the available data for that variable during the equivalent period prior to and, if the data is available, subsequent to that given period. However, if no data is available for that variable for the equivalent period prior to that given period, the replacement data to be used is the value determined for that variable during the equivalent period subsequent to the given period.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500809" lims:id="1500809"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500810" lims:id="1500810">Maximum number of hours</MarginalNote><Label>(4)</Label><Text>Replacement data may be used for more than one period during a calendar year but must not be used for more than 672 hours during the calendar year.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500811" lims:id="1500811" level="2"><TitleText>Accuracy of Data</TitleText></Heading><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500812" lims:id="1500812"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500813" lims:id="1500813">Measuring devices — installation, maintenance and calibration</MarginalNote><Label>36</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500814" lims:id="1500814"><Label>(1)</Label><Text>A responsible person must install, maintain and calibrate all measuring devices, other than a CEMS, that are used for the purposes of these Regulations in accordance with the manufacturer’s instructions or any applicable generally recognized national or international industry standard.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500815" lims:id="1500815"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500816" lims:id="1500816">Frequency of calibration</MarginalNote><Label>(2)</Label><Text>The responsible person must calibrate each measuring device</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500817" lims:id="1500817"><Label>(a)</Label><Text>at least once in every calendar year and at least five months after a previous calibration; or</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500818" lims:id="1500818"><Label>(b)</Label><Text>at the minimum frequency recommended by the manufacturer.</Text></Paragraph></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500819" lims:id="1500819"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500820" lims:id="1500820">Accuracy of measurements</MarginalNote><Label>(3)</Label><Text>The responsible person must use measuring devices that enable measurements to be made with an accuracy of</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500821" lims:id="1500821"><Label>(a)</Label><Text>± 3% in the case of any device used to measure a quantity of electricity; and</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500822" lims:id="1500822"><Label>(b)</Label><Text>± 5% in the case of any other device.</Text></Paragraph></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500823" lims:id="1500823"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500824" lims:id="1500824">Documents incorporated by reference</MarginalNote><Label>(4)</Label><Text>However, if a document incorporated by reference into these Regulations requires measurements that are more accurate than what is required by subsection (3), the responsible person must use a measuring device that enables measurements to be made with the degree of accuracy required by that document.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500825" lims:id="1500825" level="1"><TitleText>Errors and Omissions</TitleText></Heading><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500826" lims:id="1500826"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500827" lims:id="1500827">Correcting errors and omissions</MarginalNote><Label>37</Label><Text>A responsible person must, as soon as feasible, notify the Minister of any error or omission in any information submitted in accordance with these Regulations and must submit to the Minister the corrected information no later than 120 days after the day on which the responsible person becomes aware of the error or omission.</Text></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500828" lims:id="1500828"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500829" lims:id="1500829">Corrected emissions report</MarginalNote><Label>38</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500830" lims:id="1500830"><Label>(1)</Label><Text>A responsible person must submit to the Minister a corrected emissions report for a unit no later than 120 days after the day on which</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500831" lims:id="1500831"><Label>(a)</Label><Text>the responsible person submits a notice under section <XRefInternal>37</XRefInternal> that indicates that the responsible person has become aware of an error or omission that resulted in the issuance of an incorrect number of compliance credits for the unit; or</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500832" lims:id="1500832"><Label>(b)</Label><Text>the Minister notifies the responsible person of an error or omission that resulted in the issuance of an incorrect number of compliance credits for the unit.</Text></Paragraph></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500833" lims:id="1500833"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500834" lims:id="1500834">Contents of report</MarginalNote><Label>(2)</Label><Text>The corrected emissions report must contain the information set out in Schedule 5 for the same calendar year as the calendar year to which the error or omission relates, along with</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500835" lims:id="1500835"><Label>(a)</Label><Text>the information that required correction and a description of the corrections made;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500836" lims:id="1500836"><Label>(b)</Label><Text>a description of the circumstances that led to the error or omission and an indication of the reasons why the error or omission was not previously detected; and</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500837" lims:id="1500837"><Label>(c)</Label><Text>a description of the measures that have been and will be implemented to avoid errors or omissions of the same type.</Text></Paragraph></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500838" lims:id="1500838"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500839" lims:id="1500839">Remittance obligation</MarginalNote><Label>(3)</Label><Text>If, as a result of the error or omission, the number of compliance credits issued for a unit is greater than the number of compliance credits that would have been issued had the correct quantities been used to calculate that number at the time of issuance, the responsible person must remit to the Minister, no later than the December 15 that follows the time limit referred to in subsection (1), a number of compliance credits and, if applicable, Canadian offset credits that is equal to the difference between the number of compliance credits issued and the number that should have been issued.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500840" lims:id="1500840"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500841" lims:id="1500841">Order of precedence</MarginalNote><Label>(4)</Label><Text>The credits remitted for a unit for the purposes of subsection (3) must be, in the following order of precedence,</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500842" lims:id="1500842"><Label>(a)</Label><Text>compliance credits issued for the unit for the same calendar year as the calendar year to which the error or omission relates;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500843" lims:id="1500843"><Label>(b)</Label><Text>if an insufficient number of compliance credits referred to in paragraph (a) are held by the responsible person to fulfill the remittance obligation, any other compliance credits that are held in respect of that unit on the day that the notice referred to in paragraph (1)(a) or (b) is provided; or</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500844" lims:id="1500844"><Label>(c)</Label><Text>if an insufficient number of compliance credits referred to in paragraphs (a) and (b) are held by the responsible person to fulfill the remittance obligation, any combination of transferable compliance credits and Canadian offset credits.</Text></Paragraph></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500845" lims:id="1500845"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500846" lims:id="1500846">Conditions</MarginalNote><Label>(5)</Label><Text>The responsible person may only remit compliance credits and Canadian offset credits for a unit for the purposes of this section if</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500847" lims:id="1500847"><Label>(a)</Label><Text>in the case of compliance credits, the credits were issued</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500848" lims:id="1500848"><Label>(i)</Label><Text>for a calendar year that is no more than five calendar years before the calendar year in which they are remitted, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500849" lims:id="1500849"><Label>(ii)</Label><Text>for a unit that reports to the same electricity system operator as the unit for which they are remitted; and</Text></Subparagraph></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500850" lims:id="1500850"><Label>(b)</Label><Text>in the case of Canadian offset credits,</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500851" lims:id="1500851"><Label>(i)</Label><Text>the credits were issued for greenhouse gas reductions or removals that occurred no more than eight calendar years before the calendar year in which they are remitted, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500852" lims:id="1500852"><Label>(ii)</Label><Text>the number remitted does not exceed the number that is equal to the difference between</Text><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500853" lims:id="1500853"><Label>(A)</Label><Text>the sum of the maximum number of Canadian offset credits that may be remitted for the unit under section <XRefInternal>28</XRefInternal> for each calendar year beginning with the calendar year to which the error or omission relates and ending with the calendar year in which the credits are remitted, and</Text></Clause><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500854" lims:id="1500854"><Label>(B)</Label><Text>the sum of the number of Canadian offset credits that have already been remitted for the unit for each of those calendar years.</Text></Clause></Subparagraph></Paragraph></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500855" lims:id="1500855"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500856" lims:id="1500856">Partial remittance</MarginalNote><Label>(6)</Label><Text>Despite subsection (3), if a responsible person does not hold and is unable to obtain a sufficient number of compliance credits or Canadian offset credits that meet the conditions set out in subsections (4) and (5) to fulfill the remittance obligation by the time limit set out in subsection (3), the responsible person must remit the number of credits that it was able to obtain by that time limit and remit to the Minister the outstanding number of compliance credits or Canadian offset credits in the following calendar year — or, if it still does not hold and is unable to obtain a sufficient number of credits in that following calendar year, in a subsequent calendar year — in accordance with subsection (7).</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500857" lims:id="1500857"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500858" lims:id="1500858">Remittance in following year</MarginalNote><Label>(7)</Label><Text>Credits remitted for a unit after the time limit set out in subsection (3) must be</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500859" lims:id="1500859"><Label>(a)</Label><Text>compliance credits issued for the unit; or</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500860" lims:id="1500860"><Label>(b)</Label><Text>if an insufficient number of compliance credits referred to in paragraph (a) are held by the responsible person to fulfill the remittance obligation, any combination of transferable compliance credits or Canadian offset credits that the responsible person is able to obtain in that calendar year that meet the conditions set out in subsection (5).</Text></Paragraph></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500861" lims:id="1500861"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500862" lims:id="1500862">Timing of remittance</MarginalNote><Label>(8)</Label><Text>Compliance credits and Canadian offset credits remitted under this section are considered to be remitted on the day on which a reconciliation report that contains all of the information set out in sections 1, 3 and 5 of Schedule 6 in respect of the credits is submitted to the Minister in accordance with section <XRefInternal>41</XRefInternal>.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500863" lims:id="1500863" level="1"><TitleText>Reports</TitleText></Heading><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500864" lims:id="1500864"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500865" lims:id="1500865">Emissions report</MarginalNote><Label>39</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500866" lims:id="1500866"><Label>(1)</Label><Text>Beginning with the calendar year in which a unit becomes subject to an emission limit under subsection <XRefInternal>9</XRefInternal>(1), the responsible person must submit to the Minister an annual emissions report for the unit that contains the information set out in Schedule 5.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500867" lims:id="1500867"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500868" lims:id="1500868">June 1</MarginalNote><Label>(2)</Label><Text>The emissions report must be submitted on or before June 1 of the calendar year that follows the calendar year that is the subject of the report.</Text></Subsection></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500869" lims:id="1500869"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500870" lims:id="1500870">Short emissions report</MarginalNote><Label>40</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500871" lims:id="1500871"><Label>(1)</Label><Text>A responsible person must submit to the Minister — for each calendar year that the unit is subject to an exemption, under subsection <XRefInternal>14</XRefInternal>(1), from the application of section <XRefInternal>39</XRefInternal> — a short emissions report for the unit that contains the information set out in sections 1, 2, 4 and 9 of Schedule 5.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500872" lims:id="1500872"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500873" lims:id="1500873">June 1</MarginalNote><Label>(2)</Label><Text>The short emissions report must be submitted on or before June 1 of the calendar year that follows the calendar year that is the subject of the report.</Text></Subsection></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500874" lims:id="1500874"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500875" lims:id="1500875">Reconciliation report</MarginalNote><Label>41</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500876" lims:id="1500876"><Label>(1)</Label><Text>Beginning with the calendar year in which a unit becomes subject to an emission limit under subsection <XRefInternal>9</XRefInternal>(1), the responsible person must submit to the Minister an annual reconciliation report for the unit that contains the information set out in Schedule 6.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500877" lims:id="1500877"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500878" lims:id="1500878">December 15</MarginalNote><Label>(2)</Label><Text>The reconciliation report must be submitted on or before December 15 of the calendar year that follows the calendar year that is the subject of the report.</Text></Subsection></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500879" lims:id="1500879"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500880" lims:id="1500880">Short reconciliation report</MarginalNote><Label>42</Label><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500881" lims:id="1500881"><Label>(1)</Label><Text>If a compliance credit is held in respect of a unit for any portion of a calendar year and a reconciliation report is not required under subsection <XRefInternal>41</XRefInternal>(1) in respect of the unit for that calendar year, the responsible person must submit to the Minister a short reconciliation report for the unit for that calendar year that contains the information set out in sections 1 and 3 of Schedule 6.</Text></Subsection><Subsection in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500882" lims:id="1500882"><MarginalNote in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500883" lims:id="1500883">December 15</MarginalNote><Label>(2)</Label><Text>The short reconciliation report must be submitted on or before December 15 of the calendar year that follows the calendar year that is the subject of the report.</Text></Subsection></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500884" lims:id="1500884"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500885" lims:id="1500885">Permanent cessation</MarginalNote><Label>43</Label><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500886" lims:id="1500886"><Label>(1)</Label><Text>If a unit permanently ceases to generate electricity, the responsible person for the unit must, no later than 60 days after the day on which the unit permanently ceases generating electricity, submit to the Minister a notice of permanent cessation of electricity generation that contains the information set out in Schedule 7.</Text></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500887" lims:id="1500887"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500888" lims:id="1500888">Continuing responsibility</MarginalNote><Label>(2)</Label><Text>A responsible person that submits the notice referred to in subsection (1) must</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500889" lims:id="1500889"><Label>(a)</Label><Text>submit any report required under any of sections <XRefInternal>39</XRefInternal> to <XRefInternal>42</XRefInternal> in respect of the unit for the calendar year in which the unit permanently ceases to generate electricity; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500890" lims:id="1500890"><Label>(b)</Label><Text>continue to comply with the requirements set out in sections <XRefInternal>29</XRefInternal>, <XRefInternal>37</XRefInternal>, <XRefInternal>38</XRefInternal> and <XRefInternal>44</XRefInternal> to <XRefInternal>48</XRefInternal> in respect of the unit.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500891" lims:id="1500891"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500892" lims:id="1500892">Signature and submission — electronic</MarginalNote><Label>44</Label><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500893" lims:id="1500893"><Label>(1)</Label><Text>Any information that is required to be submitted under these Regulations, including any notice provided under subsection <XRefInternal>8</XRefInternal>(5), paragraph <XRefInternal>25</XRefInternal>(1)(f), subsection <XRefInternal>25</XRefInternal>(3), section <XRefInternal>37</XRefInternal> or subsection <XRefInternal>46</XRefInternal>(3), and any application that is made under these Regulations, must be submitted electronically in the form specified by the Minister and must bear the electronic signature of the responsible person or its authorized official.</Text></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500894" lims:id="1500894"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500895" lims:id="1500895">Provision on paper</MarginalNote><Label>(2)</Label><Text>If the Minister has not specified an electronic form or if the responsible person is unable to submit the information electronically in accordance with subsection (1) because of circumstances beyond the responsible person’s control, the information must be submitted on paper, signed by the responsible person or its authorized official, in the form specified by the Minister or, if no form has been specified, in any form.</Text></Subsection></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500896" lims:id="1500896" level="1"><TitleText>Records</TitleText></Heading><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500897" lims:id="1500897"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500898" lims:id="1500898">Contents</MarginalNote><Label>45</Label><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500899" lims:id="1500899"><Label>(1)</Label><Text>A responsible person must make records containing the following documents and information with respect to the unit:</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500900" lims:id="1500900"><Label>(a)</Label><Text>any notice, attestation, declaration, application, report or information submitted to the Minister under these Regulations;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500901" lims:id="1500901"><Label>(b)</Label><Text>if the responsible person is required to make a determination or perform a calculation under these Regulations,</Text><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500902" lims:id="1500902"><Label>(i)</Label><Text>the determination or calculation required,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500903" lims:id="1500903"><Label>(ii)</Label><Text>the measurements on which the determination or calculation was based,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500904" lims:id="1500904"><Label>(iii)</Label><Text>an indication of the standard or method that was used to determine the value of any variable of a formula required to complete the calculations, as well as any information, including the methodology, that is used to determine that value, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500905" lims:id="1500905"><Label>(iv)</Label><Text>any supporting documents for the information referred to in subparagraphs (i) to (iii);</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500906" lims:id="1500906"><Label>(c)</Label><Text>if a quantity is assigned to Q<Sub>a</Sub> in subsection <XRefInternal>13</XRefInternal>(2), the documentation referred to in paragraph <XRefInternal>13</XRefInternal>(4)(c) and information demonstrating that useful thermal energy was supplied to a recipient facility;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500907" lims:id="1500907"><Label>(d)</Label><Text>an indication of the standard or method used to determine the value of CC<Sub>i</Sub> in subsection <XRefInternal>20</XRefInternal>(4) for a sample of gaseous fuel, including an indication of whether a direct measuring device was used to determine that value;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500908" lims:id="1500908"><Label>(e)</Label><Text>the manufacturer’s instructions for any measuring device used to determine any value or quantity under these Regulations;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500909" lims:id="1500909"><Label>(f)</Label><Text>information demonstrating that the requirements set out in section <XRefInternal>36</XRefInternal> have been met;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500910" lims:id="1500910"><Label>(g)</Label><Text>for each calendar year during which the responsible person uses a CEMS,</Text><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500911" lims:id="1500911"><Label>(i)</Label><Text>information demonstrating that the requirements set out in the CEMS Protocol for the design, certification, operation and performance evaluation of the CEMS have been met,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500912" lims:id="1500912"><Label>(ii)</Label><Text>documents confirming that the CEMS certification requirement set out in subsection <XRefInternal>18</XRefInternal>(2) has been met, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500913" lims:id="1500913"><Label>(iii)</Label><Text>a copy of each quality assurance plan developed for the CEMS and information demonstrating that the requirements set out in section 6 of the CEMS Protocol for the quality assurance plan have been met;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500914" lims:id="1500914"><Label>(h)</Label><Text>the results of the analysis of every sample taken for the purposes of subsections <XRefInternal>20</XRefInternal>(1) or (4), as well as the date on which each sample was taken and an indication of the standards that were used to take representative samples of the fuel;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500915" lims:id="1500915"><Label>(i)</Label><Text>if a supplier of hydrogen, ammonia or steam has provided the values of E<Sub>k</Sub> and P<Sub>k</Sub> under subsection <XRefInternal>24</XRefInternal>(2), the information provided by the supplier;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500916" lims:id="1500916"><Label>(j)</Label><Text>if a supplier of fuel has provided the carbon content of that fuel under subsection <XRefInternal>34</XRefInternal>(4), the information provided by the supplier;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500917" lims:id="1500917"><Label>(k)</Label><Text>information demonstrating the manner in which the electricity generation capacity set out in any registration report submitted under section <XRefInternal>7</XRefInternal> or subsection <XRefInternal>8</XRefInternal>(2) and each emissions report submitted under section <XRefInternal>39</XRefInternal> was determined; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500918" lims:id="1500918"><Label>(l)</Label><Text>if replacement data was used under section <XRefInternal>35</XRefInternal>, information demonstrating the reason replacement data was required, along with the replacement data that was used.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500919" lims:id="1500919"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500920" lims:id="1500920">Time limit</MarginalNote><Label>(2)</Label><Text>A record must be made no later than 30 days after the day on which the information and documents to be included in it become available.</Text></Subsection></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500921" lims:id="1500921"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500922" lims:id="1500922">Retention of information</MarginalNote><Label>46</Label><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500923" lims:id="1500923"><Label>(1)</Label><Text>A responsible person must keep the records that are required to be made under these Regulations with respect to the unit, along with the supporting documents, for the following periods:</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500924" lims:id="1500924"><Label>(a)</Label><Text>in the case of a registration report submitted under subsection <XRefInternal>7</XRefInternal>(1), paragraph <XRefInternal>7</XRefInternal>(2)(a) or subsection <XRefInternal>8</XRefInternal>(2) and any supporting documents related to that registration report, the period that begins on the day on which the registration report is submitted to the Minister and ends on the day that is seven years after the day on which the notice referred to in subsection <XRefInternal>43</XRefInternal>(1) is submitted in respect of the unit; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500925" lims:id="1500925"><Label>(b)</Label><Text>in any other case, a period of seven years after the later of the day on which the record is made and the day on which the information is submitted to the Minister.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500926" lims:id="1500926"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500927" lims:id="1500927">Location of records</MarginalNote><Label>(2)</Label><Text>The records and supporting documents must be kept at the responsible person’s principal place of business in Canada or at any other place in Canada where they can be inspected. If the records and documents are not kept at the responsible person’s principal place of business, the responsible person must provide the Minister with the civic address of the place where they are kept.</Text></Subsection><Subsection lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500928" lims:id="1500928"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500929" lims:id="1500929">Relocation of records</MarginalNote><Label>(3)</Label><Text>If the records and supporting documents are moved, the responsible person must notify the Minister of the civic address of the new location within 30 days after the day of the move.</Text></Subsection></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500930" lims:id="1500930"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500931" lims:id="1500931">Minister’s request</MarginalNote><Label>47</Label><Text>A responsible person must provide to the Minister a copy of any record that is required to be kept no later than 30 days after the Minister requests it.</Text></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500932" lims:id="1500932" level="1"><TitleText>Language of Documents</TitleText></Heading><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500933" lims:id="1500933"><MarginalNote lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500934" lims:id="1500934">English or French</MarginalNote><Label>48</Label><Text>All documents required by these Regulations must be in English or French or be accompanied by a translation in English or French and an affidavit of the translator attesting to the accuracy of the translation.</Text></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500935" lims:id="1500935" level="1"><TitleText>Consequential Amendments</TitleText></Heading><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500936" lims:id="1500936" level="2"><TitleText><XRefExternal reference-type="regulation" link="SOR-2012-134">Regulations Designating Regulatory Provisions for Purposes of Enforcement (Canadian Environmental Protection Act, 1999)</XRefExternal></TitleText></Heading><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500937" lims:id="1500937" target="SOR/2012-134" type="amending"><Label>49</Label><Text>[Amendments]</Text></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500939" lims:id="1500939" level="2"><TitleText><XRefExternal reference-type="regulation">Regulations Limiting Carbon Dioxide Emissions from Natural Gas-fired Generation of Electricity</XRefExternal></TitleText></Heading><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500940" lims:id="1500940" target="SOR/2018-261" type="amending"><Label>50</Label><Text>[Amendments]</Text></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500942" lims:id="1500942" level="1"><TitleText>Repeals</TitleText></Heading><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500943" lims:id="1500943" target="SOR/2012-167" type="amending"><Label>51</Label><Text>[Amendments]</Text></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1500944" lims:id="1500944" type="amending"><Label>52</Label><Text>[Amendments]</Text></Section><Heading lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500945" lims:id="1500945" level="1"><TitleText>Coming into Force</TitleText></Heading><Section lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2024-12-13" lims:fid="1500946" lims:id="1500946" type="CIF"><MarginalNote lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500947" lims:id="1500947">January 1, 2025</MarginalNote><Label>53</Label><Subsection lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500948" lims:id="1500948" type="CIF"><Label>(1)</Label><Text>Subject to subsections (2) and (3), these Regulations come into force on January 1, 2025, but if they are registered after that day, they come into force on the day on which they are registered.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500949" lims:id="1500949" type="CIF"><MarginalNote lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500950" lims:id="1500950">January 1, 2035</MarginalNote><Label>(2)</Label><Text>Sections <XRefInternal>9</XRefInternal> and <XRefInternal>12</XRefInternal>, subsection <XRefInternal>13</XRefInternal>(1), sections <XRefInternal>15</XRefInternal> to <XRefInternal>24</XRefInternal>, <XRefInternal>27</XRefInternal> to <XRefInternal>30</XRefInternal>, <XRefInternal>33</XRefInternal> to <XRefInternal>36</XRefInternal>, <XRefInternal>38</XRefInternal> to <XRefInternal>42</XRefInternal> and <XRefInternal>49</XRefInternal> to <XRefInternal>51</XRefInternal> and Schedules 3 to 6 come into force on January 1, 2035.</Text></Subsection><Subsection lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500951" lims:id="1500951" type="CIF"><MarginalNote lims:inforce-start-date="2024-12-13" lims:enacted-date="2024-12-13" lims:fid="1500952" lims:id="1500952">January 1, 2050</MarginalNote><Label>(3)</Label><Text>Section <XRefInternal>52</XRefInternal> comes into force on January 1, 2050.</Text></Subsection></Section></Body><Schedule lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500953" lims:id="1500953" bilingual="no" spanlanguages="no"><ScheduleFormHeading lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500954" lims:id="1500954"><Label>SCHEDULE 1</Label><OriginatingRef>(Subsection <XRefInternal>6</XRefInternal>(4) and paragraph 3(h) of Schedule 2)</OriginatingRef><TitleText>Performance Test Verifier Report — Information Required</TitleText></ScheduleFormHeading><RegulationPiece lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500955" lims:id="1500955"><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500956" lims:id="1500956"><Label>1</Label><Text>The registration number, if any, assigned to the unit by the Minister under subsection <XRefInternal>7</XRefInternal>(3) of these Regulations.</Text></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500957" lims:id="1500957"><Label>2</Label><Text>The following information about a unit that has not been assigned a registration number:</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500958" lims:id="1500958"><Label>(a)</Label><Text>the unit’s name and, if any, civic address; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500959" lims:id="1500959"><Label>(b)</Label><Text>the unit’s geographic coordinates (latitude and longitude), expressed in decimal degrees to five decimal places.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500960" lims:id="1500960"><Label>3</Label><Text>The name, civic address, telephone number, email address and, if any, fax number of the performance test verifier.</Text></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500961" lims:id="1500961"><Label>4</Label><Text>Information demonstrating that the performance test verifier meets the requirements set out in subsection <XRefInternal>6</XRefInternal>(3) of these Regulations.</Text></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500962" lims:id="1500962"><Label>5</Label><Text>The procedures followed by the performance test verifier to assess whether</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500963" lims:id="1500963"><Label>(a)</Label><Text>the maximum gross power was measured at the electrical terminals of the unit’s generators; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500964" lims:id="1500964"><Label>(b)</Label><Text>the performance test was conducted in accordance with subsection <XRefInternal>6</XRefInternal>(2) of these Regulations.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500965" lims:id="1500965"><Label>6</Label><Text>A statement by the performance test verifier that affirms that</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500966" lims:id="1500966"><Label>(a)</Label><Text>the maximum gross power was measured at the electrical terminals of the unit’s generators; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500967" lims:id="1500967"><Label>(b)</Label><Text>the performance test was conducted in accordance with subsection <XRefInternal>6</XRefInternal>(2) of these Regulations.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500968" lims:id="1500968"><Label>7</Label><Text>The unit’s maximum gross power, expressed in MW, as determined by the performance test.</Text></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500969" lims:id="1500969"><Label>8</Label><Text>The unit’s most recent maximum continuous rating.</Text></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500970" lims:id="1500970"><Label>9</Label><Text>The date of the performance test.</Text></Section></RegulationPiece></Schedule><Schedule lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500971" lims:id="1500971" bilingual="no" spanlanguages="no"><ScheduleFormHeading lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500972" lims:id="1500972"><Label>SCHEDULE 2</Label><OriginatingRef>(Subsection <XRefInternal>7</XRefInternal>(1), paragraph <XRefInternal>7</XRefInternal>(2)(a) and subsections <XRefInternal>7</XRefInternal>(4) and <XRefInternal>8</XRefInternal>(2))</OriginatingRef><TitleText>Registration Report — Information Required</TitleText></ScheduleFormHeading><RegulationPiece lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500973" lims:id="1500973"><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500974" lims:id="1500974"><Label>1</Label><Text>The following information about the responsible person that is submitting the report:</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500975" lims:id="1500975"><Label>(a)</Label><Text>its name and civic address;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500976" lims:id="1500976"><Label>(b)</Label><Text>an indication of whether it is the owner and whether it has the charge, management or control of the unit;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500977" lims:id="1500977"><Label>(c)</Label><Text>the federal Business Number assigned to it by the Canada Revenue Agency, if any;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500978" lims:id="1500978"><Label>(d)</Label><Text>its percentage of ownership interest in the unit, if any;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500979" lims:id="1500979"><Label>(e)</Label><Text>the name, title, civic and postal addresses, telephone number, email address and, if any, fax number of its authorized official; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500980" lims:id="1500980"><Label>(f)</Label><Text>the name, title, civic and postal addresses, telephone number, email address and, if any, fax number of a contact person, if different from the authorized official.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500981" lims:id="1500981"><Label>2</Label><Text>The following information about the facility where the unit is located:</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500982" lims:id="1500982"><Label>(a)</Label><Text>its name and, if any, civic address;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500983" lims:id="1500983"><Label>(b)</Label><Text>its geographic coordinates (latitude and longitude), expressed in decimal degrees to five decimal places;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500984" lims:id="1500984"><Label>(c)</Label><Text>the name of each owner or person that has the charge, management or control of the facility and the federal Business Number, if any, assigned to each of those persons by the Canada Revenue Agency; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500985" lims:id="1500985"><Label>(d)</Label><Text>in respect of a facility that transmits electricity to an electricity system and supplies useful thermal energy to a recipient facility,</Text><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500986" lims:id="1500986"><Label>(i)</Label><Text>the name and, if any, civic address of the recipient facility,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500987" lims:id="1500987"><Label>(ii)</Label><Text>the geographic coordinates (latitude and longitude) of the recipient facility, expressed in decimal degrees to five decimal places, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500988" lims:id="1500988"><Label>(iii)</Label><Text>the name of each owner or person that has the charge, management or control of the recipient facility and the federal Business Number, if any, assigned to each of those persons by the Canada Revenue Agency.</Text></Subparagraph></Paragraph></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1500989" lims:id="1500989"><Label>3</Label><Text>The following information and documents about the unit:</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500990" lims:id="1500990"><Label>(a)</Label><Text>for each responsible person for the unit, other than the responsible person referred to in section 1, if any,</Text><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500991" lims:id="1500991"><Label>(i)</Label><Text>its name and, if any, civic address,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500992" lims:id="1500992"><Label>(ii)</Label><Text>an indication of whether it is an owner and whether it has the charge, management or control of the unit,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500993" lims:id="1500993"><Label>(iii)</Label><Text>its percentage of ownership interest in the unit, if any, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500994" lims:id="1500994"><Label>(iv)</Label><Text>the federal Business Number assigned to it by the Canada Revenue Agency, if any;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500995" lims:id="1500995"><Label>(b)</Label><Text>the unit’s name and, if any, civic address;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500996" lims:id="1500996"><Label>(c)</Label><Text>the unit’s geographic coordinates (latitude and longitude), expressed in decimal degrees to five decimal places;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500997" lims:id="1500997"><Label>(d)</Label><Text>if applicable, any National Pollutant Release Inventory identification number assigned by the Minister to the unit or the facility where it is located for the purposes of section 48 of the <XRefExternal reference-type="act" link="C-15.31">Canadian Environmental Protection Act, 1999</XRefExternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500998" lims:id="1500998"><Label>(e)</Label><Text>if applicable, any identifiers assigned by the Minister to the unit or the facility where it is located for the purposes of the Greenhouse Gas Reporting Program;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1500999" lims:id="1500999"><Label>(f)</Label><Text>the electricity system operator;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501000" lims:id="1501000"><Label>(g)</Label><Text>the unit’s electricity generation capacity;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501001" lims:id="1501001"><Label>(h)</Label><Text>if the electricity generation capacity was determined under paragraph <XRefInternal>6</XRefInternal>(1)(a) of these Regulations, the unit’s maximum gross power and the performance test report prepared by the performance test verifier that contains the information set out in Schedule 1;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501002" lims:id="1501002"><Label>(i)</Label><Text>the unit’s most recent maximum continuous rating and the date on which it was reported to the electricity system operator;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501003" lims:id="1501003"><Label>(j)</Label><Text>the year in which subsection <XRefInternal>9</XRefInternal>(1) and section <XRefInternal>12</XRefInternal> of these Regulations begin to apply in respect of the unit;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501004" lims:id="1501004"><Label>(k)</Label><Text>if the responsible person has made an election under section <XRefInternal>11</XRefInternal> of these Regulations with respect to the unit, the date on which the information referred to in subsection <XRefInternal>11</XRefInternal>(2) of these Regulations was submitted and the date elected as the unit’s end of prescribed life;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501005" lims:id="1501005"><Label>(l)</Label><Text>the unit’s commissioning date;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501006" lims:id="1501006"><Label>(m)</Label><Text>the name of each boiler and combustion engine in the unit and the date on which each boiler and combustion engine started operating;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501007" lims:id="1501007"><Label>(n)</Label><Text>an indication of whether the unit combusted coal during the previous calendar year;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501008" lims:id="1501008"><Label>(o)</Label><Text>an indication of whether the maximum continuous rating for the unit has increased by 15% or more from the maximum continuous rating reported for the unit in the registration report that was submitted in respect of the unit under subsection <XRefInternal>7</XRefInternal>(1), paragraph <XRefInternal>7</XRefInternal>(2)(a) or subsection <XRefInternal>8</XRefInternal>(2) of these Regulations;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501009" lims:id="1501009"><Label>(p)</Label><Text>an indication of whether the unit is a boiler unit referred to in subsection 3(4) of the <XRefExternal reference-type="regulation">Regulations Limiting Carbon Dioxide Emissions from Natural Gas-fired Generation of Electricity</XRefExternal> that has an end of prescribed life after December 31, 2034, and, if so, the year of its end of prescribed life;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501010" lims:id="1501010"><Label>(q)</Label><Text>an indication of whether the unit produces useful thermal energy;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501011" lims:id="1501011"><Label>(r)</Label><Text>the registration number, if any, assigned to the unit by the Minister under subsection 4(2) of the <XRefExternal reference-type="regulation">Reduction of Carbon Dioxide Emissions from Coal-fired Generation of Electricity Regulations</XRefExternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501012" lims:id="1501012"><Label>(s)</Label><Text>the registration number, if any, assigned to the unit by the Minister under subsection 21(4) of the <XRefExternal reference-type="regulation">Regulations Limiting Carbon Dioxide Emissions from Natural Gas-fired Generation of Electricity</XRefExternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501013" lims:id="1501013"><Label>(t)</Label><Text>if the unit is a subunit referred to in section <XRefInternal>8</XRefInternal> of these Regulations,</Text><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501014" lims:id="1501014"><Label>(i)</Label><Text>the registration number, assigned by the Minister under subsection <XRefInternal>7</XRefInternal>(3) of these Regulations, of each other subunit that was registered as one of the multiple subunits referred to in subsection <XRefInternal>8</XRefInternal>(1) of these Regulations,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501015" lims:id="1501015"><Label>(ii)</Label><Text>an indication of whether all of the conditions set out in subsection <XRefInternal>8</XRefInternal>(1) of these Regulations are met,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501016" lims:id="1501016"><Label>(iii)</Label><Text>the sum of the maximum continuous rating of the subunit and each other subunit that was registered as one of the multiple subunits referred to in subsection <XRefInternal>8</XRefInternal>(1) of these Regulations, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501017" lims:id="1501017"><Label>(iv)</Label><Text>an indication of whether the sum of the maximum continuous rating for each of the subunits has increased by 15% or more from the sum of the maximum continuous ratings reported in the registration reports submitted for the subunits under subsection <XRefInternal>8</XRefInternal>(2) of these Regulations;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501018" lims:id="1501018"><Label>(u)</Label><Text>a process diagram of the facility where the unit is located that clearly identifies the assembly of equipment that constitutes the unit as well as</Text><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501019" lims:id="1501019"><Label>(i)</Label><Text>major equipment, including boilers, combustion engines, duct burners and other combustion devices, heat recovery systems, steam turbines, generators, emission control devices, carbon capture and storage system equipment and continuous emission monitoring systems,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501020" lims:id="1501020"><Label>(ii)</Label><Text>the manner in which the equipment referred to in subparagraph (i) is physically connected and operates together,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501021" lims:id="1501021"><Label>(iii)</Label><Text>the boundaries used to identify each unit,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501022" lims:id="1501022"><Label>(iv)</Label><Text>if applicable, the boundaries used to identify the unit that was registered as multiple subunits in accordance with subsection <XRefInternal>8</XRefInternal>(1) of these Regulations,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501023" lims:id="1501023"><Label>(v)</Label><Text>the electric flows that cross the boundary of a unit and those that cross the boundary of the facility,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501024" lims:id="1501024"><Label>(vi)</Label><Text>the location of any electricity-measuring device,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501025" lims:id="1501025"><Label>(vii)</Label><Text>if applicable, the heat streams that cross the boundary of a unit and those that cross the boundary of the facility,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501026" lims:id="1501026"><Label>(viii)</Label><Text>if a carbon capture and storage system is shared between multiple units or other sources, information that identifies those units and sources, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501027" lims:id="1501027"><Label>(ix)</Label><Text>if applicable, any major equipment that is physically connected with another facility and the name of that facility;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501028" lims:id="1501028"><Label>(v)</Label><Text>if the unit includes major equipment that is physically connected with another facility, the name of that facility and the name of the owner or person that has the charge, management or control of that facility;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501029" lims:id="1501029"><Label>(w)</Label><Text>an indication of whether the unit is deemed, under subsection <XRefInternal>5</XRefInternal>(2) of these Regulations, to meet the criterion set out in paragraph <XRefInternal>5</XRefInternal>(1)(a) of these Regulations and, if so, the names and registration numbers, assigned by the Minister under subsection <XRefInternal>7</XRefInternal>(3) of these Regulations, of the units for which the sum of the electricity generation capacity is at least 25 MW;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501030" lims:id="1501030"><Label>(x)</Label><Text>if the unit contains a combustion engine, boiler or steam turbine that was contained in another unit previously registered under these Regulations,</Text><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501031" lims:id="1501031"><Label>(i)</Label><Text>the registration number assigned to the previously registered unit by the Minister under subsection <XRefInternal>7</XRefInternal>(3) of these Regulations,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501032" lims:id="1501032"><Label>(ii)</Label><Text>in the case of a combustion engine or steam turbine, the electricity generation capacity associated with the combustion engine or steam turbine, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501033" lims:id="1501033"><Label>(iii)</Label><Text>the date on which the combustion engine, boiler or steam turbine started operating in the unit that is the subject of the report;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501034" lims:id="1501034"><Label>(y)</Label><Text>if the unit is a planned unit, information demonstrating that the unit is a planned unit and an explanation, along with supporting documents, of how each of the criteria set out in section <XRefInternal>3</XRefInternal> of these Regulations was met in relation to the unit, including the following:</Text><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501035" lims:id="1501035"><Label>(i)</Label><Text>if the unit’s commissioning date is after December 31, 2025, a description of the plans for the unit as they existed on December 31, 2025,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501036" lims:id="1501036"><Label>(ii)</Label><Text>if no impact assessment or environmental assessment was required in relation to the unit, a declaration to that effect and an explanation of why it was not required,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501037" lims:id="1501037"><Label>(iii)</Label><Text>if an impact assessment or environmental assessment was required, an explanation of how the information submitted to the relevant authority on or before December 31, 2025 was all of the information required to initiate the relevant assessment and the date on which the information was submitted,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501038" lims:id="1501038"><Label>(iv)</Label><Text>information respecting the ownership or control, on or before December 31, 2025, of the land on which the unit is located,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501039" lims:id="1501039"><Label>(v)</Label><Text>information respecting any permit required to begin construction of the unit,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501040" lims:id="1501040"><Label>(vi)</Label><Text>an explanation of how the information submitted on or before December 31, 2025 in relation to any permit required to begin construction at the site where the unit is located was all the information required to obtain that permit and the date on which the information was submitted,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501041" lims:id="1501041"><Label>(vii)</Label><Text>the value of the contracts referred to in subparagraph <XRefInternal>3</XRefInternal>(a)(iv) of these Regulations and the date on which those contracts were entered into,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501042" lims:id="1501042"><Label>(viii)</Label><Text>details of the value of the equipment that is the subject of the contracts and an explanation of how that equipment is used in the unit,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501043" lims:id="1501043"><Label>(ix)</Label><Text>information respecting the construction of the unit, including the date on which construction began at the site where the unit is located, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501044" lims:id="1501044"><Label>(x)</Label><Text>an explanation of how the unit is substantially the same on its commissioning date as the unit in relation to which the criteria set out in section <XRefInternal>3</XRefInternal> of these Regulations were met, including an indication of the electricity generation capacity that was planned for the unit on the date on which the unit met the criteria set out in that section; and</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501045" lims:id="1501045"><Label>(z)</Label><Text>if the unit has been modified in a way that resulted in the creation of one or more units for which a registration report is required under paragraph <XRefInternal>7</XRefInternal>(2)(a) of these Regulations, the registration number assigned to each of those units by the Minister under subsection <XRefInternal>7</XRefInternal>(3) of these Regulations.</Text></Paragraph></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1501046" lims:id="1501046"><Label>4</Label><Text>If the report is submitted in accordance with subsection <XRefInternal>7</XRefInternal>(4) of these Regulations, the following information:</Text><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501047" lims:id="1501047"><Label>(a)</Label><Text>an indication of the provisions of this Schedule to which the updated information relates;</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501048" lims:id="1501048"><Label>(b)</Label><Text>a description of the updated information; and</Text></Paragraph><Paragraph lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501049" lims:id="1501049"><Label>(c)</Label><Text>the effective date of the change.</Text></Paragraph></Section></RegulationPiece></Schedule><Schedule in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501050" lims:id="1501050" bilingual="no" spanlanguages="no"><ScheduleFormHeading in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501051" lims:id="1501051"><Label>SCHEDULE 3</Label><OriginatingRef>(Subsection <XRefInternal>16</XRefInternal>(1) and section <XRefInternal>17</XRefInternal>)</OriginatingRef></ScheduleFormHeading><TableGroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501052" lims:id="1501052" pointsize="8" topmarginspacing="10"><table in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501053" lims:id="1501053" frame="topbot"><title in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501054" lims:id="1501054">List of Fuels and Default Higher Heating Value</title><tgroup in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501055" lims:id="1501055" cols="4"><colspec colname="1" colwidth="6.86*" /><colspec colname="2" colwidth="37.19*" /><colspec colname="3" colwidth="15.77*" /><colspec colname="COLSPEC0" colwidth="15.77*" /><thead in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501056" lims:id="1501056"><row rowsep="0" topdouble="yes"><entry colsep="0" rowsep="0" valign="bottom" /><entry colname="2" colsep="0" rowsep="0" valign="top">Column 1</entry><entry colname="3" colsep="0" rowsep="0" valign="top">Column 2</entry><entry colsep="0" valign="top">Column 3</entry></row><row valign="bottom"><entry colsep="0" rowsep="1" valign="bottom">Item</entry><entry colsep="0" rowsep="1" valign="bottom">Fuel type</entry><entry colsep="0" rowsep="1" valign="bottom">Default higher heating value</entry><entry colsep="0">Units</entry></row></thead><tbody in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501057" lims:id="1501057"><row height="10pt"><entry colsep="0" rowsep="0">1</entry><entry colsep="0" rowheader="yes" rowsep="0">Distillate fuel oil No. 1</entry><entry colsep="0" rowsep="0">38.78</entry><entry colsep="0" rowsep="0">GJ/kL</entry></row><row height="10pt"><entry colsep="0" rowsep="0">2</entry><entry colsep="0" rowheader="yes" rowsep="0">Distillate fuel oil No. 2</entry><entry colsep="0" rowsep="0">38.50</entry><entry colsep="0" rowsep="0">GJ/kL</entry></row><row height="10pt"><entry colsep="0" rowsep="0">3</entry><entry colsep="0" rowheader="yes" rowsep="0">Distillate fuel oil No. 4</entry><entry colsep="0" rowsep="0">40.73</entry><entry colsep="0" rowsep="0">GJ/kL</entry></row><row height="10pt"><entry colsep="0" rowsep="0">4</entry><entry colsep="0" rowheader="yes" rowsep="0">Kerosene</entry><entry colsep="0" rowsep="0">37.68</entry><entry colsep="0" rowsep="0">GJ/kL</entry></row><row height="10pt"><entry colsep="0" rowsep="0">5</entry><entry colsep="0" rowheader="yes" rowsep="0">Liquefied petroleum gases (LPG)</entry><entry colsep="0" rowsep="0">25.66</entry><entry colsep="0" rowsep="0">GJ/kL</entry></row><row height="10pt"><entry colsep="0" rowsep="0">6</entry><entry colsep="0" rowheader="yes" rowsep="0">Propane<FootnoteRef idref="footnote11_e">1</FootnoteRef></entry><entry colsep="0" rowsep="0">25.31</entry><entry colsep="0" rowsep="0">GJ/kL</entry></row><row height="10pt"><entry colsep="0" rowsep="0">7</entry><entry colsep="0" rowheader="yes" rowsep="0">Propylene</entry><entry colsep="0" rowsep="0">25.39</entry><entry colsep="0" rowsep="0">GJ/kL</entry></row><row height="10pt"><entry colsep="0" rowsep="0">8</entry><entry colsep="0" rowheader="yes" rowsep="0">Ethane</entry><entry colsep="0" rowsep="0">17.22</entry><entry colsep="0" rowsep="0">GJ/kL</entry></row><row height="10pt"><entry colsep="0" rowsep="0">9</entry><entry colsep="0" rowheader="yes" rowsep="0">Ethylene</entry><entry colsep="0" rowsep="0">27.90</entry><entry colsep="0" rowsep="0">GJ/kL</entry></row><row height="10pt"><entry colsep="0" rowsep="0">10</entry><entry colsep="0" rowheader="yes" rowsep="0">Isobutane</entry><entry colsep="0" rowsep="0">27.06</entry><entry colsep="0" rowsep="0">GJ/kL</entry></row><row height="10pt"><entry colsep="0" rowsep="0">11</entry><entry colsep="0" rowheader="yes" rowsep="0">Isobutylene</entry><entry colsep="0" rowsep="0">28.73</entry><entry colsep="0" rowsep="0">GJ/kL</entry></row><row height="10pt"><entry colsep="0" rowsep="0">12</entry><entry colsep="0" rowheader="yes" rowsep="0">Butane</entry><entry colsep="0" rowsep="0">28.44</entry><entry colsep="0" rowsep="0">GJ/kL</entry></row><row height="10pt"><entry colsep="0" rowsep="0">13</entry><entry colsep="0" rowheader="yes" rowsep="0">Butylene</entry><entry colsep="0" rowsep="0">28.73</entry><entry colsep="0" rowsep="0">GJ/kL</entry></row><row height="10pt"><entry colsep="0" rowsep="0">14</entry><entry colsep="0" rowheader="yes" rowsep="0">Natural gasoline</entry><entry colsep="0" rowsep="0">30.69</entry><entry colsep="0" rowsep="0">GJ/kL</entry></row><row height="10pt"><entry colsep="0" rowsep="0">15</entry><entry colsep="0" rowheader="yes" rowsep="0">Motor gasoline</entry><entry colsep="0" rowsep="0">34.87</entry><entry colsep="0" rowsep="0">GJ/kL</entry></row><row height="10pt"><entry colsep="0" rowsep="0">16</entry><entry colsep="0" rowheader="yes" rowsep="0">Aviation gasoline</entry><entry colsep="0" rowsep="0">33.52</entry><entry colsep="0" rowsep="0">GJ/kL</entry></row><row height="10pt"><entry colsep="0" rowsep="0">17</entry><entry colsep="0" rowheader="yes" rowsep="0">Kerosene-type aviation</entry><entry colsep="0" rowsep="0">37.66</entry><entry colsep="0" rowsep="0">GJ/kL</entry></row><row height="10pt"><entry colsep="0" rowsep="0">18</entry><entry colsep="0" rowheader="yes" rowsep="0">Pipeline quality natural gas</entry><entry colsep="0" rowsep="0">0.03793</entry><entry colsep="0" rowsep="0">GJ/m<Sup>3</Sup> at standard conditions</entry></row><row height="10pt"><entry colsep="0" rowsep="0">19</entry><entry colsep="0" rowheader="yes" rowsep="0">Bituminous Canadian coal — Western</entry><entry colsep="0" rowsep="0">25.6</entry><entry colsep="0" rowsep="0">GJ/tonne</entry></row><row height="10pt"><entry colsep="0" rowsep="0">20</entry><entry colsep="0" rowheader="yes" rowsep="0">Bituminous Canadian coal — Eastern</entry><entry colsep="0" rowsep="0">27.9</entry><entry colsep="0" rowsep="0">GJ/tonne</entry></row><row height="10pt"><entry colsep="0" rowsep="0">21</entry><entry colsep="0" rowheader="yes" rowsep="0">Bituminous non-Canadian coal — U.S.</entry><entry colsep="0" rowsep="0">25.7</entry><entry colsep="0" rowsep="0">GJ/tonne</entry></row><row height="10pt"><entry colsep="0" rowsep="0">22</entry><entry colsep="0" rowheader="yes" rowsep="0">Bituminous non-Canadian coal — other countries</entry><entry colsep="0" rowsep="0">29.9</entry><entry colsep="0" rowsep="0">GJ/tonne</entry></row><row height="10pt"><entry colsep="0" rowsep="0">23</entry><entry colsep="0" rowheader="yes" rowsep="0">Sub-bituminous Canadian coal — Western</entry><entry colsep="0" rowsep="0">19.2</entry><entry colsep="0" rowsep="0">GJ/tonne</entry></row><row height="10pt"><entry colsep="0" rowsep="0">24</entry><entry colsep="0" rowheader="yes" rowsep="0">Sub-bituminous non-Canadian coal — U.S.</entry><entry colsep="0" rowsep="0">19.2</entry><entry colsep="0" rowsep="0">GJ/tonne</entry></row><row height="10pt"><entry colsep="0" rowsep="0">25</entry><entry colsep="0" rowheader="yes" rowsep="0">Coal — lignite</entry><entry colsep="0" rowsep="0">15.0</entry><entry colsep="0" rowsep="0">GJ/tonne</entry></row><row height="10pt"><entry colsep="0" rowsep="0">26</entry><entry colsep="0" rowheader="yes" rowsep="0">Coal — anthracite</entry><entry colsep="0" rowsep="0">27.7</entry><entry colsep="0" rowsep="0">GJ/tonne</entry></row><row height="10pt"><entry colsep="0" rowsep="0">27</entry><entry colsep="0" rowheader="yes" rowsep="0">Coal coke and metallurgical coke</entry><entry colsep="0" rowsep="0">28.8</entry><entry colsep="0" rowsep="0">GJ/tonne</entry></row><row height="10pt"><entry colsep="0" rowsep="0">28</entry><entry colsep="0" rowheader="yes" rowsep="0">Petroleum coke from refineries</entry><entry colsep="0" rowsep="0">46.4</entry><entry colsep="0" rowsep="0">GJ/tonne</entry></row><row height="10pt"><entry colsep="0" rowsep="0">29</entry><entry colsep="0" rowheader="yes" rowsep="0">Petroleum coke from upgraders</entry><entry colsep="0" rowsep="0">40.6</entry><entry colsep="0" rowsep="0">GJ/tonne</entry></row><row height="10pt"><entry colsep="0" rowsep="0">30</entry><entry colsep="0" rowheader="yes" rowsep="0">Municipal solid waste</entry><entry colsep="0" rowsep="0">11.5</entry><entry colsep="0" rowsep="0">GJ/tonne</entry></row><row height="10pt"><entry colsep="0" rowsep="0">31</entry><entry colsep="0" rowheader="yes" rowsep="0">Tires</entry><entry colsep="0" rowsep="0">31.2</entry><entry colsep="0" rowsep="0">GJ/tonne</entry></row><row height="10pt"><entry colsep="0" rowsep="0">32</entry><entry colsep="0" rowheader="yes" rowsep="0">Diesel</entry><entry colsep="0" rowsep="0">38.3</entry><entry colsep="0" rowsep="0">GJ/kL</entry></row><row height="10pt"><entry colsep="0" rowsep="0">33</entry><entry colsep="0" rowheader="yes" rowsep="0">Light fuel oil</entry><entry colsep="0" rowsep="0">38.8</entry><entry colsep="0" rowsep="0">GJ/kL</entry></row><row height="10pt"><entry colsep="0" rowsep="0">34</entry><entry colsep="0" rowheader="yes" rowsep="0">Heavy fuel oil</entry><entry colsep="0" rowsep="0">42.5</entry><entry colsep="0" rowsep="0">GJ/kL</entry></row><row height="10pt"><entry colsep="0" rowsep="0">35</entry><entry colsep="0" rowheader="yes" rowsep="0">Ethanol</entry><entry colsep="0" rowsep="0">21</entry><entry colsep="0" rowsep="0">GJ/kL</entry></row><row height="10pt"><entry colsep="0" rowsep="0">36</entry><entry colsep="0" rowheader="yes" rowsep="0">Hydrogen</entry><entry colsep="0" rowsep="0">0.012289</entry><entry colsep="0" rowsep="0">GJ/m<Sup>3</Sup> at standard conditions</entry></row></tbody></tgroup></table><Footnote id="footnote11_e" placement="table" status="official"><Label>1</Label><Text>The default higher heating value for propane is only for pure gas propane. The product commercially sold as propane is to be considered LPG for the purpose of these Regulations.</Text></Footnote></TableGroup></Schedule><Schedule in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501058" lims:id="1501058" bilingual="no" spanlanguages="no"><ScheduleFormHeading in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501059" lims:id="1501059"><Label>SCHEDULE 4</Label><OriginatingRef>(Paragraph <XRefInternal>18</XRefInternal>(3)(a))</OriginatingRef><TitleText>CEMS Report — Information Required</TitleText></ScheduleFormHeading><RegulationPiece in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501060" lims:id="1501060"><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501061" lims:id="1501061"><Label>1</Label><Text>The registration number assigned to the unit by the Minister under subsection <XRefInternal>7</XRefInternal>(3) of these Regulations.</Text></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501062" lims:id="1501062"><Label>2</Label><Text>The name, civic address and telephone number of the responsible person.</Text></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501063" lims:id="1501063"><Label>3</Label><Text>The auditor’s name, qualifications, civic address, telephone number, email address and, if any, fax number.</Text></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501064" lims:id="1501064"><Label>4</Label><Text>The procedures followed by the auditor to assess whether</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501065" lims:id="1501065"><Label>(a)</Label><Text>the responsible person’s use of the CEMS complied with the quality assurance plan referred to in section 6.1 of the CEMS Protocol; and</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501066" lims:id="1501066"><Label>(b)</Label><Text>the responsible person complied with the CEMS Protocol and the CEMS met the specifications set out in the CEMS Protocol, in particular those set out in sections 3 and 4 of the CEMS Protocol.</Text></Paragraph></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501067" lims:id="1501067"><Label>5</Label><Text>A statement of the auditor’s opinion as to whether</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501068" lims:id="1501068"><Label>(a)</Label><Text>the responsible person’s use of the CEMS complied with the quality assurance plan referred to in section 6.1 of the CEMS Protocol;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501069" lims:id="1501069"><Label>(b)</Label><Text>the responsible person complied with the CEMS Protocol and the CEMS met the specifications set out in the CEMS Protocol, in particular those set out in sections 3 and 4 of the CEMS Protocol; and</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501070" lims:id="1501070"><Label>(c)</Label><Text>the responsible person complied with subsection <XRefInternal>18</XRefInternal>(2) of these Regulations.</Text></Paragraph></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501071" lims:id="1501071"><Label>6</Label><Text>A statement of the auditor’s opinion as to whether the responsible person has ensured that the quality assurance plan has been updated in accordance with sections 6.1 and 6.5.2 of the CEMS Protocol.</Text></Section></RegulationPiece></Schedule><Schedule in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501072" lims:id="1501072" bilingual="no" spanlanguages="no"><ScheduleFormHeading in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501073" lims:id="1501073"><Label>SCHEDULE 5</Label><OriginatingRef>(Paragraph <XRefInternal>20</XRefInternal>(3)(g) and subsections <XRefInternal>38</XRefInternal>(2), <XRefInternal>39</XRefInternal>(1) and <XRefInternal>40</XRefInternal>(1))</OriginatingRef><TitleText>Emissions Report — Information Required</TitleText></ScheduleFormHeading><RegulationPiece in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501074" lims:id="1501074"><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501075" lims:id="1501075"><Label>1</Label><Text>The registration number assigned to the unit by the Minister under subsection <XRefInternal>7</XRefInternal>(3) of these Regulations.</Text></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501076" lims:id="1501076"><Label>2</Label><Text>The following information about the unit:</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501077" lims:id="1501077"><Label>(a)</Label><Text>an indication of whether the unit is subject to an exemption, under subsection <XRefInternal>14</XRefInternal>(1) of these Regulations, from the application of subsection <XRefInternal>9</XRefInternal>(1) of these Regulations for the calendar year that is the subject of the report;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501078" lims:id="1501078"><Label>(b)</Label><Text>an indication of whether a declaration of net supply has been submitted in accordance with subsections <XRefInternal>14</XRefInternal>(2) to (4) of these Regulations with respect to the facility where the unit is located;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501079" lims:id="1501079"><Label>(c)</Label><Text>an indication of whether the unit generated electricity during a deduction period during the calendar year that is the subject of the report;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501080" lims:id="1501080"><Label>(d)</Label><Text>an indication of whether the unit was designated as a substitute unit under section <XRefInternal>32</XRefInternal> of these Regulations for the calendar year that is the subject of the report and, if so, the following information:</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501081" lims:id="1501081"><Label>(i)</Label><Text>with respect to the unit for which it is being substituted,</Text><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501082" lims:id="1501082"><Label>(A)</Label><Text>the registration number assigned to that unit by the Minister under subsection <XRefInternal>7</XRefInternal>(3) of these Regulations,</Text></Clause><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501083" lims:id="1501083"><Label>(B)</Label><Text>electricity generation capacity of that unit,</Text></Clause><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501084" lims:id="1501084"><Label>(C)</Label><Text>the electricity system operator for that unit, and</Text></Clause><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501085" lims:id="1501085"><Label>(D)</Label><Text>an attestation, dated and signed by the responsible person for that unit or its authorized official, that the responsible person agrees to the substitution,</Text></Clause></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501086" lims:id="1501086"><Label>(ii)</Label><Text>an explanation of how the conditions set out in subsection <XRefInternal>32</XRefInternal>(1) of these Regulations were met,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501087" lims:id="1501087"><Label>(iii)</Label><Text>the information referred to in subsection <XRefInternal>32</XRefInternal>(2) of these Regulations, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501088" lims:id="1501088"><Label>(iv)</Label><Text>the date on which the unit became a substitute unit and, if applicable, the date it ceased to be one.</Text></Subparagraph></Paragraph></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501089" lims:id="1501089"><Label>3</Label><Text>The unit’s emission limit for the calendar year that is the subject of the report, determined in accordance with section <XRefInternal>9</XRefInternal> of these Regulations.</Text></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501090" lims:id="1501090"><Label>4</Label><Text>The net supply, for the calendar year that is the subject of the report, from the facility where the unit is located and the values determined for Q<Sub>t</Sub>, Q<Sub>r</Sub>, Q<Sub>a</Sub>, Q<Sub>na</Sub> and Q<Sub>ec</Sub> in subsection <XRefInternal>13</XRefInternal>(2) of these Regulations, expressed in GWh, that were used to calculate that net supply.</Text></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501091" lims:id="1501091"><Label>5</Label><Text>The following information about the quantity of CO<Sub>2</Sub> emissions attributed to the unit for the calendar year that is the subject of the report:</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501092" lims:id="1501092"><Label>(a)</Label><Text>the value determined for E in accordance with subsection <XRefInternal>12</XRefInternal>(1) of these Regulations, expressed in tonnes;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501093" lims:id="1501093"><Label>(b)</Label><Text>with respect to the quantity of CO<Sub>2</Sub> emissions from the combustion of fossil fuel in the unit (E<Sub>u</Sub>),</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501094" lims:id="1501094"><Label>(i)</Label><Text>if the quantity is determined in accordance with section <XRefInternal>15</XRefInternal> of these Regulations, that quantity, expressed in tonnes, and, if section <XRefInternal>17</XRefInternal> of these Regulations applies to the unit, the values determined for Q<Sub>u,j</Sub>, HHV<Sub>u,j</Sub>, Q<Sub>i,j</Sub>, HHV<Sub>i,j</Sub> and E in that section, expressed in the applicable units of measurement, used to determine the quantity of CO<Sub>2</Sub> emissions attributed to the unit,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501095" lims:id="1501095"><Label>(ii)</Label><Text>if the quantity is determined in accordance with section <XRefInternal>16</XRefInternal> of these Regulations, that quantity, expressed in tonnes, as well as</Text><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501096" lims:id="1501096"><Label>(A)</Label><Text>the values determined for E<Sub>comb</Sub>, V<Sub>ff</Sub>, Q<Sub>i</Sub>, F<Sub>c,i</Sub>, HHV<Sub>i</Sub>, V<Sub>T</Sub> and E<Sub>S</Sub> in subsection <XRefInternal>16</XRefInternal>(1) of these Regulations, expressed in the applicable units of measurement, and</Text></Clause><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501097" lims:id="1501097"><Label>(B)</Label><Text>if section <XRefInternal>17</XRefInternal> of these Regulations applies to the unit, the values determined for Q<Sub>u,j</Sub>, HHV<Sub>u,j</Sub>, Q<Sub>i,j</Sub>, HHV<Sub>i,j</Sub> and E in that section, expressed in the applicable units of measurement, used to determine the quantity of CO<Sub>2</Sub> emissions attributed to the unit,</Text></Clause></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501098" lims:id="1501098"><Label>(iii)</Label><Text>if the quantity is determined in accordance with section <XRefInternal>19</XRefInternal> of these Regulations, that quantity, expressed in tonnes, as well as</Text><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501099" lims:id="1501099"><Label>(A)</Label><Text>the values determined for E<Sub>i</Sub> and E<Sub>s</Sub> in that section, expressed in tonnes,</Text></Clause><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501100" lims:id="1501100"><Label>(B)</Label><Text>the values determined for V<Sub>f</Sub>, CC<Sub>A</Sub>, MM<Sub>A</Sub>, MV<Sub>cf,</Sub> M<Sub>f</Sub>, CC<Sub>i</Sub> and Q<Sub>i</Sub> in subsections <XRefInternal>20</XRefInternal>(1) and (4) of these Regulations, expressed in the applicable units of measurement,</Text></Clause><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501101" lims:id="1501101"><Label>(C)</Label><Text>the values determined for V<Sub>total</Sub> and V<Sub>RNG</Sub> in subsection <XRefInternal>20</XRefInternal>(2) of these Regulations, expressed in m<Sup>3</Sup> at standard conditions, and</Text></Clause><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501102" lims:id="1501102"><Label>(D)</Label><Text>with respect to the data used to determine the value of CC<Sub>A</Sub> in subsection <XRefInternal>20</XRefInternal>(4) of these Regulations, an indication of the standard or method, including use of a direct measuring device, used to measure the carbon content of fuel samples or composite samples, as the case may be, or if the carbon content of a fuel was provided by the supplier of the fuel, an indication of the methods used to measure the carbon content of the fuel samples or composite samples, as the case may be;</Text></Clause></Subparagraph></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501103" lims:id="1501103"><Label>(c)</Label><Text>if applicable, the following information about the quantity of CO<Sub>2</Sub> emissions attributed to the production of useful thermal energy by the unit (E<Sub>th</Sub>):</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501104" lims:id="1501104"><Label>(i)</Label><Text>the quantity determined in accordance with section <XRefInternal>21</XRefInternal> of these Regulations, expressed in tonnes, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501105" lims:id="1501105"><Label>(ii)</Label><Text>the values determined for H<Sub>pnet</Sub>, h<Sub>out<Emphasis><Sub>i</Sub></Emphasis></Sub>, M<Sub>out<Emphasis><Sub>i</Sub></Emphasis></Sub>, h<Sub>in<Emphasis><Sub>j</Sub></Emphasis></Sub> and M<Sub>in<Emphasis><Sub>j</Sub></Emphasis></Sub> in section <XRefInternal>21</XRefInternal> of these Regulations, expressed in the applicable units of measurement;</Text></Subparagraph></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501106" lims:id="1501106"><Label>(d)</Label><Text>if applicable, the following information about the quantity of CO<Sub>2</Sub> emissions attributed to electricity generated by the unit that is used internally at the facility (E<Sub>int</Sub>):</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501107" lims:id="1501107"><Label>(i)</Label><Text>the quantity determined in accordance with section <XRefInternal>22</XRefInternal> of these Regulations, expressed in tonnes, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501108" lims:id="1501108"><Label>(ii)</Label><Text>the values determined for G<Sub>int</Sub>, G<Sub>F</Sub> and G<Sub>U</Sub> in section <XRefInternal>22</XRefInternal> of these Regulations, expressed in GWh;</Text></Subparagraph></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501109" lims:id="1501109"><Label>(e)</Label><Text>if applicable, the following information about the quantity of CO<Sub>2</Sub> that is captured from the unit and stored in a storage project (E<Sub>ccs</Sub>):</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501110" lims:id="1501110"><Label>(i)</Label><Text>the quantity determined in accordance with subsection <XRefInternal>23</XRefInternal>(1) of these Regulations, expressed in tonnes,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501111" lims:id="1501111"><Label>(ii)</Label><Text>the values determined for E<Sub>cap</Sub> and E<Sub>in</Sub> in subsection <XRefInternal>23</XRefInternal>(1) of these Regulations, expressed in tonnes, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501112" lims:id="1501112"><Label>(iii)</Label><Text>information demonstrating that the CO<Sub>2</Sub> was captured, transported and permanently stored in accordance with subsection <XRefInternal>23</XRefInternal>(2) of these Regulations;</Text></Subparagraph></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501113" lims:id="1501113"><Label>(f)</Label><Text>if applicable, the following information about the quantity of CO<Sub>2</Sub> emissions from the production of the hydrogen, ammonia or steam used by the unit to generate electricity (E<Sub>ext</Sub>):</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501114" lims:id="1501114"><Label>(i)</Label><Text>the quantity determined in accordance with section <XRefInternal>24</XRefInternal> of these Regulations, expressed in tonnes, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501115" lims:id="1501115"><Label>(ii)</Label><Text>the values determined for E<Sub>k</Sub>, P<Sub>k</Sub> and Q<Sub>k</Sub> in section <XRefInternal>24</XRefInternal> of these Regulations, expressed in tonnes, m<Sup>3</Sup> or GJ, as applicable; and</Text></Subparagraph></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501116" lims:id="1501116"><Label>(g)</Label><Text>if applicable, the following information about the quantity of CO<Sub>2</Sub> emissions attributed to the unit for each deduction period (E<Sub>ec</Sub>):</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501117" lims:id="1501117"><Label>(i)</Label><Text>the quantity determined in accordance with section <XRefInternal>27</XRefInternal> of these Regulations, expressed in tonnes, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501118" lims:id="1501118"><Label>(ii)</Label><Text>the values determined for E<Sub>u</Sub>, E<Sub>th</Sub>, E<Sub>int</Sub>, E<Sub>ccs</Sub> and E<Sub>ext</Sub> in subsection <XRefInternal>27</XRefInternal>(1) of these Regulations, expressed in tonnes.</Text></Subparagraph></Paragraph></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501119" lims:id="1501119"><Label>6</Label><Text>If biomass was combusted in the unit during the calendar year that is the subject of the report,</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501120" lims:id="1501120"><Label>(a)</Label><Text>an explanation of how the combusted material is <DefinitionRef>biomass</DefinitionRef> as defined in subsection <XRefInternal>2</XRefInternal>(1) of these Regulations; and</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501121" lims:id="1501121"><Label>(b)</Label><Text>the quantity of biomass combusted, expressed in m<Sup>3</Sup>, kL or tonnes, as applicable, during that year.</Text></Paragraph></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501122" lims:id="1501122"><Label>7</Label><Text>If a CEMS was used to measure CO<Sub>2</Sub> emissions from the unit during the calendar year that is the subject of the report, a copy of the CEMS report referred to in subsection <XRefInternal>18</XRefInternal>(3) of these Regulations.</Text></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501123" lims:id="1501123"><Label>8</Label><Text>If, in order to determine the value of V<Sub>f</Sub> in paragraph <XRefInternal>20</XRefInternal>(1)(a) of these Regulations, a volume was claimed for V<Sub>RNG</Sub> in subsection <XRefInternal>20</XRefInternal>(2) of these Regulations, the following information in relation to each producer of renewable natural gas supplied to the unit during the calendar year that is the subject of the report:</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501124" lims:id="1501124"><Label>(a)</Label><Text>the name of each person from which the natural gas containing renewable natural gas that was produced by the producer was purchased;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501125" lims:id="1501125"><Label>(b)</Label><Text>the producer’s name, civic address, telephone number and email address;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501126" lims:id="1501126"><Label>(c)</Label><Text>the name, civic address and geographic coordinates (latitude and longitude), expressed in decimal degrees to five decimal places, of the facility where the renewable natural gas was produced;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501127" lims:id="1501127"><Label>(d)</Label><Text>information demonstrating that the renewable natural gas was kept physically separated from any other substance and was clearly identifiable as renewable natural gas from the time it was produced until the time it was injected into a North American pipeline network;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501128" lims:id="1501128"><Label>(e)</Label><Text>a map that indicates</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501129" lims:id="1501129"><Label>(i)</Label><Text>the location where the producer injected the renewable natural gas into a North American pipeline network or, if the producer is not directly injecting the renewable natural gas into a North American pipeline network, a description of the location where the renewable natural gas is no longer kept physically separated and is no longer clearly identifiable as originating from the producer and the location where the renewable natural gas is injected into a North American pipeline network,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501130" lims:id="1501130"><Label>(ii)</Label><Text>the location of the unit, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501131" lims:id="1501131"><Label>(iii)</Label><Text>the pipeline network into which the renewable natural gas was injected and from which it was supplied to the unit;</Text></Subparagraph></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501132" lims:id="1501132"><Label>(f)</Label><Text>the volume of renewable natural gas produced by the producer that was injected into a North American pipeline network during the calendar year; and</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501133" lims:id="1501133"><Label>(g)</Label><Text>information demonstrating that the conditions referred to in paragraphs <XRefInternal>20</XRefInternal>(3)(e) and (f) of these Regulations are met.</Text></Paragraph></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501134" lims:id="1501134"><Label>9</Label><Text>The following information about each deduction period during the calendar year that is the subject of the report:</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501135" lims:id="1501135"><Label>(a)</Label><Text>a description of the irresistible emergency event or risk to human health and safety referred to in paragraph <XRefInternal>25</XRefInternal>(1)(a) of these Regulations, including</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501136" lims:id="1501136"><Label>(i)</Label><Text>an indication of whether the electricity system operator determined that there was an irresistible emergency event or whether the Minister determined that there was a risk to human health and safety,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501137" lims:id="1501137"><Label>(ii)</Label><Text>the date on which and hour at which the event or risk began and, if applicable, the date on which and hour at which it ended,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501138" lims:id="1501138"><Label>(iii)</Label><Text>a description of how the event or risk led to a disruption or significant risk of disruption to the electricity supply in the province in which the unit is located or in a contiguous province or state,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501139" lims:id="1501139"><Label>(iv)</Label><Text>in the case of an irresistible emergency event,</Text><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501140" lims:id="1501140"><Label>(A)</Label><Text>an indication of whether the event was natural and, if so, details of the event,</Text></Clause><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501141" lims:id="1501141"><Label>(B)</Label><Text>an indication of whether the event arose from human action and, if so, the identity of the person whose actions resulted in the event and an explanation of how the event was outside the control of both the electricity system operator and the responsible person for the unit, and</Text></Clause><Clause in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501142" lims:id="1501142"><Label>(C)</Label><Text>an indication of whether the event led to a disruption or a significant risk of disruption to the electricity supply and an explanation of the disruption or risk,</Text></Clause></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501143" lims:id="1501143"><Label>(v)</Label><Text>the province or state in which the event or risk occurred, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501144" lims:id="1501144"><Label>(vi)</Label><Text>the province or state in which the disruption or significant risk of disruption to the electricity supply occurred;</Text></Subparagraph></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501145" lims:id="1501145"><Label>(b)</Label><Text>the date on which and hour at which the deduction period began and ended or, if the deduction period has not ended, an indication to that effect;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501146" lims:id="1501146"><Label>(c)</Label><Text>information demonstrating that the unit was directed by the electricity system operator to generate electricity due to an event or risk referred to in paragraph <XRefInternal>25</XRefInternal>(1)(a) of these Regulations;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501147" lims:id="1501147"><Label>(d)</Label><Text>the date on which the Minister was notified that a direction referred to in paragraph <XRefInternal>25</XRefInternal>(1)(d) of these Regulations was given; and</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501148" lims:id="1501148"><Label>(e)</Label><Text>if an application for an extension of the deduction period was submitted to the Minister under section <XRefInternal>26</XRefInternal> of these Regulations,</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501149" lims:id="1501149"><Label>(i)</Label><Text>the date on which the application was submitted to the Minister,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501150" lims:id="1501150"><Label>(ii)</Label><Text>an indication of whether the extension was granted, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501151" lims:id="1501151"><Label>(iii)</Label><Text>if the extension was granted and the deduction period has ended, an indication of the reason that the deduction period ended.</Text></Subparagraph></Paragraph></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501152" lims:id="1501152"><Label>10</Label><Text>The following information for the calendar year that is the subject of the report:</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501153" lims:id="1501153"><Label>(a)</Label><Text>the difference between the emission limit for the unit determined in accordance with subsection <XRefInternal>9</XRefInternal>(1) of these Regulations and the value determined for E in accordance with subsection <XRefInternal>12</XRefInternal>(1) of these Regulations;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501154" lims:id="1501154"><Label>(b)</Label><Text>an indication of whether the unit became subject to an emission limit under subsection <XRefInternal>9</XRefInternal>(1) of these Regulations on or after July 1 of that calendar year; and</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501155" lims:id="1501155"><Label>(c)</Label><Text>an indication of whether the unit meets the conditions for the issuance of transferable compliance credits set out in subsection <XRefInternal>31</XRefInternal>(1) and <XRefInternal>32</XRefInternal>(3) of these Regulations and, if so, an explanation of how the conditions are met.</Text></Paragraph></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501156" lims:id="1501156"><Label>11</Label><Text>If replacement data referred to in section <XRefInternal>35</XRefInternal> of these Regulations was used during the calendar year that is the subject of the report, the total number of hours for which replacement data was used during the calendar year and the following information about the replacement data that was used for each given period during the calendar year:</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501157" lims:id="1501157"><Label>(a)</Label><Text>the reason why the data required to determine the value of a variable in a formula referred to in these Regulations was missing for a period of the calendar year and an explanation of how that reason was beyond the responsible person’s control;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501158" lims:id="1501158"><Label>(b)</Label><Text>the variable for which data was missing and the date on which and hour at which the period during which replacement data was used began and ended; and</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501159" lims:id="1501159"><Label>(c)</Label><Text>the value determined for the variable referred to in paragraph (b), along with details of that determination, including</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501160" lims:id="1501160"><Label>(i)</Label><Text>the replacement data used to make that determination,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501161" lims:id="1501161"><Label>(ii)</Label><Text>the method used to obtain that replacement data, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501162" lims:id="1501162"><Label>(iii)</Label><Text>in the case of a determination referred to in subsection <XRefInternal>35</XRefInternal>(3) of these Regulations, an explanation of why a particular equivalent period was used as the basis for determining the value of the variable.</Text></Subparagraph></Paragraph></Section></RegulationPiece></Schedule><Schedule in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501163" lims:id="1501163" bilingual="no" spanlanguages="no"><ScheduleFormHeading in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501164" lims:id="1501164"><Label>SCHEDULE 6</Label><OriginatingRef>(Subsections <XRefInternal>28</XRefInternal>(7), <XRefInternal>29</XRefInternal>(4), <XRefInternal>33</XRefInternal>(3), <XRefInternal>38</XRefInternal>(8), <XRefInternal>41</XRefInternal>(1) and <XRefInternal>42</XRefInternal>(1))</OriginatingRef><TitleText>Reconciliation Report — Information Required</TitleText></ScheduleFormHeading><RegulationPiece in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501165" lims:id="1501165"><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501166" lims:id="1501166"><Label>1</Label><Text>The registration number assigned to the unit by the Minister under subsection <XRefInternal>7</XRefInternal>(3) of these Regulations.</Text></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501167" lims:id="1501167"><Label>2</Label><Text>The following information for the calendar year that is the subject of the report:</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501168" lims:id="1501168"><Label>(a)</Label><Text>the values determined for E, C<Sub>off</Sub> and C<Sub>c</Sub> in accordance with subsection <XRefInternal>12</XRefInternal>(1) of these Regulations, expressed in tonnes;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501169" lims:id="1501169"><Label>(b)</Label><Text>for each collection of compliance credits that have the same characteristics and that are being remitted for the purposes of subsection <XRefInternal>12</XRefInternal>(1) of these Regulations,</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501170" lims:id="1501170"><Label>(i)</Label><Text>the total number of tonnes of CO<Sub>2</Sub> that the credits represent,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501171" lims:id="1501171"><Label>(ii)</Label><Text>the calendar year for which the credits were issued,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501172" lims:id="1501172"><Label>(iii)</Label><Text>an indication of whether the credits are non-transferable or transferable,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501173" lims:id="1501173"><Label>(iv)</Label><Text>the registration number, assigned by the Minister under subsection <XRefInternal>7</XRefInternal>(3) of these Regulations, of the unit for which the credits were issued, if it is a unit other than the unit that is the subject of the report, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501174" lims:id="1501174"><Label>(v)</Label><Text>an indication that the credits meet the conditions for remittance set out in subsection <XRefInternal>33</XRefInternal>(2) of these Regulations;</Text></Subparagraph></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501175" lims:id="1501175"><Label>(c)</Label><Text>the maximum number of Canadian offset credits that may be remitted, determined in accordance with section <XRefInternal>28</XRefInternal> of these Regulations;</Text></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501176" lims:id="1501176"><Label>(d)</Label><Text>for each collection of Canadian offset credits issued under subsection 29(1) of the <XRefExternal reference-type="regulation" link="SOR-2022-111">Canadian Greenhouse Gas Offset Credit System Regulations</XRefExternal> that have the same characteristics and sequential serial numbers and that are being remitted for the purposes of subsection <XRefInternal>12</XRefInternal>(1) of these Regulations,</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501177" lims:id="1501177"><Label>(i)</Label><Text>the total number of tonnes of CO<Sub>2</Sub> that the credits represent,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501178" lims:id="1501178"><Label>(ii)</Label><Text>the first and last serial number of the credits,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501179" lims:id="1501179"><Label>(iii)</Label><Text>the year in which the greenhouse gas reduction or removal for which the credits were issued occurred,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501180" lims:id="1501180"><Label>(iv)</Label><Text>the date on which the credits were issued, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501181" lims:id="1501181"><Label>(v)</Label><Text>an indication of whether the credits are being remitted in accordance with subsection <XRefInternal>28</XRefInternal>(5) of these Regulations and, if so, an indication that the conditions set out in that subsection are met; and</Text></Subparagraph></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501182" lims:id="1501182"><Label>(e)</Label><Text>for each collection of Canadian offset credits recognized under subsection 78(1) of the <XRefExternal reference-type="regulation">Output-Based Pricing System Regulations</XRefExternal> that have the same characteristics and sequential serial numbers and that are being remitted for the purposes of subsection <XRefInternal>12</XRefInternal>(1) of these Regulations,</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501183" lims:id="1501183"><Label>(i)</Label><Text>the total number of tonnes of CO<Sub>2</Sub> the credits represent,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501184" lims:id="1501184"><Label>(ii)</Label><Text>the province or program authority referred to in subsection 78(1) of those Regulations that issued the credits,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501185" lims:id="1501185"><Label>(iii)</Label><Text>the date of retirement of the credits or the date on which the credits were designated by the province or program authority for the purposes of remittance under these Regulations,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501186" lims:id="1501186"><Label>(iv)</Label><Text>the first and last serial number of the credits,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501187" lims:id="1501187"><Label>(v)</Label><Text>the start date of the project for which the credits were issued,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501188" lims:id="1501188"><Label>(vi)</Label><Text>the year in which the greenhouse gas reduction or removal for which the credits were issued occurred,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501189" lims:id="1501189"><Label>(vii)</Label><Text>the offset protocol applicable to the project for which the credits were issued, including the version number and publication date,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501190" lims:id="1501190"><Label>(viii)</Label><Text>the name of the verification body that verified the credits, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501191" lims:id="1501191"><Label>(ix)</Label><Text>an indication of whether the credits are being remitted in accordance with subsection <XRefInternal>28</XRefInternal>(5) of these Regulations and, if so, an indication that the conditions set out in that subsection are met.</Text></Subparagraph></Paragraph></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501192" lims:id="1501192"><Label>3</Label><Text>The following information about compliance credits:</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501193" lims:id="1501193"><Label>(a)</Label><Text>for compliance credits issued for the unit,</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501194" lims:id="1501194"><Label>(i)</Label><Text>the number of non-transferable compliance credits issued for each calendar year,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501195" lims:id="1501195"><Label>(ii)</Label><Text>the number of non-transferable compliance credits that have been remitted under these Regulations and the calendar year for which they were remitted,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501196" lims:id="1501196"><Label>(iii)</Label><Text>the number of non-transferable compliance credits that have not been remitted,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501197" lims:id="1501197"><Label>(iv)</Label><Text>the number of transferable compliance credits issued for each calendar year,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501198" lims:id="1501198"><Label>(v)</Label><Text>the number of transferable compliance credits that have been remitted for the unit under these Regulations and the calendar year for which they were remitted, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501199" lims:id="1501199"><Label>(vi)</Label><Text>the number of transferable compliance credits that have not been remitted for the unit and have not been transferred to another unit;</Text></Subparagraph></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501200" lims:id="1501200"><Label>(b)</Label><Text>for each collection of transferable compliance credits that have the same characteristics and that have been transferred to the unit,</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501201" lims:id="1501201"><Label>(i)</Label><Text>the calendar year for which the credits were issued,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501202" lims:id="1501202"><Label>(ii)</Label><Text>the total number of tonnes of CO<Sub>2</Sub> that the credits represent,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501203" lims:id="1501203"><Label>(iii)</Label><Text>the registration number, assigned by the Minister under subsection <XRefInternal>7</XRefInternal>(3) of these Regulations, of the unit from which the credits were transferred,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501204" lims:id="1501204"><Label>(iv)</Label><Text>a document, dated and signed by the responsible person for the unit from which the credits were transferred, or its authorized official, and the responsible person for the unit to which the credits were transferred, or its authorized official, confirming that both responsible persons agree to the transfer,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501205" lims:id="1501205"><Label>(v)</Label><Text>the registration number, assigned by the Minister under subsection <XRefInternal>7</XRefInternal>(3) of these Regulations, of the unit for which the credits were issued and the electricity system operator for that unit, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501206" lims:id="1501206"><Label>(vi)</Label><Text>the calendar year for which the credits were remitted or an indication that they have not been remitted; and</Text></Subparagraph></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501207" lims:id="1501207"><Label>(c)</Label><Text>for each collection of transferable compliance credits that have the same characteristics and that have been transferred from the unit,</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501208" lims:id="1501208"><Label>(i)</Label><Text>the calendar year for which the credits were issued,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501209" lims:id="1501209"><Label>(ii)</Label><Text>the total number of tonnes of CO<Sub>2</Sub> that the credits represent,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501210" lims:id="1501210"><Label>(iii)</Label><Text>the registration number, assigned by the Minister under subsection <XRefInternal>7</XRefInternal>(3) of these Regulations, of the unit to which the credits were transferred,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501211" lims:id="1501211"><Label>(iv)</Label><Text>a document, dated and signed by the responsible person for the unit from which the credits were transferred, or its authorized official, and the responsible person for the unit to which the credits were transferred, or its authorized official, confirming that both responsible persons agree to the transfer, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501212" lims:id="1501212"><Label>(v)</Label><Text>the registration number, assigned by the Minister under subsection <XRefInternal>7</XRefInternal>(3) of these Regulations, of the unit for which the credits were issued and the electricity system operator for that unit.</Text></Subparagraph></Paragraph></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501213" lims:id="1501213"><Label>4</Label><Text>The following information about Canadian offset credits that are being remitted for the purposes of subsection <XRefInternal>29</XRefInternal>(4) of these Regulations:</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501214" lims:id="1501214"><Label>(a)</Label><Text>for each collection of Canadian offset credits issued under subsection 29(1) of the <XRefExternal reference-type="regulation" link="SOR-2022-111">Canadian Greenhouse Gas Offset Credit System Regulations</XRefExternal> that have the same characteristics and sequential serial numbers,</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501215" lims:id="1501215"><Label>(i)</Label><Text>the total number of tonnes of CO<Sub>2</Sub> that the credits represent,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501216" lims:id="1501216"><Label>(ii)</Label><Text>the first and last serial number of the credits,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501217" lims:id="1501217"><Label>(iii)</Label><Text>the year in which the greenhouse gas reduction or removal for which the credits were issued occurred, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501218" lims:id="1501218"><Label>(iv)</Label><Text>the date on which the credits were issued; and</Text></Subparagraph></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501219" lims:id="1501219"><Label>(b)</Label><Text>for each collection of Canadian offset credits recognized under subsection 78(1) of the <XRefExternal reference-type="regulation">Output-Based Pricing System Regulations</XRefExternal> that have the same characteristics and sequential serial numbers,</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501220" lims:id="1501220"><Label>(i)</Label><Text>the total number of tonnes of CO<Sub>2</Sub> that the credits represent,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501221" lims:id="1501221"><Label>(ii)</Label><Text>the province or program authority referred to in subsection 78(1) of those Regulations that issued the credits,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501222" lims:id="1501222"><Label>(iii)</Label><Text>the date of retirement of the credits or the date on which the credits were designated by the province or program authority for the purposes of remittance under these Regulations,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501223" lims:id="1501223"><Label>(iv)</Label><Text>the first and last serial number of the credits,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501224" lims:id="1501224"><Label>(v)</Label><Text>the start date of the project for which the credits were issued,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501225" lims:id="1501225"><Label>(vi)</Label><Text>the year in which the greenhouse gas reduction or removal for which the credits were issued occurred,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501226" lims:id="1501226"><Label>(vii)</Label><Text>the offset protocol applicable to the project for which the credits were issued, including the version number and publication date, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501227" lims:id="1501227"><Label>(viii)</Label><Text>the name of the verification body that verified the credits.</Text></Subparagraph></Paragraph></Section><Section in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501228" lims:id="1501228"><Label>5</Label><Text>The following information about compliance credits or Canadian offset credits that are being remitted for the purposes of section <XRefInternal>38</XRefInternal> of these Regulations:</Text><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501229" lims:id="1501229"><Label>(a)</Label><Text>for each collection of compliance credits that have the same characteristics,</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501230" lims:id="1501230"><Label>(i)</Label><Text>the total number of tonnes of CO<Sub>2</Sub> that the credits represent,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501231" lims:id="1501231"><Label>(ii)</Label><Text>the calendar year for which the credits were issued,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501232" lims:id="1501232"><Label>(iii)</Label><Text>an indication of whether the credits are non-transferable or transferable,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501233" lims:id="1501233"><Label>(iv)</Label><Text>the registration number, assigned by the Minister under subsection <XRefInternal>7</XRefInternal>(3) of these Regulations, of the unit for which the credits were issued, if it is a unit other than the unit that is the subject of the report, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501234" lims:id="1501234"><Label>(v)</Label><Text>an explanation of how the credits meet the conditions for remittance set out in paragraph <XRefInternal>38</XRefInternal>(5)(a) of these Regulations;</Text></Subparagraph></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501235" lims:id="1501235"><Label>(b)</Label><Text>for each collection of Canadian offset credits issued under subsection 29(1) of the <XRefExternal reference-type="regulation" link="SOR-2022-111">Canadian Greenhouse Gas Offset Credit System Regulations</XRefExternal> that have the same characteristics and sequential serial numbers,</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501236" lims:id="1501236"><Label>(i)</Label><Text>the total number of tonnes of CO<Sub>2</Sub> that the credits represent,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501237" lims:id="1501237"><Label>(ii)</Label><Text>the first and last serial number of the credits,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501238" lims:id="1501238"><Label>(iii)</Label><Text>the year in which the greenhouse gas reduction or removal for which the credits were issued occurred,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501239" lims:id="1501239"><Label>(iv)</Label><Text>the date on which the credits were issued, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501240" lims:id="1501240"><Label>(v)</Label><Text>an explanation of how the credits meet the conditions for remittance set out in paragraph <XRefInternal>38</XRefInternal>(5)(b) of these Regulations; and</Text></Subparagraph></Paragraph><Paragraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501241" lims:id="1501241"><Label>(c)</Label><Text>for each collection of Canadian offset credits recognized under subsection 78(1) of the <XRefExternal reference-type="regulation">Output-Based Pricing System Regulations</XRefExternal> that have the same characteristics and sequential serial numbers,</Text><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501242" lims:id="1501242"><Label>(i)</Label><Text>the total number of tonnes of CO<Sub>2</Sub> that the credits represent,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501243" lims:id="1501243"><Label>(ii)</Label><Text>the province or program authority referred to in subsection 78(1) of those Regulations that issued the credits,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501244" lims:id="1501244"><Label>(iii)</Label><Text>the date of retirement of the credits or the date on which the credits were designated by the province or program authority for the purposes of remittance under these Regulations,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501245" lims:id="1501245"><Label>(iv)</Label><Text>the first and last serial number of the credits,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501246" lims:id="1501246"><Label>(v)</Label><Text>the start date of the project for which the credits were issued,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501247" lims:id="1501247"><Label>(vi)</Label><Text>the year in which the greenhouse gas reduction or removal for which the credits were issued occurred,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501248" lims:id="1501248"><Label>(vii)</Label><Text>the offset protocol applicable to the project for which the credits were issued, including the version number and publication date,</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501249" lims:id="1501249"><Label>(viii)</Label><Text>the name of the verification body that verified the credits, and</Text></Subparagraph><Subparagraph in-force="no" lims:enacted-date="2024-12-13" lims:fid="1501250" lims:id="1501250"><Label>(ix)</Label><Text>an explanation of how the credits meet the conditions for remittance set out in paragraph <XRefInternal>38</XRefInternal>(5)(b) of these Regulations.</Text></Subparagraph></Paragraph></Section></RegulationPiece></Schedule><Schedule lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1501251" lims:id="1501251" bilingual="no" spanlanguages="no"><ScheduleFormHeading lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501252" lims:id="1501252"><Label>SCHEDULE 7</Label><OriginatingRef>(Subsection <XRefInternal>43</XRefInternal>(1))</OriginatingRef><TitleText>Notice of Permanent Cessation of Electricity Generation — Information Required</TitleText></ScheduleFormHeading><RegulationPiece lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:fid="1501253" lims:id="1501253"><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1501254" lims:id="1501254"><Label>1</Label><Text>The registration number assigned to the unit by the Minister under subsection <XRefInternal>7</XRefInternal>(3) of these Regulations.</Text></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1501255" lims:id="1501255"><Label>2</Label><Text>An attestation, dated and signed by the responsible person or its authorized official, that the unit has permanently ceased generating electricity.</Text></Section><Section lims:inforce-start-date="2025-01-01" lims:enacted-date="2024-12-13" lims:lastAmendedDate="2025-01-01" lims:fid="1501256" lims:id="1501256"><Label>3</Label><Text>The date on which the unit permanently ceased generating electricity.</Text></Section></RegulationPiece></Schedule></Regulation>