Clean Electricity Regulations (SOR/2024-263)
Full Document:
- HTMLFull Document: Clean Electricity Regulations (Accessibility Buttons available) |
- XMLFull Document: Clean Electricity Regulations [325 KB] |
- PDFFull Document: Clean Electricity Regulations [749 KB]
Regulations are current to 2025-12-10 and last amended on 2025-01-01. Previous Versions
SCHEDULE 1(Subsection 6(4) and paragraph 3(h) of Schedule 2)Performance Test Verifier Report — Information Required
1 The registration number, if any, assigned to the unit by the Minister under subsection 7(3) of these Regulations.
2 The following information about a unit that has not been assigned a registration number:
(a) the unit’s name and, if any, civic address; and
(b) the unit’s geographic coordinates (latitude and longitude), expressed in decimal degrees to five decimal places.
3 The name, civic address, telephone number, email address and, if any, fax number of the performance test verifier.
4 Information demonstrating that the performance test verifier meets the requirements set out in subsection 6(3) of these Regulations.
5 The procedures followed by the performance test verifier to assess whether
(a) the maximum gross power was measured at the electrical terminals of the unit’s generators; and
(b) the performance test was conducted in accordance with subsection 6(2) of these Regulations.
6 A statement by the performance test verifier that affirms that
(a) the maximum gross power was measured at the electrical terminals of the unit’s generators; and
(b) the performance test was conducted in accordance with subsection 6(2) of these Regulations.
7 The unit’s maximum gross power, expressed in MW, as determined by the performance test.
8 The unit’s most recent maximum continuous rating.
9 The date of the performance test.
Page Details
- Date modified: