﻿<?xml version="1.0" encoding="utf-8"?><Regulation lims:pit-date="2016-02-27" hasPreviousVersion="true" lims:lastAmendedDate="2016-02-27" lims:current-date="2019-06-21" lims:inforce-start-date="2016-02-19" lims:fid="821624" lims:id="821624" gazette-part="II" in-force="yes" regulation-type="SOR" xml:lang="fr" xmlns:lims="http://justice.gc.ca/lims"><Identification lims:inforce-start-date="2016-02-19" lims:fid="821625" lims:id="821625"><InstrumentNumber>DORS/2016-21</InstrumentNumber><RegistrationDate><Date><YYYY>2016</YYYY><MM>2</MM><DD>19</DD></Date></RegistrationDate><ConsolidationDate lims:inforce-start-date="2016-02-19"><Date><YYYY>2019</YYYY><MM>6</MM><DD>22</DD></Date></ConsolidationDate><EnablingAuthority lims:inforce-start-date="2016-02-19" lims:fid="821627" lims:id="821627"><XRefExternal reference-type="act" link="C-7.5">LOI DE MISE EN OEUVRE DE L’ACCORD ATLANTIQUE CANADA — TERRE-NEUVE-ET-LABRADOR</XRefExternal></EnablingAuthority><LongTitle lims:inforce-start-date="2016-02-19" lims:fid="821628" lims:id="821628">Règlement sur le recouvrement des coûts en matière d’hydrocarbures dans la zone extracôtière Canada — Terre-Neuve-et-Labrador</LongTitle><RegulationMakerOrder><RegulationMaker>C.P.</RegulationMaker><OrderNumber>2016-69</OrderNumber><Date><YYYY>2016</YYYY><MM>2</MM><DD>19</DD></Date></RegulationMakerOrder></Identification><Order lims:inforce-start-date="2016-02-19" lims:fid="821629" lims:id="821629"><Provision lims:inforce-start-date="2016-02-19" lims:fid="821630" lims:id="821630" format-ref="indent-0-0" language-align="yes"><Text>Attendu que, conformément au paragraphe 150(1) de la <XRefExternal reference-type="act" link="C-7.5">Loi de mise en oeuvre de l’Accord atlantique Canada — Terre-Neuve-et-Labrador</XRefExternal><FootnoteRef idref="nbp_81000-2-2356-F-CG2_hq_15848">a</FootnoteRef>, le projet de règlement intitulé <XRefExternal reference-type="regulation">Règlement sur le recouvrement des coûts en matière d’hydrocarbures dans la zone extracôtière Canada — Terre-Neuve-et-Labrador</XRefExternal>, conforme en substance au texte ci-après, a été publié dans la Partie I de la <XRefExternal reference-type="other" link="gazette">Gazette du Canada</XRefExternal> le 11 juillet 2015 et que les intéressés ont ainsi eu la possibilité de présenter leurs observations à cet égard au ministre des Ressources naturelles;</Text><Footnote id="nbp_81000-2-2356-F-CG2_hq_15848" placement="page" status="official"><Label>a</Label><Text>L.C. 1987, ch. 3; L.C, 2014, ch. 13, art. 3</Text></Footnote></Provision><Provision lims:inforce-start-date="2016-02-19" lims:fid="821631" lims:id="821631" format-ref="indent-0-0" language-align="yes"><Text>Attendu que, conformément au paragraphe 7(1)<FootnoteRef idref="nbp_81000-2-2356-F-CG2_hq_15847">b</FootnoteRef> de cette loi, le ministre des Ressources naturelles a consulté le ministre provincial sur ce projet de règlement et que ce dernier a approuvé la prise de ce règlement,</Text><Footnote id="nbp_81000-2-2356-F-CG2_hq_15847" placement="page" status="official"><Label>b</Label><Text>L.C. 2015, ch. 4, art. 38</Text></Footnote></Provision><Provision lims:inforce-start-date="2016-02-19" lims:fid="821632" lims:id="821632" format-ref="indent-0-0" language-align="yes"><Text>À ces causes, sur recommandation du ministre des Ressources naturelles et en vertu de l’article 29.1<FootnoteRef idref="nbp_81000-2-2356-F_hq_14891">c</FootnoteRef> de la <XRefExternal reference-type="act" link="C-7.5">Loi de mise en oeuvre de l’Accord atlantique Canada — Terre-Neuve-et-Labrador</XRefExternal><FootnoteRef idref="nbp_81000-2-2356-F-CG2_hq_15848">a</FootnoteRef>, Son Excellence le Gouverneur général en conseil prend le <XRefExternal reference-type="regulation">Règlement sur le recouvrement des coûts en matière d’hydrocarbures dans la zone extracôtière Canada — Terre-Neuve-et-Labrador</XRefExternal>, ci-après.</Text><Footnote id="nbp_81000-2-2356-F_hq_14891" placement="page" status="official"><Label>c</Label><Text>L.C. 2015, ch. 4, art. 39</Text></Footnote></Provision></Order><Body lims:inforce-start-date="2016-02-19" lims:fid="821633" lims:id="821633"><Heading lims:inforce-start-date="2016-02-19" lims:fid="821634" lims:id="821634" level="1"><TitleText>Définitions</TitleText></Heading><Section lims:inforce-start-date="2016-02-27" lims:lastAmendedDate="2016-02-27" lims:fid="821635" lims:id="821635"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821636" lims:id="821636">Définitions</MarginalNote><Label>1</Label><Text>Les définitions qui suivent s’appliquent au présent règlement.</Text><Definition lims:inforce-start-date="2016-02-27" lims:fid="821637" lims:id="821637"><Text><DefinedTermFr>activités de réglementation directes</DefinedTermFr> Activités requises pour que l’Office s’acquitte de ses responsabilités réglementaires, telles que l’évaluation des demandes, la délivrance de permis, d’approbations et d’autorisations, la vérification de la conformité avec la Loi et le contrôle d’application de celle-ci, ainsi que la fourniture de renseignements, de produits et de services. (<DefinedTermEn>direct regulatory activities</DefinedTermEn>)</Text></Definition><Definition lims:inforce-start-date="2016-02-27" lims:fid="821638" lims:id="821638"><Text><DefinedTermFr>coûts de réglementation indirects</DefinedTermFr> Coûts à l’appui des activités de réglementation directes de l’Office, notamment les coûts des bureaux, des fournitures et du matériel, des services professionnels, des communications, des déplacements, de la gestion, de la formation, de l’administration, des services de ressources humaines, des finances, des services de technologie de l’information, du matériel informatique et des logiciels, de l’élaboration de documents (y compris les politiques, normes, directives, marches à suivre et avis) et de l’expertise (y compris la fourniture de conseils à l’égard des lois et des règlements) fournie sur demande du ministre fédéral ou provincial. (<DefinedTermEn>indirect regulatory costs</DefinedTermEn>)</Text></Definition><Definition lims:inforce-start-date="2016-02-27" lims:fid="821639" lims:id="821639"><Text><DefinedTermFr>coût entier réel</DefinedTermFr> Coût entier confirmé par les états financiers vérifiés de l’Office. (<DefinedTermEn>actual full cost</DefinedTermEn>)</Text></Definition><Definition lims:inforce-start-date="2016-02-27" lims:fid="821640" lims:id="821640"><Text><DefinedTermFr>Loi</DefinedTermFr> La <XRefExternal reference-type="act" link="C-7.5">Loi de mise en oeuvre de l’Accord atlantique Canada — Terre-Neuve-et-Labrador</XRefExternal>. (<DefinedTermEn>Act</DefinedTermEn>)</Text></Definition><Definition lims:inforce-start-date="2016-02-27" lims:fid="821641" lims:id="821641"><Text><DefinedTermFr>projet</DefinedTermFr> L’activité visée à l’alinéa 138(1)b) de la Loi. (<DefinedTermEn>project</DefinedTermEn>)</Text></Definition></Section><Heading lims:inforce-start-date="2016-02-19" lims:fid="821642" lims:id="821642" level="1"><Label>PARTIE 1</Label><TitleText>Redevances : plan des activités de réglementation</TitleText></Heading><Heading lims:inforce-start-date="2016-02-19" lims:fid="821643" lims:id="821643" level="2"><TitleText>Redevances annuelles estimatives</TitleText></Heading><Section lims:inforce-start-date="2016-02-27" lims:lastAmendedDate="2016-02-27" lims:fid="821644" lims:id="821644"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821645" lims:id="821645">Plan des activités de réglementation</MarginalNote><Label>2</Label><Text>Pour chaque nouveau projet ayant trait au développement, à la production, à l’abandon, au forage exploratoire ou à un programme de prospection sismique pluriannuelle ou complexe lié à des opérations pétrolières, l’Office, sur réception d’une description du projet ou d’une lettre d’intention concernant le projet :</Text><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821646" lims:id="821646"><Label>a)</Label><Text>prépare un plan des activités de réglementation;</Text></Paragraph><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821647" lims:id="821647"><Label>b)</Label><Text>calcule les redevances annuelles estimatives à payer par le demandeur ou l’exploitant pour l’exercice en établissant le coût entier estimatif lié à la mise en oeuvre du plan des activités de réglementation, y compris les coûts de réglementation indirects, en se fondant sur :</Text><Subparagraph lims:inforce-start-date="2016-02-27" lims:fid="821648" lims:id="821648"><Label>(i)</Label><Text>le coût relatif au nombre total d’unités de temps estimées nécessaires, au cours de l’exercice, à la réalisation des activités de réglementation directes du projet,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2016-02-27" lims:fid="821649" lims:id="821649"><Label>(ii)</Label><Text>les autres coûts, à l’exclusion des coûts calculés selon une autre méthode de recouvrement des coûts;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821650" lims:id="821650"><Label>c)</Label><Text>avise par écrit le demandeur ou l’exploitant de l’existence du plan des activités de réglementation et des redevances annuelles estimatives à payer.</Text></Paragraph></Section><Section lims:inforce-start-date="2016-02-27" lims:lastAmendedDate="2016-02-27" lims:fid="821651" lims:id="821651"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821652" lims:id="821652">Projet existant</MarginalNote><Label>3</Label><Text>Après que le budget qu’il a soumis pour un exercice donné conformément au paragraphe 27(2) de la Loi a été approuvé, l’Office, pour chaque projet existant pour lequel un plan des activités de réglementation était en place :</Text><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821653" lims:id="821653"><Label>a)</Label><Text>prépare un nouveau plan des activités de réglementation;</Text></Paragraph><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821654" lims:id="821654"><Label>b)</Label><Text>calcule les redevances annuelles estimatives à payer par le demandeur ou l’exploitant pour l’exercice en établissant le coût entier estimatif lié à la mise en oeuvre du nouveau plan, y compris les coûts de réglementation indirects, en se fondant sur :</Text><Subparagraph lims:inforce-start-date="2016-02-27" lims:fid="821655" lims:id="821655"><Label>(i)</Label><Text>le coût relatif au nombre total d’unités de temps estimées nécessaires, au cours de l’exercice, à la réalisation des activités de réglementation directes du projet,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2016-02-27" lims:fid="821656" lims:id="821656"><Label>(ii)</Label><Text>les autres coûts, à l’exclusion des coûts calculés selon une autre méthode de recouvrement des coûts;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821657" lims:id="821657"><Label>c)</Label><Text>avise par écrit le demandeur ou l’exploitant de l’existence du nouveau plan et des redevances annuelles estimatives à payer.</Text></Paragraph></Section><Section lims:inforce-start-date="2016-02-27" lims:lastAmendedDate="2016-02-27" lims:fid="821658" lims:id="821658"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821659" lims:id="821659">Recalcul</MarginalNote><Label>4</Label><Text>Si un demandeur ou un exploitant propose d’apporter des modifications à son projet qui ne sont pas prévues dans le plan des activités de réglementation, l’Office peut recalculer les redevances annuelles estimatives liées au projet et ajuster le montant à payer en conséquence.</Text></Section><Heading lims:inforce-start-date="2016-02-19" lims:fid="821660" lims:id="821660" level="2"><TitleText>Facturation trimestrielle</TitleText></Heading><Section lims:inforce-start-date="2016-02-27" lims:lastAmendedDate="2016-02-27" lims:fid="821661" lims:id="821661"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821662" lims:id="821662">Facture</MarginalNote><Label>5</Label><Subsection lims:inforce-start-date="2016-02-27" lims:fid="821663" lims:id="821663"><Label>(1)</Label><Text>L’Office dresse une facture représentant 25 % des redevances annuelles estimatives qu’il envoie trimestriellement à chaque demandeur ou exploitant avisé conformément aux alinéas 2c) ou 3c).</Text></Subsection><Subsection lims:inforce-start-date="2016-02-27" lims:fid="821664" lims:id="821664"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821665" lims:id="821665">Paiement dans les trente jours</MarginalNote><Label>(2)</Label><Text>Dans les trente jours suivant la date de facturation, le demandeur ou l’exploitant s’acquitte de la facture.</Text></Subsection></Section><Heading lims:inforce-start-date="2016-02-19" lims:fid="821666" lims:id="821666" level="2"><TitleText>Rajustement annuel des redevances</TitleText></Heading><Section lims:inforce-start-date="2016-02-27" lims:lastAmendedDate="2016-02-27" lims:fid="821667" lims:id="821667"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821668" lims:id="821668">Rajustement annuel</MarginalNote><Label>6</Label><Subsection lims:inforce-start-date="2016-02-27" lims:fid="821669" lims:id="821669"><Label>(1)</Label><Text>Chaque année après la clôture de l’exercice, pour chaque projet faisant l’objet d’un plan des activités de réglementation, l’Office :</Text><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821670" lims:id="821670"><Label>a)</Label><Text>calcule le coût entier réel lié à la mise en oeuvre du plan des activités de réglementation;</Text></Paragraph><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821671" lims:id="821671"><Label>b)</Label><Text>calcule, le cas échéant, le rajustement des redevances en soustrayant du coût entier réel les redevances annuelles estimatives calculées conformément aux alinéas 2b) ou 3b);</Text></Paragraph><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821672" lims:id="821672"><Label>c)</Label><Text>avise par écrit le demandeur ou l’exploitant du montant du coût entier réel et du montant des redevances rajustées.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2016-02-27" lims:fid="821673" lims:id="821673"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821674" lims:id="821674">Effet du rajustement</MarginalNote><Label>(2)</Label><Text>Dans le cas où le coût entier réel, calculé conformément à l’alinéa (1)a), est :</Text><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821675" lims:id="821675"><Label>a)</Label><Text>inférieur au montant des redevances annuelles estimatives, la différence est portée au crédit du compte du demandeur ou de l’exploitant et est remboursée sous forme de crédit sur la prochaine facture;</Text></Paragraph><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821676" lims:id="821676"><Label>b)</Label><Text>supérieur au montant des redevances annuelles estimatives, l’Office envoie au demandeur ou à l’exploitant une facture égale à la différence devant être acquittée par le demandeur ou l’exploitant dans les trente jours suivant la date de facturation.</Text></Paragraph></Subsection></Section><Heading lims:inforce-start-date="2016-02-19" lims:fid="821677" lims:id="821677" level="1"><Label>PARTIE 2</Label><TitleText>Droits : formules</TitleText></Heading><Heading lims:inforce-start-date="2016-02-19" lims:fid="821678" lims:id="821678" level="2"><TitleText>Interprétation</TitleText></Heading><Section lims:inforce-start-date="2016-02-27" lims:lastAmendedDate="2016-02-27" lims:fid="821679" lims:id="821679"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821680" lims:id="821680">Interprétation</MarginalNote><Label>7</Label><Text>Dans la présente partie :</Text><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821681" lims:id="821681"><Label>a)</Label><Text>le nombre d’unités de temps de base est le nombre d’unités de temps nécessaires à l’exécution des activités de réglementation directes relativement à chacune des activités visées à l’un des tableaux figurant à l’article 9 estimé par l’Office et publié par celui-ci conformément à l’article 8;</Text></Paragraph><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821682" lims:id="821682"><Label>b)</Label><Text>le nombre d’unités de temps variables est le nombre d’unités de temps nécessaires à l’exécution des activités de réglementation directes relativement aux variables énumérées à la colonne 3 du tableau figurant au paragraphe 9(3) estimé par l’Office et publié par celui-ci conformément à l’article 8;</Text></Paragraph><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821683" lims:id="821683"><Label>c)</Label><Text>le taux effectif est le taux publié par l’Office conformément à l’article 8 et établi sur la base de la différence entre la somme estimée des coûts des activités de réglementation directes et des coûts de réglementation indirects de l’Office et la somme des coûts engagés par l’Office relativement aux activités réglementaires non recouvrés par l’Office, à la demande du ministre provincial et du ministre fédéral, divisée par le nombre total d’unités de temps consacrées par l’Office à ces activités de réglementation directes;</Text></Paragraph><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821684" lims:id="821684"><Label>d)</Label><Text>le coefficient de fardeau considérable est un multiplicateur que l’Office peut appliquer à un droit pour une activité s’il estime que ce droit doit être majoré en fonction du nombre d’unités de temps supplémentaires qu’il consacre aux activités de réglementation directes par suite de la non-conformité avec la Loi, d’une négligence ou d’un manque d’effort de la part du demandeur ou de l’exploitant pour répondre aux questions de l’Office lors du processus de demande ou lors d’une activité.</Text></Paragraph></Section><Heading lims:inforce-start-date="2016-02-19" lims:fid="821685" lims:id="821685" level="2"><TitleText>Publication</TitleText></Heading><Section lims:inforce-start-date="2016-02-27" lims:lastAmendedDate="2016-02-27" lims:fid="821686" lims:id="821686"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821687" lims:id="821687">Publication par l’Office</MarginalNote><Label>8</Label><Text>Chaque année, l’Office publie, électroniquement ou d’une autre façon susceptible de joindre les demandeurs et les exploitants :</Text><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821688" lims:id="821688"><Label>a)</Label><Text>les unités de temps de base pour chaque activité indiquée à l’un des tableaux figurant à l’article 9;</Text></Paragraph><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821689" lims:id="821689"><Label>b)</Label><Text>les unités de temps variables pour chaque activité indiquée au tableau figurant au paragraphe 9(3);</Text></Paragraph><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821690" lims:id="821690"><Label>c)</Label><Text>le taux effectif applicable.</Text></Paragraph></Section><Heading lims:inforce-start-date="2016-02-19" lims:fid="821691" lims:id="821691" level="2"><TitleText>Formules</TitleText></Heading><Section lims:inforce-start-date="2016-02-27" lims:lastAmendedDate="2016-02-27" lims:fid="821692" lims:id="821692"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821693" lims:id="821693">Formule de base</MarginalNote><Label>9</Label><Subsection lims:inforce-start-date="2016-02-27" lims:fid="821694" lims:id="821694"><Label>(1)</Label><Text>Les droits prévus pour chacune des activités indiquées au tableau du présent paragraphe sont calculés selon la formule suivante :</Text><FormulaGroup lims:inforce-start-date="2016-02-27" lims:fid="821695" lims:id="821695"><Formula lims:inforce-start-date="2016-02-27" lims:fid="821696" lims:id="821696"><FormulaText>A × C</FormulaText></Formula><FormulaConnector>où :</FormulaConnector><FormulaDefinition lims:inforce-start-date="2016-02-27" lims:fid="821697" lims:id="821697"><FormulaTerm>A</FormulaTerm><Text>représente le nombre d’unités de temps de base pour chacune de ces activités;</Text></FormulaDefinition><FormulaDefinition lims:inforce-start-date="2016-02-27" lims:fid="821698" lims:id="821698"><FormulaTerm>C</FormulaTerm><Text>le taux effectif.</Text></FormulaDefinition></FormulaGroup><TableGroup lims:inforce-start-date="2016-02-27" lims:fid="821699" lims:id="821699" pointsize="8" topmarginspacing="10"><Caption lims:inforce-start-date="2016-02-27" lims:fid="821700" lims:id="821700" position="over">TABLEAU</Caption><table lims:inforce-start-date="2016-02-27" lims:fid="821701" lims:id="821701" frame="topbot"><tgroup lims:inforce-start-date="2016-02-27" lims:fid="821702" lims:id="821702" cols="2"><colspec colname="1" colwidth="14.25*" /><colspec colname="2" colwidth="85.75*" /><thead lims:inforce-start-date="2016-02-27" lims:fid="821703" lims:id="821703"><row rowsep="0" topdouble="yes"><entry colname="1" colsep="0" rowsep="1" valign="top">Article</entry><entry colname="2" colsep="0" rowsep="1" valign="top">Activité</entry></row></thead><tbody lims:inforce-start-date="2016-02-27" lims:fid="821704" lims:id="821704"><row height="10pt"><entry colsep="0" rowsep="0">1</entry><entry colsep="0" rowsep="0">Demande de déclaration de découverte importante</entry></row><row><entry colsep="0" rowsep="0">2</entry><entry colsep="0" rowsep="0">Demande de déclaration de découverte exploitable</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">3</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Demande d’attestation de découverte importante</entry></row><row><entry colsep="0" rowsep="0">4</entry><entry colsep="0" rowsep="0">Demande de licence de stockage souterrain</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">5</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Demande de licence de production</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">6</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Demande de modification ou de fusion de licences ou de permis de prospection</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">7</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Enregistrement d’un transfert</entry></row><row><entry colsep="0" rowsep="0">8</entry><entry colsep="0" rowsep="0">Enregistrement d’un avis de sûreté</entry></row><row><entry colsep="0" rowsep="0">9</entry><entry colsep="0" rowsep="0">Enregistrement d’un titre</entry></row><row><entry colsep="0" rowsep="0">10</entry><entry colsep="0" rowsep="0">Enregistrement d’un avis</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">11</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Enregistrement d’un acte autre qu’un transfert ou qu’un avis de sûreté</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">12</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Demande de prolongation par arrêté de la licence de production</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">13</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Demande pour les dépenses admissibles</entry></row></tbody></tgroup></table></TableGroup></Subsection><Subsection lims:inforce-start-date="2016-02-27" lims:fid="821705" lims:id="821705"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821706" lims:id="821706">Formule sans unités de temps variables</MarginalNote><Label>(2)</Label><Text>Les droits prévus pour chacune des activités indiquées à la colonne 2 du tableau du présent paragraphe sont calculés selon la formule suivante :</Text><FormulaGroup lims:inforce-start-date="2016-02-27" lims:fid="821707" lims:id="821707"><Formula lims:inforce-start-date="2016-02-27" lims:fid="821708" lims:id="821708"><FormulaText>A × C × D</FormulaText></Formula><FormulaConnector>où :</FormulaConnector><FormulaDefinition lims:inforce-start-date="2016-02-27" lims:fid="821709" lims:id="821709"><FormulaTerm>A</FormulaTerm><Text>représente le nombre d’unités de temps de base pour chacune de ces activités;</Text></FormulaDefinition><FormulaDefinition lims:inforce-start-date="2016-02-27" lims:fid="821710" lims:id="821710"><FormulaTerm>C</FormulaTerm><Text>le taux effectif;</Text></FormulaDefinition><FormulaDefinition lims:inforce-start-date="2016-02-27" lims:fid="821711" lims:id="821711"><FormulaTerm>D</FormulaTerm><Text>le cas échéant, le coefficient de fardeau considérable.</Text></FormulaDefinition></FormulaGroup><TableGroup lims:inforce-start-date="2016-02-27" lims:fid="821712" lims:id="821712" pointsize="8" topmarginspacing="10"><Caption lims:inforce-start-date="2016-02-27" lims:fid="821713" lims:id="821713" position="over">TABLEAU</Caption><table lims:inforce-start-date="2016-02-27" lims:fid="821714" lims:id="821714" frame="topbot"><tgroup lims:inforce-start-date="2016-02-27" lims:fid="821715" lims:id="821715" cols="3"><colspec colname="1" colwidth="14.10*" /><colspec colname="2" colwidth="47.80*" /><colspec colname="3" colwidth="37.11*" /><thead lims:inforce-start-date="2016-02-27" lims:fid="821716" lims:id="821716"><row bottommarginspacing="4" rowsep="0" topdouble="yes"><entry colname="1" colsep="0" rowsep="0" valign="top" /><entry colname="2" colsep="0" rowsep="0" valign="middle">Colonne 1</entry><entry colname="3" colsep="0" rowsep="0" valign="top">Colonne 2</entry></row><row rowsep="1" valign="bottom"><entry colname="1" colsep="0" valign="top">Article</entry><entry colname="2" colsep="0" valign="top">Catégorie d’activités</entry><entry colname="3" colsep="0" valign="top">Activité</entry></row></thead><tbody lims:inforce-start-date="2016-02-27" lims:fid="821717" lims:id="821717"><row><entry colsep="0" rowsep="0">1</entry><entry colsep="0" rowsep="0">Autorisation d’opérations géologiques (avec travail sur le terrain)</entry><entry colsep="0" rowsep="0">Étude géochimique</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">2</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Activité géophysique (sans travail sur le terrain)</entry><entry colname="3" colsep="0" rowsep="0" valign="top">Étude géophysique</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">3</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Activité géologique (sans travail sur le terrain)</entry><entry colname="3" colsep="0" rowsep="0" valign="top">Achat d’études géologiques</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">4</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Activité géologique (sans travail sur le terrain)</entry><entry colname="3" colsep="0" rowsep="0" valign="top">Datation d’isotope</entry></row><row><entry colsep="0" rowsep="0">5</entry><entry colsep="0" rowsep="0">Activité géologique (sans travail sur le terrain)</entry><entry colsep="0" rowsep="0">Études géologiques internes</entry></row><row><entry colsep="0" rowsep="0">6</entry><entry colsep="0" rowsep="0">Activité géologique (sans travail sur le terrain)</entry><entry colsep="0" rowsep="0">Pétrographie</entry></row><row><entry colsep="0" rowsep="0">7</entry><entry colsep="0" rowsep="0">Activité géologique (sans travail sur le terrain)</entry><entry colsep="0" rowsep="0">Étude paléontologique ou palynologique</entry></row><row><entry colsep="0" rowsep="0">8</entry><entry colsep="0" rowsep="0">Activité géologique (sans travail sur le terrain)</entry><entry colsep="0" rowsep="0">Autres activités géophysiques</entry></row><row><entry colsep="0" rowsep="0">9</entry><entry colsep="0" rowsep="0">Droit de conformité annuel</entry><entry colsep="0" rowsep="0">Tous projets géophysiques</entry></row></tbody></tgroup></table></TableGroup></Subsection><Subsection lims:inforce-start-date="2016-02-27" lims:fid="821718" lims:id="821718"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821719" lims:id="821719">Formule avec unités de temps variables</MarginalNote><Label>(3)</Label><Text>Les droits prévus pour chacune des activités indiquées à la colonne 2 du tableau du présent paragraphe sont calculés selon la formule suivante :</Text><FormulaGroup lims:inforce-start-date="2016-02-27" lims:fid="821720" lims:id="821720"><Formula lims:inforce-start-date="2016-02-27" lims:fid="821721" lims:id="821721"><FormulaText>(A + B) × (C × D)</FormulaText></Formula><FormulaConnector>où :</FormulaConnector><FormulaDefinition lims:inforce-start-date="2016-02-27" lims:fid="821722" lims:id="821722"><FormulaTerm>A</FormulaTerm><Text>représente le nombre d’unités de temps de base pour chacune de ces activités;</Text></FormulaDefinition><FormulaDefinition lims:inforce-start-date="2016-02-27" lims:fid="821723" lims:id="821723"><FormulaTerm>B</FormulaTerm><Text>le nombre d’unités de temps variables multipliées par le nombre de navires principaux ou d’aéronefs utilisés pour chacune de ces activités;</Text></FormulaDefinition><FormulaDefinition lims:inforce-start-date="2016-02-27" lims:fid="821724" lims:id="821724"><FormulaTerm>C</FormulaTerm><Text>le taux effectif;</Text></FormulaDefinition><FormulaDefinition lims:inforce-start-date="2016-02-27" lims:fid="821725" lims:id="821725"><FormulaTerm>D</FormulaTerm><Text>le cas échéant, le coefficient de fardeau considérable.</Text></FormulaDefinition></FormulaGroup><TableGroup lims:inforce-start-date="2016-02-27" lims:fid="821726" lims:id="821726" pointsize="8" spanlanguages="yes" topmarginspacing="10"><Caption lims:inforce-start-date="2016-02-27" lims:fid="821727" lims:id="821727" position="over">TABLEAU</Caption><table lims:inforce-start-date="2016-02-27" lims:fid="821728" lims:id="821728" frame="topbot"><tgroup lims:inforce-start-date="2016-02-27" lims:fid="821729" lims:id="821729" cols="4"><colspec colname="1" colwidth="8.48*" /><colspec colname="2" colwidth="31.32*" /><colspec colname="3" colwidth="42.47*" /><colspec colname="4" colwidth="17.71*" /><thead lims:inforce-start-date="2016-02-27" lims:fid="821730" lims:id="821730"><row bottommarginspacing="4" rowsep="0" topdouble="yes"><entry colname="1" colsep="0" rowsep="0" valign="top" /><entry colname="2" colsep="0" rowsep="0" valign="top">Colonne 1</entry><entry colname="3" colsep="0" rowsep="0" valign="top">Colonne 2</entry><entry colname="4" colsep="0" rowsep="0" valign="top">Colonne 3</entry></row><row rowsep="1" valign="bottom"><entry colname="1" colsep="0" valign="top">Article</entry><entry colname="2" colsep="0" valign="top">Catégorie d’activités</entry><entry colname="3" colsep="0" valign="top">Activité</entry><entry colname="4" colsep="0" valign="top">Variable</entry></row></thead><tbody lims:inforce-start-date="2016-02-27" lims:fid="821731" lims:id="821731"><row height="10pt"><entry colsep="0" rowsep="0">1</entry><entry colsep="0" rowheader="yes" rowsep="0">Autorisation d’opérations géophysiques (avec travail sur le terrain)</entry><entry colsep="0" rowsep="0">Levé sismique de réflexion 2D (activité principale)</entry><entry colsep="0" rowsep="0">Navire principal</entry></row><row><entry colsep="0" rowsep="0">2</entry><entry colsep="0" rowheader="yes" rowsep="0">Autorisation d’opérations géophysiques (avec travail sur le terrain)</entry><entry colsep="0" rowsep="0">Levé sismique de réflexion 3D (activité principale)</entry><entry colsep="0" rowsep="0">Navire principal</entry></row><row><entry colsep="0" rowsep="0">3</entry><entry colsep="0" rowheader="yes" rowsep="0">Autorisation d’opérations géophysiques (avec travail sur le terrain)</entry><entry colsep="0" rowsep="0">Levé sismique de réflexion 4D (activité principale)</entry><entry colsep="0" rowsep="0">Navire principal</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">4</entry><entry colname="2" colsep="0" rowheader="yes" rowsep="0" valign="top">Autorisation d’opérations géophysiques (avec travail sur le terrain)</entry><entry colname="3" colsep="0" rowsep="0" valign="top">Levé de gravité du fond de mer (activité principale)</entry><entry colname="4" colsep="0" rowsep="0" valign="top">Navire principal</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">5</entry><entry colname="2" colsep="0" rowheader="yes" rowsep="0" valign="top">Autorisation d’opérations géophysiques (avec travail sur le terrain)</entry><entry colname="3" colsep="0" rowsep="0" valign="top">Levé sismique de réfraction (activité principale)</entry><entry colname="4" colsep="0" rowsep="0" valign="top">Navire principal</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">6</entry><entry colname="2" colsep="0" rowheader="yes" rowsep="0" valign="top">Autorisation d’opérations géophysiques (avec travail de terrain)</entry><entry colname="3" colsep="0" rowsep="0" valign="top">Levé électromagnétique de source contrôlée</entry><entry colname="4" colsep="0" rowsep="0" valign="top">Navire principal</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">7</entry><entry colname="2" colsep="0" rowheader="yes" rowsep="0" valign="top">Autorisation d’opérations géophysiques (avec travail sur le terrain)</entry><entry colname="3" colsep="0" rowsep="0" valign="top">Autre programme géophysique</entry><entry colname="4" colsep="0" rowsep="0" valign="top">Navire principal</entry></row><row><entry colsep="0" rowsep="0">8</entry><entry colsep="0" rowheader="yes" rowsep="0">Autorisation d’opérations géophysiques (avec travail sur le terrain)</entry><entry colsep="0" rowsep="0">Levé aéromagnétique (activité principale)</entry><entry colsep="0" rowsep="0">Aéronef</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">9</entry><entry colname="2" colsep="0" rowheader="yes" rowsep="0" valign="top">Autorisation géotechnique (levé marin)</entry><entry colname="3" colsep="0" rowsep="0" valign="top">Carottier à piston</entry><entry colname="4" colsep="0" rowsep="0" valign="top">Navire principal</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">10</entry><entry colname="2" colsep="0" rowheader="yes" rowsep="0" valign="top">Autorisation géotechnique (levé marin)</entry><entry colname="3" colsep="0" rowsep="0" valign="top">Levé sismique peu profond du fond marin</entry><entry colname="4" colsep="0" rowsep="0" valign="top">Navire principal</entry></row></tbody></tgroup></table></TableGroup></Subsection></Section><Heading lims:inforce-start-date="2016-02-19" lims:fid="821732" lims:id="821732" level="2"><TitleText>Paiement des droits</TitleText></Heading><Section lims:inforce-start-date="2016-02-27" lims:lastAmendedDate="2016-02-27" lims:fid="821733" lims:id="821733"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821734" lims:id="821734">Droits calculés conformément à l’article 9</MarginalNote><Label>10</Label><Subsection lims:inforce-start-date="2016-02-27" lims:fid="821735" lims:id="821735"><Label>(1)</Label><Text>Sur présentation d’une demande à l’égard de l’une des activités énumérées à l’un des tableaux figurant à l’article 9, le demandeur paie à l’Office les droits calculés conformément à cet article.</Text></Subsection><Subsection lims:inforce-start-date="2016-02-27" lims:fid="821736" lims:id="821736"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821737" lims:id="821737">Coefficient de fardeau considérable</MarginalNote><Label>(2)</Label><Text>Dans le cas où il utilise un coefficient de fardeau considérable pour calculer des droits supplémentaires liés à l’exercice de l’activité, l’Office dresse une facture représentant ces droits. Dans les trente jours suivant la date de facturation, le demandeur ou l’exploitant s’acquitte de la facture.</Text></Subsection></Section><Heading lims:inforce-start-date="2016-02-19" lims:fid="821738" lims:id="821738" level="1"><Label>PARTIE 3</Label><TitleText>Centre de géodonnées</TitleText></Heading><Section lims:inforce-start-date="2016-02-27" lims:lastAmendedDate="2016-02-27" lims:fid="821739" lims:id="821739"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821740" lims:id="821740">Définition de <DefinitionRef>taux d’accès quotidien</DefinitionRef></MarginalNote><Label>11</Label><Text>Dans la présente partie, <DefinedTermFr>taux d’accès quotidien</DefinedTermFr> s’entend du taux établi et publié par l’Office, électroniquement ou d’une autre façon susceptible de joindre les demandeurs et les exploitants.</Text></Section><Section lims:inforce-start-date="2016-02-27" lims:lastAmendedDate="2016-02-27" lims:fid="821741" lims:id="821741"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821742" lims:id="821742">Droits de consultation des échantillons</MarginalNote><Label>12</Label><Text>À l’exception d’une personne demandant à consulter des échantillons à des fins collégiales ou universitaires, du ministre fédéral ou du ministre provincial, toute personne qui consulte des échantillons physiques au centre de géodonnées paie le taux d’accès quotidien pour chaque journée d’accès aux échantillons.</Text></Section><Heading lims:inforce-start-date="2016-02-19" lims:fid="821743" lims:id="821743" level="1"><Label>PARTIE 4</Label><TitleText>Autres redevances</TitleText></Heading><Section lims:inforce-start-date="2016-02-27" lims:lastAmendedDate="2016-02-27" lims:fid="821744" lims:id="821744"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821745" lims:id="821745">Remboursement des frais engagés par l’Office</MarginalNote><Label>13</Label><Text>L’Office peut exiger le remboursement de la totalité des frais qu’il engage pour toute activité qui n’est pas visée par les parties 1 à 3 et qui est liée :</Text><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821746" lims:id="821746"><Label>a)</Label><Text>à des déplacements du personnel de l’Office occasionnés par la vérification de la conformité avec la Loi;</Text></Paragraph><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821747" lims:id="821747"><Label>b)</Label><Text>au Comité des hydrocarbures;</Text></Paragraph><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821748" lims:id="821748"><Label>c)</Label><Text>aux analyses techniques ou aux examens des processus, dans le cadre d’un projet particulier, demandés par le demandeur ou l’exploitant;</Text></Paragraph><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821749" lims:id="821749"><Label>d)</Label><Text>aux audiences et débats, aux enquêtes ou aux examens publics, dans le cadre d’un projet particulier, que l’Office exige ou à l’origine desquels l’Office est;</Text></Paragraph><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821750" lims:id="821750"><Label>e)</Label><Text>à un programme d’aide financière aux participants dans le cadre d’une évaluation environnementale effectuée en application de la <XRefExternal reference-type="act" link="C-15.21">Loi canadienne sur l’évaluation environnementale (2012)</XRefExternal>;</Text></Paragraph><Paragraph lims:inforce-start-date="2016-02-27" lims:fid="821751" lims:id="821751"><Label>f)</Label><Text>à des renseignements, à des produits ou à des services demandés par une personne.</Text></Paragraph></Section><Heading lims:inforce-start-date="2016-02-19" lims:fid="821752" lims:id="821752" level="1"><Label>PARTIE 5</Label><TitleText>Dispositions générales</TitleText></Heading><Heading lims:inforce-start-date="2016-02-19" lims:fid="821753" lims:id="821753" level="2"><TitleText>Intérêts</TitleText></Heading><Section lims:inforce-start-date="2016-02-27" lims:lastAmendedDate="2016-02-27" lims:fid="821754" lims:id="821754"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821755" lims:id="821755">Intérêts composés de 1,5 %</MarginalNote><Label>14</Label><Text>Des intérêts composés calculés mensuellement, au taux de 1,5 %, sont à payer sur toutes les créances de l’Office à compter de la date d’échéance jusqu’à la veille de la date de la réception du paiement par l’Office.</Text></Section><Heading lims:inforce-start-date="2016-02-19" lims:fid="821756" lims:id="821756" level="2"><TitleText>Remise des droits et des redevances</TitleText></Heading><Section lims:inforce-start-date="2016-02-27" lims:lastAmendedDate="2016-02-27" lims:fid="821757" lims:id="821757"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821758" lims:id="821758">Remise</MarginalNote><Label>15</Label><Text>Pour l’application de l’article 29.3 de la Loi, les droits et les redevances perçus en vertu du présent règlement sont versés chaque trimestre sous réserve des besoins opérationnels de l’Office.</Text></Section><Heading lims:inforce-start-date="2016-02-19" lims:fid="821759" lims:id="821759" level="1"><Label>PARTIE 6</Label><TitleText>Modifications corrélatives, dispositions transitoires et entrée en vigueur</TitleText></Heading><Heading lims:inforce-start-date="2016-02-19" lims:fid="821760" lims:id="821760" level="2"><TitleText>Modifications corrélatives au Règlement sur l’enregistrement des titres et actes relatifs à la zone extracôtière de Terre-Neuve</TitleText></Heading><Section lims:inforce-start-date="2016-02-27" lims:lastAmendedDate="2016-02-27" lims:fid="821761" lims:id="821761"><Label>16</Label><Text>[Modification]</Text></Section><Section lims:inforce-start-date="2016-02-27" lims:lastAmendedDate="2016-02-27" lims:fid="821762" lims:id="821762"><Label>17</Label><Text>[Modifications]</Text></Section><Section lims:inforce-start-date="2016-02-27" lims:lastAmendedDate="2016-02-27" lims:fid="821763" lims:id="821763"><Label>18</Label><Text>[Modification]</Text></Section><Section lims:inforce-start-date="2016-02-27" lims:lastAmendedDate="2016-02-27" lims:fid="821764" lims:id="821764"><Label>19</Label><Text>[Modification]</Text></Section><Heading lims:inforce-start-date="2016-02-19" lims:fid="821765" lims:id="821765" level="2"><TitleText>Dispositions transitoires</TitleText></Heading><Section lims:inforce-start-date="2016-02-27" lims:lastAmendedDate="2016-02-27" lims:fid="821766" lims:id="821766" type="transitional"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821767" lims:id="821767">Non-application de l’article 3</MarginalNote><Label>20</Label><Subsection lims:inforce-start-date="2016-02-27" lims:fid="821768" lims:id="821768" type="transitional"><Label>(1)</Label><Text>L’article 3 ne s’applique pas à un projet ayant trait au développement, à la production, à l’abandon, au forage exploratoire ou à un programme de prospection sismique pluriannuelle ou complexe si le demandeur ou l’exploitant concerné a payé pour le projet la totalité des coûts estimés par l’Office pour l’exercice au cours duquel le présent règlement entre en vigueur.</Text></Subsection><Subsection lims:inforce-start-date="2016-02-27" lims:fid="821769" lims:id="821769" type="transitional"><MarginalNote lims:inforce-start-date="2016-02-27" lims:fid="821770" lims:id="821770">Présomption</MarginalNote><Label>(2)</Label><Text>Les projets existants ayant trait au développement, à la production, à l’abandon, au forage exploratoire ou à un programme de prospection sismique pluriannuelle ou complexe qui sont réglementés par l’Office avant l’entrée en vigueur du présent règlement et pour lesquels il n’existe pas de plan des activités de réglementation sont réputés, pour l’application de l’article 3, avoir eu un plan des activités de réglementation en place avant cette entrée en vigueur.</Text></Subsection></Section><Heading lims:inforce-start-date="2016-02-19" lims:fid="821771" lims:id="821771" level="2"><TitleText>Entrée en vigueur</TitleText></Heading><Section lims:inforce-start-date="2016-02-19" lims:lastAmendedDate="2016-02-19" lims:fid="821772" lims:id="821772" type="transitional"><MarginalNote lims:inforce-start-date="2016-02-19" lims:fid="821773" lims:id="821773">L.C. 2015, ch. 4</MarginalNote><Label><FootnoteRef idref="fn_Ind3FC6_hq_16920">*</FootnoteRef>21</Label><Text>Le présent règlement entre en vigueur à la date d’entrée en vigueur de l’article 39 de la <XRefExternal reference-type="act">Loi sur la sûreté et la sécurité en matière énergétique</XRefExternal>, ou, si elle est postérieure, à la date de son enregistrement.</Text><Footnote id="fn_Ind3FC6_hq_16920" placement="section" status="editorial"><Label>*</Label><Text>[Note : Règlement en vigueur le 27 février 2016.]</Text></Footnote></Section></Body></Regulation>