Wastewater Systems Effluent Regulations
Version of section 46 from 2024-05-27 to 2024-08-18:
Marginal note:Content of authorization
46 A temporary bypass authorization is to be issued for a period that is sufficient to allow for the construction work, for the maintenance of the system or for the response referred to in paragraph 43(2)(a) and the authorization must be in the form set out in Schedule 6.
- SOR/2024-97, s. 39
- Date modified: